Loading...
HomeMy WebLinkAboutWPO202000053 Calculations 2020-12-11PLEASANT GREEN- PHASES II & III STORMWATER MANAGEMENT CALCULATIONS PACKET F Lfr�1 SCOTT R. LLINS; No. 35791 a 11/30/20 � 1`�'1oNAL Date of Calculations NOVEMBER 30, 2020 PREPARED BY: COLLINS =NGi,-4EERIN 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com SCS TR-55 Calculations Soils Table (Source: NRCS Web Soil Survey Online Database) Albemarle County, Virginia (VA003) Map Unit Map Unit Name Acres Percent of Symbol in AOI AOI 713 Braddock loam, 7.6 21.7% 2 to 7 percent slopes 8C3 Braddock clay 6.7 19.1% loam, 7 to 15 percent slopes, severely eroded 17 Craigsville 4.4 12.6% loam, 0 to 2 percent slopes, frequently flooded 25B Dyke silt loam, 13.2 37.7% 2 to 7 percent slopes 36D Hayesville 2.7 7.8% loam, 15 to 25 percent slopes 37D3 Hayesville clay 0.4 1.1% loam, 15 to 25 percent slopes, severely eroded Totals for Area of 35.0 100.0% Interest The NRCS web soil survey defines this development's soils as predominantly having a hydrologic group type B. Precipitation Data (Source: NCAA's National Weather Service, Hydrometerorological Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates) P,Aap v 71 Terrain t c 0 ooA 00 e{V 9laa a a° 4 0a ;p O4, Vanetdr Ocy: O' ae od' O °t clarrook or O � °a.! �a a Braeburn St Ir o J C/d 1 a' ? Laura L'o o E � R Ci��F J C 'PQ; o e OJO S/ VO � C ya aorOaq i �CCon� d J, yo` l V a y v Waylan� 0 n y` Crozet o V q G p Wmdmere Ln e O T < u Q Tabor St,i V f r tb rG _o "o TOP St p. 2 'Yoo a as/F Oo — 0.4kR1 0,. ao,.., hr �00, ° MYrne St cnudlus � .2 Cmxl Pak POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 90'. CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14. VOIIIITe 2, Version 3 SII PDS-based precipitation frequency estimates with 90% confidence intervals (in inches)' Ammwnence n al (yams) 309 24-Ilr (2.78a4el (3.�4.17) (4.275.31) (s.02�is) (e. a7B..w) n.00-8..a2t n. ;o.n (9.O1-11b) (%5- a.e) t1v°;sn N N p N S O O z O z O O m Z- m ti OLL LL � K � b b c m `v a � m m z a a c � � m w U w L O U 0 C J K N w L 0 3 x m r d 0 u v � 2 c w o x Z � w - c o U m N L o w u y E c E E o w u o a c w m o O m m u y Z U z W 3 Lu s v a E z v Z 0 " 0 o o c z a y W � = > m vmi e ry u vi vi u m m ry u 11 N � � 01 a m Q 1O 3 m o z � " u x U o� n„ j a eel N e'I m n r'I N e'I .+ N e'I of N O N M V m O M M N �n O a 0 a a: .¢i m Si .ni r00i li m o vmi v o m v o Q a 4 of N rl V IA ci (V N N ui O T vi ci N N OO Z m e9 Ifl m ei Yf m eel VI m eel vl m V1 m V1 U m b Iff m b Yf m b Vl m b M m b Vf m b Vf o u v v n m C N O � O_ cm Z O n L E c 0 o a n o a v L 0 a a o ac m � u c c c c c c c c c c c c vt; E c as :e as :oa :e a :ov m e 0 c c a c c 0 c c 0 c c 0 c c 0 c c 0 c 0 m U u 0 m u u 0 m 0 u 0 m 0 u 0 m u u 0 m u u u 01 a s a o C a o °1 a o a o m o Q 0 0¢ 0 0¢ 0 0¢ 0 0¢ 0 0¢ 0 0 o 0 U' o U' b a 0 b a � 0�� o b b� 0 U' U' o_ c 5 o c 5 a_ c 5 0_ c o_ c 5 o c 5 o v Z v Z 'e 2 v E v E 'e u E a 3 o m 3 o a 3 o n 3 o m 3 o a 3 0 m 0 4 o x ry L y a n c m m m m m m an w n m� c 0 pp N C , .-. ¢ ° w > m w > u v i p w i m 0 i U i O D W.c ¢ o v o v o o o d ao a o d 0 U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 3: Time of Concentration (T,) or Travel Time (T,) Project: Pleasant Green Phases II & III Location: West of McComb Street Check One: Present X Developed X Check One: T, X T, Segment ID: Sheet Flow: (Applicable to T, only) 1 Surface description (Table 3-1) 2 Manning's roughness coeff., n (Table 3-1 3 Flow length, L (total L < 100) (ft) 4 Two-year 24-hour rainfall, P, (in.) 5 Land slope, s (ft/ft) 6 Compute T, = [0.007(n*L)"aj / Pi .5 0.4 Shallow Concentrated Flow Designed By: FGM, PE Checked By: SRC, PE Through subarea n/a FL-ENG-21A 06/04 Date: 11/30/2020 Date: 11/30/2020 DAB DA C DA D DAB DA C DA D (Pre-Dev.) (Pre-Dev.) (Pre-Dev.) (Post-Dev.) (Post-Dev.) (Post-Dev.) Dense Dense Woods -Light Dense Dense Dense Grass Grass Underbrush Grass Grass Grass 0.24 0.24 0.4 0.24 0.24 0.24 100 100 100 100 100 100 3.73 3.73 3.73 3.73 3.73 3.73 0.06 0.05 0.04 0.06 0.05 0.03 0.14 0.15 0.25 0.14 0.15 0.19 7 Surface description (paved or unpaved) Unpaved Unpaved Unpaved Unpaved Unpaved Unpaved 8 Flow Length, L (ft) 535 150 400 300 150 225 9 Watercourse slope, s (ft/ft) 0.07 0.03 0.08 0.07 0.03 0.05 10 Average velocity, V (Figure 3-1) (ft/s) 4.2 2.8 4.5 4.2 2.8 3.6 11 T,=L/3600*V 0.04 0.01 0.02 0.02 0.01 0.02 Channel Flow: 12 Cross sectional flow area, a (ft) 13 Wetted perimeter, P. (ft) 14 Hydraulic radius, r= a/P* (ft) 15 Channel Slope, s (ft/ft) 16 Manning's Roughness Coeff, n 17V=[1.49r2"s"sj/n 18 Flow length, L (ft) 19 T,= L / 3600*V 20 Watershed or subarea T, or T, (Add T, in steps 6, 11 and 19) Note: The shoretest SCS Tc is 0.10 hrs. c c > c 0 > 30 l0 Y- 0 N O N LT d O tf E 11:W d i> 1.1 LL LL c y l0 ai Q> 6 7 X W Q �. 6 q C r m E C UI o'i m C=- u a x c U! oy m -6r o u y x u 0 v Y x ut " Q o o O m o 0 No 0 Q in LD a in p n o t7 n 1- c N Q D N W 1 O Q n 0.06 0.02 0.03 0.02 0.18 0.22 0.27 1 0.18 1 0.19 0.23 E 2 \!/ !E \\ \\\\\} } \®§f \«§] \« / III I 4 it§1§1 1/ i f 6 !, / !:r §L § 2 2 ;; KK Channel and Flood Protection Computations 9 VAC 25-870-66 (Concentrated Outfall from Subarea B) Section B: Channel Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.1.b. "The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subdivision 3 of this subsection shall be met." Section B.3 "... the maximum peak flow rate from the one-year 24-hour storm following the land -disturbing activity shall be calculated either.." a. or b." Section B.3.a. In accordance with the following methodology: Q Allowed !� I.F. * (Q Pre -Developed * IRV Pre -Developed I ) / (RV Developed J Q Allowed Where: Q Pre -Developed = CN Pre -Developed = S Pre -Developed = RV Pre -Developed= CN Post -Developed= S Post -Developed = RV Post -Developed — I.F. _ Q Developed < 1.92 cfs Section B.4 Limits of Analysis 4.31 cfs (From Worksheet 4 Watershed Summary) 64 (From Worksheet 4 Watershed Summary) 5.60 (From SCS TR-55 eq. 2-4) 0.51 in. (From SCS TR-55 eq. 2-3) 73 (From Worksheet 4 Watershed Summary) 3.68 (From SCS TR-55 eq. 2-4) 0.92 in. (From SCS TR-55 eq. 2-3) 0.80 (Factor of Safety) 1.76 cfs The analysis terminates at the SWM facility since subsection B.3.a is met. 9 VAC 25-870-66 (Concentrated Outfall from Subarea B) Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section C.2.b.: The point of discharge (the SWM facility outfall), "releases a postdevelopment peak flow rate for the 10-year 24-hour storm event that is less than the predevelopment peak flow rate from the 10-year 24-hour storm event. Downstream stormwater conveyance systems do not require any additional analysis to show compliance with flood protection criteria if this option is utilized." 10-Year, 24-Hour Pre -Development Subarea 1 Peak Flow Rate = 19.90 cfs 10-Year, 24-Hour Post -Development Subarea 1 Peak Flow Rate = 15.96 cfs Section C.3 Limits of Analysis The flood protection analysis terminates at the SWM facility since subsection C.2.b is met. 9 VAC 25-870-66 (Concentrated Outfall from Subarea Q Section B: Channel Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.1.b. "The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subdivision 3 of this subsection shall be met." Section B.3 "... the maximum peak flow rate from the one-year 24-hour storm following the land -disturbing activity shall be calculated either.." a. or b." Section B.3.a. In accordance with the following methodology: Q Allowed !� I.F. * (Q Pre -Developed * IRV Pre -Developed I ) / (RV Developed J Q Allowed Where: Q Pre -Developed = CN Pre -Developed = S Pre -Developed = RV Pre -Developed= CN Post -Developed= S Post -Developed = RV Post -Developed — I.F. _ Q Developed < 1.41 cfs Section B.4 Limits of Analysis 3.86 cfs (From Worksheet 4 Watershed Summary) 63 (From Worksheet 4 Watershed Summary) 5.83 (From SCS TR-55 eq. 2-4) 0.48 in. (From SCS TR-55 eq. 2-3) 75 (From Worksheet 4 Watershed Summary) 3.25 (From SCS TR-55 eq. 2-4) 1.05 in. (From SCS TR-55 eq. 2-3) 0.80 (Factor of Safety) 1.40 cfs The analysis terminates at the SWM facility since subsection B.3.a is met. 9 VAC 25-870-66 (Concentrated Outfall from Subarea C) Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section C.2.a.: The point of discharge (the SWM facility outfall), "Confines the postdevelopment peak flow rate from the 10-year 24-hour storm event within the stormwater conveyance system [the SWM facility] to avoid the localized flooding. Detention of stormwater or downstream improvements may be incorporated into the approved land -disturbing activity to meet this criterion...." 10-Year, 24-Hour Design Storm Peak Back Water Surface Elevation = 729.98 ft SWM Facility'C' Crown of Pipe Elevation at High Point = 729.86 ft SWM Facility'C' Rim Elevation at Lowest Access MH / Weir Plate = 737.75 ft (No overtopping Occurs) Section C.3 Limits of Analysis ....stormwater conveyance systems shall be analyzed for compliance with flood protection criteria to a point where:" a, b or c are met. Section C.3.c.: "The stormwater conveyance system [the SWM Facility outfall] enters a mapped floodplain or other flood -prone area, adopted by ordinance, of any locality." 9 VAC 25-870-66 (Concentrated Outfall from Subarea D) Section B: Channel Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.1.b. "The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subdivision 3 of this subsection shall be met." Section B.3 "... the maximum peak flow rate from the one-year 24-hour storm following the land -disturbing activity shall be calculated either.." a. or b." Section B.3.a. In accordance with the following methodology: Q Allowed !� I.F. * (Q Pre -Developed * IRV Pre -Developed I ) / (RV Developed J Q Allowed Where: Q Pre -Developed = CN Pre -Developed = S Pre -Developed = RV Pre -Developed= CN Post -Developed= S Post -Developed = RV Post -Developed — I.F. _ Q Developed < 0.32 cfs Section B.4 Limits of Analysis 1.29 cfs (From Worksheet 4 Watershed Summary) 61 (From Worksheet 4 Watershed Summary) 6.53 (From SCS TR-55 eq. 2-4) 0.38 in. (From SCS TR-55 eq. 2-3) 79 (From Worksheet 4 Watershed Summary) 2.68 (From SCS TR-55 eq. 2-4) 1.25 in. (From SCS TR-55 eq. 2-3) 0.80 (Factor of Safety) 0.30 cfs The analysis terminates at the SWM facility since subsection B.3.a is met. 9 VAC 25-870-66 (Concentrated Outfall from Subarea D) Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section C.2.a.: The point of discharge (the SWM facility outfall), "Confines the postdevelopment peak flow rate from the 10-year 24-hour storm event within the stormwater conveyance system [the SWM facility & outfall pipe] to avoid the localized flooding. Detention of stormwater or downstream improvements may be incorporated into the approved land -disturbing activity to meet this criterion...." 10-Year, 24-Hour Design Storm Peak Water Surface Elevation = 700.28 ft SWM Facility'D' Top of Dam Elevation = 702.00 ft Section C.3 Limits of Analysis ....stormwater conveyance systems shall be analyzed for compliance with flood protection criteria to a point where:" a, b or c are met. Section C.3.c.: "The stormwater conveyance system [the SWM Facility outfall] enters a mapped floodplain or other flood -prone area, adopted by ordinance, of any locality." Riprap Lined Level Spreader Calculations LEVEL SPREADER W DESIGN Per VSMH Chpt. 11, Section 11.5.3: Step 1 Area = 7.97 ac. (Eqn 11.11) Tv= 12892 cf Q.= 0.45 watershed inches Adjusted CN = 84 Step 2 Tc = 0.18 hrs Step 3 la = 0.38 la/P= 0.38 q = 625 csm/in A = 0.012 m i Z q PTV= 3.5 cfs Note, q pTv is the Treatment Volume peak discharge, or the peak flow rate for the 1-inch rainfall event. Per the VA DEQ Specification #2, page 14, the Level Spreader should be designed per the following: "Where the Conserved Open Space is a mix of grass and forest (or re -forested), establish the Level Spreader length by computing a weighted average of the lengths required for each vegetation type." 75%+/- Native Grasses/groundcover below tree canopy at a LS length of 13 ft per 1 cfs 25%+/- Forest Litter/groundcover below tree canopy at a LS length of 40 ft per 1 cfs Site Specific / Weighted Average LS length = 19.8 ft LS W Design Length= 68 ft Note: Max. LS Length = 130 ft Min. LS Length = 13 ft LEVEL SPREADER 'C' DESIGN Per VSMH Chpt. 11, Section 11.5.3: Step 1 Area = 9.01 ac. (Eqn 11.11) Tv= 16152 cf Q,= 0.49 watershed inches Adjusted CN = 88 Step 2 Tc = 0.19 hrs Step 3 la = 0.27 la/P= 0.27 q = 675 csm/in A = 0.014 m i Z q PTV= 4.7 cfs Note, q pTvis the Treatment Volume peak discharge, or the peak flow rate for the 1-inch rainfall event. Per the VA DEQ Specification #2, page 14, the Level Spreader should be designed per the following: "Where the Conserved Open Space is a mix of grass and forest (or re -forested), establish the Level Spreader length by computing a weighted average of the lengths required for each vegetation type." 75%+/- Native Grasses/groundcover below tree canopy at a LS length of 13 ft per 1 cfs 25%+/- Forest Litter/groundcover below tree canopy at a LS length of 40 ft per 1 cfs Site Specific / Weighted Average LS length = 19.8 ft LS'C' Design Length= 93 ft Note: Max. LS Length = 130 ft Min. LS Length = 13 ft LEVEL SPREADER 'D' DESIGN Per VSMH Chpt. 11, Section 11.5.3: Step 1 Area = 4.79 ac. (Eqn 11.11) Tv= 9767 cf Q,= 0.56 watershed inches Adjusted CN = 96 Step 2 Tc = 0.23 hrs Step 3 la = 0.09 la/P= 0.09 q = 775 csm/in A= 0.007 mi' q PTV= 3.3 cfs Note, q pTvis the Treatment Volume peak discharge, or the peak flow rate for the 1-inch rainfall event. Per the VA DEQ Specification #2, page 14, the Level Spreader should be designed per the following: "Where the Conserved Open Space is a mix of grass and forest (or re -forested), establish the Level Spreader length by computing a weighted average of the lengths required for each vegetation type." 75%+/- Native Grasses/groundcover below tree canopy at a LS length of 13 ft per 1 cfs 25%+/- Forest Litter/groundcover below tree canopy at a LS length of 40 ft per 1 cfs Site Specific / Weighted Average LS length = 19.8 ft LS'D' Design Length= 64 ft Note: Max. LS Length = 130 ft Min. LS Length = 13 ft SWM Facility'B' Routing Calculations (Confirms the 1-year outflow is compliant with energy balance computations and the peak 10-year post -development outfall is less than the peak pre -development 10-year flow.) Pleasant Green- Phases II and III SWM Facility B BasinFlow printout INPUT: Basin: Pleasant Green- Phases II and III SWM Facility B 7 Contour Areas Elevation(ft) Area(sf) Computed Vol.(cy) 739.75 1.00 0.0 740.00 320.00 1.0 742.00 1188.00 53.5 744.00 2573.00 189.5 746.00 4442.00 446.2 748.00 6755.00 857.9 750.00 9497.00 1457.0 Start—Elevation(ft) 5 Outlet Structures Outlet structure 0 Orifice 739.75 Vol.(cy) 0.00 name: Barrel area (sf) 1.767 diameter or depth (in) 18.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 739.480 multiple 1 discharge out of riser Outlet structure 1 Orifice name: Low -Flow Orifice area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 739.750 multiple 1 discharge into riser Page 1 Pleasant Green- Phases II and III SWM Facility B Outlet structure 2 Orifice name: Mid -Flow Orifices area (sf) 0.785 diameter or depth (in) 12.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 745.670 multiple 4 discharge into riser Outlet structure 3 Weir name: Riser diameter (in) 48.000 side angle 0.000 coefficient 3.300 invert (ft) 747.330 multiple 1 discharge into riser transition at (ft) 1.215 orifice coef. 0.500 orifice area (sf) 12.566 Outlet structure 4 Weir name: Emergency Spillway length (ft) 25.000 side angle 0.000 coefficient 3.300 invert (ft) 748.330 multiple 1 discharge through dam 4 Inflow Hydrographs Hydrograph 0 SCS name: 1-yr 24-hr SCS Design Storm Area (acres) 7.970 CN 73.000 Type 2 rainfall, P (in) 3.090 time of conc. (hrs) 0.1800 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 8.119 peak time (hrs) 11.970 volume (cy) 977.568 Page 2 Pleasant Green- Phases II and III SWM Facility B Hydrograph 1 SCS name: 2-yr 24-hr SCS Design Storm Area (acres) 7.970 CN 73.000 Type 2 rainfall, P (in) 3.730 time of conc. (hrs) 0.1800 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 11.886 peak time (hrs) 11.970 volume (cy) 1431.046 Hydrograph 2 SCS name: 10-yr 24-hr SCS Design Storm Area (acres) 7.970 CN 73.000 Type 2 rainfall, P (in) 5.610 time of conc. (hrs) 0.1800 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 24.612 peak time (hrs) 11.970 volume (cy) 2963.281 Hydrograph 3 SCS name: 100-yr 24-hr SCS Design Storm Area (acres) 7.970 CN 73.000 Type 2 rainfall, P (in) 9.120 time of conc. (hrs) 0.1800 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 51.696 peak time (hrs) 11.970 volume (cy) 6224.170 Page 3 Pleasant Green- Phases II and III SWM Facility B OUTPUT: Routing Method: storage -indication Hydrograph 0 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Hydrograph 1 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Hydrograph 2 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Hydrograph 3 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Peaks: 1-yr 24-hr SCS Design Storm 8.119 at 11.96 (hrs) 1.757 at 12.24 (hrs) 744.975 at 12.24 (hrs) 297.379 Peaks: 2-yr 24-hr SCS Design Storm 11.886 at 11.96 (hrs) 3.966 at 12.16 (hrs) 745.991 at 12.16 (hrs) 444.745 Peaks: 10-yr 24-hr SCS Design Storm 24.612 at 11.96 (hrs) 15.956 at 12.08 (hrs) 747.351 at 12.08 (hrs) 705.348 Peaks: 100-yr 24-hr 51.695 at 48.985 at 748.819 at 1078.830 Wed Nov 25 13:41:46 EST 2020 SCS Design Storm 11.96 (hrs) 12.00 (hrs) 12.00 (hrs) Page 4 SWM Facility `C' Routing Calculations (Confirms the 1-year outflow is compliant with energy balance computations and the 10-year outfall is confined within the SWM Facility.) Pleasant Green- Phases II and III SWM Facility C BasinFlow printout INPUT: Basin: Pleasant Green- Phases II and III SWM Facility C 0 Contour Areas Elevation(ft) Area(sf) Computed Vol.(cy) 1 Storage Pipes Storage pipe 0 name: UGD System diameter (in) 120.000 length (ft) 250.000 invert (ft) 719.420 angle 0.287 volume (cy) 727.221 Start—Elevation(ft) 719.42 Vol.(cy) 0.00 5 Outlet Structures Outlet structure 0 Orifice name: Low -Flow Barrel, Str. C-101 area (sf) 1.767 diameter or depth (in) 18.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 719.400 multiple 1 discharge out of riser Page 1 Pleasant Green- Phases II and III SWM Facility C Outlet structure 1 Orifice name: Low -Flow Orifice area (sf) 0.136 diameter or depth (in) 5.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 719.420 multiple 1 discharge into riser Outlet structure 2 Orifice name: Overflow / Emergency Spillway in Weir Plate area (sf) 3.839 diameter or depth (in) 26.530 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 725.920 multiple 1 discharge into riser Outlet structure 3 Weir name: Access Riser diameter (in) 48.000 side angle 0.000 coefficient 3.300 invert (ft) 737.750 multiple 1 discharge into riser transition at (ft) 1.215 orifice coef. 0.500 orifice area (sf) 12.566 Outlet structure 4 Orifice name: High Flow Bypass Barrel, Str. C-109 area (sf) 1.767 diameter or depth (in) 18.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 725.920 multiple 1 discharge into riser Page 2 Pleasant Green- 3 Inflow Hydrographs Hydrograph 0 SCS Phases II and III SWM Facility C name: 1-yr 24-hr SCS Design Storm Area (acres) 9.010 CN 75.000 Type 2 rainfall, P (in) 3.090 time of conc. (hrs) 0.1900 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 10.126 peak time (hrs) 11.953 volume (cy) 1234.455 Hydrograph 1 SCS name: 2-yr 24-hr SCS Design Storm Area (acres) 9.010 CN 75.000 Type 2 rainfall, P (in) 3.730 time of conc. (hrs) 0.1900 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 14.562 peak time (hrs) 11.953 volume (cy) 1775.231 Hydrograph 2 SCS name: 10-yr 24-hr SCS Design Storm Area (acres) 9.010 CN 75.000 Type 2 rainfall, P (in) 5.610 time of conc. (hrs) 0.1900 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 29.307 peak time (hrs) 11.953 volume (cy) 3572.773 Page 3 Pleasant Green- Phases II and III SWM Facility C OUTPUT: Routing Method: storage -indication Hydrograph 0 Routing Summary of Peaks: 1-yr 24-hr SCS Design Storm inflow (cfs) 10.122 at 11.96 (hrs) discharge (cfs) 1.402 at 12.34 (hrs) water level (ft) 725.960 at 12.34 (hrs) storage (cy) 447.477 Hydrograph 1 Routing Summary of Peaks: 2-yr 24-hr SCS Design Storm inflow (cfs) 14.556 at 11.96 (hrs) discharge (cfs) 10.114 at 12.08 (hrs) water level (ft) 726.776 at 12.08 (hrs) storage (cy) 520.067 Hydrograph 2 Routing Summary of Peaks: 10-yr 24-hr SCS Design Storm inflow (cfs) 29.295 at 11.96 (hrs) discharge (cfs) 22.224 at 12.06 (hrs) water level (ft) 729.981 at 12.06 (hrs) storage (cy) 722.259 Mon Nov 30 09:40:03 EST 2020 Page 4 SWM Facility `D' Routing Calculations (Confirms the 1-year outflow is compliant with energy balance computations and the 10-year outfall is confined within the SWM Facility.) Pleasant Green- Phases II and III SWM Facility D BasinFlow printout INPUT: Basin: Pleasant Green- Phases II and III SWM Facility D 5 Contour Areas Elevation(ft) Area(sf) Computed Vol.(cy) 695.00 1111.00 0.0 696.00 1600.00 49.9 698.00 2826.00 211.7 700.00 4376.00 476.4 702.00 6200.00 866.1 Start—Elevation(ft) 5 Outlet Structures Outlet structure 0 Orifice 695.00 Vol.(cy) 0.00 name: Str. D-101, A High -Flow Bypass Barrel area (sf) 3.142 diameter or depth (in) 24.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 696.240 multiple 1 discharge out of riser Outlet structure 1 Orifice name: Str. D-103, A Low -Flow Barrel area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 694.840 multiple 1 discharge out of riser Page 1 Pleasant Green- Phases II and III SWM Facility D Outlet structure 2 Orifice name: Low -Flow Orifice area (sf) 0.034 diameter or depth (in) 2.500 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 695.000 multiple 1 discharge into riser Outlet structure 3 Weir name: Str. D100, A Riser diameter (in) 48.000 side angle 0.000 coefficient 3.300 invert (ft) 699.750 multiple 1 discharge into riser transition at (ft) 1.215 orifice coef. 0.500 orifice area (sf) 12.566 Outlet structure 4 Weir name: Emergency Spillway length (ft) 20.000 side angle 0.000 coefficient 3.300 invert (ft) 700.750 multiple 1 discharge through dam 4 Inflow Hydrographs Hydrograph 0 SCS name: 1-yr 24-hr SCS Design Storm Area (acres) 4.790 CN 79.000 Type 2 rainfall, P (in) 3.090 time of conc. (hrs) 0.2300 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 6.275 peak time (hrs) 11.991 volume (cy) 807.137 Page 2 Pleasant Green- Phases II and III SWM Facility D Hydrograph 1 SCS name: 2-yr 24-hr SCS Design Storm Area (acres) 4.790 CN 79.000 Type 2 rainfall, P (in) 3.730 time of conc. (hrs) 0.2300 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 8.735 peak time (hrs) 11.991 volume (cy) 1123.618 Hydrograph 2 SCS name: 10-yr 24-hr SCS Design Storm Area (acres) 4.790 CN 79.000 Type 2 rainfall, P (in) 5.610 time of conc. (hrs) 0.2300 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 16.671 peak time (hrs) 11.991 volume (cy) 2144.431 Hydrograph 3 SCS name: 100-yr 24-hr SCS Design Storm Area (acres) 4.790 CN 79.000 Type 2 rainfall, P (in) 9.120 time of conc. (hrs) 0.2300 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 32.800 peak time (hrs) 11.991 volume (cy) 4219.055 Page 3 Pleasant Green- Phases II and III SWM Facility D OUTPUT: Routing Method: storage -indication Hydrograph 0 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Hydrograph 1 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Hydrograph 2 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Hydrograph 3 Routing Summary of inflow (cfs) discharge (cfs) water level (ft) storage (cy) Peaks: 1-yr 24-hr SCS Design Storm 6.244 at 11.98 (hrs) 0.295 at 12.86 (hrs) 699.744 at 12.86 (hrs) 435.895 Peaks: 2-yr 24-hr SCS Design Storm 8.692 at 11.98 (hrs) 5.231 at 12.12 (hrs) 699.992 at 12.12 (hrs) 475.034 Peaks: 10-yr 24-hr SCS Design Storm 16.589 at 11.98 (hrs) 16.354 at 12.02 (hrs) 700.281 at 12.02 (hrs) 523.132 Peaks: 100-yr 24-hr 32.637 at 30.113 at 700.907 at 636.333 Mon Nov 02 14:54:17 EST 2020 SCS Design Storm 11.98 (hrs) 12.04 (hrs) 12.04 (hrs) Page 4 Riprap Lined Outlet Protection Calculations SjS-dQSfl :aoinoS ------------------------ --awl m LF � s 3 �O 2 b V V J L \f p jA -C � o G a H r � r LA T W \F 4. o m G s H 3 � H C. i lA wn D i i f G � Cry �Dt P n I Si'£ Z661 p o w "VE Wind o� o [a Y• O a kv rn U D o � z a a 0 0 SDS-d(jSIl :aa.moS O 3 N lD N aa[ N O my a Gl A 1 M m r m 6 GF h—E �I p E 3 •Po �++ ° V N a ,WiT o, — r m m v mm z _ _ o r _ p g r gl•£ Z661 Water Quality Calculations for Pleasant Green, Using the DEQ Virginia Runoff Reduction Method for New Developments (Includes Phases I, II, III and the Connector Road) NOTEWORTH WATER QUALITY ITEMS: 1. A water quality analysis for the entire Pleasant Green development was completed. The analysis included approved WPO 201900003's phase I, the proposed connector road under WPO 201900027 and this plan's phases II and III. The analysis also used the total ESC limits of disturbance boundary for the VRRM water quality boundary. 2. Please see the following sheet for a summary of the required minimum phosphorous removal rate, as well as a breakdown of how the Pleasant Green development meets this requirement. SUMMARY OF PHOSPHOROUS REMOVAL RATE REQUIRED Total Phosphorous Removal Rate Required for Proposed Pleasant Green Phases I, II, III and the Connector Road 24.57 Ibs/yr Portion of Phosphorous Removal Rate Provided (By Others) for Connector Road's Impacts to SWM Forest & Open Space Esmt. 0.37 Ibs/yr Total Phosphorous Removal Rate Required for the Proposed Pleasant Green Developer 24.20 Ibs/yr SUMMARY OF PHOSPHOROUS REMOVAL RATE PROVIDED Approved Phase I (WPO 201900003) Phosphorous Removal Rate Achieved from Nutrient Credits 6.97 Ibs/yr Connector Road (WPO 201900027) Phosphorous Removal Rate Achieved from Level II Bioretention Basin (Subarea A) 1.17 Ibs/yr Proposed Phosphorous Removal Rate Achieved from Phase It's Outfall to Conserved Open Spaces (Subarea B) 6.07 Ibs/yr Proposed Phosphorous Removal Rate Achieved from Phase II's Outfall to Conserved Open Spaces (Subarea C) 7.6 Ibs/yr Proposed Phosphorous Removal Rate Achieved from Phase 11 & III's Outfall to Conserved Open Spaces (Subarea D) 4.60 Ibs/yr Approved Phase I (WPO 201900003) Phosphorous Removal Rate Achieved from the Level II Bioretention Basin (Subarea E) 1.42 Ibs/yr Total Phosphorous Removal Rate Provided 27.83 Ibs/yr Total Phosphorous Removal Rate Provided Onsite 20.86 Ibs/yr Percentage of the Required Phosphorous Removal Rate Treated Onsite (20.86 / 24.20 x 100) 86 % ml i 999999990 99 999 99 09 1111 oil 1111111111111 oil 1111111111111 oil MINIMUM IIIIIII! MINIMUM IIIIIII! MINIMUM IIIIIII! MINIMUM IIIIIII! 1111111111111 oil i 999999990 99 999 99 09 1111 oil e e e e e e e e e e e e e e e e e e e e e e ® e e e e e e e e e e e a e e e e e e e e e e e e 9 a e e e e e e e e e e e a e e e e e e e e e e s e q e e e e e e e e e e e a e e e e e e e e e e e e e e dd ggg 6 {{ jF bi d 8 6 Iloilo } , ; } , ; t � 1111 l 1111 oil MINIMUM IIIIIII! MINIMUM IIIIIII! MINIMUM IIIIIII! 1111111111111 oil r p i u W U Y X Y H X Q f{ m n N m m m m W 00 O O O O m N ry m a 1' Q a D p S 0 O 0 d 0 �+ .+ Y O Q O G N V .ti ti O p 6 ^� O S In In C 0 Y M -I m Vq m Q Q' vmf �mif C O ]L Q ^n O C �+i f+i vi vi O p N O n 1 i N a E 0 19 Io m m x q oti no o m O o ni ri vi vi O O m W m I y m 3 cr W f0 M 3 L i m m a o C O G 00 C G O 0 .i+ ry ti ti N N d_ Z i Q W O u w a Q 0 Q A m U 7 x> N O? m 7 0 0 H w C m C Q c N Qo 2 W z_ W 0 6 o s Z a sz Q d O O S y4'1 i F W 1' LL C C Q CQ Q L d F f W M1' U Q Q W CJ' K C O z W U Q W ii Y CO C Z yCj C Z W Z Z m Z �+ p Z o p Z E m > W F Q F O n F F Q F F Z F O O u w F •O O g O C d O W � W O F p w = O W W {� U Q C M1' m � o F K Z W o Q Q Q Q Q O O d Q O C N p Q O OJ OJ j 1L OJ W G LL Q C F i W LL a 4 H 6 H p H C L W W O O Z F p Z O W � O N Z O C C F Z Y F 6 O Z Q Z Z 0 Z � Q W O � w � C O C_ Runoff Volume and Curve Number Calculations Enter design storm rainfall depths (in): 1-year storm 2-year storm 10-year storm 3.09 373 561 —11 Use NOAA All., 14 pw,Vbds.nws oaa.9ou//'ds/pJdSQ •Notes (see below): [1] The curve numbers and rmwff volumes computed in this spreadsheet for each drainage area are limited in their applicability for determining and demonstrating compliance with water quantity requirements. See VRRM user's Guide and Documentation M additional information. 121 Runoff Volume (RV) for on, and pactdr-firpment drainage areas must be in wlumetric units leg., acce-feet or cubic been when using the Energy Balance Equation. Runoff measured in watershed- nches and shown in the spreadsheet as RVlwatershed-in[hl can only be used in the EneW Balance Equation when the pre -and po4development drainage areas are equal. Otherwise RVleatershed-inc must be multiplied by the drainage area. 13l Adjusted CNs are based on runoff reduction volumes as calculated in GA. tabs. An alternative CN adjustment calculation for Vegetated Roofs is included in BMp specification No. S. Drainage Area Curve Numbers and Runoff Depths* Curve numbers (CN, Cli and rapi depths (RV,) are completed with and without reduction pmctii Drainage Area ASolis BSoils CSoils I DSoils TatalArea(acres): 1.10 Forert/Open Space— undisturbed, protected Area(-mi brest/open space comfntated land CN Managed Turf— disturbed, gaoled for yards or other WH Area(acres) non o.0a 30 55 0.59 0.00 crop Crap Runoa ReduRbn 70 ]T Volume its: 1,664 crop Crap towmrwed/mans d CN Impervious Cover Area(anes) 39 61 0.51 0.00 74 80 O.ap coup CN 98 98 98 98 r ili 66 _ 1-year storm 2-year storm 10.year storm RVDevemised (Ropleco ed inch) with no Runoff Reduction• os9 a.93 216 _ Info eF•d (wmemed-inch) with Runoff Reduction• C.v os1 1.T4 Mitered! EN• I 53 5T a 'See Notes above Drainage Area Forest/Open Space— undisturbed, protected 1 Area(acres) ASolls BSolls coup 000 CSolls DSoils Total AMA jacres): 7.97 Crop nor RunoRReductbn forest/open space .-greased land CN 30 55 70 A Volume its: 9669 Managed Turf—diUurbed,gadedforyaNsorotherW Arca(acres) 0.00 5.36 Crop Oran townowed/managed CN 39 61 74 80 Impervious Cover Area(acres) 0.00 2.61 scram 0.00 CN 98 98 98 98 [NIA T, RVDeveloped (wh tershed-inch) with no Runoff Reduction' RVp„„yred (watershed -inch) with Runoff Reducton' i AdjustedN' C 1-year storm 2-year storm 1 1.11 1.34 osB ioa 66 67 10.year storm 2.77 2A3 6s 'See Notes above Drainage AreaC F.de./Open Space— undisturbed, puddecled Area a fares!/ reforested lantl CNcre Managed Turf— disturbed, graded for yards or honer to prea laces) ASoils 0.00 0.00 BSoils DAD 55 I.AB CSoils 00 o.O 70 0.00 DSoils CLOD ]) ODD Total Area laden): RunoRReduction Volume h'i 9.01 12114 .bemowed/mana d CN 39 61 74 80 Impervious Cover Arealacres) 0.00 3.53 0.00 0.0D CN 98 98 98 98 CNIa.Aq RVoevelolua(watershed-rcAwwraftfflimo Runoff Reducion• RVaawaa (svntershed-isrcM1unoff Reduction' ... iAtllusted EN 1-year storm 1D2 0.65 67 2-year storm 1.4T 1.1a 69 1(l-year storm 255 2sg Ti TS •See Notes above Drainage Area Forest/Open Space-- undisturbed, protected Arealed res) ASoils 0.00 BSoils DAD CSoils Drop DSoils ODO Total Area lacres): RunoRReduclion 4.79 farest/open space or reforesed land CN Managed Turf-- disturbed, graded for yartls or Other N Arealacres) 30 0.00 55 2AR 70 0.00 ]T oD0 Volume ha: 7325 to be ne—djmana d CN 39 61 74 80 Impervious Cover Arealacres ODD 2.31 ODD .1 CN 98 98 98 98 [Mara ul 19 Wow,,d (watershed -inch) with no Runoff Redu[[ion' RVo„a d (watershed -inch) with Runoff Reduction' _.. Adlusted CN' 1-year storm 125 o.g3 TS 2-year storm 1.T5 1.33 T3 I0.Vear storm 3 33 2.91 T4 •See Notes above Drainage Area ASoils BSoils CSoils DSoils Total Area (aores): 1.66 Forest/Open Space— undisturbed, protected Arealacres) faresth nn space or reforested land CN Managed Turf— disturbed, graded for yartls or other to Arealacres) to be mowed/mana ed CN Impervious [over Arealacres) O.DD 30 0.00 39 0.00 DAD 55 1.18 61 OAR om 70 oD0 74 0.0D oD0 D oD0 80 oD0 RunoRReduRbn Volume ha: 2,010 CN 98 98 98 98 CNIaa.I 13 1-year storm 2-year storm 10.year storm _ _- - - -RVpp (watershed -inch) with no Runoff Reducion• RVoaagea (watershed -inch) wish Runoff Reduction' iAdlusted CN' Dss os3 65 1.2T p.94 66 zsa n34 0 *See Notes above , oq | ! } ) ) k ) t \ ! f \! ) k } )k)� 0 I T O 9 -IeIm Clg�� alggS r e � E o z v m g d FA 0 1 1 0 d yV o O m O O b C C C i m q CA ^ m O < C A i m A C n n O N N O Y� m O� vAi N C A i c m o 0 O yV G < m C � vmi O N O N O u�i O C g qq yL g C T K T V K T V G O 6 n o 6 m c 2 V