Subject: Town & Country Phase II (WP0200600075) critical slope waiver request
The critical slope waiver request for Town & Country Phase II has been reviewed. The request may affect
future transportation planning for the Pantops area. This report will briefly discuss the typical critical slope
waiver request items and then will focus on the proposed road alignment for Olympia Drive.
Description of the project, critical slope area, and proposed disturbance:
This project is proposing the extension of Olympia drive to connect with the recently approved Town &
Country Lane (Phase I). Town and Country Lane will connect with Rte 250; therefore creating a new
connector road to Rte 250 for the residents of Fontana. The critical sloped areas of the site are mainly
wooded and run to a stream on the northern border of the parcel (TMP 78 -09). The proposed disturbance
areas will include the Olympia Road extension, grading to make the placement of the road possible, as well
as Erosion Control measures such as Sediment Traps, and permanent Stormwater Facilities. Figure 1 on
the following page shows the critical slope areas and the disturbed critical slopes. The summary of
disturbance is as follows:
Areas*
Acres
Total site
16.1 acres approximately
Critical slopes
6.1 acres
380/. of site
Critical slopes disturbed
3.6 acres
59% of critical slopes_
*In addition, there is proposed grading on adjacent parcel TMP 78 -11 to connect the road to the existing
(and currently under construction) Olympia Drive. There is a small area of critical slopes (around 5000
square feet) which is proposed to be disturbed (See Figure 2 on the following page.).
Exemptions to critical slopes waivers for driveways, roads and utilities without reasonable
alternative locations:
This disturbance is not exempt. The road can be moved further away from the stream. Its current location
is to allow for more development between the new road and Rte 250.
Compliance with Zoning Ordinance 18 -4.2:
"movement of soil and rock"
Proper slope construction, control of drainage, and vegetative stabilization will prevent any movement
of soil.
"excessive stormwater runoff'
Stormwater runoff will run down to the stream which borders the northern portion of the property. The
stream flows into the 100 year floodplain, which begins at the very north- western tip of the property.
(There is no disturbance proposed inside the limits of the 100 year floodplain.)
"siltation"
Inspection and bonding by the County will ensure siltation control during construction. Proper
Albemarle County Community Development
Page 2 of 6
stabilization and maintenance will ensure long term stability.
"loss of aesthetic resource"
A significant portion of wooded area is proposed to be removed in order to put in Olympia Drive. A
portion of the site north of Phase I (the Guadalajara site) was previously the site of the old Town &
Country Motel. The proposed road will be visible from Wilton Farm, Avemore, and portions of
Fontana.
"septic effluent"
Septic effluence is not an issue, as the site and areas around it are served by public sewer.
Figure 1— Proposed Critical Slope Disturbance
wleyn�'
W N - /
Imj
- Disturbed Critical Slope
- Undisturbed Critical Slop
- Proposed Road
Parcel Outline
xke��NJ Ait�
`[MkW 5ns
Figure 2— Offsite Critical Slope Disturbance
M,
p
''peg Disturbed Critical
% rk' Gt E
-- Slopes on TMP 78 -11,A
.N sHmnl
lu
,
_
a
' V. U.P
Figure 3 — Photo Locations
- Existing
- Under Construction
- Proposed
Olympia
to 3 % hoto 2
w 14
Photo 1: From Olympia Drive
Albemarle County Community Development
Page 3 of 6
Photo 2: From above Rolkin Road
Photo 3: L
Albemarle County Community Development
Page 4 of 6
Drive
r
Albemarle County Community Development
Page 5 of 6
Engineering concern for the proposed road layout:
Engineering is concerned about the proposed layout of the connection where Olympia Drive tees into
Town & Country Road. The main concern is whether or not the road configuration is the best
configuration for serving traffic in this area. Currently, a County and City of Charlottesville funded study is
under way to find the best possible alignment for the Eastern Connector Road. The alignment of the
proposed Olympia Drive /Town & Country Road intersection is part of the study. The study is anticipated
to be completed in the Spring of 2008. The alignment for Olympia drive has yet to be identified.
Figure 4 below shows the current Pantops Master Plan layout of Olympia Drive, Town & Country Road,
and Rte 20. (this layout precedes the study now underway and may change) Figure 5 provides more details
of the proposed layout for Town & Country Phase II and Figure 6 shows a possible alternative layout.
Figure 4 — Current Pantops Master Plan
Rte 20�
a
Olympia
Drives
e
MN
Town & r
b
Country
4 �}
h.
JL
.o
Figure 5 - Proposed Town & Country Phase II Layout:
Beneficial if it is used primarily for traffic coming onto Rte 20
(red) from Rte 250 (in orange). However, if the majority of the
traffic is going onto Rte 20 from the existing Rte 250 and Rte 20
intersection, then traffic on the proposed Olympia Drive will have
to make an unnecessary stop to get onto Rte 20.
Albemarle County Community Development
Page 6 of 6
Figure 6 — Alternate Layout (matches Pantops Master Plan):
Beneficial if traffic is heavier on Olympia Drive going onto Rte
20 than traffic on Town & Country Road going to Rte 20.
.flt fr
gP� . ■,iii .�;'
i
Engineering can recommend approval of the critical slope waiver for the portion of the site shown in green
below. The remainder of the site should wait until the Eastern Connector Road study is complete. The
intersection may play a key role in the study, and approving the proposed layout before the study's
completion may preempt, or limit the effectiveness of the study.
Figure 7 — Engineering's Recommendations
rx re -ror ea
nr re -tm ser
�,.„eqr, arc
■iliw. Faun LP.
D8 2181 -PN"
t�V
Yonsd R -!5
Gse, xeaidenRn!
a�udA -t!
NaNH
tdt � �mS
p�.nas s e
fn
04
hurl efinere� C0.
1961 F
t9l•_SBa
SMM rod�,y mo
48 -,
8owi96xSC -pC
NN
GooN- yaNtman�r rru•.rt
0 23u -xt
i4.1J0 1¢a
3¢ er www
PSw..uafB4!
sr Pu,
tme.e,t
m rz9 -tom
" FoAilcfl
sea
t�V
p�.nas s e
�` .•
°i' ■RtI1 Nm�iai NolN L.LC
+tKd yyxrgv r4 S8- Po.9.�,
HaNi aac
{JrP SO-'M
➢8 YESd -25E
U _
i4.1J0 1¢a
559- "=•O�r
PSw..uafB4!
ex rt0..V3 Pre
Z e.
3sr8
-9E
8wud'HC -d'C
N 9 :a
Recommend Deferral
t
x
rs
�
Recommend Approval
oA caa -rt4
5{m
r .
Proposed Road Layout
u.4 near aa.
l
_
w>r.d. O;mc Air