HomeMy WebLinkAboutSDP202100001 Correspondence 2020-12-31 (3)608 Preston Avenue P 434.295.5624 Suite 200 IF434.295.1800 T I M M O N S GROUP Charlottesville, VA 22903 www.timmons.com December 31, 2020 Khris Taggart, Planner County of Albemarle Dept. of Community Dev. 401 McIntire Rd, North Wing Charlottesville, VA 22902 RE: ARB-2020-104: Ivy Proper — Initial Site Plan Review — (TMP: 058A2-00-00- 02000, 058A2-00-00-01400) - Comment Response Letter Dear Khris: We have reviewed all of your comments from November 18, 2020 and made the necessary revisions. Please find our responses to the comments below in bold lettering. • Regarding the final site plan submittal: A Certificate of Appropriateness is required prior to final site plan approval. The following items and all items on the ARB Final Site Plan Checklist must be addressed: Provide architectural designs with the next submittal. Note that the EC -facing elevation of the building must have the appearance of a fully designed fa4ade and the side elevations must be designed to eliminate blankness and achieve appropriate form, scale, etc. Additional architectural designs will be provided in upcoming submittals. 2. Show the location of mechanical equipment (building and ground mounted) on the site and architectural plans and show how it will be screened from the EC. The following Final Site Plan submittal will include mechanical equipment locations. 3. Provide a detail of the dumpster enclosure in the site plan. Specify materials that are coordinated and compatible with the building. Rendering of proposed dumpster enclosure has been added to sheet C 1.2. 4. Include the standard mechanical equipment note on the architectural plans: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." Acknowledged. This will coordinated with the architectural plans. S. Provide a lighting plan with the next submittal. ENGINEERING I DESIGN I TECHNOLOGY A lighting/photometric plan will be submittal with the next Final Site Plan submittal. b. Provide a complete plant schedule with the next submittal. Plant schedule has been added to Layout Plan, sheet C4.0. 7. Provide a confirmation that easements will not conflict with the proposed/required landscaping. All proposed trees are located outside of drainage and stormwater management easements. 8. Adjust the site layout to provide sufficient planting area for large shade trees along the eastern perimeter of the parking lot. Layout is constrained by steep grades up to railroad on northwest portion of site, and existing building on adjacent parcel to the east. Shade trees have been provided at either end of eastern parking area, along with flowering trees adjacent to parking spaces. Parking lot landscaping calculations have been provided on Layout Sheet, sheet C4.0. 9. Submit a construction/landscape easement for any parking or landscaping that are proposed off -site. Proposed construction & landscape easement has been added to Layout Sheet, sheet C4.0. 10. Provide trees at the west end of the parking lot and shrubs at the base of the northern retaining wall. Tree line of existing forest to remain on west side of parking lot has been added for clarity. Shrubs have been added at base of retaining wall. I. Add the standard landscaping note to the landscape plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." Note has been added to Layout Plan, sheet C4.0. 12. Show existing trees on the existing conditions plan. Approximate existing tree line has been added. 13. Indicate retaining wall material(s) and color(s) on the plan. A physical sample may be necessary for review. Retaining wall color and materials will be provided separately for review. 14. Provide landscaping at the base of the visible retaining walls to integrate them into the site. Shrubs have been added at base of retaining wall adjacent to parking lot. S. Coordinate the tree line that is to remain throughout the site plan. Tree line has been added to Layout Plan, sheet C4.0. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624 or email at clint.shifflett cD..timmons.com . Sincerely, Clint Shifflett, PE Project Manager