HomeMy WebLinkAboutWPO202000053 Approval - Agencies 2020-12-11Graham Murray From: Yuya Ishizuka <Yuya.lshizuka@ContechLLC.com> Sent: Thursday, December 3, 2020 4:53 PM To: Graham Murray; Jenni Pack Subject: Pleasant Green Phase II - Contech CMP Detention System Good afternoon, The purpose of this email is to document Contech's review of the design and proposed application of the CMP underground detention system for the subject project. Based on our review of the site plans provided by the FOR on 12/1/2020 (httos://www.d ropbox.com/s/lwbzx9stphe ndae/201130%20PIeasa nt%2OG reen%2OPhase%2011%20VSM P%20PIa n. odf?d 1=0), we believe the CMP detention system is an appropriate solution for this site and the design is acceptable. Please let me know if you have any questions, or need anything else. Thanks, Yuya Ishizuka Sr. Stormwater Design Engineer Contech Engineered Solutions LLC 7037 Ridge Road, Suite 350 1 Hanover, MD 21076 Off:443-457-1513 vishizuka@conteches.com www.ContechES.com