HomeMy WebLinkAboutWPO201900028 Bond Estimates 2019-09-05 Advance Mills Farm Lot 24
WPO file number:WP0201900028
TMP(s): 02000-00-00-006AD
Date Estimate Completed: 09/05/19
Erosion and Sediment Control Bond Estimate
Item Item No. Unit Unit Cost Cost
Number (installed)
stablization(PS,TS) acres $5,000.00 $10,000.00
silt fence(SF) ft $5.00 $3,000.00
safety fence(SAF) ft $5.00 $0.00
diversion(DD,FD,RWD) ft $13.00 $3,900.00
temporary slope drain(TSD) pipe length ft pipe diameter _in $0.00 $0.00
earthwork for trap/basin
height of dam at toe ft cut at high side ft
height of fill at face ft cut at face ft
length of dam ft length of cut ft
top width ft width of cut ft
(area above transition 0 sf (area below transitit 100 sf
(total width of dam) 0 ft (total width of cut) 34 ft
(height below transitio 0 ft (depth below transit 2 ft
(area below transition 0 sf (area above transitic 30 sf
0.0 cy (total fill volume) 240.7 cy
length of spillway ft (TOAL CY estimate 241 cy $13.00 $3,133.00
-
width of spillway ft (spillway stone tons 6.9 tons $50.00 $345.00
structures for basin
riser height ft
riser diameter in (riser unit price) $0.00 $0.00
barrel length ft base plate or fdn $200.00 $0
barrel diameter in (barrel unit price) $0.00 $0.00
barrel collars $200.00 $0
baffle length ft $50.00 $0
silto fence inlet eaten(IP)
(IP) ■ $200.00 $0.00
stone inlet protection(IP) $200.00 $600.00
outlet protection(OP) length ft width ft $202.50 $810.00
channel(SCC,matted) length ft width ft $4,680.00
check dam depth in channel ft channel width ft $0.00 $0.00
construction entrance(CE) $2,500.00 $2,500.00
wash rack $2,000.00 $2,000.00
paved construction entrance $3.500.00 $0.00
rip-rap,placed depth -ft length -ft
width (to-:.' 0 tons $60.00 $0.00
survey and layout(price per 0.1 mi.) acres 11111.1Pr traps and basins mug $1,500.00
mobilization $2,500.00
stream crossing(computed independently) $0.00
Level Spreaders $1,500.00 $4,500.00
cost sum $39,468.00
contingency $3,946.80
9/5/2019
Advance Mills Farm Lot 24
WPO file number:WPO201900028
TMP(s): 02000-00-00-006AD
Date Estimate Completed: 09/05/19
Erosion and Sediment Control Bond Estimate
Item Item No. Unit Unit Cost Cost
Number linstalledI
Total $43,420
9/5/2019