Loading...
HomeMy WebLinkAboutSDP202000049 Correspondence 2020-12-22® COLLINS ENGINEERING December 21, 2020 Paty Saternye Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Mill Creek Industrial Park— Lot 11- Final Site Development Plan (SDP2020-00049) 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll ns-eng ineeri ng.com Thank you for your comments dated December17, 2020 on the above referenced project. The following provides a summary of how the comments have been addressed: Planning Comments: 1. Comment previously addressed. 2. Comment previously addressed. 3. Comment previously addressed. 4. Comment previously addressed. 5. Per the email from Cameron on December 181h, this comment has been removed. 6. Comment previously addressed. 7. Comment previously addressed. 8. Comment previously addressed. 9. Comment previously addressed. 10. The easement plat for the SWM easement and utility easement has been submitted to the County for review and approval. 11. See below: a. Comment previously addressed. b. Comment previously addressed. C. Comment previously addressed. 12. Comment previously addressed. 13. Comment previously addressed. 14. Comment previously addressed. 15. Comment previously addressed. 16. Comment previously addressed. 17. Comment previously addressed. 18. Comment previously addressed. 19. Comment previously addressed. 20. Comment previously addressed. 21. Comment previously addressed. 22. See below: a. Comment previously addressed. b. The color of the light for the free stranding light fixture has been changed from the cool white to the neutral white, as requested. The lighting is at 4000 luminaires, which is acceptable as long as the light fixture is a full cut-off light fixture, which it is, per the design and the details. C. Comment previously addressed. d. Comment previously addressed. e. Comment previously addressed. f. Comment previously addressed. 23. Comment previously addressed. 24. Comment previously addressed. 25. Comment previously addressed. 26. Comment previously addressed. 27. The applicant acknowledges the fact that all reviewers must grant their approval for approval of the site plan. This comment is not necessary. 28. Comment previously addressed. 29. Per the email from Cameron on December 18`h, this comment has been removed. Engineering Comments: 1. Comment previously addressed. 2. Comment previously addressed. 3. Comment previously addressed. 4. Comment previously addressed. 5. Comment previously addressed. 6. Comment previously addressed. 7. Comment previously addressed. 8. Comment previously addressed. 9. Comment previously addressed. 10. Acknowledged. The WPO was resubmitted on December 7'h for final review and approval. 11. Acknowledged. The easement plats have been submitted for final review and approval. 12. Comment previously addressed. 13. Comment previously addressed. 14. Comment previously addressed. 15. As requested, the 451 contour has been added and shown on the grading plan, extending from the spillway down to the outfall. 16. As requested, the tree has been moved below the 452 contour from the embankment. ACSA Comments: 1. A detail of the retaining wall and geo-grid has been provided on sheet 6. Measurements have been added to the detail indicating the length of the geo-grid behind the wall and the location of the existing waterline. The geo-grid will stop 2' from the existing waterline and will not extend over the waterline. Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com. Sincerely, Scott Collins, PE