HomeMy WebLinkAboutSUB202000021 Review Comments Road Plan and Comps. 2020-12-090
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Road and Drainage Plan Review
Project title: Foothill Crossing Phase V
Project file number: SUB202000021
Plan preparer:
Collins Engineering [scott@collins-engineering.com]
Owner or rep.:
Riverbend Development, Inc. [alan@riverbenddev.com]
Plan received date:
3 February 2020
(Rev. 1)
21 April 2020
(Rev. 2)
24 June 2020
(Rev. 3)
6 November 2020
Date of comments:
6 April 2020
(Rev. 1)
9 June 2020
(Rev. 2)
12 August 2020
(Rev. 3)
9 December 2020
Reviewers:
Matt Wendand
Scott,
We have reviewed the plans and have the following comments:
Engineering
1. The WPO submittal will need to be approved prior to road plan approval. (Rev. 1) The
WPO is currently under review. (Rev. 2) The WPO has been approved.
2. Label all drainage easements as public or private. (Rev. 1) Comment not addressed.
(Rev. 2) Comment addressed.
3. Show the overland relief path for Inlet 12 in case it becomes clogged or overwhelmed.
(Rev. 1) Comment not addressed. (Rev. 2) The label appears to be located in the
wrong spot, show the path in the front of the attached units (26-28). (Rev. 3)
Comment partially addressed. The lots, lot numbering, and storm is not consistent
between sheets (the path on sheet 5 matched with the inlet on sheet 4 would address
this comment). Please revise sheets to be consistent.
4. Show and label removable bollards at both ends of the emergency access road. (Rev. 1)
Comment partially addressed. The Foothill Crossing II cul-de-sac is not yet
approved or built. The bollards on that side should be shown where the access road
connects to a bonded and constructed road in Foothill Crossing II/Glenbrook. (Rev.
2) Since SUB201600237 has not been approved, please remove labels and linework
associated with it (just show the approved road in the platted ROW). Showing the
proposed road location (other than the emergency access) from the approved WPO
was only needed for the Foothill V WPO approval and may cause confusion on these
road plans. (Rev. 3) Comment addressed.
Revision 1 comments
Engineering Review Comments
Page 2 of 2
5. It should be made clear that the emergency access road is part of and to be built with the
construction of this subdivision and that it will be constructed up to a point where it
meets a road in Foothill Crossing IUGlenbrook that is approved, bonded and constructed.
(Rev. 2) Comment addressed.
Planning — Mariah Gleason
Planning comments are attached to this email.
ACSA, VDOT, Fire Rescue and E911 had no objection.
File: SUB202000021 Foothill Crossin, Phase V Review Comments rev3 12-09-20.doc