Loading...
HomeMy WebLinkAboutWPO201700020 Plan - VSMP 2020-12-22GENERAL NOTES OWNERS: TMP o56Ko-oo-oo-000A2 GLENBROOK, LLC PO BOX 1467 CHARLOTTESVILLE, VA 22902 TOTAL ACREAGE: 4.7o AC ZONING: R-6 DB.5075, PG. 672 TMP o5600-oo-Eo-o571B2 GLENBROOK, LLC PO BOX 1467 CHARLOTTESVILLE, VA 22902 ACREAGE: 8.172 AC ZONING: R-6 DB.5075, PG.672 DEVELOPER: RIVERBEND DEVELOPMENT, INC. 455 SECOND STREET SE, SUITE 400 CHARLOTTESVILLE, VA 22903 ENGINEER: COLLINS ENGINEERING Zoo GARRETT ST, SUITE K CHARLOTTESVILLE, VA 22902 TOTAL PROJECT AREA: TMP o56Ko-oo-oo-000A2: 4.7o AC (PORTION OF) ORIGINAL PARCEL: 6.3 ACRES SUBTRACT EASTERN AVENUE R/W (1.055) & PHASE IIA (0.545 AC) TMP o5600-oo-Eo-o57B2: 8.18 AC (PORTION OF) ORIGINAL PARCEL: 8.502 ACRES SUBTRACT PHASE IIA (o.33 AC) TOTAL ACREAGE: 22.88 AC PROPOSED ZONING: R-6 ZONING WITH PROFFERS (ZMA 2oi6-05) & PRESERVED SLOPES OVERLAY DISTRICT. (PARCELS SUBJECT TO PROFFERS) PROPOSED USE: 48 SINGLE FAMILY DETACHED UNITS TOPOGRAPHY: TOPOGRAPHY PROVIDED BY ROUDABUSH, GALE & ASSOCIATES, JANUARY 2020. BOUNDARY INFORMATION PROVIDED BY ROUDABUSH, GALE & ASSOCIATES FROM RECORDED PLATS AND SURVEYS, AUGUST 2020. TOPO FIELD VERIFIED MAY, 2020. DATUM: NAVD 1988 EXISTING VEGETATION: MOSTLY WOODED PRESERVED/MANAGED SLOPES: PRESERVED SLOPES ARE SHOWN WITHIN THE LIMITS OFTHE PROPERTY. SEE EXISTING CONDITIONS SHEET FOR LOCATIONS. THEREARE NO MANAGED SLOPES ON THE PROPERTY. FLOODPLAIN: THERE IS NO FLOODPLAIN LOCATED ON THIS SITE. FEMA MAP ID 51003CO229D DATED FEBRUARY 4, DOES. WPO STREAM BUFFER: THE ioo' STREAM BUFFERS ARE SHOWN ON THE PROPERTY. NO PROPOSED DEVELOPMENT SHALL BE LOCATED WITHIN THE ioo' STREAM BUFFER AREA. WATERSHED: LICKINGHOLE CREEK WATER SUPPLY WATERSHED AGRICULTURAL/FORESTAL DISTRICT: NONE BURIAL SITES: NONE DENSITY: 48 UNITS / 12.88 ACRES = 3.73 UNITS / ACRE OVERALL ALLOWABLE DENSITY FOR PARCELS PER REZONING =D8o UNITS PHASE I =84 UNITS (23.887 ACRES) - NOTE: io UNITS OUTSIDE REZONING LIMITS PHASE IIA = 7 UNITS (o.875 ACRES) PHASE IIB = 48 UNITS (12.88 ACRES) TOTAL DENSITY: 149 UNITS / 37.642 ACRES = 3.96 UNITS/ACRE TOTAL REZONING UNITS (TO -DATE) = 139 UNITS BUILDING TYPE: A MINIMUM OF 50%OF THE PROPOSED LOTS WILL BE SINGLE FAMILY DETACHED HOUSES. SINGLE FAMILY ATTACHED (SFA) UNITS AND TOWNHOUSES MAY BE CONSTRUCTED IN THE AREAS ADJACENT TO PARK RIDGE DRIVE AND THE EASTERN CONNECTOR ROADWAY. A MINIMUM OF io%OF THE UNITS SHALL BE SFA OR TOWNHOUSE UNITS. PHASE I: (84 UNITS) i8 SFD UNITS & 66 SFA UNITS & (io BY -RIGHT R-6 SFD UNITS) PHASE IIA: (7 UNITS) 7 SFD UNITS PHASE IIB: (48 UNITS) 48 SFD UNITS TOTAL (TO -DATE): 139 UNITS (R-6 REZONING) & io UNITS (BY -RIGHT R-6 ZONING) SINGLE FAMILY ATTACHED UNITS: 66 TOTAL (47. S%) SINGLE FAMILY DETACHED UNITS: 73 TOTAL (52.5%) AFFORDABLE HOUSING: TO BE ACCOMMODATED AS NOTED IN THE PROFFERS. SEE SHEET FOR ADDITIONAL DETAILS. BUILDING SITES: EACH LOT CONTAINS A BUILDING SITE THAT COMPLIES WITH THE REQUIREMENTS OF SECTION 4.2.1 OF THE ALBEMARLE COUNTY ZONING ORDINANCE. SUBDIVISION STREETS: CURB & GUTTER UTILITIES: COUNTY WATER AND SEWER SETBACKS: FRONT - 5' MIN AND 25' MAX (i8' MIN. FROM R/W FOR FRONT LOADED GARAGES) SIDE -5'MIN REAR - 20' MIN NOTE: SINGLE FAMILY DETACHED UNIT GARAGES - MINIMUM 3' STEP BACK FROM THE FRONT OF THE PRIMARY RESIDENCE. BUILDING HEIGHT: MAXIMUM BUILDING HEIGHT SHALL NOT EXCEED 35' CIVIC AREA/RECREATION: NO CIVIC OR RECREATION SPACE IS PROPOSED WITHIN THIS PHASE OF THE PROJECT. OPEN SPACE: OVERALL REQUIRED OPEN SPACE (25%) = 37.642 AC * 25%= 9.491 ACRES TOTAL OPEN SPACE PROVIDED PHASE]: 5.8 ACRES PHASE IIA: o.o ACRES PHASE IIB: 0.947 ACRES (THIS PHASE) OPEN SPACE "A" =o.o64 ACRES OPEN SPACE'B =o.>_98 ACRES OPEN SPACE'C =o.685 ACRES GREENWAY DEDICATION AREA: 2.7o ACRES TOTAL OPEN SPACE PROVIDED: 9.447 ACRES OPEN SPACE SHALL BE DEDICATED TO THE HOA, WITH EXCEPTION OF THE GREENWAY OPEN SPACE, WHICH WILL BE DEDICATED TO ALBEMARLE COUNTY FOR THE EXTENSION OF THE GREENWAY TRAIL THROUGH THE PROPERTY. PARKING: 2OFF-STREET PARKING SPACES SHALL BE PROVIDED FOR EACH DWELLING UNIT ADDITIONAL ON -STREET PARKING SHALL ALSO BE PROVIDED ALONG THE ROADWAYS AS SHOWN ON THE PLAN. GUEST PARKING REQUIRED: 48 SFD UNITS x i SPACE/4 UNITS = 12 SPACES GUEST PARKING PROVIDED: ig SPACES LANDSCAPING: STREET TREES ARE PROPOSED ALONG THE NEIGHBORHOOD STREETS IN ACCORDANCE WITH ALBEMARLE COUNTY LANDSCAPING REQUIREMENTS WITHIN SECION 32.7.9 OF THE COUNTY CODE. LIGHTING: NO LIGHTING IS PROPOSED WITH THIS DEVELOPMENT. TRASH: EACH LOT SHALL HAVE AN INDIVIDUAL TRASH CONTAINER. RETAINING WALLS: THERE ARE NO RETAINING WALLS PROPOSED WITH THIS PLAN. OFFSITE DISTURBANCE: NO OFFSITE DISTURBANCES AREA PROPOSED WITH THIS PLAN. TRAFFIC GENERATION: TRIP GENERATION BASED ON THE ITE TRIP GENERATION MANUAL (ioTH EDITION) SEE SHEET FOR TRAFFIC INFORMATION. GREENWAY: PROPOSED OPEN SPACE (2.7o ACRES) TO BE DEDICATED TO ALBEMARLE COUNTY AS PART OF THE GREENWAY EXTENSION. SEE PROFFERS FOR FURTHER DETAILS, AND SHEET 2. LAND AREAS: OPEN SPACE = i58.870 SF (3.647 AC) LOTS = 295,107 SF (6.77 AC) ROW DEDICATION = 107,290 SF (2.463 AC) IMPERVIOUS AREAS: ROADWAYS 66,702 SF(D.S3 AC) SIDEWALKS 18,3o8 SF (0.42 AC) BUILDINGS & PATIOS/DECKS 91,296 SF(2.og AC) DRIVEWAYS 18,537 SF(o.43 AC) TOTAL 194,843 (4.47 AC) MARTIN I I I 1 FOOTHILL CROSSING II VSMP PLAN AMENDMENT #5 AMENDMENT TO WP02017IIIIIIIIIIII00020 WHITEHALL DISTRICT ALBEMARLE COUNTY, VIRGINIA TMP: � 051E�0-00-00-'05769,\ ` OWNER:. GLEIV�ROOI \ LLC ✓ I - I f , 901 ACREAG : 8.172 P� I _ c e ZONING '.R-6 DB/PG: `5075/672' o Po �• I\♦♦♦♦ I ,\\. � � J .,_i `__- I L Tlu Of ♦ r A. + - - l % ob ♦ voncaes \ 'Y I \ TMP 0560E 00 00-05500' ♦♦♦ OWNER COULE NIYOFAEMARLE - ACREAGE. 219 AC ZONING R4 . BlPG -2397/431 �v v GLENBROOK AT FOOT INLLS ! /' TMP 0561<9000a03900 PHASE IIB I OWNER', FOOTHILL ` �. I'I I / \ 0.46AC CROSSING, INC ACREAGE DA6AC N O ING: R-1 r r I _ I \ TMP: 0%So P052G0 A 1 OWNER: F R, GEORGE BOR JANIEE 1 ACREAGE: 281A - \ \ \ ZONING: R-4 \` \V DBIPG: 9481017 0 A2 A ' � SWM FACILITY � BROLLC \�\\ i C^ _ ;J-1AER✓ A E. 4.70 AC / X DB/PG: 5075/672-____ _7 1 TMP: 0560E-00-00-04800 OWNER: HEVENE� RICHARD LLOYD II ACREAGE. 14.94 AG' ZONING: R-6 DBIPG: 660210 t I \ TMP: COUN 00OFALBE \ � / OWNER: COUNTY OF ALBEMARLE \ \ \ SHEET LAYOUT SCALE: 1" = 100' ACREAGE: 1.08AC ZONING: PRD DBIPG: 4081MI ----_ TEmaDRnnv caAOlNc �ASEMENTF RE- GNSTRDGTIDNOF EASTERN VENOE G9NNECT RTO RE VAq.4TEO WHEN MUCWN AVEN IS GONBTfiUG D.B. 4a'n,Pc ns --_--_ ` y�r TMPJ 056K0-00-04t00040 \ OWNER: FOOTHILL C' O$SING INC \ ACREAGE: 2 78 AC ^ Q H'P - �BIPG. 3 \ 1 Tfi' 9 1 _ ( SITE VICINITY MAP SCALE: 1" = 2000' WPO PLAN SHEET LIST Sheet Number Sheet Title 1 COVER -2- EXISTING CONDITIONS 3- GRADING & MITIGATION PLAN 3fk GRADING & DRAINAGE PLAN -a& CONNECTOR ROAD GRADING & DRAINAGE PLAN 3C GLENBROOK PHASE 2 GRADING & DRAINAGE PLAN -4- PRE & POST -DEVELOPMENT STORMWATER MANAGEMENT PLAN 5 PRE & POST -DEVELOPMENT STORMWATER MANAGEMENT PLAN -fr STORMWATER MANAGEMENT DETAILS & CALCULATIONS STORMWATER MANAGEMENT DETAILS & CALCULATIONS ;404 STORMWATER MANAGEMENT DETAILS 8 EROSION & SEDIMENT CONTROL NARRATIVE & DETAILS -9- EROSION & SEDIMENT CONTROL PLAN PHASE 1 4@- EROSION & SEDIMENT CONTROL PLAN PHASE II 4@A EROSION & SEDIMENT CONTROL PLAN PHASE III _44- EROSION & SEDIMENT CONTROL CALCULATIONS 42- EROSION & SEDIMENT CONTROL CALCULATIONS 13 EROSION & SEDIMENT CONTROL PLAN PHASE IV 14 EROSION & SEDIMENT CONTROL PLAN PHASE V 15 EROSION & SEDIMENT CONTROL PLAN PHASE VI 16 EROSION & SEDIMENT CONTROL CALCULATIONS SCOTT7R. CDLLINSZ Lic. No. 0357911n Po 10/19/20�� \=5'IOnrA I_ F- z w E 0 O z O r � zo a O U W Z J O z J a o w m zQ cA' w � � w N � O w TOTAL 8PAGES PLAN AMENDMENT PROPOSED CHANGES: 1. UPDATED AMENDMENT PLAN TO ADD IN THE CONSTRUCTION OF GLENBROOK PHASE 2. APPROVED by the Albemarle County Commulniitty/D2evel ment Department Date 2 File WP0201700020 Amendment #5 • L9 z w w z L7 z w Ul z J J 0 U r M M N M I N C) a) N \N ILLI J U) Uj U W D ILLI LU Ll. LL.I Of O C) N LU 0 U w J U w a to w W (Y = JOB NO. 112066 SCALE N/A SHEET NO. 1 a Lo \ % GLENBROOK AT\,\ j - \ - - \ \ FOOTHILLS - \ \ ,i �,. - _ - \ LOT 101 / / F FOOISTING THILLS PHASE IOSOK AT TORM PHASE I \ ���'..,., - / �- di SEWER V - z 66 - - - �� fi6�- / �\ LOT 102 / A , /� / y ' ,� SCOT T R. LINS'7 60_ i/ \ � � � / V A / / / � tam' / / v U Lio. No. 035791 a V 6615 _ �vl A EXISTINGSS1r0o/N19A/L20 XISTING 03 LOT 11OGLENBROOK AT OPEN SPACE 7N SPACE I FOOTHILLS LOT 112 LOT 111 PHASE I V I LOT 104 l LOT 110 OT 109 LOT y �L V A / GAR=66z.00 ` `! - `r� 108 / y FFE=662.67 A A - LOT 107 / V / / %ramV / /A/ A/ LOT117 LOT 105 / J, j GAR=--____ - T 166 x \ I 1 \ I \ \ FFE=658.67 - / ,C� ��- x_. I� --- I L,0 // l /�\ \ /// / li LOT \v\ �� � 653.0 / .-__ ! _ �� / // // �.."'✓� Q� -'-..fir � � � / / AV A \ / / / / / �� .; ..: _FFE=656.67 ,. QA�� �c��p�?�'� GAR=665.3 i - 1 f o fo Av / / ,.v � / / / \ V / / O w Ilk OQ --_ -W / A / / I \ � � �' \ sV , s .`, v , R� 6 ,�- � �� / / / d � -; � >;_ ' _ � � ��`>" I 4 � , � � LOT 115 � / i` a � :::) LO \\ yi Z w � 157 __ -____� I _ _-I_ I_ I `r // \ / _ Q Z0 Q CO GAR=66y.o8 \\ . 4 i LO 1S8 LO iS9 __b; �- ✓ �/ / H n F ER-656.o0 -656 6764 _ / „'> / y ,GLENBROOK AT 1 Cr \ FFE 66 .75 LO 160 .C� / /\ > BSMT=6y683 2 k / � FFE-66 6 I � , ` ,� / v FOOTHILLS �� , I 3� r - �. o'er a 3 7 FFE=66 z.6 �, I T 161I / PHASE I I GAR 66z.6j 10 // n / i I / / Lnn i uj FFE 663.33 { �/ _ V A / / ` G cR=6 -oo LOT 113 /____ � { I / FfE=63g.b7 \l � / GAR=656.00 `� .., � �` GAR=65333 i S2 _ � � l r ' \ � FFE=6 6.6 5 7 � � � FFE=65y.00 / - � - - - - - � I � �� � \`EXISTING GLENBROOK AT EXISTING BSMT=646.83 / - A° \ - i - - / _ i Q�p� OOTHILLS PHASE I STORM. OPEN SPACE /� EXISTING SEWER '� � 4� ///�, \\ \ GAR=6515a O��°��� N SPACE __ FFE=65zz5 r r, � v � � �� � OPE - ✓ � /x O _ \, '• \ ✓ � GAR= 55.ao i � �. ,i I _�---- � �i Q w r � � / f \ / / / FFE-6 6 r\ \ \ / !r GAR-65o.58 ��' OQ� i - 5545 3 s \ \ < f i FFE-651.25 r 5 5 / i . BSMT-6 8 � R 51 a \` -/�:,�. I o GAR=l.°-.' 00 BSMT5645533 0.... r r< F E=65z�58/ 54 , \ � _ __ /,. - � 5 � � r GAR=6 8 ' r =654-: GAR-65333 53 5 FE=654.00 1 J BSMT-6 i _ 44.7 ' 1 ,:. - i, \ \\® \ FFE-6yg.67 j � _ � ___ -- -•° _ ___III Im � � I - / ARBOLEDA DRIVE Nam- _541 ----- - I L9 V_ --ill s - PROPOSED PUBLIC ROAD PUB 'i � \ \ O \ ,\ � �y, � 6y. .• _54 LIC R/W _ � 1 \ _A/1--� \ �\ M \ 1 ram._ I _GAR=64g.00 _ - _ - ✓" -L \ \tA (V /1 EXISTING VARIABLE WIDTH SWM, / \ i ..GAR=6y7 46 -� s% I -_ I------M \ / Lu FOREST AND OPEN SPACE EASEMENT) M D.B. o PG. 66 \ - I�� � - y , 5 75� 4 i _ I GAR=65z.33 I _ _ 7� / FFE=653.00 iL \ T _ ---- // 60 \ ,. \ � I. /\ V1 ' FFE-6y8.67 Egg - ,. - I � I I In _, _ ,•I �/ � � Y • ' - -I'1 - ��1 ' . - - \ \. \ \ \ \ V \ \ � ` '' _. 'I - r, �, _,r r Way , _~r..�o�,�'Ja� m p� 5 7 II II LE6 i 1 54.0YI 0 BSM1-638.83 R5\ w FE654 7 R � FFE-649d3 N w GREENWAY 5- Q DEDICATION z AREA 1- 4 2.70ACRES - AD u 4733 \ 1 GAR-6 oa i -- _ J \ \ FFE=6 4 7 47. I - - _ PROPOSED GLENBROOK PHASE z / i _ > FLOW DIRECTION r 66 I I STORM SEWER TO TIE INTO EXISTING CROZET \ \ \ \ BSMT=637.5o ARROW TYP. - 47 7 I I I I o J \ \ ( ) i FFE-6 6 � I I I ¢ _ EXISTING CONNECTOR ROADWAY �- ,n 06 DOG PARK \ ' \ \\ 1 \ \\ \ _ \ i I S ��� - STORM AND SHALL CONVEY / W V TO WET POND zBONTHE / \ \ I GAR-6y6s3 I� x�i 1 _ 6oa.°VV\�E 1I I FOOTHILLS CROSSING PHASE IV � P O6 gPROPERTY L9 I --I � 3 7 V" GAR=6y5.83 n�/ , ^ - ,, - _- '� GAR=6 0 1 GAR-6 0 BSMT-6 6.6 3 .._ C FFE-6 - 435 ,^�sazFFE. -- FOOTHILLS / \ _ BSMT=6.50 / - _ I _ 44 �7 II �. FFE=6yy.i7 \ i / FFE=6 6. 0 4� - 3 7 r - `' _ 6% � o z �� - - \ - CROSSING - � I I 3 7 PHASE IV fV 4 5 SMT-6 6.6 f� �A GAR=64383 1 - 1 � U) I 1 � I \� =6 4 00 - / \ FFE loo' STREAM BUFFER �' . �. 0 - V - 1 BSMT=6 6 GAR-6 z.8 1 1 `- 4 33 ' V / / Ln 0 $ -� FFE 6 33 7 � � ', I FFE-643.0o i .- �- LU \ - S PROPOSED PRIMITIVE TRAILWAY 1// / W O 22 \ i 4 \ r- \--- PROPOSED \ - \ \ 433 /� A GAR-6 -0 \ _ LOT LINE (TYP.) \\ _ _ /� 3h ,� __,{2 / _ LL 1 i I� _ Cl) z FLOW DIRECTION i, OPEN ` �. GAR=6y�.33 \\ \ rSTORM TIE / W \ - __ � PROPOSED GLENBTIEOK PHASE z J INTO ' ; � � � I � J � �1 1 ARROW (TYP.) EXISTING CONNECTOR ROADWAY - / J V SPACE \ � �� BSMT=632.17 / � � \. i I STORM AND SHALL CONVEY //, / I �� � J W 6 r GAR=642.17 �TO WET POND zB ON THE / T �� FE=642-83 i FOOTHILLS CROSSING PHASE IV / + BSMT=633.00 ROPERTY 1 >__ MT 3 _ ___ _ _ - O FFE 643.33 /� , b,�\ _ `� V - % \ - S ,\ -- _�_ _ -.��� S BS =6 i.5o 3$ y� - . AR=64o.i7 \ - WET N O FFE=6 0.8 �� � I,•' \ Il POND zB \ \ %x GAR=6yo.i7 '>)$� $SMT=63i3oo FFE=64o.83 / w .i2 BSMT=63s.00 w -_ - �_ 10 \ \ _ 6' AQUATIC B1 w I I EXISTING VARIABLE WIDTH SWM `�- ` / \ 11\ 8'SAFETYB _ FOREST AND OPEN SPACE EASEMENT �� / i -6 16� 3oe No. D.B. 5075, PG. 664- `, 112066 / - �7GRAPHIC SCALE -- - SCALE 040 i 1 80A 160 I , . ( SHEET NO. IN ..FEET - ✓ i 1 inch = \40 ft. , L F : 4 - -L-1 _,, WATERSHED Watershed Summary for DA 1A: Outflow Summary:APPROVED _ \ OVERALL SWM PLAN FINAL (2-Year Storm Event) \ y - - ; \. FUTURE BUILDOUT °" , SCALE 1 =1000' 1-yr, cis 2-yr, cfs 10-yr, cfs Pre -Development Post -Development - \ \ ` SCALE 1"=200' Approved Pre -Development 6.86 8.49 25.44 Approved Post -Development Routings 1.48 1.61 2.39 Full Buildout Proposed Post-Dev. Routings 0.94 0.98 7.58 APPROVED Note: Per the approved 9VAC25-870-66 calculations, this development meets channel - -- protection compliance by having apost-development 1-year peak SCS design storm outflow / Total= 15.46 cfs 6.93 cfs ! / �_�_ - - \, less than or equal to 1.48 cfs. ( � /APPROVED FINAL BUILD OUT NOTES: � -Roadways euildout Impervious Area Summary - - - -� - �� - ' •� al. THE LAYOUT SHOWNINCLUDES THE - OIJtFlOW Summary: (10-Year Storm Event) APPROVED / � �-: - �-� '� \•- s � ♦�� ♦ � �� ��■.\ ' "+:� (*Roadways 188,477 sf a GURRENTLY N ER REVIEW. A FINAL VISION Pre -Development Post -Development : ' > - - �♦• �� „- `- ) 'Sidewalks &IOU Driveways 102,924 sf - CURRENTLY UNDER REVIEW. AFINAL ( 5Attached Lots where Half is Captured 4,600 sf SUBDIVISION PLAN IS REQUIRED FOR THE _ 6 Detached Lots where Half is Captured 6,000 sf DEVELOPMENT OF THESE LOTS. ( 61 Attached Lots where Most or All is Captured 112,240 sf ,2. AMENDED SWM FACILITY 41A(LEVEL II WET - POND) WAS SIZED FOR A MINIMUM DESIGN Allis Ca ld s were osp 22 ( Detached LothMt or Captured 44000 sf - TREATMENT VOLUME OF 68,039 cf. THIS Approved Foothill IV Impervious Area 16,C85 sf VOLUME WAS CALCULATED USING THE 474,326 sf VRRM AND ASSUMES THE FULL BUILD OUT DA'1A' 8.49 cfs DA'1A' 0.98 cfs DA'213' 1.89 cfs DA 26 6.97 cfs DA'3C' 1.81 cfs 0A'4D' 2.25 cfs APPROVED \ =� B ♦ FINAL UILDOUT DA#1A 21.64,dc.- \ � CN=80 & Tc 0.23firs, r i V" ¢ * SUBAREA CONSISTING OF 10.89 ac. j ; ( / �. includes Park Ridge Dr, Glenbrook Subdvlsion, Eastern Connector Total= 53.23 cfs 32.63 cfs -Road Ext.) IMPERVIOUS AREAS & 10.75 ac. OF - / , ♦_ _ _ _ _- L I /....... , , ' '.' \N .;;\ / MANAGEDTURF. THE CAPACITY OF THE _,�\ �'/ ,,� / / i N,kF,"m• / /. -_ l /'- `. \ \ S v \;- ,1 I __ --me .A DA#28 UPDATED FOR GtENBROOK 2 Final Bwltlurtlm rviom Area surninnar, APPROVED FACILITY EXCEEDS THIS DESIGN -J \ '/ ' ' -/ ♦ 'i '' ' a `% i':v ` " " - ' iFor Water Qua naty& Quality Calculations) REQUIREMENT. \ ss / / �: / / y / / \ ♦ _ .. \. \�:. \ \ S -/ _ / .\ - \ :.(Water Quality and Quantity Calculations) .THE PROPOSED GLENBROOK PHASE II �� \-- - /� /�//' /.. o v ♦ •s \ % \s j \ -. BUI LDOUT WILL UTILIZE SWM FACILITY #2B, /Roadways 97,477 sf Sidewalks& 15 Driveways 27,948 sf WITHIN THE FOOTHILL PHASE IV/V PROJECT. / , , / ♦ �_� `� `; �\ ' ' j t /%M1 :.\ \' l I -- THEEXISTINGDETENTIONBASINWILLBE 36 Detached Lots where Most or All is Captured (1767 sf 63,612 sf '// • ��-' '' ` \'� s y-\' \ `�\ \ \,''.�= ll \ \'' I \ P UPGRADED WET POND. Approved Foothill IV Impervious Area 49,658 sf THE OVERALL PROJECT SITE WATER QUALITY ,. / / _ /t r / \\ v// `�'t\ ■ \ Proposed DA #2B Total Impervious Area 238,695 sf MEASURES WILL REQUIRE AN ADDITIONAL - / ( �� ,r' \\, / ■ '\ \ 1.7PHOSPHOROUS REMOVAL BE A #28245,179 Approved Di Impervious Area s( METT PERPER THE VRRM. THIS LOAD WILL BE 01UPoAlEO FOR GLENBROOK 2 Final BUildout impervious Area Summary TREATED BY PAYMENT INTO THE For Water Qua ntit&Quall Calculations \ P / ♦ /, /// \. y `.. ,,. ` \./ \ •' \ l _ ♦ \ ( v N I LICKINGHOLE PRO RATASHAREWHICH WILL (For Glenbrook at Foothills Water Quality&Quantity Calculations) REMOVE 30%OF THE 7.89 LB/YR REMAINING .. fit' ` \' l° -� l �• l / / / ' ,`\ :\. A', p Bmlon Drive (Portion) & Road A 10,449 sf LOAD FROM SWM FACILITY #2B (2.37 LB/YR), �, �.. '-�, .. �,7 / „ - -.r ; , �/ / : / <�' ,:' � \/ � „ \ , : L EXCEEDING WATER QUALITY _ , ♦/: ....( / is /\ �:�:\ / I. Sidewalks&4 Driveways 5,247 sf ',\ .�.f ( / / /F, F W/ A ELEV.-1 & ♦ /: :. �' / \, < \\ / -.:.\\ / / )..I ,�' \ \ REQUIREMENTS. ^1Detached Lots where Half is Captured 1,000 sf \ ''s '' '��r � i ♦ / - � _ �r : ,1 I / \ DRAINAGE AREA #3C AND #4D SHALL � -. /' /, ,f � y = _,. 9' CF w LEY.=1 `,... / .. �� /\ \✓ ;,�_ I _, !:I I / /; 3De[ached Lots where Most or All is Captured 6,000 sf RELEASE STORMWATER DISCHARGE TO THE D Proposed DA #3C Total impervious Area 22,6%sf CREEK. THE OVERALL CONTRIBUTING \ .: ', // ./ /_ i� •'.' � / �- - - i♦ ;' � , >: `, �., ";� -. // /.-. ,l ---'i '.,. II \ i ,�. DRAINAGE AREA TO THE CREEK AT THIS SITE Approved DA#3CTotal Impervious Area 21,696 sf IS 134 ACRES. THE PROPOSED DRAINAGE ISS \ ^.\d� i�'�7 /,' �/. \�.. � \�•.• ";`\,' 1 ' i. _ \ DA'1A' 25.44 cfs DA'1A' 7.58 cfs DA'213' 16.50 cfs DA'26' 27.79 cfs DA3C' 4.01 cfs DA'4D' 4.54 cfs SCOTT R. LINSZ F� Lic. No. 035791 a PO 10/19/20�4 11�__lnKTAT_ E," / H Z w 0 O U Z O J a Z rrAA u U Or) W Z o In a Z J O O Q w Z Cr Cif w CL \N o W DA#40 UPDATED FOR GU'.NBROOK 2 Final BUII#out Impervious Area Summary AREAS #3C AND #4D ARE 1.22 ACRES AND \ ' \\J " �` Y' , I) - (For Water4ua ntity&4uality calculations) 1.04 ACRES, RESPECTIVELY, WHICH ARE LESS �< �vl - _ -'- \ ♦ --- -L / G / '�=! / i f. �� ', (For Glenbrook at Foothills Water Quality&Quantity Calculations) THAN 1%OF THE TOTAL CONTRIBUTING - / I� ♦♦ 100 OF OLF w/ A ELEV.=3 & w IDetached union Drive (portion) 7,808 sf DRAINAGE AREA TO THE STREAM AT EACH IIG ;:'_" - -- i� L I, ;,.,n �f/-` \ f ♦ 165 OF CF w/ Q ELEV.-5 idewalks&SDriveways 5,854 sf OUTFACE, HENCE THE I%RULE APPLIES AND THE OUTLETS MEET CHANNEL ADEQUACYLotswhereMostorAllisCaptured 12,000 sf Proposed DA #4D Totallmpervious Area 26,662 sf ;, REQUIREMENTS. FUTURE Total Impervious 23112 sf ti PHASE \\ p APPROVE) FINAL \ DA \ 1.22 aC. Approved I v \ CN=76 & Tc-0.�� hrs c \ PROPOSED FIN L r \ BUILDOUTDA#3 \ _ FUTURE 1.34 ac. \ PHASE CN=75 & Tc=0.30 hrs r I4Wv V A - APPROVED FIN L BUILDOUTDA# > & Tc=0.19 I h L S. P / , l ROPOSED FINA1 y/ '�27 ac / ; / \ \ L9 I\ CN-78 & Tc-0.19 hrs.\Ln 00' LFw A ELEV.=3' \ a >\\\ / / ,^;< \ M 8 Dt CF W/ A ELEV.=14 \ \ i . ( / \\ \ •� \ J CV J / 00 /J airy ui _711LUCN / i / „v.;�� _ GLENBROOK ✓ v CV W PHASE z N W J AW N S � / V . , , , \ 5 f z L 4 / -v... A ., �t ��,. I,� - - f / X4,. A LL _ I ARIABLE WIDTH S M, FOREST, � / � � .. ,,i, -,- -` -` =- I I I - -' r` � / / , �r� /� i. ° \\ i LJJ AND OPEN SPACE E SEMENT \, ^" _ 1 A ROVED FOOTHILL PHA IV / THE M i v � _ r/� T U) ♦, �v D.B. 5075, PG. 664 W _N , TH SW PLAN FROM HE � � Q v�-aw APPROVED FOOTHILLS CROSSING II VSMP f � a APPROVEDDA26 ❑ -�i APPRovEDFAcIurY l'i✓<� -_� ' 6y -�`- PLAN AMENDMENT#31S UPDATED WITH \L9 0 is f PRE -DEVELOPMENT SCALE 1"=200' �� v - - s PPROVED FINAL BUILDOUT DA APPROVED Tc=0.37 hrs ' �� � � - �� � _ � � I ' `I I �� i '.; 1 \ THE GLENBROOK PHASE 2 PROPOSED Q Tc=0.29hrs. 100'OFOVERLANDFLOWATI%' w -i , -_ _ 13.Tc=0.46 LAYOUT. PROPOSED DA #2B DRAINAGE Z = _ _ _. CN-76 & Tc 0.24 hrs. Tc=0.08 hrs. (952' OF CHANNEL FLOW AT 4%) f _ V) ( - -- PROPO�FINALBUILDouTDA#z6 ; ,% ,; �j � '� ' �. AREA AND IMPERVIOUS COVER ARE U � �\ x cN=76&o.z4nr5. REDUCED IN THE PROPOSED PLAN. THE F--i / \ APPROVED ` - _ ,� I �1 PROPOSED DRAINAGE AREA IS 1 8 ac. LEI I i a � z ` I ;' i �\, III � � - `\1� , / 3.3 � l FI _ POE -DEVELOPMENT \\\ \ ' 6 I �� �{' fr ��` ;; , VERSUS THE APPROVED DRAINAGE AREA _ Z \ ®- 1691ac. %� i `\ " '' - V yI !; f 111 • '� OF 13.46 ac. THE PROPOSED IMPERVIOUSUl ® - cNl-'P1&Tc=0.37hrs ,,� \\ \ �� �I , ! ♦ COVERIS238,695 5f, WHICH IS REDUCED O 000 r � ''" ` v n � °, ( 'I, ;�+E� �I vv �dFROM THE APPROVED 245,179 sf. w > LU A EXISTING TREELINE v f-(TYP.) O ) �iA � / i - � � ��'ice' \. A �\ A � � e^e� �. �'` �� VA� � I. �;; � � / � •�": e"t. __ VA APPROVED I \'vOPRE-DEVELOPMENTLLDA #26�; \ I 19.97 ac.A--4;=;', , ;,/�fBM Nz h .. V /. \ J s_ ' �•/' V ".? . ^.�.,t 'TOP OF. MH 699A Cli & TC=0.29 hrs. v /, A ,! : / . �, ' - 4.. ; �;r: y G ARHIC SCAI �v / II TOP OF MNB618yl , / .r.-.. I 'I I ''., ,_ t' ; : - } \ - .�:. .. I i .� I; �r .� .r. ., •.>: '�.T."-o ao ao t azo H ti-- � VARIABLE WIDTH SWM, FOR�ST,-�'� \ ® \ D.B. SOPS, PG. 664 \ \ AND OPEN SPACE EASEME T - __ v ( ) ` - %__ \ \) I ,... -- �� \ \ 1 inch m \\ EXISTING TREELINE (TYP.) \ APPROVED Tc=0.29 hrs Tc=0.25hrs.(100'OFOVERLAND FLOW AT4%.\ PROPOSED FACILITY � Tc=0.04 hrs. (500' OF CHANNEL FLOW AT 6%). _ Nil�.,�„ JOB NO. 112066 SCALE AS SHOWN SHEET NO. 5 EROSION &SEDIMENT CONTROL MEASURES: STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. STRUCTURAL PRAC7CES USED IN THIS SECTION CONSIST OF THE FOLLOWING. 3.01 SAFETY FENCE. A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY THE PUBLIC. APPLICABLE TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH CAN BE CONSIDERED UNSAFE BY VIRTUE OF POTENTIAL ACCESS BY 7HE PUBLIC. 3.02 CONSTRUCTION ENTRANCE.' A STABILIZED PAVED CONSTRUCTION ENTRANCE WITH A WASH RACK LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE TO REDUCE THE AMOUNT OF MUD 7RANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. CONSTRUCTION EN7RANCES SHALL BE INSTALLED AS SHOWN ON THE PLANS TO REDUCE THE AMOUNT SEDIMENT TRANSPORTED ONTO PUBLIC ROADWAYS. 3.05 SILT FENCE: A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC S7RETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED, TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUC77ON OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE SITE, AND TO DECREASE THE VELOCITY OF SHEET FLOWS AND LOW -TO -MODERATE LEVEL CHANNEL FLOWS. THE SILT FENCE BARRIERS SHALL BE INSTALLED DOWN SLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT LADEN RUNOFF FROM SHEET FLOW AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK (VESCH). 3.07 STORM DRAIN INLET PRO7EC770N: A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA. INLET PROTEC7ON APPLIES WHERE STORM DRAIN INLETS ARE TO BE MADE OPERATIONAL BEFORE PERMANENT STABILIZATION OF THE CORRESPONDING DISTURBED DRAINAGE AREA. 3.09 TEMPORARY DIVERSION DIKE., A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT 7HE TOP OR BASE OF A SLOPING DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM UNPROTECTED DISTURBED AREAS AND SLOPES TO A STABILIZED OUTLET. TO DIVERT SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT -TRAPPING FACILITY SUCH AS A SEDIMENT TRAP OR SEDIMENT BASIN. USE WHEREVER STORMWATER RUNOFF MUST BE TEMPORARILY DIVERTED TO PR07ECT DISTURBED AREAS AND SLOPES OR RETAIN SEDIMENT ON SITE DURING CONSTRUCTION. THESE STRUCTURES GENERALLY HAVE A LIFE EXPECTANCY OF 18 MONTHS OR LESS, WHICH CAN BE PROLONGED WITH PROPER MAINTENANCE. 3.11 TEMPORARY RIGHT-OF-WAY DIVERSION: A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS DISTURBED RIGHTS -OF -WAY AND SIMILAR SLOPING AREAS. TO SHORTEN THE FLOW LENG7H WITHIN A SLOPING RIGHT-OF-WAY 7HEREBY REDUCING THE EROSION P07EN77AL BY DIVERTING STORM RUNOFF TO A STABILIZED OUTLET. GENERALLY EARTHEN DIVERSIONS ARE APPLICABLE WHERE THERE WILL BE LITTLE OR NO CONSTRUCTION TRAFFIC W17HIN THE RIGHT-OF-WAY. GRAVEL STRUCTURES ARE MORE APPLICABLE TO ROADS AND OTHER RIGHTS -OF -WAY WHICH ACCOMMODATE VEHICULAR 7RAFFIC. A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE S7RUCTURE FORMED BY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY. TO DETAIN SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS IN "WET" AND "DRY" STORAGE LONG ENOUGH FOR THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. APPLIES BELOW DISTURBED AREAS WHERE THE TOTAL CONTRIBU77NG DRAINAGE AREA IS EQUAL TO OR GREATER THAN THREE ACRES THERE MUST BE SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY FOR THE CONSTRUCTION OF A TEMPORARY IMPOUNDMENT. STRUCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPA77NG DEVICES PLACED AT THE OUTLETS OF PIPES OR PAVED CHANNEL SECTIONS. TO PREVENT SCOUR AT STORMW47ER OUTLETS, TO PROTECT 7HE OUTLET STRUCTURE, AND TO MINIMIZE THE P07EN77AL FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND ENERGY OF CONCENTRATED STORMW47ER FLOWS APPLICABLE TO 7HE OU7LETS OF ALL PIPES AND ENGINEERED CHANNEL SECTIONS. J. 19 RIPRAP: A PERMANENT EROSION -RESISTANT GROUND COVER OF LARGE LOOSE ANGULAR STONE WITH FILTER FABRIC OR GRANULAR UNDERLINING. TO PROTECT THE SOIL FROM THE EROSIVE FORCES OF CONCENTRATED RUNOFF, SLOW THE VELOCITY OF CONCENTRATED RUNOFF WHILE ENHANCING THE P07EN77AL FOR INFIL7RATION, AND TO STABILIZE SLOPES WITH SEEPAGE PROBLEMS, AND/OR NON -COHESIVE SOILS. USE WHEREVER SOIL AND WATER INTERFACE AND THE SOIL CONDITIONS, WATER TURBULENCE AND VELOCITY, EXPECTED VEGETA7VE COVER, ETC., ARE SUCH THAT THE SOIL MAY ERODE UNDER 7HE DESIGN FLOW CONDITIONS. 3.31 TEMPORARY SEEDING THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS TO REDUCE EROSION AND SEDIMENTATION BY STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 30 DAYS. TO REDUCE DAMAGE FROM SEDIMENT AND RUNOFF TO DOWNSTREAM OR OFF -SITE AREAS, AND TO PROVIDE PROTECTION TO BARE SOILS EXPOSED DURING CONSTRUCTION UNTIL PERMANENT VEGETATION OR 07HER EROSION CONTROL MEASURES CAN BE ESTABLISHED. 3.32 PERMANENT STABILIZATION: THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY PLANTING SEED. TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS TO PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE TO SITE CONDITIONS, AND ALLOWS SELECTION OF 7HE MOST APPROPRIA7E PLANT MATERIALS TO IMPROVE WILDLIFE HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, ALL AREAS WILL RECEIVE A PERMANENT VEGETA7VE COVER. 3.38 TREE PRESERVATION AND PROTECTION: PR07ECT70N OF DESIRABLE TREES FROM MECHANICAL OR OTHER INJURY DURING LAND DISTURBING AND CONSTRUCTION ACTIVITY. TO ENSURE THE SURVIVAL OF DESIRABLE TREES WHERE THEY WILL BE EFFECTIVE FOR EROSION AND SEDIMENT CONTROL, WATERSHED PROTECTION, LANDSCAPE BEAUTIFICATION, DUST AND POLLUTION CON7ROL, NOISE REDUCTION, SHADE AND 07HER ENVIRONMENTAL BENEFITS WHILE THE LAND IS BEING CONVERTED FROM FOREST TO URBAN -TYPE USES. APPLIES IN TREE -INHABITED AREAS SUBJECT TO LAND DISTURBING ACTIVITIES. 3.39 DUST CONTROL: REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOLITION AND CONSTRUCTION ACTIVITIES. TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY DOCCECONTI MEASURES SHALL B1 E EMPLOYED R�O PREVENT SURFACE AND AIR DUSTMOVEMENT OF SOIL DESCRIPTION DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE WITH 7HE VESCH. 4E - ASHE LOAM, 257 TO 45% SLOPES. SOIL IS SOMEWHAT EXCESSIVELY DRAINED, WITH MORE THAN 80 IN. DEPTH TO THE WATER TABLE. MADE FROM RESIDUUM WEATHERED FROM GRANITE AND GNEISS, THIS SOIL HAS CONVEX DOWN AND ACROSS -SLOPE SHAPE. 7H1S SOIL HAS NO FREQUENCY OF BONDING OR FLOODING AND A VERY LOW TO HIGH KSAT WITH MODERATE LOW WATER CAPACITY. 5B - BELVOIR LOAM-27 TO 7% SLOPES. SOIL IS SOMEWHAT POORLY DRAINED, WITH 12 TO 24 INCHES TO THE WATER TABLE. MADE FROM RESIDUUM WEATHERED FROM GRANITE AND GNEISS, THIS SOIL HAS CONCAVE DOWN -SLOPE AND CONCAVE ACROSS -SLOPE SHAPE. NO FREQUENCY OF PONDING OR FLOODING, AND MODERATELY LOW TO MODERATELY HIGH KSA T. 7B - BRA DD0CK CLAY LOAM-2% TO 77. SLOPES. SOIL /S WELL DRAINED, WITH MORE THAN 80 INCHES TO THE WATER TABLE. MADE FROM ALLUVIUM AND COLLUWUM DERIVED FROM ACID CRYSTALLINE ROCKS, THIS SOIL HAS CONVEX DOWN -SLOPE AND LINEAR ACROSS -SLOPE SHAPE. NO FREQUENCY OF BONDING OR FLOODING, HIGH WATER CAPACITY, AND MODERATELY HIGH TO HIGH KSAT 37C3 - HAYESVILLE CLAY LOAM-7% TO 151w SLOPES. SOIL IS WELL DRAINED, WI7H MORE THAN 80 INCHES TO 7HE WATER TABLE. MADE FROM RESIDUUM WEATHERED FROM GRAN17F AND GNEISS, THIS SOIL HAS CONVEX DOWN -SLOPE AND CONVEX ACROSS -SLOPE SHAPE. NO FREQUENCY OF BONDING OR FLOODING, HIGH WATER CAPACITY, AND MODERATELY HIGH TO HIGH KSAT REFERENCE: WEB SOIL SURVEY ONLINE DATABASE, FOUND AT h t tp: //web soilsurvey.nres. usdo. go vloppIWebSoilSurvey.ospx EROSION CONTROL NOTES ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATONS. ES-2: THE PLAN APPROVING AUTHORITY MUST BE N077FIED ONE WEEK PRIOR TO THE PRE-CONS7RUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY; AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES-J.-ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SI7F AT ALL TIMES. ES-5.-PRIOR TO COMMENCING LAND DISTURBING ACTIO77ES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIM17ED TO, OFF-S17E BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDIT70NAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTAT70N AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES-7.-ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION /S ACHIEVED. ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED WATER FILTERING DEVICE. ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. EROSION CONTROL NOTES 1. THE PLAN APPROVING AUTHORITY MUST BE N077FIED ONE WEEK PRIOR TO THE PRE-CONS7RUC77ON CONFERENCE, ONE WEEK PRIOR TO 7HE COMMENCEMENT OF LAND DISTURBING ACTIVITY AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND NRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. J. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CON7ROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES /N AREAS OTHER THAN INDICATED ON THESE PLANS INCLUDING BUT NOT LIMITED TO OFF -SITE BORROW OR WASTE AREAS THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO 7HE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AU7HORITY. 6. 774E CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY 7HE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING S17E DEVELOPMENT UN77L FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFEC77VENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WAS7E AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECT70N 5.1.26.. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WI7H SECTION 13-301 OF 7HE CODE OF ALBEMARLE. 14. BORROW FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7.•OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE 0 SLIDES SINKING OR COLLAPSE. 16. 7HE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACIL177ES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT BUILDING OR OTHER PORTION OF 7HE PROPERTY. 17. TEMPORARY STABILIZAT70N SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET S7RAW MULCH IS TO BE APPLIED AT BOLBS/10OSF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZA7ON SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICUL7URAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS 1000SF INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS ACRE AND CONSIST OF A 10-20-10 NU7RIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYECRASS OR KENTUCKY BLUEGRASS. S7RAW MULCH IS TO BE APPLIED AT 80LB5110OSF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE.. ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CON7ROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G) 22. PERMANENT VEGETATON SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DA7E 7HE LAND DISTURBING ACT70TY COMMENCED. (WATER PR07ECT70N ORDINANCE SECTION 17-2078) DESCRIPTION OF EROSION & SEDIMENT EROSION CONTROL NOTES & NARRATIVE CONTROL MEASURES: PURPOSE., THE PURPOSE OF THIS LAND -DISTURBING ACTIVITY IS TO CREATE THE ROADWAY AND LOTS FOR GLENBROOK EROSION AND SEDIMENT CONTROL MEASURES, PHASE ll. THE TOTAL ACREAGE TO BE DISTURBED IS 70.93 ACRES. IT /S ANT7CIPATED THAT A SEDIMENT BASIN, CONSTRUCTION ENTRANCE, EXIS77NG SITE CONDITIONS. CONSTRUC7ION ROAD STABILIZATION, RIGHT OF WAY DIVERSION, DIVERSION DIKE, THE EXISTING PARCEL IS VACANT AND HILLY. THERE IS AN EXISTING STREAM THAT RUNS ALONG THE OUTLET PROTECTION, INLET PROTECTION, TREE PROTECTION AND SILT FENCE WILL SOUTHERN SIDE OF 7HE PARCEL. THE S7REAM FLOWS WEST TO EAST ALONG 7HE PROPERTY LINE. THE SITE IS GENERALLY WELL DRAINED AND SLOPES FROM THE NORTH TO THE SOUTH. EROSION AND SEDIMENT CONTROL BE INSTALLED TO CONTROL SURFACE DRAINAGE. TEMPORARY SEEDING WILL BE MEASURES HAVE BEEN DESIGNED TO CONFORM TO THE EXIS77NG SI7F SLOPE AND PROTECT THE PERIMETER USED IMMEDIATELY FOLLOWING ALL LAND DISTURBANCE ACTIVITIES. TEMPORARY STREAMS AND ADJACENT PROPERTIES. STOCKPILE AREAS WILL BE MAINTAINED FROM TOPSOIL THAT WILL BE STRIPPED ADJACENT AREAS,• FROM AREAS TO BE GRADED AND STORED FOR LATER SPREADING. STOCKPILE 7HE SITE /S POSITIONED BETWEEN GLENBROOK AT FOOTHILLS PHASE I SUBDIVISION TO THE NORTH, FOOTHILL LOCA77ONS SHALL BE ON SITE AND SHALL BE STABILIZED WITH A TEMPORARY CROSSING ll TO THE WEST, THE CONNECTOR ROAD/EASTERN AVENUE AND FOOTHILL CROSSING SUBDIVISION TO VEGETATVE COVER. PERMANENT SEEDING WILL BE PERFORMED FOR ALL AREAS THE EAST, AND WESTLAKE HILLS TO 7HE SOUTH. THE GLENBROOK AT FOOTHILLS SUBDIVISION IS CURRENTLY WHICH WILL NO LONGER BE EXCAVATED AND WHERE CONSTRUC770N ACTIV177ES UNDER CONS7RUCT7ON. 7HE FOOTHILL CROSSING SUBDIVISION AND THE LOTS LOCATED ALONG JONNA STREET ARE OCCUPIED. HAVE CEASED. PERMANENT SEEDING SHALL ALSO BE PERFORMED FOR ALL OFFSITE LAND DISTURBANCE.• DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR A YEAR OR MORE. THERE IS NO OFFSITE LAND DISTURBANCE REQUIRED WITH THIS PLAN. SELECTION OF SEED MIXTURE WILL DEPEND ON THE 77ME OF YEAR APPLIED. CRI77CAL AREAS: TEMPORARY SEEDING WILL BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL NO PRESERVED STEEP SLOPES ARE PROPOSED TO BE IMPACTED. STREAMS, STREAM BUFFERS, SWM FOREST & BE LEFT DORMANT FOR MORE THAN SEVEN DAYS. THESE AREAS SHALL BE OPEN SPACE EASEMENTS AND OCCUPIED RESIDENTIAL LOTS ARE TO BE PROTECTED. SILT FENCE SHALL SEEDED WITH FAST GERMINATING VEGETATION IMMEDIATELY FOLLOWING GRADING PROTECT EXISTING HEATHERFIELD LANE. OF THOSE AREAS SELECTION OF SEED MIXTURE WILL DEPEND ON THE TIME OF OIL YEAR APPLIED. SEES BOUNDARIES AND NAMES ON THE PHASE I EROSION AND SEDIMENT CONTROL PLAN, AND THIS SHEET FOR THE SOIL DESCRIP77ONS. 3.01 SAFETY FENCE - SAFETY FENCE WILL BE INSTALLED AROUND THE SEQUENCE OF CONSTRUCTION: PROPOSED SEDIMENT BASIN. 1. NOTIFY ALBEMARLE COUNTY TO SCHEDULE A PRE-CONSTRUC77ON MEETING AS REQUIRED. 3.02 CONSTRUC7ION ENTRANCE - ONE CONSTRUCTION ENTRANCE SHALL BE 2. NO EROSION CONTROL MEASURES MAY BE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT THE INSTALLED. THIS WILL BE THE ONLY POINT OF INGRESS AND EGRESS TO THE APPROVAL FROM THE ESC INSPECTOR ON THE PROJECT. SITE CARE WILL BE TAKEN TO PROTECT ADJACENT ROADWAYS FROM TRANSFER J. CONTRACTOR SHALL IDEN77FY THE LIMITS OF DISTURBANCE AND THE SWM FOREST AND OPEN SPACE OF SEDIMENT EASEMENTS AND INSTALL TREE PROTECTION TAPE ALONG THE BOUNDARIES AS SHOWN ON THE ESC PHASE IV PLAN. THE CONTRACTOR SHALL INSTALL TREE PR07EC77ON FENCING WHERE INDICATED ON THE PLANS 3.05 SILT FENCE- SILT FENCE WILL BE PLACED ON THE DOWNSTREAM SIDE OF BEFORE ANY S17E DISTURBANCE SHALL TAKE PLACE. CONTRACTOR SHALL ENSURE 7HAT TREES TO BE DISTURBANCE WHERE NOTED ON THE PLANS. SAVED ARE FLAGGED ALONG THE LIMITS OF CLEARING. 307 STORM DRAIN INLET PROTECTION- /P WILL BE INSTALLED ON EACH 4. INSTALL THE PAVED CONSTRUCTION ENTRANCE WITH WASH RACK AS SHOWN ON THE PLANS. PROPOSED INLET AS SHOWN ON THE PLANS CONSTRUCTION ENTRANCE TO BE INSTALLED WHERE CONSTRUCTION VEHICLE ROUTES INTERSECT PAVED 3.09 TEMPORARY DIVERSION DIKE- A DIVERSION DIKE WILL BE USED AROUND PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIM1ZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) THE PERIMETER OF S17E DISTURBANCE WHERE SHOWN ON 7HE PLANS TO DIRECT TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE RUNOFF TO ON-S/7E SEDIMENT CONTROL FACILITIES.SURFACE, REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPOR77NG TO A SEDIMENT CONTROL 311 TEMPORARY RIGHT-OF-WAY DIVERSION- A TEMPORARY RIGHT-OF-WAY DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS DIVERSION IS PROPOSED AT THE CONSTRUCT70N ENTRANCE, LOCATED ON THE MANNER. INSTALL THE WASH RACK UPHILL FROM THE PROPOSED SEDIMENT BASIN LOCATION. A DIVERSION CONNECTOR ROAD. SHALL BE INSTALLED WHERE SHOWN ON THE PLANS, DIREC77NG RUNOFF FROM THE SIT[, WASH RACK, 314 TEMPORARY SEDIMENT BASIN -TEMPORARY SEDIMENT BASIN WILL BE CONSTRUCTION ENTRANCE AND RIGHT-OF-WAY DIVERSION TO THE SEDIMENT BASIN. ACSA WILL DETERMINE INSTALLED WHERE SHOWN ON THE PLANS. THE APPROPRIATE METHOD OF SUPPLYING WATER TO THE WASH RACK. PARKING AND CONSTRUCTI0N ENTRANCE AREAS SHALL BE CLEARED OF ALL VEGETATION R0075 OR OTHER OBJEC770NABLE MATERIALS 3.18 OUTLET PROTECTION- TO BE PROVIDED AT THE OU7FALL OF DRAINAGE BEFORE CONSTRUCTION ROAD STABILIZAT70N IS INSTALLED. PIPES WHERE SHOWN ON PLANS. 5. INSTALL THE REMAINING INITIAL CONSTRUC770N MEASURES AS SHOWN ON THE PHASE l EROSION CONTROL 3.19 RIPRAP- RIPRAP SHALL BE INSTALLED AS OUTLET PROTECTION WHERE PLAN SHEETS. THIS INCLUDES THE SEDIMENT BASIN SILT FENCE WITH WIRE BACKING AND THE DIVERSION SHOWN ON THE PLANS, AS WELL AS AT THE UTILITY STREAM CROSSING BERMS STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS BERMS TRANSITIONS. AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE 331 TEMPORARY SEEDING- TEMPORARY SEEDING SHALL BE APPLIED WHERE CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. SHOWN ON THE PLANS. 6. ONCE ALL THE EROSION CONTROL ITEMS HAVE BEEN INSTALLED AS SHOWN ON THE PHASE l EROSION 3.32 PERMANENT SEEDING- PERMANENTLY SEEDING SHALL BE APPLIED WHERE CONTROL PLAN AND THE INSPECTOR HAS APPROVED THE EROSION CONTROL MEASURES, THE CONTRACTOR SHOWN ON THE PLANS CAN BEGIN GRADING OPERATIONS. THE CONTRACTOR SHALL ENSURE THE EROSION & SEDIMENT CONTROL 338 TREE PRESERVA77ON AND PROTECTION- TREE PRESERVA77ON FENCING MEASURES SHOWN ON THE PHASE H EROSION CONTROL PLAN SHEETS ARE INSTALLED. MEASURES SHALL BE INSTALLED WHERE SHOWN ON THE PLANS NO TREES SHALL BE INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. HARMED OUTSIDE OF THE LIMITS OF TREE PROTECTION FENCING. 7. THE CONTRACTOR SHALL ROUGH GRADE THE ROAD AND ITS 77E-IN SLOPES TO THE CONTOURS SHOWN ON 3.39 DUST CONTROL- DUST CON7ROL SHALL BE APPLIED THROUGHOUT THE SITE THE ESC PHASE V PLAN. WHERE SHOWN ON THE PLANS. 8. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION STORMWATER MANAGEMENT.- SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL STORMWA7ER QUANTITY AND UTILITY COMPLIANCE IS MET THROUGH THE USE OF Q Q REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. PERMANENT STABILIZAT70N SHALL E B B ( ) SWM FOREST & OPEN SPACE EASEMENTS AND WET PONDS. SEE APPROVED APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 9. THE CONTRACTOR CAN THEN BEGIN INSTALLING THE PROPOSED UTILITIES, CURB AND GUTTER, STORM FOOTHILL CROSSING AMENDMENT /fr3 VSMP PLANS AND CALCULATIONS SEWER AND THE CONNECTOR ROAD. IMMEDIATELY FOLLOWING THE INSTALLATION OF THE DROP INLETS, INLET PROTECTION SHALL BE INSTALLED. INLET PROTEC7ON SHALL BE INSPECTED AFTER EACH RAINFALL MAINTENANCE.- EVENT AND REPAIRS SHALL BE MADE AS NEEDED. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, 7HE STONE MUST BE PULLED IN GENERAL, DURING CONSTRUCTION THE RLD OR CONTRACTOR ON -SITE WILL CHECK AWAY AND CLEANED AND/OR REPLACED. INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ALL EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH ON THE ESC PHASE Vl PLAN. SIGNIFICANT RAINFALL. MONITORING REPORTS WILL BE REQUIRED FROM THE RLD IF 10. NO ITEM SHALL BE REMOVED UNLESS THE UPSTREAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES NEEDED. SPECIFIC ATTENTION WILL BE GIVEN TO THE FOLLOWING ITEMS:PERMISSION. a. SEDIMENT BASINS WILL BE CLEANED AND MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION &SEDIMENT CONTROL HANDBOOK. 11. MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION AND SEDIMENT ET PROTECTION AND GRAVEL OUTLETS WILL CHECKED REGULARLY FOR b. INLET NLDIMENT CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN SEBUILDUP THAT WILL PREVENT PROPER DRAINAGE. IF THE GRAVEL IS SE A ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. CLOGGED BY SEDIMENT, THE GRAVEL WILL BE REMOVED AND CLEANED, OR IT WILL 12. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER BE REPLACED. FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS c.ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR 07HERWSE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND 7HE DISTURBED DETERIORAT70N OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL SOIL AREAS RESULTING FROM THE DISPOS177ON OF TEMPORARY MEASURES SHALL BE PERMANENTLY BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHED HALF WAY TO STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. THE TOP OF THE BARRIER. d. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FER77LIZED AND RESEEDED AS NEEDED. IN CASE OF EMERGENCY, THE PRIMARY CONTACT FOR THE PROJECT WILL BE THE RLD OR CONTRACTOR ON -SITE THE CONTRACTOR WILL BE DETERMINED AT 774E TIME THE CONTRACT IS AWARDED. IN ADDITION THE OWNER MAY BE CONTACTED, MR. ALAN TAYLOR. UPON COMPLETION OF THE PROJECT THE OWNER WILL BE RESPONSIBLE FOR SITE MAINTENANCE. TABLE 331-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS -QUICK REFERENCE FOR ALL REGIONS" Rate Planting Dates SKcies lbs. acre Sept. 1 - Feb. 15 50/50 Mu of Annual Ryegrass multi-flomm)multi-flommm) (Lolium & 50 - 100 Cereal (Winter) Rye (Secale ttre {Sec l ile ttre;Ve) Feb. 16 - Apr. 30 Annual Ryegrass (Inlium multi-flomm) 60 - 100 May 1 - Aug 31 German Millet (&lar'a italim) 50 Source: Va. DSWC TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion 7:1 Coarse Spray 1,200 Latex Emulsion 125:1 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion (Non -Traffic) 7:1 Coarse Spray 450 Acrylic Emulsion (Traffic) 35:1 Coarse Spray 350 Source: Va. DSWC La i T d , L SECTION A -A PIPE OUTLET TO FLAT AREA W17H NO DEFINED CHANNEL d PLAN SECTION A -A OP PIPE OUTLET CONDITIONS NO SCALE MTER FABRIC ENTRENCHED a• COMPACTED SOIL h 9 IDNBt01E •I - I� IJ �TLI- uIm-II I -Lr�I=11 lF I- II=I-I I T1-I�I 1m II� IlT L�II 1�1�1111�11�11=IIIJ1= - e• 1@t�OY �~ Bo TEMPORARY 24" DIVERSION BERM 1. SET POSTS AND EXCAVATE A 4"X4" TRENCH UPSLOPE ALONG THE LINE OF POSTS. 2. STAPLE WIRE FENCING TO THE POSTS. SILT FENCE sF (WITH WIRE SUPPORT) NO SCALE Paved camtruction entrance for erosion control plans IsT9UOd1 '. ESS 3 SM-1A ASv"4Iax '0- CIX _F. ]S : AccREu PROFILE 70• MIN. �TIV :➢M'.-. e. "i-'. ASP y PAVED wwSMaACR €nsn"D It 2x PAVEVI NI � 12'Ma•• •MUS' ENIENJ FA_ arDtN L-0 !-TOSEDIITME ONNWIGC 0 ENMENT AND a INCRI [CRESS TRAP"w. DEVICE IWERATgN PJBN IY MN. H a% TO rRA SECTION A -A a oral t L't Ilr wi NI ssaa ! tl A Rluwl wt rr tap of 1 ewN I u P ae , ummwwl 1 ekq bako AuNoH rah-r mipplym a wa 11 II Hitha ,6awdo, of 1 ' wataw for adequMe tol69blll pleAaue Wadi watt" uaw br ,aalwd ao'aN hwu the 01"Mre to an applocN eetdug as to Ianorr snlanal as .r+Wnnll •ha0 be yln'mlal buw alnwa stww AIAum, CII of walnrnmsrs PAVED WASH RACK I I II _I k f: Cat•. I r�.. Jill/ •iY'i I'i'i'i •ti '.�i : �.•� :•>ll -_� 1 Y_- i i sue`-.-.�9y�,.•r. •hw i7 i is I I I1� W Source: Adapted from Comed Plastics and Plate 3.01-1 DO REsjLjERsU3IiillIn TOTAL LBS GENERAL SLOPE (3:1 OR LESS) PER ACRE KENTUCKY 31 fL' 1- 128 LBS. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP 20 LBS. SEASONAL NURSE CROP 150 LBS FEBRUARY 16 THROUGH APRIL ANNUAL RYE MAY 1 THROUGH AUGUST 15 FOXIAIL MILLET AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE NOTES: 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION, IN ,ACCORDANCE W/ VESCH STD 3.35. PS PERMANENT SEEDING SCHEDULE NO SCALE (STD. & SPEC. 3.32 OF VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK, 3RD ED.) CURB INLET BLOCK WIRE SCREE CRAWL• FILTER OR #5 COARSE AGGREGATE. OBLOCK & GRAVEL CURB INLET 07-$ IP SEDIMENT FILTER NO SCALE 3 ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. I i H lam/ r�� _ I I � r- 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. FLOW 1 1 1-1 I' - if � T I I- EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SCOTT/R. CITLLINSZ Lic. No. 035791,E pow 10/19/20 ti S 1 s NA 11 C. r o L E z O a r U Z w o to O z J o a H Ln t7. Z LU H LU / IIIIi 0 N Q � o CD �-_1(14 w w J J U ti M C'7 N M 1 N O N N L J J CO LU U 1 i D U) LU U)ll�^ LU L.L rQ V O N J Q LU 0 W LU Q z O O v LU _2 0 LLJ , �,) W z O O W w F F w a in JOB NO. 112066 SCALE N/A SHEET NO. 8 LIMITS OFDISTURBANCE, / ; / `��� �G'% O 4 / / ! /' -� / / / / T UP TOTAL AREA=ac. --- -- io. 93 �. II � I 1 _ j / T "�� _ �SCOTT R. LINS`Z' 6 L , _ / 1 iU. O. 357 - _ -- N 0 L I i � !j � ` / '�w� �o�O� S`SI ONAL F'��� � �, - - - - D 40'g - ` - N s -� w, ro� "� w/ WIRE� v;�� ' z lw -- PROPERTY BOUNDARY (TYP.)to 6 lot WIRE w - - — SF BACKING ♦ - — - - �� _ - U �1 Z u m — % Z. O J 'D INAGE DIVIDE (TYP.�) \ �� ey a z a U �y / I I _- 1 Y�i cn Co w CONTRACTOR SHALL INSTALL A R/W J f ° FLOW DIREG1Ib ARROW TYP �� - �j / o aLu r - — �? _-y) DIVERSION ACROSS THE CONSTRUCTION RWD , O > Co e - ENTRANCE AND DIVERT CE RUNOFF TO f I > a a - _- w 6 BASIN. I V 1 w s THE PROPOSED SEDIMENT o - - -- TS IP hYYY ; ' PROPOSED PAVED - • S� i — - TS PROPOSED 18 DIVERSION. CONSTRUCTION ENTRANCE CE ,■ W \ - \ CONTRACTOR SHALL ENSURE 6 (12x70 MIN,) � WASH RACK � o - - U - DID POSITIVE SLOPE IS MAINTAINED. i CRS I / - 658- - SOIL TYP BERM SHALL BE STABILIZED AS A AA - 76 66p-- FIRST STEP IN DISTURBANCE. PROPOSED PHASE TRACTOR STAGING &SP DRAINAGE AREA TO L - - w " N PHASES I LOCATION _ DIVERSION DIKE - 3.50 ac. OF PORTA-POTTIES � I -� � � � ¢ °' oo , N O S\ PROPOSED 18" DIVERSION. _, �/ I o / CONTRACTOR SHALL ENSURE _ THE FUELING TANK SHALL BE COMPLETELY PHASES I LC ®ON I 6S0I / POSITIVE ERM ALL BE ST BILIZEDI NEDA A SURROUNDED BY A 2' DEEP, 2' WIDE EARTHEN OF 15cY D OIF TER 640 o / pDBHPHASE I DRAINAGE AREA BERM WITH A HEAVY MIL POLYETHYLENE FIRST STEP IN DISTURBANCE. LINING, OR BE PLACED IN AN IMPERVIOUS o NT BASIN vF TO SEDIMENT @ PHASE I LOCATIO SOIL T S �\ 37C3 9.09 ac. 650 OPEN -TOP DUMPSTER. THE PROPOSED BERM E OR DUMPSTER SHALL CONTAIN FUEL IN THE OF FUELING AREA PROPOSED STOCKPILE EVENT OF A SPILL. CONTRACTOR SHALL , pD \ - SURROUNDED BY SILT FENCE _ ENSURE VOLUME CAPACITY IS 10% LARGER EXISTING STORMWATER 638 ✓� THAN THE MAXIMUM VOLUME OF STORED FUEL. - � $ � � •• \ MANAGEMENT FACILITY ' M � TS *4z CN s,s \ SF w/ WIRE - _ ^� _ _ 3 BACKING 64E - TS ` \ — — M PR6POSED 18" DIVERSION. CONTRACTOR SHALL ENSURE v 0 POSITIVE SLOPE IS MAINTAINED. DIDj` — LL.I a a - - \ BERM SHALL BE STABILIZED AS A - N DRAINAGE AREA TO FIRST STEP IN DISTURBANCE. � - m- w �� \� DIVERSION DIKE = 4,77 ac. , - / i- N uj o \ s \� ` \ CONTRACTOR SHALL ENSURE DURING - _ �. ' IP � - ; �. � � � ` 1;" � N EXISTING VARIABLE WIDTH SWIM, ESC PHASES I & II, WHEN THE BULK OF - �. I �J i� EXISTING TREELINE (TYP.) \ / Q � � �� THE CLEARING &GRADING OPERATIONS d�� Q FOREST AND OPEN SPACE EA MENT 1 64o--- -- - OCCUR, THAT THE DOWNSTREAM DC , - � - \ \ z � D.B. 5075, PG. 66q i DIVERSION IS IN PLACE & FUNCTIONAL Q ° \ \ �AT THE END OF EACH DAY. ' / - I _j J � I z v �• �SOILTYPE ��' Q ( ) - DRAINAGE DIVIDE TYP. - � I ,� v PROPOSED "� 76 !� > _j J o CONTRACTOR SHALLENSURE N.■■,, N\ B BERM SHALL BE STABILIZED E . \ PROPOSED SAFETY FENCE, It D KEEP OUT" LL - Q a O BENCH GPL o�o`N � 501 TYPE DID POSITIVE SLOPE IS MAINTAINED. WARNING UICK SAND KEEP OUT' I a Pa�Pt� gENOH �' o FIRST STEP IN DISTURBANCE. IP ___I 3 r (n 0 a \ + TS PROPOSED 30" , + CKU \ - CP STANDPIPE AI G -y" Z DRAINAGE AREA TO SILT , R U \\ FENCE = 0.79 AC. - _ z o i 638 ro� o - • ,• ,� i 1--i ILL ] m PROPOSED AFFLES 1 w - ♦ w/ WIRE 0� �� \ A�/ _ 1, SF BACKING �' _ _ 24 �"'v k PROPOSEDFLATVDOTC SSAIC A 5 �� - �� U \ , ' I OP AGGREGATE OUTLET PROTECTION w/ - U) \ \ \ \ __g30 x / \ , SB / GEOTEXTILE FILTER FABRIC \ �'/�" 06 (OD / \ O /UNDERLAYMENT & VDOT STD. EW-1PC F- V / L ♦ I S ' `�LIMITS OF DISTURBANCE, �® ♦ 62/ L-l4', ww�6', wz=16', D=1s' Mw. • _ -- Lu O z W TOTAL AREA=io.93 ac. \' ( _ Y O Z B CKING 6 W. LL _t-n w w WIRE � � � i � , �30 s s - TREE \ - TP TROT _ �' -� o _ - _� PR ECTION s ♦ \ _ - _ - - PROTECTION TP PRRCP BARREL s - - LLI Hi LLI o • __ ---- s - ----_='--- EXISTINGVARIABLEWIDTHSWM --FOREST AND OPEN SPACE EASEMENT ��- BACKING. SF - -s- -' s— --- s D.B.5075,PG.664----� - ---------- - - - / s ---- -- s + - — O -- -- -- --- _` s _ C� x - ----- --- _ _ s-- --s _ - N 0 s_ --- _ . __-- \ / \ PROPOSED TREELINE TYP. - - - - - - _ ( )Lu U F_ Lu F F L��� w 5 TYPE V 1 _ O w E - OIL TY / ce z °0 ` v ♦ - .. 4 \ � � _ JOB NO. o E \ � GRAPHIC SCALE � �_ PROPERTY BOUNDARY (TYP.) _ _ — —v 112066 0 Y/// i� V A \ 0 20 40 80 % --( / V A _ - SCALE a /F/ ( IN FEET ) ) V 1 \\ / , SHEET NO. n 1 inch = 40 ft. i ` ` - N \ ► i , - - — / \ �3 OFIr LIMITS OF DISTURBANCE, TOTAL AREA=1o.93 ac.�/ / B, -. I ,�a " robl� 4$ //' I -----I — I � / / \ O�o SCLINS� O6 / `b U _ Lic. No. 035791.- / 19 2 z a N W �h W w wA/CWIRE �` w ? 1 `_` ZIP PROPERTY BOUNDARY TYP. i a _— ;5 ell w/WIRE SF /-�' _ ��. Jar'` —`-- ��— w II.. � _ 1 I _ BACKING,, 6 / I I� --��� ----�1 - _ — o 0 3 E /♦ t F z U41P y /� I I 1 1 11 / / �_ 1 .� �./-- 0 w DC U Un Co w 54 1 _--- CONTRACTOR SHALL INSTALL A R/W F i / // o a w s - _ _ _ - - - J �54 DIVERSION ACROSS THE CONSTRUCTION RW D u • O m 3 _-- 'A 6------- ENTRANCE AND DIVERTCERUNOFFTO I 'A > Lu z a a 6 THE PROPOSED SEDIMENT BASIN. I V l w o - — 5 TS - \ - / F�1 IP _ o PROPOSED PAVED W PROPOSED 18" DIVERSIO / CONSTRUCTION ENTRANCE CE �! - (12'x70' MIN,) w/ WASH RACK I CONTRACTOR SHALL ENSURE 65 ° Y DIDCONTRACTOR SLOPE IS MAINTAINED. i CRS / PHASE II DRAINAGE AREA 658 BERM SHALL BE STABILIZED AS A - �' a _ TO SEDIMENT BASIN FIRST STEP IN DISTURBANCE. % M I , 54 -' - 9.60 ac. i PROPOSEDPHASE I II 52 STAGING AREA - CD So - DRAINAGE AREA TO PHASES I LOCATION I - - � \ o °J ti DIVERSION DIKE - 3.75 ac. OF'PORTA-POTTIES t I r \ _ _ o °\ N Sy PROPOSED 18" DIVERSION. CD ~ o 5 CONTRACTOR SHALL ENSURE �- y THE FUELING TANK SHALL BE COMPLETELY PHASES I LOCATION � 650I S D OSITIVE SLOPE IS MAINTAINED, Y BERM WITH A HEAVY MIL POLYETHYLENE SURRNINGEOR BE PLACED IN ANIMPERVIOUS E EARTHEN OF 15c DUMPSTER • g40 ` E ERM SHALL BE STABILIZED AS A 1 _ I I T STE IN DISC TURBANC�F. 1 % PHASES I LOCATION ° OPEN -TOP DUMPSTER. THE PROPOSED BERM OF FUELING AREA FLOW DIRECTION ARROW (TYP.) - PROPOSED STOCKPILE OR DUMPSTER SHALL CONTAIN FUEL IN THE 52 So� EVENT OF A SPILL. CONTRACTOR SHALL iL9 \ 42 SURROUNDED BY SILT FENCE ENSURE VOLUME CAPACITY IS 10% LARGER EXISTING STORMWATER v ✓� T THAN THE MAXIM M VOLUME OF STORED FU L. 5 MANAGEMENT FACILITY M u') TS CN \ _ v s v w/ WIRE �� w + — - / — ` t SF �BAc'rrxuG �. w sus TS C'') Z 3 PROPOSED 18 DIVERSION \ _ > 0 \ + CONTRACTOR SHALL ENSURE w POSITIVE SLOPE IS MAINTAINED. DID W n x BERM SHALL BE STABILIZED AS A � �' "�, - ' i � � ` � - \ (�I (n > ® \ -- ? DRAINAGE AREA TO \� FIRST STEP IN DISTURBANCE. . " -y o \\ \ \ ` DIVERSION DIKE = 4.91 ac. — — �,; CA I l o \ s \ \ CN �� \ CONT CTOR SHALL ENSU E DURING IF y (V uj \ \ EXISTING VARIABLE WIDTH SWM ESC PHASES I & II, WHEN THE BULK OF - \ N _ THE CLEARING & GRADING OPERATIONS EXISTING TREELINE (TYP.) / Q FOREST AND OPEN SPACE EASEMENTJ • \ 5 75 4 - - - _ - OCCUR, THAT j; W i Z 9 \ OCC AT THE - vv D.B. o PG. 6dB- DC � ! � s \ DIVERSION IS IN PLACE & FUNCTIONAL AT THE END OF EACH DAY. v PROPOSED 18" DIVER ION. U) CONTRACTs\ \ \ EEN�P \d I LLI DRAINAGE I D (TYP.)- POSITIVE SOLOPE IS MAINTAINED. \ L ENSURE PROPO"WAR IN QUICK SAND, KEEP OUT' SED SAFETY FENCE, INSTALL SIGNS,\\ 1 cN n \ \\ GRO\G !\O \ `e p / y 1 a�Pt\cgENCN F- OE P e _ BERM SHALL BE STABILIZED AS A � 6i \ \ PREP ES \ FIRST STEP IN DISTURBANCE. 6 P PF��y eE Q Z " PQFZ - s o \ 4 TS PROPOSED 0" 3�\ _ RCP STANDPIPE SF ACKING \� 9 _ w/ WIRE 1 ' 41#3 638- 0 ��M ; y i Hi L I J � CC 411#\ \� \� 8 PROPOSED FFLES �^, \ ~� G - - , . . r► �� DC 636�/"X, uj — v v L w/ WIRE _ � / " \.� .� z W SF BACKING �� \ zu b D 1- 4 (1) +,\ � �- � � k PROPOSED FLAT VDOT C SS A C A 5 � /� L \ • O ;� % \ \ / 0P AGGREGATE OUTLET PROTECTION w/ (n ,�maxx z �� V SIB GEOTEXTILE FILTER FABRIC ��� v W o �v �s �', - UNDERLAYMENT &VDOTSTD. EW-1PC vv U/ z LIMITS OF DISTURBANCE, , %� 6z , (L=14', w1=6', wz=16', D=1s' Mw.. \ % W O Z 'W \ ` TOTAL AREA=io.93 ac. �i' — - Y i� w O -- w/ WIRE ® '� sf �J \ — z BACKING SF 3 ! m �!i .. O V) w y, - - -- - �-' O z �� k -` • 1 TREE Ci o s PROTECTION - _ TP PROTECTION _- s _ LLI S -_- TREE - - TP �� _ PROPOSED ar," , � o . - RCP BARREL _ _ - _ - \ �N .' -s - -- � ------ ®w � _ t •� _ �s _-_-Ili- = a S " � c9 L.L s EXISTING VARIABLE WIDTH SWIM, w/ WIRE / \ FOREST AND OPEN SPACE EASEMENT SF - - �•-- - .BACKING /S/ o s— D.B.o75PG 664 , ` - --------,� -- a O . / \ - ---- � ---- s- -- -- - - - - - ---- s -S o + _� s S— s - y - - - - - — O " x PROPOSED TREELINE TYP.- - - �\-- \ U \ w �P. Nv�- E roe No. 0� ' GRAPHIC SCALE �' PROPERTY BOUNDARY (TYP.) e P #oF MN'61 _ -- —\` -- \ \ 112066 0 a/20 ap ao 160 % A 1 A / SCALE ( IN FEET) 1 A / SHEET / 1 inch = 40 ft. } A N \\ �QgNG A N0. 4 r LIMITS OF DISTURBANCE, / I / / / j. �� // / / 0 TOTAL AREA=10.93 ac. ( / �/ /F I / / --- fo�o / / SC( R. LINS� QJ L1C. No. 035791. - . .,.- -/ �r .-� � `• - ' ]� — � � tea` — . � _ �_ -�.� � /� � � � / � i t /�� � z_ HEA: IP w PROPERTY BOUNDARY TYP. w w ' 6 41P _-- - - - - / SF� w/ WIRE rr - ,�—I BACKINGLu v O 3 z O O m z x 0O o U w CO w 54 z J f o O m r �. i r"•�— - / - — — — - I __ - i - - / u In Z .3 I O w L O - - — - _ --------Lu I t- 00m U) --, 52 = dS '_ D PAVE = I IP PRbPO ED 18 DIVERSION. Ip CONSTRUCTION ENTRANCE -CE -- IP s .. (12 x70 MIN, w/ WASH RACK e o CONTRACTOR SHALL ENSURE U POSITIVE SLOPE IS MAINTAINED. - ;- -BERM SHALL BE STABILIZED AS A IP 1 54 s — c S I I I FIR T STEP IN ISTURBANCE. 5 q I _ I I CD CD 66Q,� Q ° r IP PROPbSE 18 DI kSI - ^� CDo -I M M IP MIP —..M I � CONTRACTOR SHALL ENSURE - M� �50I / DID POSITIVE SLOPE IS MAINTAINED. nn w/ MR840 E - - 4� BERM SHALL BE STABILIZED AS A a5 BA IN _ I T STEP IN ISZ�GE. C P FLOW DIRECTION ARROW`- \\ r� 1 PHASE III OF CONTRTION ACTOR RAcroR - s EXISTING'STORMWATER L 5z �- _ 1 ST GING AREA N _ — _I � � j �Nt FACILITY - g PHASES III — e 4 _ �� � j I t, ,,� -OF 15cy DUMPSTER �c � S � � I \� \ / ��� � - O o 04 ---= WIREACKING 1� 1 IP 1 - I — — —_ — �-•I ° � O /%/. - \ � I - � � � t \ 46 -- - I PHASES III LOCATION - \ PHASES III- — — PROPOSED 18 DIVERSION. a / 1, w ° , I OF PORTA POTTIES �\ �s - o LOCATION OF I \\ CONTRACTOR SHALL ENSURE 0- FUE ING AREA I _ y\ POSITIVE SLOPE IS MAINTAINED ' r /� \ L J n \ \ NDED BY A 2' BERM SHALL BE STABILIZED AS A / - N C> \ \\ ' \s Zy , - ♦ _DEEP, 2' WIDE EARTHEN BERM WITH A HEAVY MIL POLYETHYLENE FIRST STEP I DISTURBANC \ r — \---- _ - LINING, OR BE PLACED IN AN IMPERVIOUS OPEN -TOP DUMPSTER. O Q -- -THE PROPOSED BERM OR DUMPSTER SHALL CONTAIN FUEL IN THE _ N s\ ��lam' IP I EVENT OF A SPILL. CONTRACTOR SHALL ENSURE VOLUME CAPACITY' _ - ! IP N <• / " N W \ EXISTING VARIABLE WIDTH SWM,� s Y FOREST AND OPEN SPACE EASEMENT I IS 1 % LARGER THAN, THE M I VOI4UME F T Rpy FUELy / � \ D.B. 5075, PG. 66¢ � - 6 - -- -- v- - 42 ,- � / � \ ; I III DRAINAGE ♦\ �I b --- AREA TO SEDIMENT BASIN --- , ! - s / J z _j - I _ IP � .�G� ROPOSED 8" IVERS ON. v / � � � � _ J \ s \ RAINAGE AREA TO 83 CONTRACTOR SHALL ENSURE IP PROPOSED SAFETY FENCE, INSTALL I S W I I - D INAGE DIVI Eb (TYP.)� POSITIVE SLOPE IS a DIVERSION DIKE - 1.58 ac. MAINTAINED. BERM SHALL WARNING QUICK SAND, KEEP OUT \ i /I cN �% II gEN _ D D a�Pj c cN 0 z o \ \ ' ya, M M \ 6 P P�g.�y gEN � O z STEP IN DIST RBA C � \ ` �8E STABILIZED AS A FIRST �: _ /11 3 Q \ a I ♦ v � � � _ � \ 3 IP RCP STANDPIP � SF AC � .� � Z Z IP - zo 41W- \ S A _ r _ ���� ro �� 6 W\�� SE RO OS FFL ' " Z A w U 0 o SFJ5 — _ / x PROPOSED FLATVDOTC SSAIC A 5 - /� D AGGREGATE OUTLET PROTECTION w/ ul U U) �\ k �� ' _ SB ! GEOTEXTILE FILTER FABRIC 7 7 �s \ UNDERLAYMENT & VDOT STD. EW-1PC �� V) z LIMITS OF DISTURBANCE, \ : _ 624 (L=14', W1=6% W2=16% D=1.5' Mw.. \ - / w Z 'W TOTAL AREA=1o.93 aC. ♦ ♦ i - / N �` - - Y w O w/ WIRE _ _ _ \ � LL _ z ♦ ♦i / • / * s \ ��-��..._ BACKING SF + S ._� -- s� ~ U • \ \ \ s _ _ TREE \` p T - 5-= J 0 o s S _— — — ROT ' \ _ 5 P ECTION - - k - - - S - U TP � � � PROPOSED BARREL — � I J w Hi W PROTECTION ' «„ ' - s -- -- - s -_-- - - — - 4 - o EXISTING VARIABLE WIDTH SWM /� N w/ WIRE S FOREST AND OPEN SPACE EASEMENT SF �- BACKING ----- _- s------ s D.B. 5075, PG. 664 --- -- s _ S ----- — ---5 g - .�, o O > S. N . 1 \. m \ . / PROPOSED TREELINE (TYP.) \\ \ ° -- �� N, U a R d (A Zl JOB NO. a �� GRAPHIC SCALE �� �- PROPERTY BOUNDARY (TYP.) goP of M — --v �� — — - / 112066 ` m \ _ y SCALE a 0 so ao ao iao ( IN FEET SHEET NO. n 1 inch = 40 ft. J m PQgNG \ / '\ 15 PROPOSED SEDIMENT BASIN SCALE: 1"=20' PROPOSED SAFETY FENCE, INSTALL SIGNS "WARNING QUICK SAND, KEEP OUT"� 640_-- - PROPOSED BAFFLES i / /630 Xs X - now x�x � x Sediment Basin Design drainage area (acres) basin volumes: (using 2' contour intervals) elevation (ft) contour area (sf) 624.00 3238.0 626.00 5016.0 628.00 6956.0 630.00 8970.0 632.00 11084.0 633.00 12179.0 storage required (cy) (67*DA) atering orifice elevation (ft) storage provided at this elevation (cy) able volume before cleanout (cy) (34*DA) Inout elevation (ft) ance from cleanout to orifice (ft) (> V) storage required (cy) (67*DA) ciple spillway crest (ft) storage provided at this elevation (cy) neter of dewatering orifice (in) neter of flexible tubing (in) (orifice+2") C (use 0.45 for bare earth) tc (min) 12yr 3.60 1 25yr 5.30 ble head (ft) Iter riser (in) By capacity, Qp (cfs) :ter trash rack (in) length (ft) on barrel through embankment (ft) Iter of barrel (in) Q 2yr Q 25yr PPV �\P�R\OPO NV IN$ 624 00';INV OUTA623.67 ) ' \ qV ffSC 0TT R. LLINSZ Lic. No. 03579111, 636- ao 10/19/20 �� 1 _ � 634 1 \ / PROPOSED 024" CMP STANDPIPE w/ / TRASH RACK SHALL SERVE AS THE l / RISER STRUCTURE. RISER STRUCTURE SHALL HAVE A RIM ELEVATION=629.92'. / TO PREVENT FLOTATION THE RISER BASE AND BARREL CONNECTION SHALL BE FIRMLY EMBEDDED 6" INTO AN 3.8" THICK CONCRETE FOUNDATION THAT IS 6'x6' AND BURIED BELOW GROUND 6j0 / ROPOSED Vl� / TD. ES-i PROPOSED FLAT VDOT CLASS AI COARSE Mw, T WISPILLWAY CREST OF EMERGENC 2' WITHOUT SPILLWAY 9.60 DESIGN HIGH WATER 'RS-YR. STORM ELEV.) volume (cy) D.,• 0 MIN. 1.0' ------ 303.3 R5� CREST DRY • SrOWE DEWATENNG 744.8� 1333.0 • wEr • "RAG 2074.4 RN 2505.0 SEDIMENT CI.FANOUT POINT V WET • STORAGE REDUCED TO 34 CY./ ACRE] 643.2 design high water (ft) 630.92 627.58 top of dam (t) 633.00 643.2 top width of dam (ft) 10.0 321.6 bottom of basin (ft) 624.00 626.08 approx. bottom dimensions: 18k190' 1.5 upstream face slope: 2:1 downstream face slope: 3:1 643.2 baffles: YES 629.92 length of flow, L (it) 54 667.3 effective width, We (ft) 165 6.0 L I We (baffles not required if> 2) 0.3 8.0 collars: YES depth of water at spillway crest (fl) 5.92 0.45 slope of upstream face (Z1) 2:1 14 slope of barrel (Sb) 0.67 % 15.55 length of barrel in saturated zone (Ls) 36.51 22.90 number collars required 2 dimension of collars 3.Sk3.8' 1.00 emergency spillway: NO 30 required capacity (Q25-Qp) (cis) WA 22.90 bottom width (ft) WA 42 slope of exist channel (ft/ft) WA % 48.92 minimun length of exit channel (ft) N/A 7.25 crest of spillway (ft) N/A 24 AGGREGATE OUTLET PROTECTION w/ GEOTEXTILE FILTER FABRIC UNDERLAYMENT (L-14'W 1=6% W2=16', D=1.5' MIN.). z O a Z N = O 0 N Z J o a �..� Lnn j z w W W M 0') ON V M O W CA N N W W CO O J U 1 W I- w U ~ L w O w a U) JOB NO. 112066 SCALE 1" = 20' SHEET NO. 16