Loading...
HomeMy WebLinkAboutSDP201600049 Correspondence 2020-12-14PINNACLE CONSTRUCTION & DEVELOPMENT CORPORATION September 28, 2020 Mariah Gleason, Senior Planner Albemarle County, Community Development Department 401 McIntire Road Charlottesville, VA 22902 Re: The Vue SDP-2016-00049 Blue Ridge Avenue, Crozet, VA Letter of Revision #2 Amendment Dear Ms. Gleason, We have reviewed your comments provided on August 28, 2020, and have provided the following responses: 1. [Comment] Request. Please amend the request letter to be more similar to the document provided on June 6, 2019. Request letters should serve to request a change(s) to the approved site plan and briefly note the changes being made. Please note, if the applicant wishes to address staffs review comments, that is recommended and can be done in a separate comment response letter. An example request letter and comment response letter from a previously approved LOR are attached to this comment letter. Response: Reviewed and provided. 2. [4.17] Lighting plan. a. On the plan map, adjust light fixture labels such that they do not conflict with associated fixture symbols or other plan elements. There appear to be several instances where labels are not easily legible. b. The quantity of Fixture A noted in the luminaire Schedule does not match the plan map provide. Please review and revise. (The quantity should be 3). c. In the Luminaire Schedule, the number of lumens noted for fixtures "C" and "K" did not appear to match the cut sheet(s) provided. Response: a. Light fixture labels adjusted for easy legibility. b. Fixture "A" quantity changed to "3". c. Fixture "C" and "D" updated with the correct product data to match the schedule. Fixture "K" lumens corrected on schedule to match the product data. 3. [4.17] Cut Sheets. a. As discussed via phone on August 27, 2020, there appear to be two sets of cut sheets provided with this revised plan set. Please remove duplicate cut sheets and ensure that the cut sheets provided align with the Luminaire Schedule provided on Sheet 1. Response: Corrected. 4. [Comment] Light Fixture "J". In comparison of the cut sheet for Fixture J and Its intended locations, it is unclear how the intended feature will be attached/mounted. This fixture appears to be mounted on the undersides of the overhang areas, however, on the plan map, there are some areas where Fixture J seems to be located over the sidewalks with no overhang. Is this correct? Pease review and revise, if necessary. Response: Correct, fixture "J" is a ceiling fixture underneath the overhang areas. Areas that appear as sidewalks on the plan map are covered patios with a concrete base, note each location contains doors that serve as an entry for that specific unit. u1r„ 1821 Avon Street, Suite 200 tel. 434.979.2900 fax 434.979.0001 Charlottesville, VA 22902 =-.�t info@pinnacleconstructionva.com 5. [32.3.2(a), 32.5.2(a)] Revision date. In the resubmittal, ensure that a new revision date is provided in the title block and that the title block is consistent across all sheets. Response: Corrected. Please advise if you need any further information from us. Si ly. Gina I cTiimming ject Coordinator