HomeMy WebLinkAboutSDP200500144 LOR 1COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972-4126
December 12, 2006
Brian P. Smith
Brian P. Smith PE Civil Engineering Inc
105 West Nigh Street
Charlottesville VA 22902
RE: SDP - 2005 -0144 Earlysville Business Park Major Amendment
Tax Map/Parcel Number 00310- 00- 00 -021AO
Dear Mr. Smith.
This letter is to approve as a letter of revision the delineation of the 10 additional parking
spaces for the office building designated at 2400 sgft, and the gravel path to the adjacent
parking lot. This change will actually be reflected as part of SDP - 2005 -0144 Earlysville
Business Park Major Amendment, not the WPO application as noted in your letter. This
is your I st letter of revision for this site. Please note that a total of three Letters of
Revision are allowed before all changes to the site plan are required to be submitted in
the form of a new site plan amendment. Provide this letter with any permit application
that is made for the office building. If you have any questions please feel free to contact
me.
Sincerely,
Francis H IvlacCall
Senior Planner
Attachments: Letter of Request
Site Plan Change
BRIAN P. SMITH, PE
CML, ENGINEERING, INC
105 WEST HIGH STREET
CHARLOTTESVILLE, VA 22902 -5018
PHONE (434) 296 -3644
FAX (434)296 -2041
December 12, 2006
Francis MacCall
Dept. Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Earlysville Business Park
Letter of Revision - WPO- 2006 -00039
Dear Francis,
Earlier this year the County approved WPO- 2006 - 00039. This project included a warehouse and an
adjacent one story office building. Changes occurred during construction which added a basement
to the office building and a longer /higher retaining wall was built along the western side of the
warehouse. This wall projected into a proposed parking bay that eliminated two spaces as well as
relocated the dumpster slightly.
These modifications are shown on the two PDF files which are attached. One file is sheet 5 of the
original package. It shows the changes to the site. The other is the cover sheet that indicates the
revised parking computations under 915 of the Project Data.
I hope this is the information if helpful. L,et me know if you have any questions and thank you for
your assistance.
Sincerely,
Brian P. Smith_ PE
President
Attachments
Cc: Don Foster
GOLF COURSE DESIGN • ENGINEERING • SITE DESIGN • LAND
PLANNING
Account Ill'. 05- 00- 66tFrancis MaXaii 4
BRIAN P. SMITH, PE
GOLF COURSE DESIGN • ENGINEERING • SITE DESIGN • LAND
PLANNING
Ni
s $ ?' €°r �� 'ssa. g
eta Ufa 3 I ? egg 3 s �2 R
s , �� 0111 I § a €¢
a f ass$ s 21e $
¢ 3l�{ gg�at�€€
'qly�,�� %aet�
��
3 56 R4 ° 46 Esst g�
II � S
3 �Y
lac kS� F� 2
E j O lr
6 m Pit
t
/C/)
�9�0
v C z 93)
Hi
A v
r m
ij3i 2 33¢5�Z a PP�gc° py ;a�k
iz
g S EARLWS 11E Bt�^INESS PARK
� MAJOR SITE PLAN AMEXMEKf
w ¢ COVER SHEET'` -'?
�� gF
i
a
7- f
4��if z
k' m
� aI
2�
i
1 4?
ni
Leo
n
yay
p O
y�
T
EARiYSVILLE BUSINESS PARK
p `,. €gr�d� MAJOR SITE PLAN AMENDMENT)
j � >y
tt nn
i ,R ; R k
T;
11
lil
s
5
tt�
lu
d
�� gF
i
a
7- f
4��if z
k' m
� aI
2�
i
1 4?
ni
Leo
n
yay
p O
y�
T
EARiYSVILLE BUSINESS PARK
p `,. €gr�d� MAJOR SITE PLAN AMENDMENT)
8
i r
V
T;
� t
5
1
�� gF
i
a
7- f
4��if z
k' m
� aI
2�
i
1 4?
ni
Leo
n
yay
p O
y�
T
EARiYSVILLE BUSINESS PARK
p `,. €gr�d� MAJOR SITE PLAN AMENDMENT)