HomeMy WebLinkAboutWPO202000038 Plan - Revision WPO VSMP 2020-12-06GENERAL NOTES OWNER: 06100-00-00-134AO ALBEMARLE BANK & TRUST % BB&T PROPERTY TAX COMPLIANCE PO BOX 167 WINSTON-SALEM, NC 27102 APPLICANT SOUTHEASTERN RETAIL DEVELOPMENT, LLC 2050 CIRCLE HWY. 30A WEST BLDG. M-1 UNIT 231 SANTA ROSA BEACH, FL 32459 ENGINEER. COLLINS ENGINEERING 200 GARRETT ST. SUITE K, CHARLOTTESVILLE, VA 22902 TELEPHONE (434)293-3719 FAX (434)293-2813 CONTACT MR. SCOTT COLLINS, P.E. scot t9collins- engineering. com TAX MAP NO. 06100-00-00-134AO (D.B. 646/ PG. 508) AREA 0.93 AC ZONING PLANNED DEVELOPMENT SHOPPING CENTER (PD-SC) WITH OVERLAY DISTRICTS (ENTRANCE CORRIDOR (EC), AIRPORT IMPACT AREA (AIA), AND MANAGED SLOPES) ZMA (ZMA2019-00014) APPROVED BY THE BOS ON APRIL 15, 2020 SETBACKS FRONT BUILDING SETBACK: 10' MINIMUM & 30' MAXIMUM SETBACK FROM ROUTE 29 SIDE BUILDING SETBACK: NONE REAR BUILDING SETBACK: NONE PARKING SETBACK. 10' PARKING SETBACK FROM ROUTE 29 BUILDING HEIGHT MAXIMUM BUILDING HEIGHT 65' PROPOSED BUILDING HEIGHT. • 27'-4" NOTE: ANY STRUCTURE EXCEEDING 35' IN HEIGHT SHALL BE SET BACK FROM ANY STREET R/W. IN ADDITION TO THE MINIMUM YARD REQUIREMENT A DISTANCE OF 2' FOR EACH 1' IN BUILDING HEIGHT. PROPOSED USE PROPOSED 3,000 SF COMMERCIAL RETAIL / FURNITURE BUILDING IN PHASE L PROPOSED SUBDIVISION: NEW PARCEL: 0.28 ACRES RESIDUE PARCEL (TMP61-134A): 0.61 ACRES R/W DEDICATION AREA: 0.04 ACRES TOPO & SURVEY SURVEY AND BOUNDARY INFORMATION PROVIDED BY ROUDABUSH, GALE & ASSOCIATES, INC. AND FIELD SURVEY DONE IN OCTOBER, 2019. DATUM SET BY SURVEYOR. DATUM NAD 83 DATUM ADJACENT PROPERTY OWNERS: SEE EXISTING CONDITIONS, SHEET 2. EXISTING VEGETATION THE SITE IS FORESTED. CRITICAL SLOPES IN ACCORDANCE WITH THE ALBEMARLE COUNTY CRI77CAL SLOPES COUNTY MAPPING, MANAGED' CRITICAL SLOPES EXIST ON THE PARCEL. THE MANAGED SLOPES ARE SHOWN ON THE EXIS77NG COND177ONS SHEETS AND GRADING AND DRAINAGE PLAN SHEET WATERSHED THIS DEVELOPMENT LIES WITHIN THE MOORES CREEK WATERSHED. THE SITE IS NOT LOCATED WITHIN A PUBLIC WATER SUPPLY RESERVOIR WATERSHED, IT IS LOCATED DOWNSLOPE FROM THE SOUTH FORK RIVANNA WATER SUPPLY WATERSHED. FLOODPLAIN/WPO BUFFERS THERE ARE NO 100-YEAR FLOODPLAINS OR WPO BUFFERS LOCATED ON THIS SITE PER FEMA MAP PANEL #51003CO288D DATED FEBRUARY 4, 2005 & COUNTY GIS, RESPECTFULLY. ALSO NOTE THE PARCEL IS OUTSIDE THE LIMITS OF THE FEDERAL & STATE DAM BREAK INUNDATION ZONES PER COUNTY GIS DATA. SITE ACCESS: THE SITE ACCESS FOR THE PARCEL IS PROVIDED WA ROUTE 29 SEMINOLE TRAIL. A PARKING AND ACCESS EASEMENT WILL BE RECORDED ACROSS THE RESIDUE PARCEL TMP61-134A FOR THE BENEFIT OF THE NEW PARCEL CREATED WITH A SUBDIVISION PLAT. RETAINING WALLS. RETAINING WALLS ARE PROPOSED WITH THIS SITE PLAN, SEE GRADING SHEET 5. RETAINING WALLS SHALL NOT EXCEED 6 FEET IN HEIGHT. NOTE: RETAINING WALLS ABOVE 3 FT WILL REQUIRE A BUILDING PERMIT AND RETAINING WALLS ABOVE 4 FT WILL REQUIRE STAMPED ENGINEERING PLANS. LIGHTING. THE PROPOSED LIGHTING PLAN HAS BEEN INCLUDED, SEE SHEET 9. EACH OUTDOOR LUMINAIRE EQUIPPED WITH A LAMP THAT EMITS 3,000 OR MORE INITIAL LUMENS SHALL BE A FULL CUTOFF LUMINAIRE AND SHALL BE ARRANGED OR SHIELDED TO REFLECT LIGHT AWAY FROM ADJOINING PROPERTIES AND AWAY FROM ADJACENT ROADS. THE SPILLOVER OF LIGHTING FROM LUMINAIRES ONTO PUBLIC ROADS AND ADJACENT PROPERTIES SHALL NOT EXCEED ONE-HALF FOOTCANDLE. LANDSCAPING: A LANDSCAPING PLAN HAS BEEN INCLUDED IN ACCORDANCE WITH ALBEMARLE COUNTY ORDINANCE SECTION 32.7.9, SEE SHEET B. STREET TREES HAVE BEEN PROVIDED WITH THE LANDSCAPING DESIGN ALONG THE FRONTAGE OF THE PROPERTY EVERY 40, O.C. TRASH COLLECTION: AN ENCLOSED DUMPSTER SCREENED WITH LANDSCAPING IS PROVIDED ON THE PLANS. DUMPSTER ENCLOSURE MATERIAL SHALL BE A WOODEN TRASH ENCLOSURE LOCATED BEHIND THE BUILDING. SEE SHEET 6 FOR DETAILS. UTILITIES: PUBLIC WATER AND SANITARY SEWER UTILITIES WILL BE EXTENDED TO THE PROPERTY FOR CONNEC77ONS TO THE PUBLIC UTILITIES. STORMWATER MANAGEMENT FACILITY: STORMWATER MANAGEMENT WILL BE ACHIEVED FOR THE SITE WITH AN UNDERGROUND DETENT70N FACILITY AND A DETEN77ON BASIN FOR WATER QUANTITY CONTROL AND PURCHASE OF NUTRIENT CREDITS FOR THE WATER QUALITY. ES77MATED EMPLOYEES IT IS ANTICIPATED THAT APPROXIMATELY 2 EMPLOYEES WILL BE NEEDED AT THE LARGEST SHIFT. PARKING LOT/TRAVELWAYS.• CURB & GUTTER UTILITIES (WATER AND SEWER): COUNTY PUBLIC WATER AND SANITARY SEWER AGRICULTURAL/ FORESTAL DISTRICT: NONE IMPERWOUS AREAS. BUILDING - PHASE I = 3,000 SF, PAVEMENT -5,100 SF SIDEWALK -800 SF OPEN SPACE.• NONE UNDEVELOPED AREA: 20,800 SF - FUTURE PHASE lI DEVELOPMENT AREA PARKING REQUIRED: 1 SPACE/400sf FOR RETAIL SALES AREA = 1 SP/400sf x 3,000sf = 8 SPACES 1 LOADING SPACE / 8,000 SF = 1 LOAD SPACE REQUIRED PROVDED: 10 PARKING SPACES (THIS INCLUDES 1 HANDICAP SPACE) & (1) LOADING SPACE BURIAL SITE: NO CEMETERIES WERE FOUND DURING FIELD INVESTIGATION OF THE SITE IMPERI/IOUS AREAS. 8,900 SF (0.20 AC) TOTAL PAVED PARKING AND CIRCULATION AREA: 5,100 SF FIRE FLOW.• AN EXIS77NG FIRE HYDRANT IS LOCATED ON THE ADJACENT PROPERTY, AS SHOWN AND LABELED ON SHEET 4. THIS FIRE HYDRANT WILL PROVIDE FIRE PROTECTION FOR 7HE PROPOSED BUILDING. SLEEP NUMBER - CHARLOTTESVILLE u TMP 61-134 N/F CAVALIER COUNTRY BANK ZONING - COMMERCIAL OFFICE USE - BANK IDS 527 PG 43 IDS 327 PG 228 (PLAT) DI468 PG 456 (PLAT) VSMP PLAN RIO MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA SEMINOLE TRAIL — ROUTE 29 VAR. WIDTH PUBLIC RIGHT-OF-WAY (HIGHWAY PLAT BOOK I PAGE 227) --- 950'+/- TO BRANCHLANDS BLVD �7 ----4 ; o —----- �q y NEW PARCEL TOTAL AREA: 0.28 ACRES ? (�` W TMP 61-\ N/F J.C. PENNENNEY PROPERTIES, INC ZONING - PUD �E - SHOPPING CENTER DB 1908 PG 726 DB 4355 PG 625 (DESCRIPTION IN DEED OF TRUST) NOTES: CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT ENGINEER IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON THE PLANS, IF THERE APPEARS TO BE A CONFLICT, AND UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THE PLANS. THE CONTRACTOR MUST LOCATE ALL SURFACE AND SUB -SURFACE UTILITIES PRIOR TO ANY WORK ONSITE. ANY SIDEWALK AND/OR CURB DAMAGE IDENTIFIED IN THE SITE VICINITY DUE TO PROJECT CONSTRUCTION ACTIVITIES AS DETERMINED BY THE VDOT INSPECTOR SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. SIDEWALK WILL BE REPLACED AT THE DIRECTION OF THE VDOT INSPECTOR. ANY EXISTING SIDEWALK THAT IS CURRENTLY DAMAGED AND IN NEED OF REPAIR OR NOT IN COMPLIANCE WITH CURRENT STANDARDS SHOULD BE REPLACED AS PART OF THIS PROJECT AS WELL. IN ADDITION, ANY EXISTING CG-12S ALONG THE PERIMETER OF THE SITE SHOULD BE UPGRADED TO MEET CURRENT STANDARD IF NEEDED. ALL SIGNING AND PAVEMENT MARKINGS SHALL BE CONSISTENT WITH THE MUTCD. ALL WATER LINES, SEWER LINES, AND FIRE LINES FROM THE MAIN TO THE STRUCTURE MUST HAVE A VISUAL INSPECTION PERFORMED BY THE BUILDING DEPARTMENT. TMP 61-134A N/F ALBEMARLE BANK AND TRUST COMPANY 0.908 ACRES ZONING - PDSC RESIDUE PARCEL TMP 61-134A TOTAL AREA: 0.61 ACRES SHEET LAYOUT SCALE: 1" = 30' TRAFFIC GENERATION CALCULATIONS: TRIP GENERATION BASED ON ITE TRIP GENERATION MANUAL 10TH EDITION PROPOSED 3,000 SF RETAIL STORE (FURNITURE STORE) (CODE 890) ADT: 19 VPD (10 ENTER/9 EXIT) AM PEAK: 1 VEHICLES PER HOUR PM PEAK: 2 VEHICLES PER HOUR ENTRANCE CORRIDOR NOTES AND REQUIREMENTS: 1. VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE ELIMINATED. 2. ALL SIGNS FOR THE SITE SHALL BE REVIEWED AND APPROVED BY ARB UNDER A SEPARATE SIGN APPLICATION. BUILDING NOTES: 1. PROPOSED BUILDING HEIGHT (PHASE 1): MINIMUM HT.=20' 2. PHASE I BUILDING FOUNDATION TO BE CONSTRUCTED TO SUPPORT MULTIPLE STORIES. 3 t L ❑ El ❑ TMP 61-129 N/F J.C. PENNEY PROPERTIES, INC ZONING - PUD USE - SHOPPING DB 1908 PG 726 DB 4355 PG 625 (DESCRIPTION IN DEED OF TRUST) FW PROJECT SITE VICINITY MAP SCALE: 1" = 11000, Sheet List Table - SITE PLAN Sheet Number Sheet Title 1 COVER 2 EXISTING CONDITIONS & DEMOLITION PLAN 3 EROSION & SEDIMENT CONTROL PLAN NARRATIVE & DETAILS 4 PHASE I EROSION & SEDIMENT CONTROL PLAN 5 PHASE II EROSION & SEDIMENT CONTROL PLAN 6 PHASE III EROSION & SEDIMENT CONTROL PLAN 7 STORMWATER MANAGEMENT PLAN 8 STORMWATER MANAGEMENT DETAILS E LEGEND TAIE/7 TOTAL NUMBER OF SHEETS L EXIS77NG CULVERT CUL VERT u Q DROP INLET & STRUCTURE NO. CURB CURB & GUTTER PROPOSED PAVEMENT EC-3A DITCH 6." DEPTH OF EC-3A DITCH EC-2 DITCH 6" DEPTH OF EC-2 DITCH EARTH DITCH DRIVEWAY CULVERT # BENCH MARK _ _ _ — — CLEARING LIMITS T VDOT STANDARD STOP SIGN - - -200- - - - EXISTING CONTOUR zoo PROPOSED CONTOUR 240.55 PROPOSED SPOT ELEVATION TBC DENOTES TOP/BACK OF CURB TAB DENOTES TOP OF BOX APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNER/ZONING ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION HEALTH DEPARTMENT SCOTT/R. CULLINSZ Lie. No. 035791,a A 12/07/20 ,i z Z w w � � J O O 0 z z z a a m a Q 'A O O d V/ w Z"> cn g w w Oa w w cn > N z a ~ w a w a z Q o o z w w ww w N ~ ~ N O w%fir : SCALE AS SHOWN SHEET NO. 1 / TH m I � o��� SE/l4INOLE TRAIL e ROUT' 29�scoTT R. LL1Nsz RVAR. WIDTH PU�IC RIGHTOE-WAY I I U Lic. No. 035791� / / I I / �� 7/17/20 w4 TOPT46463 // // I / / (HIGHWAY PLAT/BOOK I PAGE 227) / , INV IN (24")=458.43 / STRM MH I �� �� / STRM MHI / ONAL E / TOP=466.85 / 13.34 L.F. 18' RCP @ \ ( TOP- INV 76 / INV OUT=458.23 / 8.7711 � PORTION OF EXISTING EX 1 (STRM DI) O J INV IN=4I70.21 I INV IN (18")=458.33 o / INV IN (18"x2)-460.75 �`� STRM MH SIDEWALK TO BE TOP=471.k9 \ / a::/ INV OUT�470.26 / INV IN (24")=460.70 TOP=469.64 REMOVED \ INV IN=466.34 INV OUT-460.65 STRM DI ��� INV IN-464.09 )k0 +/- T0- INV OUT=466.0q� 3 TOP-466� INV,,OUT=464.09 BRANCHLANDS BLVD \ \ W W / _13 z ) INV OUT=461\\92 W W W" \� 2 ' RCP 2.39% �� o S1� Eloff :. - ST �-sT sr4' R � 4„ ; ' , • . .. - /,' • a •, o • . , . � .. . -\ ____ ' / - 524 \ �' o s _ -sr s } / / s ST ST sT % _� Z . 0) 4 " RCP %�� � � . - •. ` ' 8. OS L. F. 24" FRCP -,9 2.87% I z �z29.21% RCP ��.� / _-- �_ IRS - -N 350000 E 125.56�------- / o _ - - - - - _ A� ® m o i _ _ IF - \ r \ TOP- 4D78.75 M i i / - _ - - - - W - -- - - ,-" - \ 7 .17 L.F. 24" RCP u z - - o - -- --- 4.g4- - \\ I INV NN=472.2 EXISTING SIDEWALK TO vvA =472.10 g v / ' EX. VDOT R/W BE REMOVED ) \ �A ���� VA /� _T ) z Z - / / rw-74.5 -- i _ - ��� A / T� 1 29 / 0 0 STRM DI- 4 " STRM GRATE NEN / / _ / /EXISTINGWATERLI ,� � �\ ` � / i in > 613 EP-7o. �� /F �.c. PENNEY / / > Lu NV OUT=460.38 TOP=46-6-86 - - PROPERTIES,lNE F NV �T=463.59 \ \ EXISTING FIRE HYDRANT / / -' III / USES SHOPPING CENTER / / / ' BLOCK - - �i �) I DB 1908 PG 726 / / W 18.58 L.F. 18" / EP 71 2 _P © 15.29% / DB 4355- PG � wALL _.(DESCRIPTION IN EXISTING CURB AND \ A GUTTER TO BE REMOVED �_, � � or v/ DEED OF TRUST) EP-71 7 EXISTING BLOCK WALL EX. P/L / TO BE REMOVED o v - / / / / TMP 61-134 SYMBOL LEGEND / / / N/F CAVALIER COUNTRY BANK IRS IRON ROD SET SIGN / / ZONING - COMMERCIAL OFFICE UTIL� �LE / / / / USE - BANK z, LIGHT POLE / / DB 527 PG 43 - / GUY WIRE / / DB 327 PG 228 (PLAT) STORM MH ELECTRIC VAULT / / / / DB 468 PG 456 (PLAT) / RCP REINFORCEONCRETE PIPE / / CC&G CONCRETE CURB & GUTTER / 'FENCE / OVERHEAD ELECTRIC UTILITY/ WATERLINE / 0 MANAGED / NOTES: ----------------------------- 1. THIS PLAT HAS BEEN PREPARED WITH THE BENEFIT OF A TITLE REPORT BY - - - STEWART TITLE GUARANTY COMPANY, COMMITMENT NUMBER 19000090147, / _ _ = EFFECTIVE DATE AUGUST 19, 2019 8:00 A.M. 2. ALL DEED AND PLAT REFERENCES SHOWN ARE RECORDED IN THE ALBEMARLE - - _ - COUNTY COURTHOUSE. / l 3. FOR ALL PARCELS SHOWN HEREON, THIS PLAT HAS BEEN PREPARED FROM AN_- = ACTUAL FIELD SURVEY DONE AS FOR ALL PARCELS SHOWN HEREON, THIS PLAT - - _ HAS BEEN PREPARED FROM AN ACTUAL FIELD SURVEY DONE AS PER THE DATE OF THIS PLAT USING MONUMENTS FOUND TO EXIST AT THE TIME OF THIS SURVEY, - THERE ARE NO VISIBLE EASEMENTS OR ENCROACHMENTS EXCEPT AS SHOWN, - - SUBJECT TO NOTE 1. - 4. THE TOPOGRAPHY BY RGA SHOWN IS BASED ON A FIELD SURVEY COMPLETED BY - " OCTOBER 17, 2019. I 5. THE AREA SHOWN HEREON APPEARS TO BE LOCATED WITHIN FLOOD ZONE X - (UNSHADED), WHICH IS AN AREA OF MINIMAL FLOOD HAZARD AS SHOWN ON FEMA NFIP COMMUNITY MAP PANEL NO. 51003CO278D, EFFECTIVE FEBRUARY 4, 2005. _ THIS DETERMINATION HAS BEEN MADE BY GRAPHIC METHODS ONLY. AN ELEVATION _ STUDY HAS NOT BEEN PERFORMED AS A PORTION OF THIS PROJECT. 6. SUBJECT PROPERTY IS ZONED PD-SC (PLANNED DEVELOPMENT SHOPPING / CENTER). PER ALBEMARLE COUNTY GIS, SUBJECT PROPERTY LIES WITHIN THE FOLLOWING OVERLAY DISTRICTS: AIRPORT IMPACT, ENTRANCE CORRIDOR, AND / MANAGED STEEP SLOPES I 7. THE PARCEL SHOWN WILL BE SERVICED BY PUBLIC WATER AND SEWER. \ / 8. THERE ARE NO KNOWN IDENTIFICATIONS OF GRAVES, OBJECTS, OR STRUCTURES \ \ \ / MARKING A PLACE OF HUMAN BURIAL ON THE SUBJECT PROPERTY. \ \ \ \ 9. THE MINIMUM BUILDING SETBACKS ARE PER ALBEMARLE COUNTY CODE. \ \ \ \ \ / 10. THE SUBJECT PARCEL HAS LEGAL ACCESS TO U.S. ROUTE 29 (SEMINOLE TRAIL). \ 11. PLAT OF RECORD FOR SUBJECT PARCEL SHOWS THE NORTHWEST AND SOUTHEAST \ 1 / SIDE LINES BEING 214.5' AND 307.5' RESPECTIVELY. FIELD FOUND EVIDENCE OF / / ADJOINING PARCELS APPEAR TO REFLECT A 5' RIGHT-OF-WAY TAKE ALONG SEMINOLE TRAIL - U.S. ROUTE 29 BUT A RIGHT-OF-WAY TAKE WAS NOT FOUND IN THE TITLE REPORT OR IN A SEARCH OF COUNTY RECORDS. FOR THE PURPOSE OF THIS SURVEY, PARCEL AREAS AND LEGAL DESCRIPTION INCLUDES THE 5' STRIP AS A PORTION OF THE SUBJECT PROPERTY. V LEGEND METES AND BOUNDS DESCRIPTION:IF PIN FOUND \ MF MONUMENT FOUND BEGINNING AT A POINT (MARKED P.O.B.), SAID POINT BEING SITUATED IN THE CP CONCRETE PAD EASTERN RIGHT-OF-WAY OF U.S. ROUTE 29, SEMINOLE TRAIL. THENCE, ALONG THE \ CW CONCRETE WALK EASTERN RIGHT-OF-WAY OF SEMINOLE TRAIL N 35'00'00" E FOR A DISTANCE OF \ \ --' DI STORM SEWER DROP INLET 125.56 FEET TO POINT. THENCE LEAVING SAID SEMINOLE TRAIL S 55-11,57" E FOR \ -' GUY GUY WIRE AND ANCHOR A DISTANCE OF 307.50 FEET, PASSING AN IRON PIN FOUND (IF) AT 5.45 FEET, A \ \ \ LP LAMP POST CORNER OF TMP 61-129, N/F J.C. PENNEY PROPERTIES, INC. AND CONTINUING MH MANHOLE WITH SAID J.C. PENNEY PROPERTIES, INC. TO A METAL ARROW FOUND ON \ \ \ OH OVERHEAD UTILITIES MONUMENT (MF). THENCE CONTINUING WITH SAID J.C. PENNEY PROPERTIES, INC. S T, SL SIGNAL POLE & BASE 64'38'24" W FOR A DISTANCE OF 197.84 FEET TO AN IRON PIN FOUND (IF) SAID \ \ ( \ \ SN SIGN IRON PIN BEING A COMMON CORNER OF SAID J.C. PENNEY PROPERTIES, INC. AND \ \ \ \ SS SANITARY SEWER WITH TMP 61-134, N/F CAVALIER COUNTRY BANK. THENCE LEAVING SAID J.C. ST STORMWATER \ \ \ \ \ PENNEY PROPERTIES, INC. AND CONTINUING WITH SAID CAVALIER COUNTRY BANK N \ \ \ __- UP UTILITY POLE 42`48'10" W FOR A DISTANCE OF 214.50 FEET, PASSING A COMMON CORNER WITH VLT UTILITY VAULT \ \ \ \ \ \ WL MARK WATERLINE SAID CAVALIER COUNTRY BANK AT 209.56', AND LEAVING SAID CAVALIER COUNTRY \ \ \ \ \ YH YARD HYDRANT BANK TO THE POINT AND PLACE OF BEGINNING, HAVING A TOTAL AREA OF 0.908 \ \ \ \ ACRES OR 39,547 SQUARE FEET, MORE OR LESS. \ \ \ \ TW-75. 1 d' - \ ' / V rl \ N rl �W-75. 1 - - EP- 72. 1 O N MANAGEDSLO-PES - - - y�) ---- ---------- \ I G IlIlI N-- ALRE-MA-RLE RANK m -NDT_RUST COMPANY ) oc,l LJ zeNTNGPSC _`N j O 49`N Cn Z O I / / / / / - _ - MANAGED SLOPES O Lu Lu 1 I 4$J > 0 II IF _ - // [W- O O16 / � (~ IRON ROD - - - C) Z FOUND o Q \ \ / I _ ° � `a, 1 O / w U LLu Q9 TMP 61 1 29 38 \ \ ul v, m Z V AN/F J.G, PENNEY \ / \ NOPERTI'SS, INC zo)N G - PUD - - \ 79 E, / / /i / X US SHOPPING CENTER- DB 1 908 PG 726 / W DB � 55 PG�625 - ' / / / (DES IIPTION 1'N // / / P4 Lu \\ DEED OF\TRUST) � \ / / /// j z / P4 Lu J 1 /// J �J/� v/ \ / \ 1METAL ARROW MF \ \ // /Z/ / IRON \ / \ WITH FENCE P ST (0.77' ST OF CO ER) V // Lu\ - STRM DI _ _ \ TOP=505.57 V A // // / / a \ NV= JOB NO. HORIZONTAL GRAPHIC SCALE � � \ /�// / / / 192036 A 25.4 15" RCP 15" RCP zo o�o zo ao 0 @ 7. % \ ��// / / / SCALE \ / / / J�Jj / / 1"=20' \ \ ( IN FEET) STRM H / I ✓ / \ 1 inch- 20 ft. TOP=504. STRM lyl ) SHEET NO. v v INV IN=49p%1 �OP=50-�/60 I 2 / INV=S 0.90 EROSION & SEDIMENT CONTROL EROSION CONTROL NOTES DESCRIPTION OF EROSION & SEDIMENT EROSION CONTROL NOTES & NARRATIVE Pa MEASURES: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE CONTROL MEASURES: PROJECT DESCRIPTION: THE PURPOSE OF THIS LAND DISTURBANCE ACTIVITY IS FOR THE CONSTRUCTION OF A PARKING LOT AND A 3,000 PRE-CONS7RUCnON CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND SF RETAIL BUILDING. THIS PROJECT PROPOSES TO DISTURB 1.74 cc. OF LAND WITH 0.56 ACRES OF ONSITE STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN DISTURBING ACTI NTY AND ONE WEEK PRIOR TO 774E FINAL INSPECTION. ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND EROSION AND SEDIMENT CONTROL MEASURES: DISTURBANCE AND 0.58 ACRES OF OFFSITE DISTURBANCE. THE PROJECT WILL BEGIN ITS CONSTRUCTION WITH THE STRUCTURAL PRACTICES USED IN THIS SECTION CONSIST OF THE FOLLOWING MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA IT IS ANTICIPATED TO USE A CONSTRUCTION ENTRANCE, RIPRAP, OUTLET PROTECTION, PROPOSED ESC MEASURES IMMEDIATELY FOLLOWING PLAN APPROVAL, WHICH IS ANTICIPATED TO BE IN THE FALL EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR DIVERSIONS, SEDIMENT TRAPS, AND SILT FENCES TO CONTROL SURFACE DRAINAGE. OF 2020. THE WORK IS ANTICIPATED TO BE COMPLETED WITHIN 12 MONTHS AND TO CONCLUDE IN THE FALL OF 3.01 SAFETY FENCE.' 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. TEMPORARY SEEDING WILL BE USED IMMEDIATELY FOLLOWING ALL LAND DISTURBANCE 2021. A PR07EC77VE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY THE PUBLIC. J. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR ACTIVITIES. TEMPORARY STOCKPILE AREAS ARE NOT BE REQUIRED NTH THIS PROPOSED EXISTING SITE CONDITIONS.' APPLICABLE TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH CAN BE 4. AS THE FIRST STEP IN CLEARING. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE DESIGN. SHOULD FIELD ADJUSTMENTS NECESSITATE A SMALL STOCKPILE AREA, IT SHALL THE AREA OF THE PROPOSED DEVELOPMENT IS VACANT LOT MOSTLY COVERED BY DENSE VEGETATION. THE SITE CONSIDERED UNSAFE BY VIRTUE OF P07EN77AL ACCESS BY THE PUBLIC MAINTAINED ON THE SITE AT ALL TIMES. BE DISCUSSED WITH THE ESC INSPECTOR AHEAD OF TIME. THE STOCKPILE WILL NEED TO GENERALLY SLOPES FROM THE SOUTHEAST TO THE NORTHWEST TOWARDS SEMINOLE TRAIL ROUTE 29. 302 CONSTRUCTION ENTRANCE 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN BE MAINTAINED AND STORED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE ON ADJACENT AREAS.' A STABILIZED CONSTRUCTION ENTRANCE LOCATED AT POINTS OF VEHICULAR INGRESS AND INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR SITE AND SHALL BE STABILIZED WITH A TEMPORARY VEGETATIVE COVER. PERMANENT THIS SITE IS BORDERED TO THE NORTH AND WEST BY THE FASHION SQUARE MALL ENTRANCE AND PARKING LOT. EGRESS ON A CONSTRUCTION SITE TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION SEEDING WILL BE PERFORMED FOR ALL AREAS WHICH WILL NO LONGER BE EXCAVATED TO THE SOUTH IS THE BRANCH, BANKING & TRUST BUILDING AND TO THE EAST IS SEMINOLE TRAIL ROUTE 29 PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. CONSTRUCTION ENTRANCES SHALL CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AND WHERE CONSTRUCTION ACTIVITIES HAVE CEASED. PERMANENT SEEDING SHALL ALSO NORTHBOUND LANES. SILT FENCE, DIVERSIONS, SEDIMENT TRAPS, INLET CONTROLS AND VARIOUS OTHER ESC BE INSTALLED AS SHOWN ON THE PLANS TO REDUCE THE AMOUNT SEDIMENT TRANSPORTED AUTHORITY. MEASURES ARE PROPOSED TO LIMIT THE POTENTIAL FOR CONTAMINATION OF THESE ADJACENT PROPERTIES. ONTO PUBLIC ROADWAYS. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR A YEAR OR OFFSl7F LAND DISTURBANCE. CONSTRUCTION ROAD STABILIZATION: CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS MORE. SELECTION OF SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. OFFSITE LAND DISTURBANCE IS LIMITED TO PUBLIC RIGHT-OF-WAY. THE THE TEMPORARY STABILIZATION OF ACCESS ROADS, SUBDIVISION ROADS, PARKING AREAS, DETERMINED BY THE PLAN APPROVING AUTHORITY. TEMPORARY SEEDING WILL BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT AND OTHER S17E VEHICLE TRANSPORTATION ROUTES WITH STONE IMMEDIATELY AFTER 7 ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES DORMANT FOR MORE THAN SEVEN DAYS. THESE AREAS SHALL BE SEEDED WITH FAST SOILS' GRADING. TO REDUCE EROSION OF TEMPORARY ROADBEDS BY CONSTRUCTION TRAFFIC AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING S17F DEVELOPMENT GERMINATING VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION SEE SOIL DESCRIPTIONS ON THIS PAGE AND THE PHASE I EROSION & SEDIMENT CONTROL PLAN FOR SOIL DURING WET WEA7HER AND TO REDUCE EROSION AND SUBSEQUENT REGARDING OF UNTIL FINAL STABILIZATION IS ACHIEVED. OF SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. BOUNDARIES. PERMANENT ROADBEDS BETWEEN THE TIME OF 1NI77AL GRADING AND FINAL STABILIZATION. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED CRITICAL AREAS.' USE WHEREVER STONE -BASE ROADS OR PARKING AREAS ARE CONSTRUCTED, WHETHER FILTERING DEVICE. THE MANAGED STEEP SLOPES AT THE SOUTHERN PORTION OF THE SITE ARE CONSIDERED TO BE CRITICAL. THE PERMANENT OR TEMPORARY FOR USE BY CONSTRUCTION TRAFFIC. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY 3.01 SAFETY FENCE- TO DISCOURAGE ACCESS TO A PARTICULAR AREA. CONTRACTOR SHALL GIVE EXTRA ATTENTION AND CAUTION IN AND AROUND THESE AREAS TO ENSURE 305 SILT FENCE:3.02 AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CONSTRUCTION ENTRANCE - TO REDUCE 774E AMOUNT OF MUD TRANSPORTED ONTO CONSTRUCTION ACTIVITY DOES NOT DISTURB THESE EXISTING FEATURES. TREE PROTECTION FENCING SILT FENCING A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC STRETCHED CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. DIVERSIONS AND SEDIMENT TRAPPING DEVICES SHALL ALSO BE INSTALLED AS A FIRST STEP IN LAND DISTURBANCE ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED, TO INTERCEPT AND 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 3.03 CONSTRUCTION ROAD STABILIZATION - TO REDUCE THE EROSION OF TEMPORARY TO ENSURE THESE CRITICAL AREAS ARE MAINTAINED. DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE SITE AND TO DECREASE 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL ROADBEDS BY CONSTRUCTION TRAFFIC AND TO REDUCE THE EROSION AND SUBSEQUENT SEQUENCE OF CONSTRUCTION: THE VELOCITY OF SHEET FLOWS AND LOW -TO -MODERATE LEVEL CHANNEL FLOWS. THE SILT SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND REGARDING OF PERMANENT ROADBEDS BETWEEN THE TIME OF INITIAL GRADING AND FINAL 1. CONTRACTOR SHALL NOTIFY THE ALBEMARLE COUNTY COMMUNITY DEVELOPMENT ENGINEERING DEPARTMENT TO FENCE BARRIERS SHALL BE INSTALLED DOWN SLOPE OF AREAS WITH MINIMAL GRADES TO OTHER DEBRIS. STABILIZATION. CONSTRUCTION ROAD STABILIZATION WILL BE APPLIED TO THE SCHEDULE APRE-CONSTRUCTION MEETING. FILTER SEDIMENT LADEN RUNOFF FROM SHEET FLOW AS INDICATED. 774EY SHALL BE 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION CONTRACTOR PARKING & STAGING AREAS AS NEEDED. 2. PRIOR TO DISTURBANCES, THE LIMITS OF DISTURBANCE SHALL BE FLAGGED AND THE TREE PROTECTION INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND MAINTAINED IN ACCORDANCE WITH THE PER ZONING ORDINANCE SECTION 5.1.28. VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK (VESCH). 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTIONJ. 13-301 05 SILT FENCE- SILT FENCE IS PROPOSED, WHERE SHOWN ON THE PLANS. FENCING SHALL BE INSTALLED. OF THE CODE OF ALBEMARLE 3.07 STORM DRAIN INLET PROTECTION- INLET PR07EC77ON IS PROPOSED ON INLETS, J. NO EROSION CONTROL MEASURES MAY BE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT THE 3.07 STORM GRAIN INLET PROTECTION: 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT WHERE SHOWN ON THE PLANS. APPROVAL FROM THE INSPECTOR ON THE PROJECT A SEDIMENT F7L7ER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS SHALL BE LIMITED TO THE HOURS OF 7..00 AM TO 9:00 PM. 3.09 DIVERSION- PERIMETER DIVERSIONS ARE PROPOSED WHERE SHOWN ON 774E PLANS 4. INSTALLATION OF THE PROPOSED CONSTRUCTION ENTRANCE SHALL OCCUR NEXT. THE CONTRACTOR SHALL PRIOR TO PERMANENT STABILIZATION. OF THE DISTURBED AREA. INLET PR07ECT70N APPLIES 15 BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT TO DIRECT RUNOFF INTO A SEDIMENT TRAPPING DEVICE. APPLY CONSTRUCTION ROAD STABILIZATION AS NEEDED. CONTRACTOR SHALL ENSURE THE CONSTRUCTION WHERE STORM DRAIN INLETS ARE TO BE MADE OPERATIONAL BEFORE PERMANENT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, 3.13 SEDIMENT TRAP- SEDIMENT 7RAPS ARE PROPOSED WHERE SHOWN ON THE PLANS. ENTRANCE DRAINS TO AN ADEQUATE E&S MEASURE. THE CONTRACTOR SHALL UTILIZE THE NEARBY SEDIMENT STABILIZATION OF THE CORRESPONDING DISTURBED DRAINAGE AREA. PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. - 3.18 OUTLET PROTECTION OUTLET PROTECTION IS PROPOSED AT THE OUTLET OF PIPES. TRAP FOR VEHICULAR WASH OFF. CONSTRUCTION ENTRANCE TO BE INSTALLED WHERE CONSTRUCTION VEHICLE 3os TEMPORARY DIVERSION DIKE 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR - 3.79 RIPRAP RIPRAP IS PROPOSED AROUND 774E EXISTING DI. ROUTES INTERSECT PAVED PUBLIC ROADS PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE 3.32 PERMANENT SEEDING -PERMANENT SEEDING IS REQUIRED AND PROPOSED WITH THIS SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A SLOPING DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE PLAN. PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT AWAY FROM UNPROTECTED DISTURBED AREAS AND SLOPES TO A STABILIZED OUTLET TO DIVERT SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT -TRAPPING SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY 3.38 TREE PRESERVATION AND PROTECTION- TREE PR07ECTION IS PROPOSED WITH THIS SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTING TO A SEDIMENT FACILITY SUCH AS A SEDIMENT TRAP OR SEDIMENT BASIN. USE WHEREVER STORMWATER 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO PLAN. SEE THE ESC PLAN FOR THE REQUIRED LOCATIONS. CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS RUNOFF MUST BE TEMPORARILY D/WR7ED TO PR07ECT DISTURBED AREAS AND SLOPES OR RETAIN SEDIMENT ON S17E DURING CONSTRUCTION. THESE STRUCTURES GENERALLY HAVE A CONSIST A 50/50 MIX OF ANNUAL RYGRASS AND CEREAL WINTER RYE, OR IN MARCH 3.39 DUST CONTROL -DUST CONTROL IS REQUIRED AND PROPOSED WITH THIS PLAN. MANNER. THE PROPOSED WASH RACK SHALL OUTFALL INTO SEDIMENT 7RAP#1, AND A RIGHT OF WAY DIVERSION BERM SHALL BE INSTALLED ACROSS THE CONSTRUCTION ENTRANCE AS SHOWN TO DIRECT THE LIFE EXPECTANCY OF 18 MONTHS OR LESS, WHICH CAN BE PROLONGED WITH PROPER AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF MAINTENANCE. GERMAN MILLET. STRAW MULCH /S TO BE APPLIED AT 80LBS/10OSF. ALTERNATIVES MAINTENANCE. RUN-OFF INTO THE SEDIMENT TRAP. ARE SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. IN GENERAL, DURING CONSTRUCTION THE RLD OR CONTRACTOR ON -SITE WILL CHECK ALL 5. THE INITIAL ESC CONSTRUCTION MEASURES, AS SHOWN ON THE PHASE I EROSION & SEDIMENT CONTROL PLAN, 311 TEMPORARY RIGHT-OF-WAY DIVERSION: A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER PERMANENT SEEDING, AND EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH SIGNIFICANT SHALL BE INSTALLED NEXT. THE CONTRACTOR SHALL BEGIN BY INSTALLING THE PERIMETER SILT FENCE, DISTURBED RIGHTS -OF -WAY AND SIMILAR SLOPING AREAS TO SHORTEN 774E FLOW LENGTH MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS11000SF, RAINFALL. MONITORING REPORTS WILL BE REQUIRED FROM THE RLD IF NEEDED. SPECIFIC SEDIMENT TRAP #1, AND TREE PROTECTION. PERIMETER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE WITHIN A SLOPING RIGHT-OF-WAY, THEREBY REDUCING 774E EROSION POTENTIAL BY INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT ATTENTION WILL BE GIVEN TO THE FOLLOWING ITEMS: CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL DIVERTING STORM RUNOFF TO A STABILIZED OUTLET. GENERALLY, EAR774EN DIVERSIONS ARE 1000LBS/ACRE AND CONSIST OF A 10 20 10 NUTRIENT MIX. PERMANENT SEEDING o. SEDIMENT BASINS AND/OR TRAPS WILL BE CLEANED AND MAINTAINED IN ACCORDANCE BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. INSTALL SEDIMENT TRAP #1 AND THE PLUNGE POOL APPLICABLE WHERE THERE WILL BE LITTLE OR NO CONSTRUCTION TRAFFIC WITHIN 774E SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK. OUTFALL, AS SHOWN ON THE PLANS, TYING IN THE PLUNGE POOL TO THE EXISTING STORM INLET. RIGHT-OF-WAY. GRAVEL STRUCTURES ARE MORE APPLICABLE TO ROADS AND OTHER FESCUE AND 0-5% PERENNIAL RYGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS b.ALL GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP 774AT WILL 6. ONCE THE PERIMETER EROSION CONTROL MEASURES HAVE BEEN INSTALLED, AND THE COUNTY INSPECTOR HAS RIGHTS -OF -WAY WHICH ACCOMMODATE VEHICULAR TRAFFIC. TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY 774E PREVENT PROPER DRAINAGE. IF THE GRAVEL IS CLOGGED BY SEDIMENT, THE GRAVEL EROSION CONTROL INSPECTOR. WILL BE REMOVED AND CLEANED, OR IT WILL BE REPLACED. APPROVED THESE MEASURES, THE CONTRACTOR SHALL BEGIN LIGHT CLEARING. THE CONTRACTOR SHALL BEGIN J.13 TEMPORARY SEDIMENT TRAP., A TEMPORARY FUNDING AREA FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT K177-1 A 19. MAINTENANCE. ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH c. ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR BY CLEARING THE AREAS REQUIRED TO ACCESS THE LOCATION OF THE SEDIMENT TRAP. FOLLOWING THE STONE OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS LONG RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED DETERIORATION OF THE FABRIC AND REPAIRED AS REQUIREDD, SEDIMENT SHALL BE INSTALLATION OF THESE MEASURES, THE CONTRACTOR SHALL INSTALL THE DIVERSIONS. ANY REMAINING ENOUGH TO ALLOW THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. USE BELOW IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHED HALF WAY TO THE TOP EROSION CONTROL ITEMS AS SHOWN ON THE PHASE l EROSION CONTROL PLAN SHALL ALSO BE CONSTRUCTED DISTURBED AREAS WHERE THE TOTAL CONTRIBUTING DRAINAGE AREA IS LESS THAN 3 ACRES, VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN OF THE BARRIER. AT THIS TIME. WHERE THE SEDIMENT TRAP WILL USED NO LONGER THAN MONTHS, AND IT MAY BE NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION d.ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS 7. ONCE ALL THE PHASE l EROSION CONTROL ITEMS HAVE BEEN INSTALLED &ARE OPERATIONAL, DRAINAGE IS EITHER INDEPENDENTLY Y OR IN CONJUNC7/ON WITHH A TEMPORARY DIVERSION CONSDIKE. DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. PROPERLY CONVEYED TO THESE MEASURES, AND THE ESC INSPECTOR HAS GRANTED APPROVAL, THE AND AND REPAIRED IMMEDIATELY. IN CASE OF EMERGENCY, 774E PRIMARY CONTACT FOR THE PROJECT WILL BE 774E RLD OR 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED CONTRACTOR ON -SITE. IN ADDITION THE OWNER MAY BE CONTACTED. UPON COMPLETION CONTRACTOR CAN BEGIN CLEARING THE REMAINDER OF THE SITE. TEMPORARY SEEDING, PERMANENT SEEDING OUTLET PROTECTION.•UCTURALLY WITHIN 30 DAYS OF FINAL S17F STABILIZATION, WHEN MEASURES ARE NO LONGER OF THE PROJECT, THE OWNER WILL BE RESPONSIBLE FOR SITE MAINTENANCE. AND DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. STR STRLINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPATING DEVICES PLACED NEEDED, SUBJECT To APPROVAL BY THE EROSION CONTROL INSPECTOR. 8. AFTER CLEARING THE PROPOSED AREAS, THE CONTRACTOR CAN PROCEED TO PHASE II OF THE EROSION & AT THE OUTLETS OF PIPES OR PAVED CHANNEL SECTIONS TO PREVENT SCOUR AT STORMWATER OUTLETS TO PROTECT THE OUTLET STRUCTURE AND TO MINIMIZE THE 21. THE E&S INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE E&S CONTROLS AS SEDIMENT CONTROL PLAN. THE CONTRACTOR SHALL BEGIN ROUGH GRADING THE SITE TO THE CONTOURS P07EN77AL FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND ENERGY OF NECESSARY IN THE FIELD AS S17E CONDITIONS CHANGE. IN ADDITION, NO SEDIMENT CONCENTRATED STORMWA TER FLOWS APPLICABLE TO THE OUTLETS OF ALL PIPES AND BASIN OR TRAP CAN BE REMOVED WITHOUT WRITTEN AUTHORIZATION. ENGINEERED CHANNEL SECTIONS. J. 19 RIPRAP: A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE WITH SOIL DESCRIPTION FILTER FABRIC OR GRANULAR UNDERLINING TO PR07ECT THE SOIL FROM THE EROSIVE FORCES OF CONCENTRATED RUNOFF, SLOW 774E VELOCITY OF CONCENTRATED RUNOFF WHILE 27B-EUOAK LOAM-2 TO 7X SLOPES SOIL IS WELL DRAINED W9774 A MEDIUM RUNOFF ENHANCING THE P07FN77AL FOR INFILTRATION, AND TO STABILIZE SLOPES WI7H SEEPAGE CLASSIRCAnON. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE PROBLEMS AND OR NON -COHESIVE SOILS. USE WHEREVER SOIL AND WATER INTERFACE / DEPTH TO THE WATER TABLE /S GENERALLY MORE THAN 800. AND THE SOIL coNolnoNs, WATER TURBULENCE AND v£Loa7r EXPECTED v£c£rATIVE 34C-GLENELG LOAM-7 TO 15X SLOPES SOIL IS WELL DRAINED WITH A MEDIUM RUNOFF COVER, ETC., ARE SUCH THAT THE SOIL MAY ERODE UNDER THE DESIGN FLOW CONDITIONS. CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE 331 TEMPORARY SEEDING., DEP7H TO THE WATER TABLE IS GENERALLY MORE THAN 80". THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING 91 -URBAN LAND-0 TO 25X SLOPES MEDIUM RUNOFF CLASSIFICATION. 100 DEPTH TO WITH APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS. TO REDUCE EROSION AND DENSIC MA 7ER/AL. SEDIMENTATION BY STABILIZING DISTURBED AREAS 774AT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 30 DAYS TO REDUCE DAMAGE FROM SEDIMENT AND REFERENCE. WEB SOIL SURVEY ONLINE DATABASE, FOUND AT RUNOFF TO DOWNSTREAM OR OFF -SITE AREAS, AND TO PROVIDE PROTECTION TO BARE http://Websollsurveynres.usda.govlappIWebSollSurvey.aspx SOILS EXPOSED DURING CONSTRUCTION UNTIL PERMANENT VEGETATION OR 07HER EROSION CONTROL MEASURES CAN BE ESTABLISHED. 332 PERMANENT STABILIZATION: EROSION CONTROL NOTES THE ESTABLISHMENT OF PERENNIAL VEGETA7W COVER ON DISTURBED AREAS BY PLANTING ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION SEED. TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS. TO PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE AND SEDIMENT CONTROL PRAC7CES WILL BE CONSTRUCTED AND MAINTAINED TO S17F CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS. ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA TO IMPROVE WILDLIFE HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLETION OF EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR CONSTRUCTION ACTIVITIES, ALL AREAS WILL RECEIVE A PERMANENT VEGETA7VE COVER. 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS ES-2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO 3.38 TREE PRESERVATION AND PROTECTION., THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE PR07EC77ON OF DESIRABLE TREES FROM MECHANICAL OR OTHER INJURY DURING LAND COMMENCEMENT OF LAND DISTURBING ACTIVITY AND ONE WEEK PRIOR TO DISTURBING AND CONSTRUCTION ACTIVITY. TO ENSURE 774E SURVIVAL OF DESIRABLE TREES 774E FINAL INSPECTION. WHERE THEY WILL BE EFFECTIVE FOR EROSION AND SEDIMENT CONTROL, WATERSHED ES-3:ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR PROTECTION, LANDSCAPE BEAUTIFICATION, DUST AND POLLU77ON CONTROL, NOISE REDUCTION, TO OR AS THE FIRST STEP IN CLEARING. SHADE AND 07HER ENVIRONMENTAL BENEFITS WHILE THE LAND IS BEING CONVERTED FROM ES-4 A COPY OF 774E APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL SHOWN ON THE PHASE H EROSION & SEDIMENT CONTROL PLAN. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 9. THE CONTRACTOR SHALL INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ON THE PHASE ll EROSION CONTROL PLAN. TEMPORARY SEEDING, PERMANENT SEEDING AND DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. 10. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 11. ONCE THE SITE IS ROUGH GRADED, THE CONTRACTOR SHALL BEGIN PHASE Ill OF THE EROSION & SEDIMENT CONTROL PLAN. THE CONTRACTOR CAN BEGIN INSTALLATION OF THE UTILITIES, CURB AND GUTTER, AND ROADS. INLET PROTECTION SHALL ALSO INSTALLED AS THE STORM SEWER IS CONSTRUCTED. INLET PROTECTION SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS SHALL BE MADE AS NEEDED. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, THE STONE MUST BE PULLED AWAY AND CLEANED AND/OR REPLACED. 12. CONTRACTOR SHALL INSTALL SEDIMENT TRAP#2 AND THE OFFSITE INLET PROTECTION PRIOR TO THE INSTALLATION OF THE OFFSITE UTILITIES. THE SEDIMENT TRAP#2 SHALL REMAIN IN PLACE DURING THE INSTALLATION OF THE OFFSITE UTILITIES AND THEN REMOVED ONCE THE INSTALLATION IS COMPLETED AND THE AREA STABILIZED. THE CONTRACTOR SHALL USE THE INLET PROTECTION AND FILTREXX DIVERSION TO PREVENT SEDIMENT FROM LEAVING THE CONSTRUCTION AREA WITH THE SANITARY SEWER INSTALLATION ACROSS THE PARKING LOTS, AS SHOWN ON THE PLANS. SEE DETAILS FOR THE FILTREXX DIVERSION ON THIS SHEET. 13. ONCE PHASE 111 OF CONSTRUCTION IS COMPLETE THE SITE /S STABILIZED AND THE INSPECTOR HAS GIVEN APPROVAL, THE CONTRACTOR CAN THEN CONVERT THE SEDIMENT TRAP#1 INTO THE PROPOSED SWM FACILITY. AT THIS TIME, THE CONTRACTOR CAN REMOVE THE REMAINDER OF THE EROSION & SEDIMENT CONTROL MEASURES. NO ITEM SHALL BE REMOVED, THROUGHOUT ALL PHASES OF CONSTRUCTION, UNLESS THE UPSTREAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES PERMISSION. FOREST To URBAN -TYPE USES. APPLIES IN TREE -INHABITED AREAS SUBJECT To LAND 14. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION BE MAINTAINED ON THE S17F AT ALL TIMES DlsruRewc Ac7rwn£s. AND SEDIMENT CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ES-5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS 0774ER THAN INDICATED ON THESE PLANS INCLUDING BUT NOT LIMITED TO OFF -SITE 3.39 DUST CONTROL: ( . REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOLITION AND BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION ACTIVITIES. TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND EXPOSED SOIL SURFACES AND REDUCE 774E PRESENCE OF AIRBORNE SUBSTANCES WHICH APPROVAL BY THE PLAN APPROVING AUTHORITY. MAY PRESENT HEALTH HAZARDS TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT ES-6: 774E CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL LIFE DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AIR EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ACCORDANCE WITH 774E VESCH. ES-7.•ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING S17E DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. ES-8.,DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED WATER FILTERING DEVICE. ES-9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. GENERAL SLOPE (3:1 OR LESS) KENTUCKY 31 FESCUE 128 LBS. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP 20 LBS. SEASONAL NURSE CROP 150 LBS FEBRUARY 16 THROUGH APRIL ANNUAL RYE MAY 1 THROUGH AUGUST 15 FOXTAIL MILLET AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE NOTES: 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION, IN ACCORDANCE W/ VESCH STD 3.35. PS PERMANENT SEEDING SCHEDULE NO SCALE (STD. & SPEC. 3.32 OF VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK, 3RD ED.) COMPACTED SOIL ts" vo- 3' MINIMUM FILTER FABRIC ENTRENCHED 6" - -- -- TEMPORARY 6' MINIMUM -- DLI TEMPORARY 18" DIVERSION BERM fSTAKES 16" DIAMETER HLTREXXV SOXX`"(ALSO AVAILABLE IN a. 12" AND 24•DIAMETERS) 2" X 2X 36' WOODEN PLACED 10' O.C. SINGLE INSTALLATION SECTION N TS FILTREXXO RUNOFF DIVERSION SECTIONS NTS TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion Latex Emulsion Resin in Water Acrylic Emulsion (Non -Traffic) Acrylic Emulsion (Traffic) ce: Va. DSWC 7:1 12.5:1 4:1 7:1 3.5:1 Coarse Spray Fine Spray Fine Spray Coarse Spray Coarse Spray 1,200 235 300 ADMINISTRATOR IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 15. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZA77ON OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. TABLE 3.31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERLALS "QUICK REFERENCE FOR ALL REGIONS" Rate Plantine Dates Speciesb(1 s,/acre) Sept. 1 - Feb. 15 50150 Mix of Annual Ryegrass (Lolium multi-florum) & 50 - 100 Cereal (Winter) Rye (Secale cereale) Feb. 16 - Apr. 30 Annual Ryegrass 60 - 100 450 (I"lium multi-florum) 350 May 1 - Aug 31 German Millet 50 (Setaria italics) I /^ t j FLOW a^ 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. FLOW 4. SACKFUL AND COMPACT THE EXCAVATED SOIL. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. "FILTERIC IRE Source: Adapted from Installation of Straw and Fabric Filter (farriers for Sediment Control, Sherwood and Wyant STONE 7D' MIN. CONSTRUCTION ACCESS T Y- A T P S S 2 ASPHALT 0 COURSE zz z z STONE CONSTRUCTION ACCESS 'l MN. 2'A AGGREGATE BASE PROFILE 70' MA, A ASPHALT PAVED WASHRACK ; x j I fx 2% t2' MM.- I 'MUST EXTEND FULL WIDTH A I� POSITIVE DRNNAGE TO SEDIMENT OF INGRESS AND EGRESS R I 1 TRAPPING DEVICE OPERATION PLAN 12' MIN. 2% 3 PAVEMENTI EXIST NG PAVEMENT ,ONE DPoVNAGE SEDIMENT PPING DEVICE I FILTER CLOTH-/ SECTION A -A A ummatin %%Aa lap of 1 mch nNLat be cost ffed wth a nmmm6u 1 inch badcock Andoll I,ah a supphaw a wash hose Anth a lhametei of 1 4 aches foi adeytute coa4allt pies»ne. \Vash w�Ma upist be caned awac born the atdance to tat apploA'ed left i-- sea to Iauclve se/lnuad .all seduuad shad be pie%•euled fiom eutaing shun chants. ditches 01 watacom, es PAVED WASH RACK E FENCING AND ARMORING I DRIP LIFE SNOW FENCE BOARD FENCE - •. fl. .dam I. A it I� Y�r+� CORRECT TRUNK ARMORING r aw TRIANGULAR BOARD FENCE 3.38 Source: Va. DSWC Plate 3.38-2 1992 3.05 CONSTRUCTION OF A SILT FENCE WITHOUT WIRE SUPPORT () 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. FLOW 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 4^ 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. i FLOW SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD RE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) Source: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, Sherwood and Wyant iCOTT R. CI?LLINSZ Lic. No. 035791 a 12/07/20�� z z w w � � J O O 01 0 g it: a a m z z Q ,A O O V/ Uri Z U Utn Z (n W W J W J > O z a Q Q O w w II�1 V) U) > DO m to Z a a g W < ~ < CL < LU H z CL Q o o z w w ai w w W N N � ON N N n W N .H .� rn N M WN W� N N ZW I- � 1--1 L9W F-+ C) Piste 3.05-2Wff h z_j QII < ^C�_ Q Vl Q \ LU W II J Q J � H� Q (n z w z a J Oa �j/ J L_L Q z U O U I Up�j� win W IG-I LU u) z C6 � z Uj 0 Uj M V 1 LU I- I w iOL U) w JOB NO. 192036 SCALE 1"=20' SHEET NO. 3 Z_ DRAINAGE ARE z W A_TO SEDIMENT, sr _ frT! ST - ST _ 5! -ST_ - FLU ' ■ - - - - ------__- - U.S. ROUTE 29 (NORTHBOUND) iz'x7o' MIN. OF THE EXISTING ASPHALT \ � ( PROPOSED RIPRAP\\ PROPOSED ORANGE SAFETY FENCE TO ENCOMPASS / / SEMINOLE TRAIL ` C� ENTRANCE SHALL REMAIN AND \ 1 \ PLUNGE POOL WITH SEDIMENT TRAP AND ITS OUTFALL AT ALL TIMES / o � VARIABLE WIDTH PUBLIC R/W � FUNCTION AS THE CONSTRUCTION PROPOSED 4.iv\ 12" PVC RISER, SEE � FOR SAFETY. INSTALL SIGNS AROUND TRAP THAT/ '� PROPOSED ON ITE LIMITS OF I I PROPOSED OFFSITE LIMITS OF WIDE STONE WEIR \ DISTURBANCE = o. 6 ACRES ENTRANCE FOR ALL THREE PHASES \ DETAILS, SHEET 4 \ 5 i DISTURBANCE = 0.58 ACRES OUTFACE \ \ READ "DANGER, QUICK SAND, DO NOT ENTER' W W w W ° r lop sr sr v sr - .. • . c j. i °". . • . \ - sr / sr - sr sr ST s sr \ Sr \ -s _ ❑ o o" o��\ s ST� s - - py�� _ /" / / SY ST sT Si •3f ST ST T . a a-_: S1%1 Si e 2 St It ST / off sr PROPOSEDFILT XXRUNOFF / Wvv DIVERSION, SEE DETAIL-SHEET3 iCOTT/R. M-LLINSZ Lic. No. 035791,a 12/07/20 4j F- F- 40 � � - _ PROPOSED PLYWOOD BAFFLE , --`- - / \ ■ / ST1 ; \ 4 H x6LONG \' � /, I) I II \F i 'TM 61 129 zo _ HIGH T � 0 0 - -- - -- -- _ ' ' ' ' N/F J.C. PENNEY PROPERTIES, INC F- m Z Z Q DB 1906 Pc 72s ' � � o 0 NOTE, FILTREXX RUNOFF DIVERSION / / l ' ' ' �I - r U z w w j / / - _ ' \ \ \ / DE1 4355 PG--625_ - - _ �' U U THE OFFSITE UTIOLIBY WORK ACROSS / / ' \\ ' o g 0 ac E&S MEASURE / 1 -- NOTE: R/W DIVERSION TO BE �" __ 480 a a a o THE EXISTING PAVED PARKING LOTS /' PROPOSED LIMITS OF DISTURBANCE INSTALLED ACROSS ENTRANCE \ / / / SILT FENCE TO - ) \ , - - _ o w w N / i.i ACRES \ ENCOMPASS O W � Co Co z 4 TO ENSURE RUN-OFF IS --- _ H DIVERTED INTO SEDIMENT TRAP / --- / STOCKPILE _ ,� J o- PROPOSED LOCATION j LOCATION - ' _ _ a a Q OF FUEL STORAGE / % - ? o o z - - -- -- PROPOSED LIMITS OF I ITH EXINCE & > vwi U. I V = k _ - - - - - - SILT FENCE COINCIDES WITH EXISTING > > PROPOSED \ � _ DD W � � TO OUTFALL INTO \ I �i I I _ _ �LJ PROPERTY LINE SEDIMENTTRAP \ �� 475 - 1/ ---- -- \ - - - - i ' -- - -- - - - - - - - AMP 6_ 8 ' i CAVALIER COUNTRY B PROPOSED Y BANK � � _ LOCATION OF DB 527 PG 43 I - - DUMPSTER(s) - _ - - - - -- QQ DB 327 PG 228 (PLAT) - - - -- --- \ �"U DB 468 PG 456 (PLAT) I - -- PROPOSED ° LOCATION OF ` i' - - - , ' / / / CONTRACTOR PARKING PORTA-POTTY ' PROPOSED z' DEEP GRADED DEPRESSION V A / / i' WITH ARUBBER MEMBRANE LINING TO AW -&STAGINGAREA; -- -'' / // o 0 0 0 PREVENT SOIL INFILTRATION, SHALL BE - - ! - -- - - / 1 / /' m � PROPOSED \ / // ^ °D N o USED OR THE CONCRETE WASHOUT AREA. "' LOCATION OF - \ - - - - - - /'/ \ rn or4 N ' ' - --- -- -- --RAIN GAUGE Sediment Trap Design 1 -1- - f PHASE_I DRAINAGE ,'' PROPOSED OFFSITE LIMITS OF - - --- --- ' � � - � � - -' Z � x ' drainage area (acres) (<3) 0.69 1' VARMLE DISTURBANCE =o.58 ACRES N� -- -AREA TO SEDIMENT � TS L trap volumes: OREST Or STONE WEIR Vutu9tE' _ , ■-- - ---- TRAP=o.69-ACRES--- elevation (ft) area (sf) volume(cf) wlume(cy) CRDOND ----- / / \ _4 -- - - - - / / 470 231 0 0.0 aEV a ' PROPOS D LIMITS OF DISTURBANCE . \ / / / / i.> ACRES - / a M-l! 470.5 349 144 5.3 DRY STORAGE - vvensLc - - - - --- ---- / / \ a 471 481 351 13.0 - _ - 472.5 626 1,178 43.6 PROPOSED ONSITE LIMITS OF /` \ - I p _ 473 783 1,530 56.7 IET STORAGE DISTURBANCE=o.56ACRE5 00 w 473.5 950 1,963 72.7 (00CAVATED) .- wu. i' * - TP, / 1 I j = / / / / / \ z ELTER OLOTN MGINQ _ O -_ caouNo - - 1�. d / / _ - - - J 474 1123 2,480 91.9 1 nEv------- /�------- /LPL 474.5 1303 3,086 114.3 -- -- 475 1489 3,784 140.1 / •SEPE TE 3.13-1 COARSE AGGREGATE CUSS I RIPRAP /N/ ___ CONTRACTOR SHALL INSTALL SILT FENCE & TREE / PROTECTION ALONG THE REAR OF THE PROPERTY. THE SILT / I I m /' ' wet storage: ' FENCE SHALL REMAIN IN PLACE UNTIL THE SEDIMENT TRAP / _ - ¢ e- z wet storage required (cy) (67*DA) 46.2 = _ - - - - - - - HAS GRANTED APPROVAL IT MOVA C a _ . IS CONVERTED TO A PERMANENTS FACILITY & THE ES bottom of stone weir (ft) 473.0 __ F / 9 a d wet storage prodded at this elevation (cy) 56.7 _ _ _ - - - - - - ..� IN• L \ / /� N > J INSPECTORS RE / / slope of wet storage sides 2:1 - _ _ - _ = -- _ _ "� _ v - I - - / / p 0 weir length (ft) (6xDA) 4.1 _� � r- A - so, -_- \ / / I I - - / / LU dry storage: bottom of trap elevation (ft) 470 V A ivTANAGED � N \ / / dry storage required (cy) (67*DA) 46.2 bottom trap dimensions: 34'xT POW-\ \ CEP SLLOPE� �� _ ' J z crest of stone weir 474.0 top of dam elevation (ft) 475 -' I I; �� V �� �� \� - / , - ' H 0 dry storage prodded at this elevation (cy) 91.9 top width of dam (ft) 4' / ' _ \ \ V / U slope of dry storage sides 3:1 top trap dimensions 85'x24' / \\ \ - - - - - o V) PROPOSED 12" TEMPORARY PERFORATED RISER TO \ \ v v DRAINAGEDIVIDUE(TY .) \Uj v CONNECT TO EXISTING DROP INLET WITH PERMANENT v \ V A o Z v �12" HDPE. INSTALL 8' OF THE PERMANENT 34.71 LF W W W V v v v �\ V �A W OF 12" OUTFALL PIPE FOR TEMPORARY OUTFALL �� A v / �5D6 �� P 61-134A AV o W PROPOSED RIPRAP PLUNGE POOL AT SEDIMENT TRAP FROM SEDIMENT TRAP. \ \ \ �i . N/F ALBEMARLE BANK AND TRUSTC0MP NY L9 F� O I --I OUTFALL WITH TEMPORARY PERFORATED RISER. \ \ \ 0.908 ACRES PG 507 SF)t INV. IN AT INLET = 466.19\ \ OTTOM OF PLUNGE POOL = 471.0 I v v v v �� \ DB Gas Pc sos _ - \ P INLET AT TEMPORARY RISER = 466.38 C) W STOP OF PLUNGE POOL = 473.0 r \ FLOW DIRECTION \ \ \ O� TOP OF TEMPORARY 12' RISER = 472.0 AV ARROW(TYP.) A A � W I // \ Q nST- ST �-ST�Sr- sr o o oe i AV A TMP 61-129 �� \ \ \ / vJ U O ST sr 9 0 0 ° o / ° o° e v o' ° o / / \ \ N/F J.C. PENNEY PROPERTIES, INC ° ° o DB 1908 PG 726 DB 4355 PG 625 GRAPHIC SCALE / / F, v Lu �O 472 473 ' \ \ \ \ J I /' / zo 0 10 zo a / j j j / � �..�..� W o \ \ I i ----- ---------------y- 4 V ( IN FEET) i LW W /� -- - -475-�� A \ / / ' \ 1 inch = 20 ft. U) 475- PROPOSED 2' WIDI� i i - - - - - - - - / [� a- - STONE WEIR �- - LU WOUTFALL Z � w In -J _ ST ST sT \T ST-ST-ST-ST 1 ST ST ST ST 5T ST sT ST T - sT ST ST U hr / ST - ST 3 _ 471- / / - - fa t�s s-_x--x--x--x--x _-- ---/-2 ■■�W -473 W _ ��� ' _- �6�- T---------- - � IVn / - - �� �• \ \ - ' I - - - - - -- - -- --- - - - - - - - - - - - - - - - - - - oN _ ora - o" -off-- - -- .. , \ --- �� - - 1 " OH - off OH - - i J\ri --�/ I'�// -- G"- ---- ' r� Lu { _ - -- - _ _ JOB . -- t ��- --472- --. \ _ � � � _- s�/ _ �Isrt1�E5 �_ � �_ � � � � � � � ®. � � �-� � � � ---- s / i a U)_ ' " - //4%p�rx =(a 192036 // s> DRAINAGE AREA _ _ _ + \' / SCALE J / - - - - - NOTE: SEE SHEET S FOR DETAILS ON - - - - / i i \s / SEDIMENT TRAP #z NOTE: SEDIMENT TRAP z TO BE INSTALLED PRIOR TRAP# 2 =0.16 AC - - C ■ -- -- - - AS SHOWN _ _ / TO SEDIMENT - / - - -` 5/ \ TO THE INSTALLATION OF THE OFFSITE SANITARY z J a ■ SHEET NO. ' V ' SEWER AND SHALL BE REMOVED ONCE THE SEWER - _ /' Ss\ ss �� WORK IS COMPLETE AND THE AREA IS STABILIZED. `� 4 >z' o' MIN. OF THE EXISTING ASPHALT \ ( PROPOSED RIPRAP U.S. ROUTE 29 (NORTHBOUND) x7 \ PROPOSED ORANGE SAFETY FENCE TO ENCOMPASS J / / SEMINOLE TRAIL C ENTRANCE SHALL REMAIN AND \ 1 \ PLUNGE POOL WITH SEDIMENT TRAP AND ITS OUTFALLATALLTIMES / Tjj �F L PROPOSED 4.1 v v / T � / FUNCTION AS THE CONSTRUCTION >z" PVC RISER SEE \ PROPOSED ON ITE LIMITS OF Z VABLE WIDTH PUBLIC R/W \ WIDE STONE WEIR \ \ FOR SAFETY. INSTALL SIGNS AROUND TRAP THAT/ / l W w _ J PROPOSED OFFSITE LIMITS OF \ENTRANCE FOR ALL TH EE PHASES \ DETAILS SHEET 4 \ DISTURBANCE = 0.56 ACRES p DISTURBANCE = 0.58 ACRES OUTFACE \ \ READ "DANGER, QUICK SAND, DO NOT ENTER" / / Z w -- 6 v W W W �- �✓ SCOTT R. LLINS� - - - U L1-- 5T _ IT - A A V V o � Lic. No. 035791,'1� ST -.......... ...... . sr sr .� IT - ' , .. \ \\ IT sT sT T sr _ o" •d 4' _ IP / / i-= _ - 5T - - - - sr ❑ a z o7 zo - - W I� (��'�`- sr s IT -� IT - ■_ sr _ ., .; I _ e S °H ONE SrONAL sr- sr-osr IT MIN �� W I-VII �� O / ' _-- / / EXX ETRUNOFF f� s PROPOSED FILTRDETAIL-SHEETS - � � � DIVERSION SEE / " ■ ■ -� x- I \ � // � //JC// / F- F- LEI LEI PROPOSED PLYWOOD BAFFLE / q - �/ // / / - / ¢ O O > ST1 ---- _ 4' HIGH x 64 LONG k I II / ' z ¢ / - - ,---- / / / TMP 61-129/ g a + ■ / - N/F J.C. PENNEY PROPERTIE> > ¢ _-- A DB 1908 PO 726 � Vl O O NOTE, FILTREXX RUNOFF DIVERSION l / / - __ - / /+ / DB 4355 �G 62� - - i U) Z w w > E&s MEASURE TO BE UTILIZED FOR ! V- I o g THE OFFSITE UTILITY WORK ACROSS / / NOTE R/W DIVERSION TO BE PHASE II DRAINAGE O z a O THE EXISTING PAVED PARKING LOTS ' PROPOSED LIMITS OF DISTURBANCE INSTALLED ACROSS ENTRANCE / / SILT FENCE TO \ - ) \ - -- o m m `n / 3.34ACRES TO ENSURE RUN-OFF IS % AREATOSEDIMENT ENCOMPASS ' \ > J J Z > ¢ ¢ g DIVERTED INTO SEDIMENT TRAP -'---- TRAP=0.69 ACRES / STOCKPILE _ _ LU LU L PROPOSED LOCATION / LOCATION - - - / ~ z - Z o 0 - OF FUEL STORAGE / _ w w U. -- S i DD \ ' PROPOSED LIMITS ISTURBANCE &' / / > > / / / / / i i i --<> - / - - - SILT FENCE COINCIDES WITH EXISTING i w w / PROPOSED WASHRACK ; ,' / _ -- - - / TO OUTFACE INTO \ I/i/ I ` ` D - --- r PROPERTY LINE / SEDIMENTTRAP %� _i F11 Lam TMP 61-134 i - �r�-- -- ROPOSED ----' / -LOCATION OF / 8 / CAVALIER COUNTRY BANK �I _---- - DUMPSTER(s) ) I DB 527 PG 43 -- _ - / DB 327 PG 228 (PLAT) ��. -- (PLAT) DB 468 PG 456 / PROPOSED / o LOCATION OF / - Z _ PORTA-POTTY PROPOSED z' DEEP GRADED DEPRESSION I - - CONTRACTOR PARKING ly-- - - / / / / / i WITH A RUBBER MEMBRANE LINING TO ` - STA6HVG frREA _ o - _ / / / / / N N N N / PREVENT SOIL INFILTRATION SHALL BE - - \ - - -- �/ •• / / a0 N c ------ -- , -�.. - /- - - - -- - PROI'OS D.. / A / A � __�/ jai � � o USED OR THE CONCRETE WASHOUT AREA. - - - - - - - _ / / / rn ----- LOCATION OF / / ------ / / -AIN GAUGE PROPOSED OFFSITE LIMITS OF--------------_-�� i ----=d87- DISTURBANCE = 0.58 ACRES PROPOS D LIMITS OF DISTURBANCE ---------------- i 1-14ACRESillllllllllllllllllll - - - - - -- - 4 -- --�' // - �V - / / \ iL9 -----------x --r_- �- y/ vII--�_U__ _ - - - - PROPOSED ONSITE LIMITS OF ------- m / / - - DISTURBANCE = o.56 ACRES - - - / Z Q x� TP 1 �� 1111 �_- --� // /// - �, / ao /� //////////---------- N ___ / � CONTRACTOR SHALL INSTALL SILT �NC� w TREE � O / N PROTECTION ALONG THE REAR OF THE PROPERTY. THE SILT / I I = m FENCE SHALL REMAIN IN PLACE UNTIL THE SEDIMENT TRAP \ -¢ Q - / // // // 0! / M Sediment Trap Design #2 �• PERMANENTIS CONVERTED TO A SWM HAS GRANTED APPROVAL IT RE MOVAL. REMOVA C INSPECTOR / I LL drainage area (acres) (<3) 0.16 v.awe�' - __ _ - - % �• _ � of // // W N / trap volumes: CREST OF STONE WEIR - f z - - _ : // iatuDLE' _ - - - - - _ ' - - - / / W elevation (ft) area (sf) wlume(cf) wlume(cy) �"� \ �l 1 -- - \ / I I - / / N �a o \ , ' J z 459 55 0 0.0 ELEV. - - - � \r" \ \ MANAGED � : \ \� \ � / I / / N J 460 95 74 2.7 \ \ \ STEEP SLOPES \ \ - - - 0 DRY STORAGE H „ vwave�E � / � / ', 461 140 191 7.1> U \ \ 2 462 185 353 13.1 463 265 577 21.4 WETSTORAGE `' - - I ,--, Uj z (EXCAVAED) DRAINAGE DIVIDE(TYP.) �464 315 866 32.1 vLrErt uor" o �D o > W r_ 2: see PLATE 313-1 conas�u AGGREGATE- css x Rwwv / \\ v v v A606 �1 MP 61 134A� �� - - oL9 0 'E�) / V A N/F ALBEMARLE BANK AND TRUST COGIAPANY �� 0.908 ACRES (39,547 SF) / 1 Uj A V A A DB 646 PG 508� A J wet storage: v vV v FLOW DIRECTION �� V ARROW (TYP.) ��(� / wet storage required (cy) (67 DA) 10.7 v v v I vv O \ v v Q 0-6 V v I v � \ bottom of stone weir (ft) 461.5 wet storage provided at this elevation (cy) 10.7 v \\ \I v v - - - - - - \ \ x slope of wet storage sides 1:1 v v TMP 61 - 129 �� A A V U 0 p g II weir length (ft) (6x DA) 2.O \ \ / \ \ \ \ N/F J.C. PENNEY PROPERTIES, INC \ \ \ \ \ \ _ - - / / / ' _ I I I I / / \ DB 1908 PO 726 A _ V I dry storage: bottom of trap elevation (ft) 459 / GRAPHIC SCALE \ DB 4355 PG 625 0 F ' dry storage required (cy) (67'DA) 10.7 bottom trap dimensions: 5'x8' / \ \ \ / / 20 0 10 20 40 v \ / / / / crest of stone weir 463.0 top of dam elevation (ft) 464 I / / / / / � w Uj dry storage provided at this elevation (cy) 10.7 top width of dam (ft) 3' / / // / slope of dry storage sides 1:1 top trap dimensions 15'x18' - { IN FEET) W NINE .1\inc = 20 ft. x-x x x-x-x x-x x-x �x-K x-x x-x x-x-x-x-x-x='k-x x x x // // EROSION & SEDIMENT CONTROL LEGEND - - - - \ Q VIRGINI- PROPOSED 2' WIDE - - - - �� --- / / / / �� � Z of HANDBOOK KSPEN&SED/MEUNT CONTROL _ _ -N ---- - - - - _ - -- / _- _ - / // --- ----------- L a HANOBOOKSPECIFICATION NUMBER -NONE WEIR OU TFALL-- - / PROPOSED z' WID� � STONE WEIR / / (^ -s CE CONSTRUCTION 3.02 -- - - - - - - -_ __ OUTFALL / ` �� �J / W W - W Uj ENTRANCE _ - / / i / _Z �i SF X SILT FENCE 3.05 - - - - - W . i - - - \JST ST ST ST ST ST ST ST ST ST ST ST ST sT T ST sT - ST -- kT / ST ST sT - ST - mommi ClP A, CULVERT INLET 3.08 - - - - - - _ - - - - - --- - T-- - - - • 46 - - - - - - - - - E i-Ei E - x x -x -x -x x - � _ ..... NO ME ME v :J l PROTECTION - _�- - _ _ - - - -�k- -xxx -x �x x-xx-x x �x ���-fr:t f1f7-� _ _-- r----___� - -- - - -- ----- -- -4 --- ^ - w OD -♦-'- TEMPORARY 3.09 - - ■ - - - - - --- - / - - - - - -- - - - - - - i-� - - - - ■ W DIVERSIONDIKE --- ----- �...------� - �_ RW �� TEMPORARYRIGI 3.11 457-� T OF-WAYDIVERSION - -- -- - - �) / / I ■ I -� _ _ * - - - - - - - ' - - - - - - - - - - -- - ST O EN TEMPORARY 3. 13 -- / / _ -- _- _ w-j --- -_ - - - -- - - - - - -- -- SEDIMENT TRAP l / / �� - 1 - - - o" __ 1"" / / / --- _ / - RR RlP21P 3,19 / / / i o" - - _ ) / I _ _ - - - - - - - - ��/� H //o" °"-a" " �_ �/� _+�' -/ / / H °"--o"-o"-0H _--------- so -cY' ��CJ w LU TS TS TEMPORARY SEEDING 3.31 / / / /-/ -/ / - - o" �, °N - - _ - l r �S - o" - -'"'h' - o" v - - - - / - / -� -LEI PS PS PERMANENT SEEDING 3.32 / / / / / J • S/ / / / / -trii /. �_ -��- `� a. - I� , d JOB NO.N IS ST Tp TREE PROTECTION 3.38 s may...1. 192036 / - GRAPHIC SCALE_ _ DRAINAGE AREA OC DC DUST CONTROL 3.39 SCALE / l / ' _ / \ / / / sr NOTE: SEE! 5 FOR DETAILS ON T O SEDIMENT / 10 0 5 ,0 20 SEDIMENT NOTE: , - / TRAP#2 =o.3.6 AC a ■ r'=zo ALL DISTURBED AREAS NOT PAVED MUST HAVE A / /� / sN 'NOTE: SEDIMENTTRAP zT0 BE INSTALLED PRIOR \ C PERMANENT VEGETATIVE COVER AFTER FINAL ! \ TO THE INSTALLATION OF THE OFFSITE SANITARY s ■ SHEET NO. GRADING IS COMPLETED. / /� / I - - ( IN FEET) SEWER AND SHALL BE REMOVED ONCE THE SEWER / WORK IS COMPLETE AND THE AREA IS STABILIZED. "� 5 1 inch = 10 ft. sS / / / /� / NOTE: CONTRACTOR SHALL ENSURE AN / / ADEQUATE GRAVEL OR PAVED CONSTRUCTION / / / / / ENTRANCE IN ACCORDANCE WITH MINIMUM VESCH STANDARDS. CONSTRUCTION ENTRANCE SHALL BE A MINIMUM OF 12'x7o' AND SHALL / REMAIN UNTIL APPROVAL TO REMOVED IT HAS / / / BEEN GRANTED BY VDOT & THE ESC INSPECTOR /SCOTT R. LLINS� / / / / \ C-) a Lic. No. 035791, / / U.S. ROUTE 29 (NORTHBOUND) 12'x7o' MIN. OF THE EXISTING ASPHALT C / J / o J o / SEMINOLE TRAIL C� ENTRANCE SHALL REMAIN AND \ \ PROPOSED ONSITE LIMITS OF / / 0ro� 12/07/20 rQ L� VARIABLE WIDTH PUBLIC R/W ` PROPOSED OFFSITE LIMITS OF FUNCTION AS THE CONSTRUCTION 5 / m / / / / �SSIONAL E�Gl ENTRANCE FOR ALL THREE PHASES \ \ DISTURBANCE = o. 6 ACRES Z w --_ o DISTURBANCE - o.58 ACRES v - v z p - W W W�1�/ c� \ ur-- ST - Sr ST ST \ ST x-sr sr •. ..-... .. �.' IP ST s ST Sr -_- ❑ oH� ST- SS ST •».: / 6 . [ J - - _ ST - - - 6 / \ Sr l 0 _�.W / "- /- /`\� s/�-s �sY—ST- .ST- s. ~..•.o. sr_--...•. -. - - \s \ °H OHEi ram_ / _ o / / sr —sr_ T •' .. .* _ ----sr-- D:` ..�/ _ - / o s sr L' IP — — Sr I P / WD °oN -------�---- ------ / ❑ - o---- - - / WM Mn�M M M M _� S V� / �/ PROPOSED FILT XX RUNOFF vv DIVERSION, SEE DETAIL -SHEETS - 0 PS El z F DETENTION BASIN 'B' r RRORO €D+_�NDE GROwvD-= - - -- - - - TMP 61-129 - - a n \ \\/ -DETENTION SYSTEM ",4'" 1 N/F J.C. PENNEY PROPERTIES, INC / w - - . - DB 1908 PG 726 - -� A A \ / DB4355 PG-,625- H P z ow nw z NOTE, FILTREXX RUNOFF DIVERSION ___ / PHASE III DRAINAGE V - , AA V �' - / A\ 0 w 0 w U. / E&SMEASURETOBEUTILIZEDFOR // - - / .. / o THE OFFSITE UTILITY WORK ACROSS / AREA TO SEDIMENT W w w THE EXISTING PAVED PARKING LOTS / / PROPOSED LIMITS OF DISTURBANCE / \ �' — °CCL / / , — / 1.14ACRE5 TRAP=o.69 ACRES \ ' ; PROPOSED 5' WIDE CURB CUTS WITH PEA \ / - �r - ! / GRAVEL &FILTER FABRIC UNDERLAYMENT- ' / TO DIRECT RUNOFF FROM PARKING LOT \ / e_ P O OSED LOCATIO- �\ - ' INTO DRY DETENTION BASIN 'B' ST - 484.0 TW PROPOSED LIMITS O ISTURBANCE & 478 D BW / / PROPOSED WASH RACK V // - - - - SILT FENCE COINCIDES WITH EXISTING TO OUTFACE INTO / �% __� y� - / I - �r �� / - PROPERTY LINE / y SEDIMENTTRAP Imo- ��-�i ii A ------ �` r- -- - _LOCATION O ROPOSED �- j --- ` i / TMP 61-134 PROPOSED 3.5' WIDE CURB - - �� - I / CAVALIER COUNTRY BANK CUT WITH PEA GRAVEL & r - .�� - - N r�u DB 527 PG 43 FILTER FABRIC UNDERLAYMENT . DUMPSTER(5) TO DIRECT RUNOFF FROM L - ---- °- / - - / N c DB 327 PG 228 (PLAT) I - - - 478.0 TW • _ / \ - �' / / o N Cl DB 468 PG 456 (PLAT) PARKING LOT INTO DRY ��. 477,BW PROPOSED ,�-- / \ / o \ ' / ^ ~ ~ DETENTION BASIN 'B' _-- - LOCATION OF ORTA-P TTY PROPOSED 2' DEEP GRADED DEPRESSION,I _ &STAGING AREA O / WITH A RUBBER MEMBRANE LINING TO / / - o / -- �� / PREVENT SOIL INFILTRATION SHALL BE - - --- -- -- ' USED OR THE CONCRETE WASHOUT AREA. / - - -------_PROPOS } OCATIONOF 0 -- -- - - AIN GAUGE ' PROPOSED OFFSITE LIMITS OF - - ----- - ------------�--467---�-y / --\ ---- / DISTURBANCE = o.58 ACRES / /----------- —4 ---- --- / / / / I` PROPOS DLIMITSOFDISTURBANCE lH-----------------` / i -� M M / 1.14 ACRES - 493 - � ------------- -- x \ 1 M - \ INly _ - - - - - - PROPOSED ONSITE LIMITS OF �/ ' �" x - 1 p / - / / / / Q - ----- � DISTURBANCE =o.56ACRE5---- x� - �— \ �a —� / ///// 01 M d - - �) �' -495- - �� I dp ------ - J ------ --- - -- - - / - _ _ ' / / / / / - _ _ - _ __ _ - - -% - / ///� CONTRACTOR SHALL INSTALL SILT FENCE & TREE / /I - p w / / / - - - - - - - - -- - - = - - - - - - - - / / PROTECTION ALONG THE REAR OF THE PROPERTY. THE SILT / = m / / / N, w - FENCE SHALL REMAIN IN PLACE UNTIL THE SEDIMENTTRAP l - - Q a - / ' / / c� J _ _ _ _ _ _ _ __ _ _ - _ -_- _ _ _ - _ _ _ _ __ _ IS CONVERTED TO A PERMANENT SWM FACILITY & THE ESC J z INSPECTOR HAS GRANTED APPROVAL OF ITS REMOVAL.\'� / I > / / _ _ _ _ A / / W / /M / \ W STEEP _ �%� / \ \ / i L9 H Q /' / / �� A \ ----- W / / / / I V �/\ DRAINAGE DIVIDE (TYPJ E2 / �/ ° z Q 06 // / / / / / �I / vv �/ �506 v TMPy61-134A �ST C0A\ --- o x Z �N/F ALBEMARL0.908E ACRES (39,5BANK AND 47USF)1dPp.NY \� [ � O / DB 646 PG 50 v V) vv �v A / �\ V A \ v v FLOW DIRECTION \ V A� / .r 1 // v�\ v v\\\ V AvRROW (TYP.) \ / /1 v / W w W v \ \ o \ ul C/J ____ V TMP 61-129 A \ N/F J.C. PENNEY PROPERTIES, INC DB 1908 PG 726 DB 4355 PG 625 /1 _ - ' / ,W,.,// �w \ W V N,/ / PROPOSED2'WIDt` ' �� /'-------- L �� / / / / / j / / [� Z STONE WEIR i' / // / � OUTFACE�� / Z w// /�/ W \JS! ST ST \ ST ST ST ST Si ST ST ST ST S< ST ST ST__ST ST _ i ST - S \ / / / _-- fix- -xx x-x fx x-x x-x_ la - - - _ - _ x-x-x-x-x x - - _ _ _ _ - - - --- __ _-- ---- o N / -F -- -� - —r''- -------- -- - - - -- --- /- — — — — \ - / \ // x i 0 cv r _ \ / - �-- —1--- - - ----------- - ---------°H_oH—off—or+ OH GH oH_OHon_aH_OH—_ _//� j % U H /� - - /-- ss e'` \ / / / / I W °ay �H/ — °H — — — ' �— \ r / � \ \ / S / �' JOB NO. / — /' s /� / l l 192036 s, DRAINAGE AREA — GRAPHIC SCALE / NOTE: SEE! 5 FOR DETAILS ON 20 0 -to 20 40 / S / / ' -- �/ /`'i / / � TOSEDINJENfi� '- /�' �— / / I SCALE SEDIMENT TRAP #2 TRAP#'2 =o.16 AC - - C , - m OIL / 1"=20' NOTE: SEDIMENT TRAP 2 TO BE INSTALLED PRIOR C / / / / / Cr TO THE INSTALLATION OF THE OFFSITE SANITARY s e ro , - ( IN FEET) / / I SHEET NO. 5 / SEWER AND SHALL BE REMOVED ONCE THE SEWER i ' 1 inch - 20 ft. / / / �ss , WORK IS COMPLETE AND THE AREA IS STABILIZED. / / V 6 'Kt-UtVtLUIJIvIt:N 151 UKFI VVA I tK IVIAINAULMLIN I NLAIV SCALE 1"=3D' I'U51-UtVtLUIJIVIt:N It) I UKlvl WA I tK IvIANAULIvIlLIN I NLAIV SCALE 1"=30' RAPHIC \ CAL / A Pre -Development Impervious Area Summary GRAPHIC \� CAI / - Post -Development p Impervious Area Summary Ira 30 o) 15 30 so 120 / \ Subarea A Subarea A Parking Areas 125 sf ( IN FEET) 1 inch = 30t / U.S/ROUTE 29 (NORTHBOUN9J \ / SEMINOLE TRAIL / \ VARIABLE WIDTH PUBLIC IRIW I I / \ \ \ vN �W W \ 2 - ITLl sr IT sr-sr-sr-,ar-sr -. .. .,_./ ,. •......: � � -. .: -- -, .+ to --__--__->_-- _ - IN/ - i i / / - - �A 2 0 o (DEFINING PRC-DEV.SUBAREAS A & B) IS""�� / LOCATED -ATTHE POST-DEVELOPMENT's'yv / &9CURB CUT (DEFINING POST-DE� it' / SUBAREAS A _ PHASE I (PROPOSED WITH THIS PLAN 1 TORECIVE SWIM TREATMENTWA UNDERGROUND. DETENTION SYSTEM-- / &DETENTION BASIN'S' / A SMALL PORTIONfdF TH EXISTING OFFSITE / IMPERVIOUS 9REAS ASS CIATED WITH THE / ENTRANCE ARE RELEASE ONTO RTE. 29 / BELOW, FOR SHEET FLOW MANNER. THI OFFSITE DRAINAGE / / - / SEE�THIS SHEET, WILLRONTINUE T IN THIS MANNER IN � _ - - -A- /T E FULL DEPICTION OF THE /THE POS-DEVELOPM NT SCENARIO. \ j, _ / ESC LIMITS OF DISTURBANCE. 4 456 - SUBAREAS A & B 0 .78 ac- IF _ CN=57 PROPOS D BOUNDARY FOR THE ESC LIMITS • - 1 Tc0.16 h�s. j h / - - OF DIS RBANCE (1.14 ac.) DEFINES THE Ar PROP SED BOUNDARY FOR THE VRRM '. -491- WATE QUALITY REQUIREMENTS, TYP. / • - 4 9 6 - . / / / / / - - - ao / / /1o00FOF oW _0 ELEV.=16' & 150' OF SHALLOW- CONC. FLOW w/ A ELEV.=18' ! / I I ' -5 / • II -501- O All, 41# 4 o /' y� /�� /�/ \411 UNDEVELOPE�� I O General Construction notes for Stormwater Management Plans `\ \ \ . �� PORTION OF 1. All dams and constructed fill to be within 95% of maximum dry \ �. . THE SITE / density and 2% of optimum moisture content. All fill material to be approved by a geotechnical engineer. A geotechnical engineer is \ \ \ \ •e S• �� ' ^ \ \'V / to be present during construction of dams. 2. Pipe and riser joints are to be watertight within stormwater management facilities. 3. For temporary sediment traps or basins which are to be converted to permanent stormwater management facilities; conversion is not to take place until the site is stabilized, and permission has been obtained from the County erosion control inspector. WATERSHED SUMMARY FOR SUBAREAS A & B CN Area, 1-year Flow, 2-year Flow, 10-year Flow,j/ v // // ac. cfs cfs cfs / / v - / DA A & B (Pre-Dev.) 57 0.78 0.13 0.34 1.33 Area, 1-year Flow, 2-year Flow, 10-year Flow, CN ac. cfs cfs cfs \V A DA A (Post-Dev.) 66 0.54 0.04 0.10 1.26 DA B (Post-Dev.) 76 0.24 Total 69 0.78 NOTE: DA A is routed initially through UGD System 'A', and then routed through Detention Basin 'B' COUNTY OF ALBEMARLE Department of Community Development Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities (reference Water Protection Ordinance 17422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: 1. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, culverVpipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide sealed computations verifying that P !� gn. P P Ym8 the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead book references labeled. Facilities and drainage must be within platted easements. Provide copies of recorded documents. 11. Guardrail, fences or other safety provisions - Display the constructed location of all safety provisions; fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Materiel layers - biofilter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Biofilter media must be an approved state mix. 13. Access roads - show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. GENERAL SWIM FACILITY NOTES: 1. CONTRACTOR SHALL CALL THE COUNTY INSPECTOR & ENGINEERING DEPARTMENT 24-HOURS BEFORE ANY ANTICIPATED CONSTRUCTION ACTIVITIES FOR THE BMPs. THIS IS INCLUSIVE OF WHEN THE UNDERGROUND DETENTION SYSTEM SUBGRADE IS READY FOR PIPE CONSTRUCTION, BUT BEFORE STONE BEDDING IS INSTALLED. 2. PROPOSED OUTLET PROTECTION BELOW THE UNDERGROUND DETENTION SYSTEM W OUTFALL TO CONSIST OF A 1o' WIDE, 4 LONG, 18" DEEP VDOT CL. Al RIPRAP LINED APRON WITH FILTER FABRIC UNDERLAYMENT. APRON TO BE LOCATED BETWEEN THE PROPOSED ENDWALL AND THE BASIN FLOOR, AS SHOWN. OUTLET PROTECTION SHALL THEN TRANSITION TO A FLAT/ o% GRADE AT THE BASE OF THE EMBANKMENT& SHALL EXTEND TO THE DETENTION BASIN'B' RISER STRUCTURE TO REDUCE THE RISK OF SCOUR & ORIFICE CLOGGING. FILTER FABRIC UNDERLAYMENT SHALL BE KEYED INTO THE EXISTING GROUND A MINIMUM OF g" AT THE ENDS &ALONG THE PERIMETER. EDGES OF FILTER FABRIC SHALL OVERLA P A MINIMUM OF 12". 3. THE DETENTION BASIN B EMBANKMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS & DESIGNS SHOWN ON THIS PLAN. 4. LOW -FLOW ORIFICE DIAMETERS LESS THAN 3" ARE REQUIRED TO MEET MINIMUM ENERGY BALANCE CALCULATIONS. TO REDUCE THE RISK OF CLOGGING, TRASHRACKS ARE PROPOSED ON ALL ORIFICES AND THE DETENTION BASIN 'B' RISER. ADDITIONALLY, THE RIPRAP OUTLET PROTECTION BELOW UNDERGROUND DETENTION SYSTEM 'A' WAS EXTENDED (AS DESCRIBED ABOVE IN #2) AT A o%SLOPE TO REDUCE THE RISK OF CLOGGING DETENTION BASIN B's LOW -FLOW ORIFICE. ALSO, PRIVATE DROP INLET STIR. 41S PROPOSED TO HAVE A REBAR GRATE TRASHRACK ACROSS ITS THROAT's OPENING TO REDUCE THE RISK OF CLOGGING THE LOW -FLOW ORIFICE IN UNDERGROUND DETENTION SYSTEM A. STORMWATER MANAGEMENT NARRATIVE: OVERVIEW THIS PROJECT PROVIDES STORMWATER MANAGEMENT SWM PRACTICES TO MITIGATE THE IMPACTS FROM THE PROPOSED IMPROVEMENTS. THIS STORMWATER MANAGEMENT PLAN COMPLIES WITH PART IIB SWIM REQUIREMENTS. WATER QUALITY SUMMARY THE STORMWATER QUALITY REQUIREMENTS FOR THIS DEVELOPMENT ARE MET THROUGH THE BEST MANAGEMENT PRACTICE OF PURCHASING NUTRIENT CREDITS. A MINIMUM PHOSPHOROUS REMOVAL RATE OF 1.03 Ibs/yr IS REQUIRED. THE DEVELOPER WILL PURCHASE NUTRIENT CREDITS PRIOR TO THE ISSUANCE OF A LAND DISTURBANCE PERMIT. PLEASE SEE THE ATTACHED CALCULATIONS PACKET AND THIS SHEET FOR ADDITIONAL DETAILS. WATER QUANTITY SUMMARY THE PROPOSED DEVELOPMENT HAS ONE CONCENTRATED OUTFALL. THIS OUTFALL IS DIRECTED INTO A MANMADE STORM SEWER INLET LOCATED ON SEMINOLE TRAIL. ITS DRAINAGE AREA (SUBAREAS A & B) MEETS MINIMUM CHANNEL AND FLOOD PROTECTION REQUIREMENTS SET FORTH IN 9 VAC 25-870-66. SUBAREA A RECEIVES ATTENUATION VIA UNDERGROUND DETENTION SYSTEM 'A' INITIALLY, AND IS THEN DIRECTED INTO DETENTION BASIN 'B'. SUBAREA B's INFLOWS AND SUBAREA A's ROUTED OUTFLOWS WERE SYNCHRONIZED. THE SYNCHRONIZED STORM EVENTS WERE THEN ROUTED THROUGH DETENTION BASIN 'B'. THE RESULTANT DETENTION BASIN 'B' ROUTED OUTFLOWS ARE COMPLIANT WITH MINIMUM COUNTY & STATE REQUIREMENTS. IN SUMMARY, CHANNEL PROTECTION FOR SUBAREAS A & B IS MET THROUGH 9VAC25-870-66 SECTION B.3.a (ENERGY BALANCE) AND FLOOD PROTECTION IS MET THROUGH 9VAC25-870-66 SECTION C.2.b. (SOyr. POST FLOW < SO yr. PRE FLOW). COMPLIANCE WITH THESE SECTIONS IS ACHIEVED PRIMARILY THROUGH THE PROPOSED UNDERGROUND DETENTION SYSTEM 'A', THE PROPOSED DETENTION BASIN 'B' AND THE REDUCTION OF RUNOFF EXITING THE PROPERTY UNDETAINED. PLEASE SEE THE ATTACHED CALCULATIONS PACKET AND THIS SHEET FOR ADDITIONAL DETAILS. 0 15 30 \ so 120 / \ /30 / / Building 2,900 sf ParkingAreas 1,100 sf ( IN FEET) \ / / / / / m Sidewalks & Concrete 1,000 sf / / / 1 inch = 30 ft. \\ � 5,000 5f / / // U.S/ 29 (NORTHBOUNq) / \ I Subarea B \ SEMINOLE TRAIL VARIABLE WIDTH PUBLIC WW \I I ParkingAreas 3,475 sf I \ I Sidewalks &Concrete 475 sf 4,300 sf W W \\ � �\ ,-. IT 31 Q o - - - - - LLI 3 / Z LU 2 m / I- Ltd / / / / POST-DEV. SUBAREA A _ (ROUTED TO UGD SYSTEM A, THEN DETENTION BASIN B) 0.54 ac., CN=66, Tc=0.15 hrs. A SMALLPORTI ENTRANCE C4AR S TO BE RELEASED ONTO-RTE. 29EET FLOW MANNER, .A$ SHOWN.SED CURB CUT &BRAIN LL DIRECT THE BULKOF THE ROPOELOPMENT's RUNOFF ENTION BASIN & DETENTION SYSTEM FOR ATTENUATION. / O POST-DEV. (ROUTED TO DETENTION BASIN B) 0.24 ac., CN=76, Tc=0.10 hm. PROPOS D BOUNDARY FOR THE ESC LIMITS OF DIS RBANCE (1.14 ac.) DEFINES THE PROP SED BOUNDARY FOR THE VRRM / r _ _ _ _ WATE QUALITY REQUIREMENTS, TYP. may/ ------ 193E � u -496- coy 3--� SW /� -- % �(�� �F9✓ -- _ _ / 100 OF oLF w/ A ELEV.=tB', �� / 20' OF SHALLOW CONC. FLOW / w/ A. ELEV.=7'-dt 5u; -_ 186--QF CHAN"PIP E�FLOW IN . / DITCH & PIPE O AL 4%, UNDEVELOPED V� - ' O / J / I I I I \ \ \ • . �� PORTION OF \ / �4f#� THE SITE D"- \ I I I V A\ \\ A 4(# 4P#� v vv v �4114,�♦ �Q CHANNEL & FLOOD PROTECTION SUMMARY Pre-Dev. Post-Dev. Method of 9VAC25-870-66 Method of 9VAC25-870-66 Method of 9VAC25-870-66 Method of 9VAC25-870-66 Subarea Subarea Channel Protection Compliance Limits of Analysis for Channel Protection Flood Protection Compliance Limits of Analysis for Flood Protection A & B A & B Section B.3.a (Energy Balance) Anergy Balance Satisified) ISection C.2.b (10-yr. Post Flow < Pre Flow) N/A (10-yr. Post Flow < Pre Flow Satisified) 'US I-ULVLLUNMLIN I b I UKlvl1NA I LK MAINAGLIVILIN I VLAN, SHUV IIVG VVA I tK QUALI I Y L1MI I b, SCALE 1"=30' / / \ / Impervious Areas within Limits of Disturbance / / / / _ // / / / / - - - - Building 2,900 sf / / ParkingAreas 18,525 sf Xb / / � � � sr sr � ;: IT - - Sidewalks &ConCrete 3,55050 sf / S S sT - r - - - 24,975 sf N xx-x- x-�-X -X 1 PROPOSED SANITARY - _ G x -x -x =x _ _ / SEWER EXTENSION -- --_- TO THE DEVELOPMENT --- - - �_ -- --__ _ - - -- ------- s ' -aH o i - OH OH i l DISTURBED AREAS ASSOCIATED WITH OFFSITE SANITARY SEWER EXTENSION TO BE RETURNED TO THEIR PRE -DEVELOPMENT CONDITIONS, A^� SHOWN. ADDITIONAL CONCENTRATED Qu TFALLS s p SHALL NOT BE CREATED IN THESE LOCATIONS. o q ui� U.1 _ Z O DO PROPOSED BOUNDARY FOR THE ESC LIMITS = Q / OF DISTURBANCE (1.14 ac.) DEFINES THE / U p / ' ' ' ' i f �� PROPOSED BOUNDARY FOR THE VRRM / Q LU - LU 1 I - WATER QUALITY REQUIREMENTS, TYP. i ' / to iCOTT/R. CI?LLINSZ Lic. No. 035791,a L 9/18/20 4J ZZ W f Z O O dIn � t!I O Z U Z ZLU g tL a w O U)> an UJ K < Q 0 u F Z OW. 0 W W LU Z M Z� Q W" lil Lfl h W J J � z LU Lu rz LU O G Icy - LE U Q L_L � LU O CW L0 G z CL LU LU ,J^ V / U U IILWU WO a to JOB NO. 192036 SCALE 1 "=30' SHEET NO. 7 SECTION A-9: TYPICAL GRAPHICAL DETAILS Homogeneous fill / . r---------I I Cut off belch-4' helot alitableI material Solt or rock L - - - - - - - - - - - J TYPICAL HOMOGENEOUS EMBANKMENT Perforated cc FOUNDATION DRAIN 0 Transition fill ,.RoU Or grorM '-Blanket drain BLANKET DRAIN / Send, gold ar rat Amin kiM Rock or grovel Rock La ° driiin IF �Transilion filter Tram -}ion filter CHIMNEY DRAIN TOE DRAIN Figu2-e A -la. Honlogeneom Earbankntems is-1 Seepage Controls EMBANKMENT NOTES: AFTER AN INVESTIGATION OF THE SITE's SOILS, SITE VISITS, AN ANALYSIS OF THE SURVEYED TOPOGRAPHY AND AN EXAMINATION OF VA DEQ APPENDIX A: EARTHEN EMBANKMENT, THE APPLICANT HAS PROVIDED A COMPREHENSIVE EMBANKMENT DESIGN THAT DOES NOT NEED A GEOTECHNICAL STUDY AT TH 15 TIME. SUCH IS THE CASE DUE TO THE PRECAUTIONARY EMBANKMENT DESIGNS PROPOSED. A SUMMARY OF THE EMBANKMENT DESIGN REQUIREMENTS ARE LISTED BELOW, MANDATING THE CONTRACTOR MEET THESE REQUIREMENTS AT A MINIMUM. THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN ON IN THIS PLAN. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC-3 MATTING & THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC-2 MATTING. ALL BERM FILL MATERIAL SHALL CONSIST OF ML, CL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON COMPACTING SOIL. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE A MINIMUM OF 95% OF MAXIMUM DRY DENSITY AND 2%OF OPTIMUM MOISTURE CONTENT, ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. r 1/Z" zinc plated hook attached with 3/8' feaener sIN ® '-1/8" die hale. ® ( P () V ® ® s ®®(D ®®® Iscym cLrlc 14• HDPE late (optional) / P (P Pipe culvert . r,. H➢PP. aroal pia/tic with O 2-1/8- hole.lem and 1/4" te srnturcd Y plastic 0O Colutionn Inc. or equal OO 0000 �" + • shown shun optiocal plate I? -.,R, HnpF aLntolural P Ieellr. with 2-ti hQlee and 1/4" pinta SCC:11011 mamufr.feetured b9 Plastic S.I.LIaD. Inc .r c9 N.l 5 8- its hole 0 0 o O 0 00 0 0 ,Ingle BaP Elevation orlricc DEBRIS CAGE �LASTIC SOLUTIONS P.° »". us86 Ninc9Mer VA 2264 INC. 877-am-6727 rnl.plisix-m1Mlaenm StormRax- ROUND SERIES TRASH RACK CONCRETE MANHOLE STANDARD 601NCH RACK SHOWN DIMENSIONS IN INCHES (OR EQUIVALENT) PLAN SIDE VIEW StannRaI Round Series for Concrete Manhole Part NO. DIM DIMS DIM MI Nbab W,24 17% 14% 23 - 24 30 Its 36 21% 14 40% 36 43 as.re 27 16 s4. 44 S7 Ai60 27}I 16si 66% 60 70 Plastic Solutions, Inc. a 8 PO III.4396. WInchely. VA 22604 M 4Q. Rd. Wlrrj., VA 2260) IBTn a77.5721 gore ISM ppO,ECT ISM 722-2219 N. TOE 9lwsmv RA9NC 9a1R10119.wL FlAencn .IL' ISOMETRIC CONCRETE STRUCTURE DIMENNONS INSIDE STRUCTURE DIMENSION OUTSIDE STRUCTURE DIMENSION AVAILAIBLE OPTIONS GROSS BRACING FOR OVERWIND HDPE ANTI -VORTEX PLATE 617E BPAYIIIBY: AM IR: DETAIL UINUtKUKUUINU Ut I LIN I ILO IN JYJ I tivl A 6( Ut I LIN I IUIN 15AJ11N b Ut I A1Lr SCALE 1"=20' PROPOSED 036" HDPE STANDPIPE (STR. 200) WITH TRASH RACK TO SERV�ASTHE , RISER STRUCTURE. SEE DETAIL ON THIS SHEET, O"QUIVALENT, FOR TRASHRACK. RISER RIM ELEV.=470.65. RISER TO HAVE CA 1.25" LOW -FLOW ORIFICE (INV.=469.00). RISER INV OUT=467.00 (TO EXISTING DI). TQQPREVENT FLOTATION � THE RISER BASE SHALL BE FIRMLY EMBEDDED 6" INTO AN 4JHICK REINFORCED CONCRETE FOUNDATION THAT IS 6'x6', AND BURIED BELOW GROUND. CONTRACTOR SHALL CONNECT 10 PROPOSED DETENTION BASIN B's EX l O ,_ _ - OUTFALL INTO EXISTING DI - 1_< 5 - -.- � S ST _ ��;§ THE FLOOR OF DETENTION BASIN'B'SHALL BE SLOPED TO DRAIN TO THE RISER o. o4fi MIN.. CON TRACTOR SHALL INSTALL A GE NTLY SLOPED CHANNEL ( 5 ) ROUGHOUT. AT THE BASIN'S LOW POINT TO ENSURE POSITIVE DRAINAGET n M M--� 0 - I 470.87 / 4r -- 472 65 - - - �� J - 'A x ��. I 1 V / \ /e I ' / I . I I i 11 1 �� \ 1 i \\ / / \ \ / 4 \ / \/ /\ 472.65' A� /lam \ RESTRICTIVE WEIR PLATE, AT LO \ WW \ POINT, TO DRAIN THE SYSTEM. SEE '�\ DETAIL ON THIS SHEET. 11 �/ \,A ,.� I' I * , ITL $ # • - �. - `-- -/ PROPOSED ELEVATED 015' HP STORM PIPE � - ---- ALLOWS MORE SIGNIFICANT & LESS -� FREQUENT STORM EVENTS TO SAFELY BYPASS - UNDERGROUND DETENTION SYSTEM W - 1 - P *7 � K, . U- 71 11 %'�� 036IN \ \ / o \ PROPOSED io' WIDE GRADEb-SJ�DEWALK WITH A 2% , � 'MAXIMUM CROSS SLOPE TO SERVkAS TOP OF DAM. W-TW W�'f 1v'� SEE GENERAL SWM FACILITY NOTES #2& y ON THE PREVIOUS SHEET FOR DESIGN _ ST s - OF OUTLET PROTECTION. OUTLET - s i PROTECTION TO EXTEND TO RISER TO _ iREDUCE THE RISK OF CLOGGING. / _----� -- -- . - ---- ----- ---- / / / /472.65 \ / i O V � I 1 \ - j ID M T. \ \ - i / V ,- I 'SIT- - - ` { I. J \ _ STORM P1PE, WITH"VDOT STD. PRIVATE PARKING -AREA & SIDEWAL I - • EW 6, TO SERVE AS PRIMARY WITHIN SWM ESMT. TO SERVE AS / UGD SYSTEM 'A' OUTFACE ACCESS TO SWM FACILITIES I " -- i -- i -. / / - 036" INV. --- - 469.25' / I _ SFE THIS SHEET FOR SCALED PROFILES \ - 4_� OF THE SWM FACILITIES, TYP. ,- "\ PROPOSED UNDERGROUND � DETENTION SYSTEM W TO � 036" INV. O � ' ATTE ATE RUNOFF CAUSED / 469.94' :I OM THIS DEVELOPMENT. D PROPOSED STRUCTURES z, y, 6 & 8 SHALL BE 6 - - / - - INSTALLED WITH STAIRS & SHALL SERVE AS ACCESS FOR INSPECTION & MAINTENANCE, TYP. - • ° ( / STR. y SHALL HAVE A REBAR GRATE TRASHRACK - - / _ _ - - ACROSS ITS THROAT'S OPENING TO REDUCE THE C� I69.46' - RISK OF CLOGGING IN UGD SYSTEM A. - 71.50' . e ... - - --- - _ ,; j - - / ST 1I -- V1N1JilltlIlCVU1N1J 1jr-1 F-IN 11V1N a a1D1V1 t1 UNDERGROUND DETENTION SYSTEM GENERAL NOTES: FACILITY INSPECTIONS DURING CONSTRUCTION: 1. TRASHRACKS SHALL BE INSTALLED ON ALL ORIFICES, INCLUDING THOSE LOCATED ALONG THE WEIR PLATE WITHIN THE CONSTRUCTION INSPECTIONS ARE CRITICAL TO ENSURE THE UNDERGROUND DETENTION SYSTEM 15 PROPERLY BUILT. BECAUSE THE TIMING OF THE INSTALLATION IS UNDERGROUND DETENTION SYSTEM, IN ACCORDANCE THE DETAIL SHOWN ON THIS SHEET (OR EQUIVALENT). DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND COUNTY INSPECTOR PRIOR TO INSTALLATION. 2. T T DETENTION SYSTEM's WEIR PLATE TO BE PRE -MANUFACTURED AND DELIVERED TO THE SITE. WEIR PLATE SHALL BE MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR, WITH THE ENGINEER AND COUNTY INSPECTOR, DURING THE FOLLOWING STAGES OF THE UNDERGROUND DETENTION SYSTEM CONSTRUCTION PROCESS: SECURELY AFFIXED TO THE INSIDE WALLS OF THE MANHOLE STRUCTURE. WEIR PLATE's MIDPOINT TO BE CENTERED ON THE MANHOLE, SPLITTING THE MH IN TWO TO OPTIMIZE AREA/ACCESS ON BOTH SIDES OF THE WEIR PLATE. i. PRE -CONSTRUCTION MEETING 3. ANY RETAINING WALLS AND FOUNDATIONS CONSTRUCTED IN THE VICINITY OF THE UNDERGROUND DETENTION SYSTEM 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) SHALL BE REVIEWED AND APPROVED BY THE ARCHITECT AND A GEOTECHNICAL ENGINEER. UNDER NO CIRCUMSTANCES 3. EXCAWHEN THE DETENTION PIPE 1NTERADEI IS R ELEVATIONS). y. WHEN THE DETENTION PIPE SUBGRADE IS READY FOR PIPE CONSTRUCTION, BUT BEFORE STONE BEDDING IS INSTALLED. SHALLANY PORTION OF THE UNDERGROUND DETENTION SYSTEM BE INSTALLED WITHIN THE PROPOSED BUILDING AND 5. AFTER STONE BEDDING IS PLACED AND COMPACTED, BUT PRIORTO PIPE INSTALLATION. PARKING STRUCTURES, OR ON AN ADJACENT PROPERTY, 6. AT THE TIME OF THE PIPE INSTALLATION. 4. PUBLIC SEMINOLE TRAIL RIGHT-OF-WAY & SIDEWALK, AND THE PRIVATE SIDEWALK& PARKING AREA LOCATED WITHIN 7. AFTER PIPE INSTALLATION, BUT PRIOR TO PLACING FILL OVER THE SYSTEM. THE SWM EASEMENT, SHALL SERVE AS ACCESS TO THE PROPOSED UNDERGROUND DETENTION SYSTEM. B. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) S. CONTACT COLLINS ENGINEERING(434.293.3719) REGARDING ANY QUESTIONS CONCERNING THE UNDERGROUND PLEASE ALSO SEE BELOW, UNDER FACILITY MAINTENANCE, FOR REQUIRED INSPECTIONS AFTER INSTALLATION IS COMPLETE. DETENTION SYSTEM. 6. ALL FILL EMBANKMENT MATERIAL SHALL CONSIST PREDOMINANTLY OF SOIL AND BE PLACED IN SUCCESSIVE UNIFORM FACILITY INSPECTIONS &MAINTENANCE AFTER CONSTRUCTION: LAYERS NOT MORE THAN 8 INCHES IN THICKNESS BEFORE COMPACTION OVER THE ENTIRE AREA IN ACCORDANCE WITH CURRENT VDOT ROAD AND BRIDGE SPECIFICATIONS OR THE FILL EMBANKMENT MATERIAL SHALL MEET THE PIPE THE FOLLOWING MAINTENANCE TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING THE INSTALLATION OF THE UNDERGROUND ' S MANUFACTURER'SPECIFICATIONS OUTLINED BELOW WHICHEVER IS MORE STRINGENT). ( ) DETENTION SYSTEM. 2. FOR THE FIRST YEAR FOLLOWING CONSTRUCTION, THE SITE SHALL BE INSPECTED BY THE CONTRACTOR QUARTERLY AND AFTER STORM EVENTS THAT EXCEED 1/2 7. ALL FILL SHALL BE PLACED AT 95% COMPACTION AND TESTED BY A GEOTECHNICAL ENGINEER TO ENSURE COMPACTION INCH OF RAINFALL. IS REACHED AND MAINTAINED, OR THE FILL SHALL MEET THE PIPE MANUFACTURER'S SPECIFICATIONS OUTLINED BELOW 2. THE CONTRACTOR SHALL LOOK FOR BARE OR ERODING AREAS IN THE CONTRIBUTING DRAINAGE AREA AND AROUND THE UNDERGROUND DETENTION SYSTEM AND (WHICHEVER IS MORE STRINGENT). MAKE SURE THEY ARE IMMEDIATELY STABILIZED. CONTRACTOR SHALL SPOT RESEED AS NECESSARY AND ENSURE ADEQUATE SITE COVERAGE IS PROVIDED WITHIN g, VDOTTD.IS-1&ST-1 ARE REQUIRED ON ALL PROPOSED PUBLIC STRUCTURES AND THE UNDERGROUND DETENTION VDTE T THE FIRST YEAR. AT THE QUARTERLY INSPECTIONS, AND AFTER EACH RAINFALL EVENT IN EXCESS ON", THE CONTRACTOR SHALL PERFORM THE ANNUAL JUNCTIONS. MAINTENANCE TASKS DESCRIBED BELOW IN #3. 9. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALLTEST-DIG ATTHE EXISTING INLET & OUTFALL TO CONFIRM THE AFTER THE FIRST YEAR THE OWNER SHALL PERFORM FOLLOW-UP INSPECTIONS ANNUALLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT: INVERTS AND TO ENSURE THE PROPOSED GRADES CAN BE ACHIEVED. CONTRACTOR SHALL CONTACT COLLINS 3. ASPRING MAINTENANCE INSPECTION AND CLEANUP SHALL BE CONDUCTED ANNUALLY. THE MAINTENANCE PROGRAM FOR THE UNDERGROUND DETENTION SYSTEM ENGINEERING OF ANY DISCREPANCIES IN THE HORIZONTAL VERTICAL ALIGNMENT PRIOR TO ORDERING AND SHALL UDE DE IMENT D ENSURING THE Y OF WEIRD.TH P ASH AND UTFAL INFLOW CONSTRUCTION. IN THE EVENT THE EXISTING STORM DROP INLET CANNOT BE PRESERVED WITH THE INSTALLATION OF IN ASH, HE SYSTEM GEE OR DAM WNER SHALL I MEDIATK A HE RATING S NTENDE DAMAGED. OWNER SHALL ENSURE AND AMAGE PIPES. THE OWNER SHASARY GIO OUTLET THE NEW OUTFALL, THE DI WILL NEED TO BE REPLACED. TO THE TI BEUELY DCLEAN&REPAIR THE FACILITY AS NECESSARY AND SHALL PAY SPECIAL ATTENTION TO THE INLET AND OUTLET LOCATIONS. THE ACCESS MANHOLES SHALL BE USED FOR INSPECTION A DSHA LPAYS SPECIALANDLOCATIONS. THE ACCESS MANHOLES SHALL AND MAINTENANCE. 10.ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR CONSTRUCTION INDUSTRY . 29 CFR PART 1926 ( ) UNDERGROUND DETENTION SYSTEM MINIMUM TRENCH &BACKFILL REQUIREMENTS: 11.PENDING PRIOR APPROVAL BY COLLINS ENGINEERING, THE DRAINAGE PIPE MATERIALS MAY BE SUBSTITUTED. ALL 1. THE TRENCH CONTAINING THE SINGLE RUN OF 36" HP STORM PIPE (STR. 5) SHALL HAVE A W WIDE TRENCH DRAINAGE PIPE INSTALLATION PRACTICES SHALL BE IN ACCORDANCE WITH CURRENT VDOT STANDARDS AND WIDTH. THE TRENCH CONTAINING THE 36" HP STORM PIPE, THE 15" HP STORM PIPE BYPASS AND THE 12" HP REQUIREMENTS. CONTRACTOR SHALL ENSURE MINIMUM COVER REQUIREMENTS ARE MET WITH ANY PIPE STORM PIPE OUTFALL SHALL HAVE AN 112" WIDE TRENCH WIDTH. SUBSTITUTION. 2. CONTRACTOR SHALL WRAP THE EXCAVATED TRENCHES WITH A 6 OUNCE FILTER FABRIC CLOTH. A SUITABLE FOUNDATION SHALL BE BENEATH THE TRENCHES' FILTER FABRIC CLOTHS. 3. TRENCHES TO INCLUDE A 6" #57 STONE BED AT 95% COMPACTION BENEATH THE HP STORM PIPES. 4. TRENCHES SHALL BE BACKFILLED WITH #57 STONE AT95% COMPACTION AND SHALL EXTEND A MINIMUM OF 6 VERTICALLY ABOVE THE CROWN OF THE HP STORM PIPES. 1 5. THE TOP OF THE #57 STONE SHALL BE COVERED WITH A 6 OUNCE FILTER FABRIC CLOTH OVERLAPPING THE S PREVIOUSLY INSTALLED CLOTH THAT SURROUNDS THE BOTTOM AND SIDES OF THE TRENCHES. N N� � N�� 6. SUITABLE FILL REACHING THE FINISHED GRADES SHALL BE APPLIED ABOVE THE TOP LAYER'S FILTER CLOTH, T- O O F- - O MEETING MINIMUM PIPE MANUFACTURER'S REQUIREMENTS TO PREVENT FLOATATION AND ENSURE PIPE O 0 O O 0 - - O INTEGRITY IS MAINTAINED. 0 0~~ ~ O � 0 0~ 7. A MINIMUM COVER OF 12" IS REQUIRED ABOVE THE CROWN OF THE HP STORM PIPES. Q H tD O n ­- ­- d- S.SEE THE'HPSTORM TRENCH INSTALLATION DETAIL'ON THIS SHEET FOR ADDITIONAL UNDERGROUND W cDO - O �� rn DETENTION SYSTEM PIPE REQUIREMENTS. r Ln O� � W � � rn rn STR:2 MODIFIED o �O o mP, r- VDOT MH-1 O 11 ON �`E �t O r, n � � STA. 0+61.62 m ±� z z » 0 0 � ±L6 z z TP=474.00 . '-- 'D � 0 INV IN: 469.25 TO 41 T- aa-zzzz � a� > > > (�I I T. A C 11 9 C 7 /n (n E li% - - - - - z z z PROPOSED AC FOR INSPECTI PROPOSED LOWER 012" HP STO EW-6 (OUTFALL INVE UNDERGROUND DETENTION SYS 100-yr PEAK DESIGN WSE 10-yr PEAK DESIGN WSE 2-yr PEAK DESIGN WSE 1-yr PEAK DESIGN WSE PROPOSED 036" HDPE STANDPIPE (STR. 2 TRASHRACK TO SERVE AS THE RISER STRUCTURE. SE ON THIS SHEET, OR EQUIVALENT, FOR TRASHRACK. R ELEV.=470.65. RISER TO HAVE ONE 1.25" LOW-FLOIA (INV. 469.00). RISER INV OUT=467.00 (TO EXISTIN PREVENT FLOTATION THE RISER BASE SHALL BI EMBEDDED 6" INTO AN 18" THICK REINFORCED CC FOUNDATION THAT IS 6'x6', AND BURIED BELOW C STR: EX 1 (STR EXISTII STA. 0+I TP=4 INV IN: 466.19 TC NV IN: 466.34 (TO REI NV IN: 466.09 (TO REI 12" MI . COVE OVE UGD i LESS MH w/ STAIRS SYSTE , TYP. - - ON & MAINTENANCE. - XISTIN 480 GRADE 480 I.M PIPE WITH VDOT STD. RT=469.00) TO SERVE AS / FEM 'A' PRIMARY OUTFALL ROPOSED / GR DE 475 475 =470.87 =470.77 / ,-- J O ERFLO / =470.67 B PASS, T STR. 8 =470.63 )0) WITH PROPOSI E DETAIL 4-70 A DOWN SERVE A ISER RIM SYSTEM ORIFICE SLOPES 3 DI). TO o 0-5 1 FIRMLY NCRETE �I 36" HP STORM ROUND. 36" HP STORM PIPE 7 .10 Li ®0.; 1 DI) 4 5 42.35 LF ® 0.50% 4651 AG DI RESTRICTIVE WEIR PLATE AT LOW POINT, INV.=469 0.00 DRAIN THE SYSTEM. SEE DETAIL ON THIS SHEET. 71.69 12" HP STORM PIPE, 8.23 LF ® 1.82% 1 200 SEE GENERAL SWM FACILITY NOTES #2 & y ON THE PREVIOUS SH 12" HP STORM PIPE, 34.71 LF ® 2.33% FAIN) 460 460 W W � ,,�m O 00OC) It N U) It It It W lei 0+50 1+00 1+50 2+00 WEIR PLATE DETAIL SCALE:1"=5' 2 84' SIMULATION OF PIPE OUTFALL OVERFLOW WEIR IS HYDRAULICALLY IMMEDIATELY UPLAND OF EQUIVALENTTO AN ORIFICE WITH AN WEIR PLATE WITHIN MH APPROX. DIAMETER OF 09.86" ELEV.=472.25' TOP OF PIPE / - INSTALLTRASH RACKS ON ALL ELEV.- a.2 ORIFICES, TYP. SEE THIS SHEET c FOR DETAIL, OR EQUIVALENT. ELEV.=469.25' o n (BOTTOM OF PIPE) N MANUFACTURE/INSTALL(i)ONE 02" EINFORCED 22 GA. STEEL WEIR PLATE, LOW -FLOW ORIFICE IN THE WEIR PLATE OR EQUIVALENT MATERIAL STRENGTH. AT THE LOW POINT OF THE DETENTION SEE'UNDERGROUND DETENTION SYSTEM SYSTEM (INVERT ELEVATION 469.25'). GENERAL NOTE, #z ON THIS SHEET. SEE GENERAL SWM FACILITY NOTE #y ON THE PREVIOUS SHEET. 480 I IA I 48 STR:8 MODIFIED VDOT MH-1 STA. 0+54.80 TP=474.79 INV IN: 470.55 TO 4 INV OUT: 470.45 TO 15" HP STORM PIPE 47.54 LF ® 3.05% :D SERIES OF 36" HP STORM PIPES WITH STREAM RESTRICTIVE WEIR PLATE TO S PROPOSED UNDERGROUND DETENTION 470 'A'. 30" HP STORM PIPES TO HAVE 0.50% NITH A TOTAL LENGTH OF 117.5' PIPE SEE GENERAL SWM FACILITY NOTES )0%. #z & y ON THE PREVIOUS SHEET FOR Cf DESIGN OF OUTLET PROTECTION. 465 N 25'. TO :ET FOR DESIGN OF OUTLET PROTECTION. UGD SYSTEM AND DETENTION BASIN 000 GRADE DETENTION BASIN'B' CONSTRUCTION NOTES: TH 0 FACILITY PLANTING SPECIFICATIONS: F j 1. THE DETENTION BASIN SHALL HAVE A TURF GROUND COVER, SUCH AS GRASS OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. LANDSCAPING BEYOND THIS IS OPTIONAL Q �� AND IS NOT REQUIRED FROM A STORMWATER MANAGEMENT STANDPOINT. HOWEVER LANDSCAPING MAY BE PROPOSED WITHIN THE FACILITY. SEE LANDSCAPING PLAN FOR f, ADDITIONAL DETAILS PERTAINING TO THE SITE's OVERALL LANDSCAPING REQUIREMENTS. SCOTT R. LLINS�I 2. THE PROPOSED INTERIOR SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 3:1 TO REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES SHALL BE GRADED TO PROVIDE O Hy POSITIVE DRAINAGE AT ALL TIMES TO THE RISER STRUCTURE. C) Lic. No. 035791,1D. 3. WOODY VEGETATION SHALL NOT BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE OF THE EMBANKMENT NOR WITHIN 25 FEET OF THE PRINCIPAL SPILLWAY A 10/29/20 Q' STRUCTURE. rV 4. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS TO ENSURE STABILITY THE DENSITY OF THESE COMPACTED O �SSIONAL SOILS CAN BE SO GREAT THAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE FOOTBALL FOR BALL -AND -BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 5. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED ASA MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS. CONTRACTOR REQUIREMENTS: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS' HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL ( COPIES ARE AVAILABLE FOR A FEE FROM THE VI RGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS VI RGINIA NURSERYMEN'S ASSOCIATION INC. AND THE VI RGIN IA SOCIETY OF LANDSCAPE DESIGNERS). ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF COLLINS ENGINEERING PRIOR TO THE CORRESPONDING CONSTRUCTION ACTIVITY. 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. F- F- 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY 1-800-552-7001 BEFORE ANY EXCAVATION). w LU 6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION. 2: E 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. ­J m 2: 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK BUDS BRANCHES STEMS OR OVERALL SHAPE OF THE STOCK. CONTAINER ¢ . O U O U GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE GROWN. 0 9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND g FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE a j > WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. � to O O 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL. CONTAINER Z LU g STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, O O w w WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. m Gn � on on 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE INSPECTOR INITIALLY, AND THEN j Q Q THE DESIGNER. LU 13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS (EX: FOOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. F- Lu LU 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. ? in in 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT LU N CRAMPING ROOTSTOCK. 16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90% CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND REPLACEMENT SHALL BEGIN W � LU AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM, FIRE, OR OTHER ACTIVITIES BEYOND THE CONTRACTOR's CONTROL. FACILITY CONSTRUCTION 1. THE DETENTION BASIN MAY SERVE AS A SEDIMENT BASIN AND/OR TRAP DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHALL BE BASED ON THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENTS VS. STORMWATER TREATMENT REQUIREMENTS). INSTALLATION OF THE PERMANENT RISER SHALL BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHALL BE SET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION FACILITY IN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBULENT WATERS WHEN THE BASIN IS BEING CONVERTED TO AN DETENTION BASIN. 2. THE DETENTION BASIN SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE FACILITY IS COMPLETELY STABILIZED. IF THE SITE OF THE PROPOSED SWM FACILITY WILL BE USED AS A SEDIMENTTRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. MODIFICATIONS SHALL BE MADE TO THE RISER, ORIFICES AND BARRELS AS REQUIRED SO THAT THEY ARE C3 CONSISTENT WITH THE FINAL CONSTRUCTION SPECIFICATIONS. N N fV 3. THE CONTRACTOR SHALL ASSEMBLE CONSTRUCTION MATERIALS ON -SITE, MAKING SURE THEY MEET DESIGN SPECIFICATIONS AND ARE PREPARED AT STAGING AREAS WHEN POSSIBLE. n w m N 4. THE CONTRACTOR SHALL CLEAR AND STRIP THE PROJECT AREA IF REQUIRED TO THE DESIRED SUB -GRADE. � � c 5. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS P` a' SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 6. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALLTHE SPILLWAY PIPE DURING THE ESC PHASE. 7. CONTRACTOR SHALL ALSO INSTALL THE RISER, OUTFLOW STRUCTURE AND/OR THE BARREL(s) WITH PERMANENT COLLARS DURING THE ESC PHASE TO ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 8. THE CONTRACTOR SHALL CONSTRUCT THE EMBANKMENT AND ANY INTERNAL BERMS IN 8-TO 12-INCH LIFTS, COMPACTION SHALL BE COMPLETED IN LIFTS WITH APPROPRIATE EQUIPMENT. T-I !E GeNTRAIST-GR S' 'ALL ALSE) ADI IERETE) T-1 1E CLAY LINER SPECIFICATIONS UTLINED IN TABLE 14.4 BELOW: Table 14.4. Clay Liner Specifications Property Test Method Unit Specification Permeabill ry ASTM D-2434 Cm/sec X10 Plasticity Index of Gay ASTM D-423/424 % Not less than 15 Liquid Limit of Clay ASTM D-2216 % Not less than 30 Cla Particles PassSTM Y M9 Dd22 % Not less Tian Mn vary Com coon ASTM o-2216 % 95%of standard Dwrociff Source: Virginia Slorm1Na➢?r ManagBment HanclD00K (1999) 9. UPON COMPLETION OF THE EMBANKMENT GRADING, THE CONTRACTOR SHALL EXCAVATE/GRADE UNTIL THE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN. 10. CONTRACTOR SHALL THEN CONSTRUCTTHE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 11. THE CONTRACTOR SHALL THEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES INCLUDING DOWNSTREAM RIP -RAP APRON PROTECTION. 12. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW. 13. THE CONTRACTOR SHALL THEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS. FACILITY MAINTENANCE: MAINTENANCE OF THE DETENTION BASIN IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION, AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN. 2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANYTREES AND SHRUBS PLANTED AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECT THE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING. 4. INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS, IF APPLICABLE, FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT BASIN OUTFALL CHANNEL, IF APPLICABLE, FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, etc. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING JOINT FAILURE LEAKAGE CORROSION OR OTHER FAILURES. 7. INSPECT CONDITION OF ALLTRASH RACKS REVERSE SLOPED PIPES OR FLASHBOARD RISERS FOR EVIDENCE OF CLOGGING LEAKAGE DEBRIS ACCUMULATION OR OTHER FAILURES. B. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING. 10. OWNER OR CONTRACTOR SHALL MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASIN s ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR WITH THE ENGINEER AND INSPECTOR DURING THE FOLLOWING STAGES OF THE DETENTION BASIN's CONSTRUCTION PROCESS: 1. PRE -CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION INCLUDING INSTALLATION OF PROJECT E&S CONTROLS 3. EXCAVATION/GRADING (e.g., INTERIM/FINAL ELEVATIONS) 4. DETENTION BASIN INSTALLATION (e.g., INTERIM AND FINAL ELEVATIONS) 5. INSTALLATION OF THE EMBANKMENT, THE RISER/PRIMARY SPILLWAY, AND THE OUTLET STRUCTURE(s). 6. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT/DIRECTING IF APPLICABLE) 7. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) 4751 STR:4 MODIFIED VDOT DI-313, L=6' 7 STA. 1 +03.97 TP=475.20 NV IN: 469.56 TO 6 INV IN: 471.56 TO 102 470 INV OUT: 469.46 TO 2 INV OUT: 471.50 TO 8 ti36" HP STORM PIPES, PART OF UNDERGROUND DETENTION SYSTEM 'A' HP STORM PIPE, 5.83 LF ® 1 (EMERGENCY OVERFLOW/ BYPASS) PROPOSED ELEVATED 015" HP STORM PIPES ALLOW MORE SIGNIFICANT B. LESS FREQUENT STORM EVENTS TO SAFELY BYPASS UNDERGROUND DETENTION SYSTEM 'A' 4601 J rl- . O ItJ � 00W Oj 00 't t It ILL PROFILE SCALES: 1"=5' (V) 1"=50'(H) 0+50 0+75 BYPASS HP STORM TRENCH INSTALLATION DETAIL F MIN. COVER TO MIN. COVER TO RIGID PAVEMENT, H FLEXIBLE PAVEMENT, H 1 „�,, FINAL i, BACKFILL SPRINGLINE - INITIAL U BACKFILL HAUNCH BEDDING 4" FOR 12'-24" PIPE ,. , ., , F FOR 301160"PIPE MINTRENCHWIDTH SUITABLE NOTES: �ISEETABLE) �1 FOUNDATION 1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS'. LATEST ADDITION. WITH THE EXCEPTION THATTHE INITIAL BACKFILL MAY EXTEND TOME CROWN OF THE PIPE. SOIL CLASSIFICATIONS ARE PER THE LATEST VERSION OF ASTM D2321. CLASS IVS MATERIALS (MH, CH) AS DEFINED IN PREVIOUS VERSIONS OF ASTM D2321 ARE NOT APPROPRIATE BACKFILL MATERIALS. 2. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL. WHEN REQUIRED. 3. FOUNDATION: WHERE THETRENCH BOTTOM IS UNSTABLE THE CONTRACTORSHALL EXCAVATE TO ADEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH SUITABLE MATERIAL AS SPECIFIED BY THE ENGINEER AS AN ALTERNATIVE AND AT THE DISCRETION OF THE DESIGN ENGINEER, THE TRENCH BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL. 4, BEDDING: SUITABLE MATERIAL SHALL BE CLASS 1. II 111 OR IV. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. COMPACTION SHALL BE SPECIFIED BY THE ENGINEER IN ACCORDANCE WITH TABLE 3 FOR THE APPLICABLE FILL HEIGHTS LISTED. UNLESS OTHERWISE NOTED BY THE ENGINEER MINIMUM BEDDING THICKNESS SHALL BE 4 (IODNI FOR 1r-2A' 300mm-5OOmm DIAMETER PIPE' 6' 150mm FOR W-60' P 50mm-1500mm DIAMETER PIPE. THE MIDDLE 1/3 BENEATH THE PIPE INVERT SHALL BE LOOSELY PLACED, PLEASE NOTE, CLASS N MATERIAL HAS LIMITED APPLICATION AND CAN BE DIFFICULT TO PLACE AND COMPACT; USE ONLY WITH THE APPROVAL OF A SOIL EXPERT. S. INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I. 11. 111, OR IV IN THE PIPE ZONE EXTENDING TO THE CROWN OF THE PIPE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE INSTALLED AS REQUIRED IN ASTM D2321, LATEST EDITION. COMPACTION SHALL BE SPECIFIED BY THE ENGINEER IN ACCORDANCE WITH TABLE 3 FOR THE APPLICABLE FILL HEIGHTS LISTED. PLEASE NOTE. CLASS IV MATERIAL HAS LIMITED APPLICATION AND CAN BE DIFFICULT TO PLACE AND COMPACT; USE ONLY WITH THE APPROVAL OF A SOIL EXPERT. 8. MINIMUM COVER: MINIMUM COVER, H, IN NON -TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) 1312' (300mm) FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOTATION. FOR TRAFFIC TABLE 1, RECOMMENDED MINIMUM TRENCH WIDTHS PIPE DIM. MIN.TRENCH WIDTH 12" 30' 300mm 62mm 15' 34" 375mm 864mm to- 450mm 991mm 24' 600mm 1219mm W 5S" 50mm 1422mm 36' W 900mm 1626mm 42" 77 1050mm 1829mm 124W 2032mm 60 1 Oxhim 2438m86m TABLE 2, MINIMUM RECOMMENDED COVER BASED ON VEHICLE LOADING CONDITIONS SURFACE LIVE LOADING CONDITION PIPE DIM. H-25 HEAVY CONSTRUCTION (75T AXLE LOAD) • IT-U. 300mm-1200mm ". 305mm d8' 1219mm 80' 1500mm �,W- 61pnm 1524mm VEHI(7IFNIN IF 75T MAY TABLE 3. MAXIMUM COVER FOR ADS HP STORM PIPE, 8 CLASS CLASS II CLASS III class V PIPE DIA COMPACTED 95% 90% 85% 95% so% 95% 1r 41 28 21 16 20 16 16 (300nm) (12.5m) (B.5m) (6.4m) (4.9m) (6.1m) (4.9m) (4.9m) is- 42 29 21 16 21 16 16 (3761nm) (12.8m) (B.Bm) (6.4m) (4.9m) (6Am) (4.9m) (4.9m) 1r 44 30 21 16 22 17 16 (450mm) (13.4m) (9.1m) (6.4m) (4.9m) (6.7m) (5.2m) (4.9m) 24" 37 26 18 14 19 14 14 (500mm) (11.3m) (T.9m) (SET) (4.3m) (5.8m) (4.3m) (4.3m) W 39 27 19 14 19 15 14 (750onm) (11.9m) (8.2m) (5.8m) (4.3m) (5.8m) (4.6m) (4.3m) 36" 28 20 14 /0 14 71 10 (900mm) (8.5m) (6.1m) (4.3m) (10m) (4.3m) (9.4m) (3.Om) 4r 30 21 14 t0 15 11 10 (105one) (9.1m) (6.4m) (4.3m) (3.0m) (4.6m) (3.4m) (3.Om) 48' 29 20 14 9 14 10 10 (1200mm) (B.Bm) (B.tm) (4.3m) (2.7m) (4.3m) pum) (3.Om) 29 20 14 9 14 10 9 IW II (8.8m) (B.tm) (4.9m) (2.7m) (4.3m) (3.0m) (2.7m) FILL HEIGHT TABLE GENERATED USING AASHTO SECTION 12. LOAD APPLICATIONS; CLASS I OR II MATERIAL COMPACTED TO 90% SPD AND CLASS III COMPACTED TO 95% BED IS REQUIRED. RESISTANCE FACTOR DESIGN(LRFD) PROCEDURE WITH THE FOLLOWING FOR TRAFFIC APPLICATIONS, MINIMUM COVER H, IS 1T (300mn) UP TO 48" (1200mm) DIAMETER PIPE AND 24" (500mm) OF ASSUMPnONS: COVER FOR W (I 500mm) DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT NO HYDROSTATIC PRESSURE OR TO TOP OF RIGID PAVEMENT, UNIT WEIGHT OF SOIL (y.) =120 PCF T. FOR ADDITIONAL INFORMATION SEE TECHNICAL NOTE 2.04, a RBv, MAw"uM wvBR HEK#ITS RWo MINT ar5,,"G REV. DESCRIPl1IXJ BY MM➢OMf CHMO ADVANCED DRAINAGE SYSTEMS.ING, ('ADS-) HAS PREPARED THIS DETAIL BASED ON INFORMATION PROVIDED TOADS. THIS DRAWING IS JAB INTENDED TO DEPICT THE COMPONENTS AS REQUESTED. ADS HAS NOT PERFORMED ANY ENGINEEW NG OR DESIGN SERVICES FOR THIS PROJECT. OR HAS ADS INDEPENQEMLYVERIFIED THE INFORMATION SUPPLIED. THE INSTALLATION DETAILS PROVIDED HEREIN P1rE GENERAL TR$NCB 11'18TdL1ATIDN 1DI''TTT6�6'6'B'•� BLVD D1R9NS RECOMMENUATONS AND ARE NOT SPECIRC FOR THIS PROJECT. THE DESIGN ENGINEER SHALL REVIEW THESE UETALS PRIOR TO CONSTRUCTION. IT ASTHE DESIGN ENGINEERS RESPONSIBILITY TO ENSURE THE DETAILS PROVIDED HEREIN MEETS OR EXCEEDS THE APFLCABLE NATIONAL, STATE. OR UO FEONREMENTS AND TO ENSURE THAT THE DETAILS PROVIDED HEREIN AREACCEPTABLEFCRTHIS DIn,UL (BP 8I,ORB) .08aemUEMAN HILLIARD. pe093026 morn wwwr.amaxrc. r MS DRAWING NUMBER: ST IOID nxvecT tOF1 z Z� Q r- J rn ^ M Cie. 01� N I.. ^ L 0! M ' ^ W1 v\, N � w J W N J � ~ W ZW 0 -7 V) T� a W Z � r- W W W L9 F-1 O .-�J Q Z Q Q Q c G W" Uw t 4 ��1// Q F-4 LL C/' W 0 Z ,.W/ Oil _ z 10- J W w W J J V ,^ O ) 0 O N H IWI W 0- U) Wl-4�'1Mreq SCALE AS SHOWN SHEET NO. 8