Loading...
HomeMy WebLinkAboutSUB202000174 Correspondence 2020-12-30I MERIDIAN PLANNING GROUP, LLC Engineering • Surveying • Planning 440 Premier Circle, Suite 200 Charlottesville, VA 22901 November 24, 2020 Phone: 434.882.0121 www.meridienwbexom RE: SUB202000174 Woolen Mills Light Industrial Easement Plat Dear Cameron Langille, Below are responses to the letter addressed November 4, 2020. Planning 1. [14-302 (A)(3)] Please state the deed book and page number for the recorded instrument that created the rights -of -way for Franklin Street and Broadway Street in the street labels across all applicable drawings. a. State the widths of each road in their labels across all applicable drawings. ✓ Road widths have been added across all drawings. b. Revise the label for Broadway Street. Per recorded plat in DB 4893, pages 401-405, Broadway Street is a 56' wide public access easement, not a private ROW. Show the limits of the easement across all applicable drawings. See attached email correspondence with VDOT staff for reference. ✓ Label has been revised. 2. [14-302 (A)(4), 14302 (A)(5), and 14-303 (L)] Please show all existing easements and state their recorded instrument number. State the easement type, width, and whether the easement is public or private. ✓ Existing easements are shown and labeled or are to be relocated. 3. [14-302 (A)(11)] Please revise the "Recorded Deeds" note on Sheet 1 so that it states "Recorded Instruments". a. Please revise the instrument state in the property labels. The plat states that the most recent recorded instrument is DB 4796 page 325. However, the most recent instrument is DB 5256 page 213 according to Albemarle County GIS. ✓ Sheet 1: note has been revised. ✓ Property label has been revised to show most recent instrument. 4. [14-302 (A)(14)] Please state the acreage of all new public easements. ✓ Sheet 6: Acreage of new public easement is shown. 5. [14-302 (A)(15)] Please state the names and addresses of each owner of record and holders of any easements affecting the property ✓ Sheet 1: Recorded Instruments table has been expanded to include owners and addresses 6. [14-302 (B)(1)] Please add a date of last revision. ✓ Revision date has been added on all sheets. 7. [14-302 (B)(5)] Please revise the zoning notes as follows: a. Revise note 3 so that it states that the property is zoned LI Light Industry. ✓ Sheet 1: note 3 has been revised. Page 1 9. [14-305 (H)] Please identify and label the location and material of all permanent reference monuments. ✓ Reference monuments have been located and material has been specified. 10. [14-303 (I)] Please identify a definite bearing and distance tie between not less than (2) permanent monuments on the exterior boundary of the property and further tie to existing street intersection where possible and reasonably convenient. ✓ Bearing and distances have been provided for ties to property corners for all easements. 11. [14-303 (L)l Please identify the location and dimensions of each public utility, drainage and sight distance easement outside of a street right-of-way; for each existing easement, include a note stating the deed book and page number. ✓ Location and dimensions are shown. Engineering — David James 1. Provide the line length & bearing information. ✓ Length and bearing of existing easements are provided in the recorded documents. 2. Sheet P3: a. Please clarify — Is this an existing (provide deed reference) or proposed (label as new and use similar hatching) easement? ✓ Sheet 3: Per ACSA regulations, ACSA easements are not recorded until construction is completed. b. Provide tie-in to property corner for the new easement. ✓ Sheet 3: tie to property corner is provided c. Provide tie-in to property corner for the new easement. ✓ Sheet 3: tie to property corner is provided 3. Sheet P5: a. Provide line length and bearing information. ✓ Length and bearing of existing easements are provided in the recorded documents. 4. Sheet P7: Provide SF, acreage of forest and open space (F/OS) easement areas to be vacated. ✓ Acreage of F/OS easement to be vacated is shown. 5. The vacation of F/OS easement will require an amendment to WPO201600072 — with the current amendment [WPO#4 under review]. The WPO amendment will need to be approved prior to SUB202000174 approval. ✓ Comment Noted. 6. Deed vacating drainage easements and F/OS easements will need to be submitted and reviewed prior to SUB202000174 approval. ✓ Comment Noted. SWM deed of dedication & easement will need to be reviewed/approved prior to SUB202000174 approval ✓ Comment Noted. Page 2 Please let me know if you need additional information. Sincerely, Timothy Miller, P.E., L.S. Principal Page 3