Loading...
HomeMy WebLinkAboutSDP200400055 Action Letter 2006-01-10pF AL U Alit �'IRGIN1A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 April 26, 2006 Marcia Joseph Joseph & Associates LLC 481 Clarks Tract Keswick VA 22947 RE: SDP - 2004 -055 Pantops Place Preliminary Site Plan Dear Madam: The Planning Commission approved the following waiver for above - referenced site plan at its January 10, 2006 meeting: Waiver to allow disturbance of critical slopes. The Department of Community Development hereby grants administrative approval to the above referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on April 26, 2007. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. The Erosion and Sediment Control Plan and the BMP Stormwater Management Plan, with the associated applications and fees, may also be submitted with the eight (8) tentative Plans. Failure to do so will result in a separate application to be filed with the Department of Community Development at a later date. Once the tentative plan is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plan. Any further responses must be made directly to each department /division /agency that has further comment. After all aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with the Planner that you may submit the final mylars (2 sets), two paper copies, the final site plan application, and final site plan fee to the Department of Community Development. Signing of the plans will occur within one week once it is determined that the final site plan mylars reflect all tentative approvals. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Zoning & Current Development Division shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: Zoning & Current Development approval to include: ❑ [18- 32.6.3] Approval of a landscape plan in compliance with Section 32.7.9; ❑ [ 18- 32.6.6.] and 18 -4.17] Submittal of a description and photograph or diagram and show the location of each type of outdoor luminaire that emits 3,000 or more initial lumens. Please be aware that installation of such luminaires in the future that are not shown on this plan shall require an amendment to this plan; ❑ [ 18- 32.6.6.] and 18 -4.17] Submittal of a photometric plan on the site plan demonstrating that parking area luminaires are in compliance with 4.17.4.b ❑ [18- 32.6.4.1] The final plan approval is subject to the issuance of a Certificate of Appropriateness from the Architectural Review Board. Please contact Francis MacCall at 296 -5832 if you have questions or require additional information. Engineering approval to include: ❑ All applicable items as specified in the Design Standards Manual, Section 902 B. Please contact Max Greene at 296 -5832 if you have questions or require additional information. Albemarle County Service Authority approval to include: ❑ Review and approval of all final water and sewer plans. Please contact Gary Whelan at 977 -4511 if you have questions or require additional information. Fire & Rescue approval to include: ❑ [ 14 -418] Verify adequate fire flow is available. Please contact James Barber at 296 -5833 if you have questions or require additional information. VDOT approval to include: ❑ Review and approval of all final plans and drainage computations. Please contact John Winn at 293 -0014 if you have questions or require additional information. Sincerely, Francis H MacCall Senior Planner Zoning & Current Development File: SDP - 2004 -055 Cc: Owner: PANTOPS INVESTORS LLC 415 DEER BROOKE DR ALLEN TX 75002