Loading...
HomeMy WebLinkAboutARB202000116 Action Letter 2020-12-09COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 Phone (434) 296-5832 Fax (434) 972-4126 December 8. 2020 Justin Shimp Shimp Engineering 912 E High Street Charlottesville, VA 22902 RE: ARB-2020-106 and -116: ABC Initial Plan and Preliminary Architectural Review (TMP 07600-00-00-046A0, 07600-00-00-046FO and 07600-00-00-05400) Dear Mr. Shimp, At its meeting on Monday, December 7, 2020, the Albemarle County Architectural Review Board unanimously voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee: • 1. Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: o Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the ARB: None. The ARB recommends approval of the Initial Plan without conditions. • Regarding recommendations on the plan as it relates to the guidelines: o Consider installing the EC frontage trees with the first block that is constructed. • Regarding conditions to be satisfied prior to issuance of a grading permit: None. • Regarding the final site plan submittal: A Certificate of Appropriateness is required prior to final site plan approval. The following items and all items on the ARB Final Site Plan Checklist must be addressed: 1. Continue to refine the storage building design to provide greater organization and unity among the various building elements. 2. Provide material/color samples for review. 3. Eliminate the film coating from the windows or provide an internal recess to allow window transparency. Alternatively, consider other strategies to break up scale and blankness. 4. Provide additional information to show that the T-tall parapet is sufficient to screen rooftop equipment. 5. Add the standard equipment visibility note to the architectural plans: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 6. Consider installing the EC frontage trees with the first block that is constructed. 7. Provide large trees, 2'/" caliper at planting, along Old Lynchburg, Country Green and Mountainwood Roads, free of utilities and easements. 8. Where large shade trees are not already provided to meet other requirements, provide medium trees, 2'/2" caliper at planting, along all paths and sidewalks. 9. Provide large trees, 2 '/_' caliper at planting, 40' on center along the perimeter of all parking areas. 10. Note that the retail, office and hotel buildings will need to have fully designed fronts on elevations visible from the EC street. 11. Integrate retaining walls with nearby site features. 12. Provide site sections to clarify visibility of the storage building from the EC. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at this link. Please be certain that your ARB submittal addresses the above -noted issues and all checklist items. If you have any questions concerning any of the above, please feel free to contact me. Sincerely, Margaret Maliszewski Chief of Planning/Resource Management 434-296-5832 x3276 mmaliszewski@albemarle.org cc: Kyle Redinger 5ch Street Forest LLC 250 West Main Street Suite 201 Charlottesville, VA 22902 File