Loading...
HomeMy WebLinkAboutWPO201700037 Correspondence 2020-12-11VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY 1111 E. Main Street, Suite 1400, Richmond, Virginia 23219 P.O. Box 1105, Richmond, Virginia 23218 (800)592-5482 www.deg.virginia.¢ov Matthew J. Strickler Secretary of Natural Resources December 11, 2020 Brookhill Town Center LLC PO Box 1467 Charlottesville, VA 22902 Alan@riverbenddev.com RE: Coverage under the 2019 VPDES Construction General Permit (VAR10) Modification General Permit Number VAR1 OK793 WP020170037 Brookhill Residential Development Residential - Development Albemarle Dear Permittee: David K. Paylor Director (804) 698-4000 DEQ has reviewed your permit modification request received complete on March 20, 2020 and determined that the proposed 58.01 acre land -disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10). The effective date of this permit coverage modification is the date of this letter. Please include a copy of this letter in the Stormwater Pollution Prevention Plan (SWPPP). You may obtain a copy of the general permit from http://www.deg.virg inia.gov/Portals/0/DEQ/ Water/Publications/CG P2019. pdf. The general permit contains the conditions of coverage and Stormwater Pollution Prevention Plan (SWPPP) requirements. Please print the general permit and read it carefully as you will be responsible for compliance with all permit conditions. Coverage under this construction general permit does not relieve the operator of complying with all other federal, state, or local laws and regulations. Our records indicate that your site may discharge to waters identified as impaired or exceptional. Please see below for additional requirements: 1. Does this proposed land -disturbing activity discharge to a surface water identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the general permit for (i) sediment or a sediment -related parameter or (ii) nutrients? Yes. If YES, then the following general permit (Part I B 4 a) and SWPPP requirements (Part II B 5) must be implemented for the land -disturbing activity: • Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site; • Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; • Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at least once every (5) business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 24 hours between business days, the inspection shall be conducted on the next business day; and • Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls. December 11, 2020 General Permit Number VAR10K793 Page 2 Does this proposed land -disturbing activity discharge to a surface water identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the general permit for polychlorinated biphenyl (PCB)? No. If YES, then the following general permit (Part I B 4 b) and SWPPP requirements (Part 11 B 6) must be implemented for the land -disturbing activity if the construction activity involves the demolition of structures (i) equal to or greater than 10,000 square feet and (ii) built or renovated on or before January 1, 1980: • Implement an approved erosion and sediment control plan; • Dispose of PCB -contaminated materials in compliance with applicable state, federal, and local requirements to minimize the exposure of PCB -containing building materials; • Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at least once every (5) business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 24 hours between business days, the inspection shall be conducted on the next business day; and • Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls. 3. Does this proposed land -disturbing activity discharge to an exceptional water as identified in Section 30 of the Water Quality Standards, 9VAC 25-260? No. If YES, then the following general permit (Part I B 5) and SWPPP requirements (Part II B 7) must be implemented for the land -disturbing activity: • Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site; • Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; • Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at least once every (5) business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 24 hours between business days, the inspection shall be conducted on the next business day; and • Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls. The general permit requires that you submit a complete Notice of Termination packet no later than 30 days after meeting one or more of the termination conditions set forth in the general permit (Part I F). In accordance with the Virginia Stormwater Management Program State Permit Fee Regulation (9VAC 25-870-830), you may be required to pay an annual permit maintenance fee until coverage under this general permit has been terminated. If you are required to pay an annual permit maintenance fee, you will receive an invoice from the VSMP Authority. The general permit will expire on June 30, 2024. The conditions of the general permit require that you submit a new registration statement at least 60 days prior to that date if you wish to continue coverage under the general permit, unless permission for a later date has been granted by the Board. Permission cannot be granted to submit the registration statement after the expiration date of the general permit. If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at ConstructionGP@deq.virginia.gov. Sincerely, l Erin Ervin Belt, Manager Office of Stormwater Management