Loading...
HomeMy WebLinkAboutSP200600009 Legacy Document 2006-11-03Lr12Gl�ta COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4012 November 1, 2006 Steve Edwards Terra Concepts, PC 200 6th Street, NE Charlottesville, VA 22902 RE: SP -2006-009 Birchwood Place (Sign #10) Tax Map Parcel 56A2-1-30 Dear Mr. Edwards: On October 4, 2006, the Albemarle County Board of Supervisors took action on SP 2006-009, Birchwood Place to allow construction of one three-story office building totaling 19,500 square feet and a one-story bank of 3,090 square feet on 3.66 acres on Tax Map Parcel 56A2-1-30 in the White Hall Magisterial District. This special use permit was approved based on the following conditions: 1. Architectural Review Board issuance of a Certificate of Appropriateness prior to final site plan approval; 2. Virginia Department of Transportation approval of entrance design and frontage improvements as well as any associated road plans and/or drainage plans; 3. Approval of site plan by County Engineer; 4. Provide a row of evergreen shrubs along the eastern boundary line, from the southeast corner of the property behind the sign for a distance of one hundred twenty (120) feet along the eastern property line, to form a hedge that will screen views of the drive- through use. Planting height shall be thirty (30) inches. Mature height shall be a minimum of four (4) feet; and 5. Provide three and one-half inch (3'/2") caliper large shade trees, thirty-five (35) feet on center, parallel to the EC street. Remove the water easement from the planting strip along the EC or guarantee that street trees will remain. If utilities conflict with the EC trees, increase the depth of the planting area to avoid conflicts. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully Edwards SP -2006-009 Birchwood Place Page 2 of 2 November 1, 2006 begin until all applicable approvals have been received and conditions have been met. This includes: compliance with conditions of the SPECIAL USE PERMIT; approval of and compliance with a SITE PLAN; and approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty-four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above -noted action, please do not hesitate to contact Sherri Proctor at 296-5832. Sincerely, William D. Fritz, AICP Chief of Current Development WDF/aer cc: Pohl, Frank (Weather Hill Development) Wood, Fairfax & Lewis A Wood Jr Amelia McCulley Chuck Proctor Tex Weaver Sherri Proctor