HomeMy WebLinkAboutARB202000096 Plan - Revision 2020-12-21RIO HILL
FACADE RENOVATION - ARB PRELIMINARY DESIGN REVIEW
Submission 2
December 21, 2020
II -
II
R
_i_B'W
II
Jhn n Y]i I sc it � CWc�i
Ilb
Z
Im I ) nF, E MMOFMANAGM
SIEEP SLOPE PEA
s
I I hd
Iv-k rOv-u
p OF CONSTRUCTION . _Ilk
n _
T SHEOETS C1I2 C2 1
I � (LrS LVI'hC fvL F rl� /
SOUTHWEST VIEW 2 "" _,..—
(SHEETS Cl.I/C2.1)
MINOR CHANGES TO
EXISTING SITE PLAN
SOUTH VIEW 1 bg'� �`
, zq\
SO
\
NORTH VIEW 1>. SOUTH VIEW 2
(SHEETS C1.O/C2.0) c II (SHEETS C1.2/C2.2) - t
_
Z AtrJ' Rb \ `..
SOUTHWEST VIEW 1 —
s — �0' (SHEETS C1.1/C2.1)
2 m o 1 I �
P
Scale: 1 " = 120 0„
) —
N'n AYNF 4hY fKfLLS —"pvc %
WC p(r ri6LlcNfk,O - 'A �' _ Z - �� -.�/ -..
' APo EL 1D. 0 `00 00 00 09400 m M t
i
c
.09 PG. 6 /ZZ]e-{-
�dq' COLA I
SITE PLAN
0 Y W A R C H I T E C T 5
7,
u1 on nea
`►-- .►n K
y
�a .- -- +j�.n • -- � .�`�ie .. � - sea _ �G.�'. - r'�"�-� j ''�1'�Ji�( __ _
2
- �. �•-ti` ...r• ,tea Sa- ���. L y
-
son 1k,
\.
aw
am-
1
We are pleased to present to the Architectural Review Board a conceptual Perhaps most the most prominant feature is the site is centered around a large
Facade Redevelopment Design for the existing Rio Hill shopping Center. This parking lot. Most would likely agree that the complex gives the impression
scope of work is a complete facade remodel of the areas shown in this de- -with its disorganized facade and tired materials - of being out-of-date.
sign package; which constitutes most of the existing shopping center (with the
exception of Krogers and the site's South East Corner - see below). While the When one begins analyzing the problems with the existing conditions, it
existing buildings will remain, new construction would involve removing por- becomes apparent that the solution for a truly successful site transformation
tions of the existing canopies and store entries and transforming these build- requires a creative design response revolving around a major reorganization
ing fronts using a variety of new materials, forms and storefront windows. As of the current facade.
strictly a 'facade remodel; the plan is to minimize site work.
Indeed, ownership approached us with the problem of how to make these 33
Most individuals livingin the region can relate to Rio Hill as a large retail acres (developed in the 1980s more 'current' and 'pedestrian friendly.' In
9 9 ( P ) P Y
space, anchored by such various stores as Krogers, TJ Maxx, JoAnns fab- developing these initial design ideas, certain themes central to the ARB have
rics and various restaurants - among a variety of other smaller businesses. become paramount in re -orienting what we see as a new'vision' for Rio Hill.
NEW VISION FOR RIO HILL
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
Perspective looking from E.C.
Perspective looking SW
Perspective looking NW
EXISTING SITE CONDITIONS
B R W A R C H I T E C T 5
n3 buM.pmrm
dwrldmnW W6nie71M
Al l9]1TIO
Given Rio's oversized scale and length (1600' In. ft.), the design team pro-
poses demolishing portions of the existing canopy. Also, removing the external
'wing walls', seen between the canopies, helps to restructure the current relent-
less march of a rather disorganized facade design. This removal of the major
existing architectural elements, in turn, begins this process of site reorganiza-
tion by'breaking down the scale' of the facade. Removing these most visible
features clears the way for a more interesting, varied front and for the potential
of replacing the block walls with new materials.
We see this idea of 'breaking down the scale' as working hand in hand with
creating a more human scale. Currently, the site's pedestrian experience is
dominated by the parking lot and the uninspiring covered canopy that stretch-
es nearly the entire front. Through the reorganizing of a series of new and
various building fronts, this design concept looks to the idea of the pedestrian
experience that is enhanced through a variety of experiences and walkway
that changes and evolves at different locations. Further, with the removal of
structures like the clocktower (south west corner), the intent is to open areas
.71porTo SIR
along the building fronts that provide potential gathering space. It is not hard
to imagine this new corner'opening' becoming a wonderful spot for outdoor
dining while also providing a much needed attractive 'pass through' between
buildings.
Working in real time within the current Covid crisis, our team realizes that the
idea of 'human scale' becomes even more important in determining the way
future stores are developed. Much can be learned by paying attention to
how certain restaurants are able to survive in these times: A priority on better
indoor/outdoor connection, easier access for quick pick-up and enticing out-
door environment all appear to be important features of new business models
trying to adapt to this changing world. And we hope to integrate these features
within the architecture of this project.
It is important to understand that the owners see a potential later phase that
may likely come into play with this site. They have identified the southwest
corner as near -term future redevelopment option. That portion the site is prob-
lematic in that its retail space is difficult to attract clients due to its awkward
d
.° Ys�r�NTIIfF®iil® 9 Y ilYi if II
a
EXP } _
i
s, p
location — generally hidden from the rest of the site and from the road. This
potential later construction phase would include the demolition the first 150
' of retail space and the re -building of a new 2 story office or medical office
building. You will notice on our elevations and renderings of this corner, we
have illustrated both the current scope of work (Phase 1) and the new potential
future building (Phase 2).
In changing the dynamic of Rio Hill, concepts like 'breaking down the over-
size scale' of this large strip mall and 'introducing ways of better relating to
the human scale' are vital to the overall project success in the way they relate
to our changing world and in this particular instance the future viability of the
retail business center. As we work through this process, our hope is to balance
this initial project with a more general road map for how to make Rio a more
pedestrian friendly, attractive space that has stronger connections to its sur-
roundings.
We respectfully ask for the ARB guidance in finding the best possible solution -
for the Center's redevelopment in its relation to the Entrance Corridor.
PROJECT NARRATIVE
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
Scale: 1"= 175'-0"
6 Y W A R C H I T E C T 5
,m,iem„n.,,,."xsvm
u. on nea
Responses tp County comments
The following are responses to County comments listed on ARB-2020-
96 document (dated 10.27.20)*. Architectural responses follow each
county comment below:
1. Provide line drawing elevations and plans to show in more detail
what is proposed. Include 3-dimensional views.
• Facade elevations and perspectives included in architectural booklet.
2. Incorporate warmer -toned materials and colors into the design. Pro-
vide a material and color palette for consideration.
• Color palette includes a variety of elements including Brick, Metal paneling,
stucco, Architectural paneling, and refinished existing walls. Brick and archi-
tectural panels meant to add warmth through not only color but also through a
combination of texture.
3. Consider alternate materials, additional architectural details, and
additional canopies/canopies with greater depth to improve human
scale and the pedestrian experience.
• Additional canopies have been added to the design in this submis-
sion. (Note: The entire range of canopy pedestrian cover is called out
in the Building elevation.) New areas with canopy cover now include
the larger Sierra and TJ Maxx stores along with a number of storefronts
around the corner of the West and South facades. It is important to
note that the fapade renovation as shown has been essential in at-
tracting new tenant interest in the existing vacancies. Retail tenants in
today's environment locate their stores in shopping centers which are
contemporary, updated and which can accommodate their specif-
ic branding and co -tenancy requirements. The new design includes
various depths ranging from 3' to 6' , and together with the existing
larger pavilions, they provide customers with protection from the ele-
ments while also giving the shopping center a new, current aesthetic
look and appeal.. The design strategically spaces these canopies so
that no matter where you are on the site's sidewalk, adequate cover
is always within reach. In keeping with the design theme of infusing
variety and interest to transform Rio Hill, the canopies are shown in a
variety of forms and heights, as well as different colors and textures that
are intended to complement the specific architecture of each section.
The variety of canopies offers the pedestrian an enhanced experience
both in providing protection from the elements and in offering an ar-
chitectural element that helps break down the current strip into human
scale.
All of the above is in contrast to the existing facade - which is dominat-
ed by the low uninviting canopy extending most of the length of the
facade. Not only is the existing canopy out of date and in disrepair, its
removal is vital to the new design in the way it improves the pedestrian
experience and appeal to the shopping center's customer. It changes
the way in which customers view and experience the shopping cen-
ter. The new canopies will offer variety along the fapade counteract-
ing the current monotony of the travel -way. Further, their new heights
will provide exalted spaces and allow for more daylight to reach the
storefronts; which are currently reduced by the existing structure's
low -ceiling, poor lighting and want of detail. Finally, in addition to all it's
other benefits, the removal of the canopy will dramatically increase the
aesthetics of the center from the Entrance Corridor.
4. Consider alternate materials and/or additional architectural detail to
reduce the scale of expansive wall areas.
• Our strategy for the expansive wall areas is to fill in these 'voids of
blankness' with some simple but interesting decorative metal paneling
that not only provides a greenscreen framework for a vines but also
has architectural merit in its own right. We see a series of these panels
as adding layers and interest to these expansive walls. In addition, we
are working with a brick and masonry stain product that when applied
to the wall, yields a fresh new look, assist (JCK: is part of the foundation
for) with the site's overall transformation and provides a proper contrast
to the new accent paneling.
5. Consider design revisions that improve the pedestrian experience
• Generally, the elements of this design are focused on the customer
and pedestrian experience - the intention of replacing the old fapade
with one that has variety in form, material as well as repetition are all
meant to lead to the idea of creating place. As ones moves through
this new facade, the facade changes and evolves as a way generat-
ing interest and creating memorable locations.
• But more specifically, we see the idea of 'opening up' the facade
as a way creating new opportunity for both tenant and pedestrian. It
gives the entire center a new visibility to consumers. Perhaps the best
example of this is at the corner of the main west and south facades;
where the design calls for removing the exiting clock tower and, in turn,
opens up a space in the void for potential outdoor eating. This creative
re -use of this underutilized outdoor space is a key to the transformation
of Rio.
• Finally, accent lighting will be an important part of the re -design in
both the pedestrian experience and overall appearance of the Com-
plex from the EC.
6. Indicate if any new accessory structures or mechanical equipment
will be included in the renovation. If so, show how they will be screened
from view from the EC.
• As strictly a fapade renovation, The Rio project does not include new
mechanical equipment; with the possible exception of the TJX stores,
whose lease mandates certain tenant improvements by the Landlord.
While the owners are currently attempting to negotiate a re -use of
the current rooftop mechanicals, it is likely that a replacement of the
existing units will be necessary, with new tenant -specific RTU's in gener-
ally the same size and location. Either way, the equipment will be fully
screened from the EC.
7. Provide the standard mechanical equipment note on the site and
architectural drawings: "Visibility of all mechanical equipment from the
Entrance Corridor shall be eliminated."
• Provided - See Site Plan -
8. Provide a lighting plan for review. Over -illumination of the building is
not appropriate for the EC.
• The main intent of architectural lighting would be to increase the
pedestrian experience, provide a well -lit and inviting atmosphere and
subtly accent elements of the architecture.
9. The owner is responsible for ensuring that the site matches the ap-
proved site plan. Missing landscaping must be installed. Alternatively,
the owner may submit a site plan amendment that proposes alternate
landscaping.
• See Site Plan
10. Consider adding landscaping close to the building to further break
up its length and to improve the pedestrian experience.
• See Site Plan
11. Provide with the next review a proposed Comprehensive Sign Plan
for the renovated building.
• Comp Sign Plan and TJX Sign review shall be provided.
Other Notes:
Economic Feasibility
The Rio Hill Center- like many strip malls in this area - has become an
outdated complex and the shopping center requires the Transforma-
tion of this Facade project to attract new tenants and remain viable
as a shopping destination on the Route 29 corridor. We feel the design
elements incorporated in our design are very much in line with the ARB
guidelines, and will substantially improve how the center is viewed from
the Entrance Corridor. Ultimately, its transformation hinges on the ability
for Rio Hill to attract customers through creating a more pedestrian
friendly experience, reinforcing a human scale and designing the po-
tential for flexibility so that the complex can adapt to remain relevant
for the long-term.
TJX Projects
The owners would like to request of the Board that the TJX projects
(which include Sierra and TJMaxx relocated to the old Dicks space)
be separated out as a review, running in parallel with the rest of the
Facade review. The TJX company has a specified accelerated time-
line and move -in date pursuant to their lease. This project is a major
driver of the overall facade project.
RESPONSES TO COUNTY COMMENTS (letterdtd 10.27.20)
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
IC K Rc, 3M SI O)CS -.
6 Y W A R C H I T E C T 5
.Forlomsnlls11n n37,
u. oea
CATO
,:NT 6
OVERALL PROPOSAL
44
�—
OVERALL PROPOSAL
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
0 1 S1.11 S1.2 S2
EXISTING CONDITIONS
POTENTIAL MOB
NEW PROPOSAL
NEW PROPOSAL MATERIALS
R W A R C H I T E C T S
dwrldmnW W6nie71M
.4 9]i TIO
FUTURE SCOPE OF WORK - N.I.S. S3.21
-1 L
POTENTIAL ALLEY
S3 3( DEMO CANOPY 1 RE -USE/ MODIFY S7 DEMO CANOPY S9 10,1)
�I RE -USE/ MODIFY ;) S10.1
DEMO CANOPY
Mu QELa % LLB -uJER" ,. -nun>rwYTTTI .-
RACK RO N M SWO[=-s_'. VACrS MUM I mud* 1NMLEmcws SEST
FUTURE CORNER DESIGN
ARCHITECTURAL PANELING (AP1) EXISTING WALL - NEW STAINED
\ FINISH (FRENCH GREY)
T1 I� I 1 II I�
NEW
ARCHITECTURAL PANELING (API
1 BRICK
NEW STOREFRONT
EXISTING WALL - NEW STAINED
FINISH (FRENCH GREY)
ARCHITECTURAL PANELING (API
STUCCO (Sl)----N
PLATO'S
CLOSET
ARCHITECTURAL
PANELING (API)-
1 MASONRY PIERS - STAINED FINISH
(CHARCOAL)
EXISTING ARCADE 02' DEEP)
ARCHITECTURAL PANELING (AP 1) ARCHITECTURAL
�
STUCCO (S1)� PANELING (AP1)
PLAtlsow wqw-
NEW BRICK (B1) FINISH (THIS
NEW BRICK (BR3) - ARCHITEC
ACCENT RECESS
RACK ROM SHOES III CIILIAWNRS I I awwme.Y
LARCHITECTURAL DETAIL STEEL
ACCENT IN RECESS
METAL CANOPIES IN DEEP)
—NEW BRICK (Bl) FINISH (THIS SECTION)
NEW BRICK (BR3) - ARCHITECTURAL
ACCENT RECESS -
RACK R M SHOES �' CLEANERS q„y
III
MASONRY PIERS - STAINED FINISH 't 'LARCHITECTURAL DETAIL STEEL
(CHARCOAL) ' ACCENT IN RECESS
EXISTING ARCADE (12' DEEP) METAL CANOPIES IN DEEP)
—ARCHITECTURAL PANELING (1)
NEW BRICK (Bl) FINISH (THIS
SECTION)
—NEW BRICK (B2) FINISH
NEW BRICK -
STUCCO (S2)
ARCHITECTURAL
ACCENT RECESS
music
0 StudA
CNS
LARCHITECTURAL OVERHANG (N DEEP) [METAL CANOPIES (5' DEEP) —
ARCHITECTURAL PANELING (1)— - NEW BRICK (Bl) FINISH (THIS
SECTION)
NEW BRICK (B2) FINISH— NEW BRICK -
STUCCO (S2)� ARCHITECTURAL
ACCENT RECESS,
Scale: 3 64" = 1'-0"
ARCHITECTURAL OVERHANG (N DEEP) METAL CANOPIES (5 DEEP)
SOUTH ELEVATION -'PHASE 1' for current project)
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
POTENTIAL MOB POTENTIAL ALLEY FUTURE CORNER DESIGN
ARCHITECTURAL PANELING (AP1)\ EXISTING WALL - NEW STAINED ARCHITECTURAL PANELING (API)i ARCHITECTURAL NEW BRICK (B1) FINISH (THIS SECTION)
�•, FINISH (FRENCH GREY) I PANELING (AP1)
BRICK (B2)� \ I STUCCO (S1J NEW BRICK (BR3) -ARCHITECTURAL
ACCENT RECESS
~ Xl�—ANN �\ F4ARACK RO M SHOES CLEANERS c��mr:eAKFW
RIM - T0'S
arm 7#! _
i —E
1 i # -
LJ
I
L'
I
4 i
MASONRY PIERS - STAINED FINISH ARCHITECTURAL DETAIL STEEL )
NEW STOREFRONT (CHARCOAL) ACCENT IN RECESS
EXISTING ARCADE (12' DEEP) METAL CANOPIES (N DEEP)
R R W A R C H I T E C T S
dwrldmnW W6nie71M
.4 9]i TIO
ARCHITECTURAL PANELING (1)
NEW BRICK (132) FINISH
1
ARCHITECTURAL OVERHANG (N DEEP)
View from Route 29
(see existing condition photo adajacent)
NEW BRICK(BI) FINISH (THIS
SECTION)
NEW BRICK -
ARCHITECTURAL
ACCENT RECESS,
11—
METAL CANOPIES (5' DEEP) I
Scale: 3/64" = 1'-0"
SOUTH ELEVATION - PHASE 2
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
y.
,.. _..c � _ _
�•_._. •_ram � _
T
�__
_.. ter- --r-
•
.ni..-
_+�--qqµ��y�- -
mad ll�
........... x- ......... .............
a a 1 ■ ,;- a ara�
1
EXISTING PERSPECTIVES
B R W A R C H I T E C T S
n3 buM.pmrm
dwrldro.nW N:6nie PIVPl
Al l9]I TIO
W'naMile[luom
{ { {
s
Mw
>
i
�Y ..i"
.. ram.
_ ,��,��J���^ry_.Y.:F�u•-
•y
-
...ram
__
.. .-������
ffV9 BELOW
EXISTING PERSPECTIVES
—ter
NEW - SOUTH ELEVATION PERSPECTIVE
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
y ryc `
y fM!!W
R R W A R C H I T E C T S
.111 .Forlomsnllsa 7, 01
u. on nea
X
IMM
EXISTING + NEW PERSPECTIVES
A
RACK
w SHOES
CATO FAVIQN!
_ .4
NEW - SOUTH ELEVATION PERSPECTIVE
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
EXISTING CONDITIONS
NEW PROPOSAL
NEW PROPOSAL MATERIALS
\A//A
I DFAAn rANnPV SMASW2.1
EXISTING MASONRY
WALL - NEW STAIN FINISH
(FRENCH GREY)
SW3 RF-I ISF
SW2 `21W4 DFMn rAhdnPY SW5
EX MASONRY - NEW STAINED FINISH
ARCHITECTURAL
PANELING - WHITE
nourlington
LDECORATIVE METAL NEW STOREFRONT
PANELING / GREEN ARCHITECTURAL PANELING
SCREEN 1T
EXISTING ARCADE -12' DEEP J
EXISTING MASONRY
WALL - NEW STAIN FINISH
(FRENCH GREY)
EX MASONRY - NEW STAINED FINISH
ARCHITECTURAL
PANELING - WHITE
TENANT
EXISTING MASONRY
WALL - NEW STAIN FINISH
(FRENCH GREY)i
DECORATIVE METAL
PANELING / GREEN
EXISTING MASONRY
WALL- NEW STAIN FINISH
(FRENCH. GREY)
D DECI
DECORATIVE METAL I NEW STOREFRONT � DECORATIVE METAL II
PANELING / GREEN PANELING/GREEN
SCREENS ARCHITECTURAL PANELING SCREEN
EXISTING ARCADE -12- DEEP
1?F-1 ISF/ Mnr)IFY '" W6
�7, UP
�re�iFramAUP
METAL PANEL SIDING
(MP-1)
EYOTO
DFMo rANOPYSW /
AP
PANELING
CANOPY
`-METAL CANOPY (8' DEPTH)-4
METAL PANEL SIDING
(MP-1)
30T
METAL CANOPY
ARCHITECTURAL PANELING (AP3)
`METAL CANOPY (8' DEPTH)—j
W
PANEL SIDING (MP1
SLAN'T1TAN CITY
METAL PANEL SIDING (MP1
SUM TAM COY
SW8
Scale: 3/64" = 1'-0"
SOUTH WEST ELEVATIONS
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
O
B R W A a C H I T E C T 5
n3 buM.pmrm
dwrldro.nW Nrpnie PIVPl
Al l9]I TIO
W'naMile[luom
-waft\ i
J..
I�r .
K`
EX - SOUTH ELEVATION PERSPECTIVE
A
Scale : 3/64" = 1'-0"
NEW - SOUTH WEST ELEVATION PERSPECTIVE
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
EXISTING CONDITIONS
NEW PROPOSAL
NEW PROPOSAL MATERIALS
B R W A R C H I T E C T S
n2 buA. m..rm
•MarlmnnYsN 91RR901
a.1on nea
1
DEMO W l W 1 .1 �> W2.1
Hem E&LLY u YNANE
STUCCO (S2) NEW BRICK (B2) FINISH
(THIS SECTION)
(STUCCO (S3)�
CANOPIES (6' DEEP)
STUCCO (S3)
METAL CANOPIES (6' DEEP)
n
CANOPIES (4' DEEP)
NEW BRICK (B2) FINISH
(THIS SECTION)
—METAL CANOPIES (4' DEEP)
p+\YYYYYn "YI Y n
�Y\lYw .r�P `.
AFFORDABLE D,' NT'ULRU
STU�CO (S4)—
ARCHITECTURAL
PANEL
AL CANOPIES (6' DEEP)
ARCHITECTURAL
PANEL
TOMnt 1I ReR¢A-t�,snke
CANOPIES (6' DEEP)
Y Y J
Mai
I
EXISTING WALL - NEW STAINED
FINISH (FRENCH GREY))
W7
P i
O
(W8,) (W9) W 1 o W i l RE -USE/ MODIFY W 12
O - LIGH GREY EXISTING WALL - NEW
PANELIN -'CHINA WHITE' STAINED FINISH
F(FRENCH GREY)
DECORATIVE METAL METAL CANOPY -�
PANELING / GREEN SCREEN BLACK - 6' DEPTH
4" RED ACCENT UNDER
EXISTING WALL - NEW STAINED
FINISH (FRENCH GREY)
STUCCO - LIGH GREY
METAL PANELIN -CHINA WHITE'
EXISTING WALL - NEW
STAINED FINISH
(FRENCH GREY)
TO KROGER - N.I.
JCCO 'ARCADIA WHITE' 4EXISTING WALL -INEW STAINED NEW BRICK (B2) FINISH
,UGH SrN TIMBERS - BROWNINISH (FRENCH GREY) (THIS SECTION)
TI
® I I
Apr
Il �y�wll 4;irlmn r OmG7 aK�MP Kc
AGED BRONZE (6' DEEP)
STUCCO ARCADIA WHITE'
ROUGHS WN TIMBERS - BROWN
k f75)
V 'II
/ NEW STOREFRO T 11 NEWS
DECORATIVE METAL METAL CANOPY-� II —METAL
PANELING/ GREEN SCREEN BLACK - 6' DEPTH
4" RED ACCENT UNDER CANOPY
AGED BRONZE (6 DEEP)
METAL CANOPIES
CHARCOAL - (5DEEP)
EXISTING WALL -INEW STAINED
FINISH (FRENCH GREY)
I
T&CnvIls11 �1�
i 'a
PANEL
NEW BRICK (132) FINISH
(THIS SECTION)
S _ KRISHA
CK
LF._S.-emu 1
METAL PANEL (CHARCOAL)
METAL CANOPIES
CHARCOAL - IS DEEP)
TO KROGER - N.I.
Scale: 3/64" = 1'-0"
\A/CCT CI C\/ATlf1Al
.AO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
—� C
f
ca
S
_ r
L
_ t `
L
EX - SOUTH ELEVATION PERSPECTIVE
B R W A R C H I T E C T B
n3 buM.pmrm
dwrldro.nW W6nie71M
.4 9]i TIO
W'naMile[luom
Tenant
MUM�
5 ,,wAL.LY
WINE T,,,
-
r
_ -,
Tenant
YT�
-- 3
T&C, i
NEW - SOUTH ELEVATION PERSPECTIVE
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21, 2020
FINISHES - VISUAL KEY
4 MAIN ADDITIVE FINISHES
TYPE'AP
AP-ARCHRECNRAI PANEL
�F
_
?
IMNUFACTURIM
PRODUCE: STANDARD PANEL
TYPE/SYSTEM: le PLANK ON CUP SYSTEM
_
-
FINISH Options:
Anro Sfmndz
— - -
-
• Stir Ave Elm
• Grey Mesh
• CoPPer Brown
'��
"�
rS
L . �
....
TYPE'BR
BR
BR
BR -BRICK
BR - BRICK
MANUFACTURER: FELDHAUS- KUNKER
MANUFA R.fR: FELDHAUS
PRODUCT: THIN BRICK
-
PRODUCT: THIN BRICK
FINISH: SINTRA/ VOLCANO t161
KNISH: VASCUL CREAMA TOCCATA YI32
Sulnopri options for owlyina to exisilo, wall:
S
TABS If or' Than Tech' or
'Lolivel R rrrri 0.in veneer stem
TYPE'E'
E - STUCCO
MANUFACTURER: STO OR EO,
PRODUCT: STANDARD FINISH
FINISH: COLORTeD
TYPE'MP'
'MP' -1
MP'-2 - ALTERNATE
1
E- METAL PANEL
E- METAL PANEL
MANUFACTURER
_
RN
PRODUCE: MATRM 1.0
1.0
=�
PRODUCT,JMNUFACEXPO: ED
PRODUCE: EXPOSED FASTENER
TYPE: 20 GUAGE GALVALUME
TYPE. 20 GUAGE GALVALUW
1 KNISH: FACTORY
RNISH: FACTORY
TYPE'M
M-1 standard
M-2 decorative
_
METAL
mMETAL
MANUFACTURER MCNICHOLS
MANUFACTURER: MCNICHOLS (OR GCSELECTf
IOC GCTANDA
PRODUCE: DESIGNER WIRE MESH K;HATFAU' 3120
PRODUCT: STANDARD WOVEN
FINISH: FOR EXIFRIOR
WIRE MESH
FINISH: MR FXEERIOR
EIVOR
--�
MATERIAL PALETTE
0 e W A R C H I T E C T S
n3 Nrpni. buM22M
dwrldrornW 71M
A l9]1TlO
W'naMile[luom
PRELIMINARY STUDIES FOR EXTERIOR PEDESTRIAN SPACE
RIO HILL FACADE RENOVATION
2nd ARB Submittal
DEecember 21. 2020