Loading...
HomeMy WebLinkAboutWPO202000040 Checklist - Project Closeout (Administrative) 2020-11-12 WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30,day of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward back to the Engineering Department. WPO#2020-00040 PROJECT TITLE True Heritage Tasting Room at Merrie Mill Farm,VSMP FULL NAME OF ENGINEER: John Anderson FINAL ACTION DATE: 11/12/2020 CountyView— El Limits of Disturbance Area(Ac)updated [1.75 Ac:] ® Status/Status Date updated Hardcopy—File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder.To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or,if the document is already in digital format, can be saved to LaserFiche.Please provide the digital location (path/name)of the document in the space provided. /1 Application(signature copy) ❑ Scan ® Saved location Already in Laserfiche Approved E&S Plan and/or SWM Plan and/or SWPPP(stamped"Approved") ❑ Scan ® Saved location All docs scanned/already in Laserfiche El Approved Mitigation Plan(stamped"Approved") El Scan El Saved location NA—Not required ® SWM Maintenance Agreement(executed and recorded) El Scan ® Saved location Already in Laserfiche El SWM Deed/Easement Plat(recorded) El Scan El Saved location NA—Not required ❑ Nutrient Credit Agreement ❑ Scan El Saved location NA—Not required El Calculations stamped"Approved" El Scan ❑ Saved location NA—Not required ® Bond Estimate El Scan ® Saved location Already in Laserfiche El ACOE/ACSA/VDOT Approval Letter(s) ❑ Scan ❑ Saved location El Other(Please explain) El Scan ❑ Saved location El At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. El Scan El Saved location NOTES: WPO project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the County Engineer for corrective action. Draft 08-10-2017