Loading...
HomeMy WebLinkAboutWPO201700040 Correspondence 2021-01-07Jet e..I Use Only Date Received: Fee Paid: Received by: Intake: Forward to Management Analyst BOND INSPECTION REQUEST APPROVED PLAN #: W PO Za 1700040 PROJECT NAME (including Phase #): V6MP F(Arl k Ida pp DV't1)%)C —6—I VEW C+ OS51 1�)C (As listed on the approved plan) This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please check the appropriate box below for the requested inspection(s). Inspections for the purposes of bond reduction or release will require a separate fee for each bond. VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per Water Protection Ordinance sections 17-207 & 17-208 $250 ❑ Reduction ;Release ❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14435 & 14-438 $269 it Reduction ❑ Release ❑ Water & Sewer bond per Subdivision Ordinance section 14-435 $269 ❑ Reduction ❑ Release ❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $301 ❑ Reduction (site work only) ❑ Release TOTAL FEES � 6 Ci Submit requests to: Department of Community Development, 401 Mchrtve Road, North Wing, Charlottesville, VA 22902, Attention: Management Analyst— Phone 434-296-5832; Fax 434-9724126. All roads and stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts, certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures). Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and County's published procedures. A minimum 20% of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded site work, a request for reduction should only be made once all landscaping is complete. If all required documentation is not received within 30 days of receipt of this request, this application shall be deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will be required. Applications may be withdrawn for a full refund within 30 days of receipt. If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner. Please provide contact information. EMAIL: Q 2gmc f 1w. w-A OR REGULAR MAIL ADDRESS: I5(oSg i17 Zo7.l Date Revised 7/1512014, 7/202015, 11/3/2015, 8114/2017, 12&'2020 From: John Anderson <janderson2@,albemarle.org> Subject: Planning Application Review for WPO201700040 Kapp Driveway - VSMP. Date: May 29, 2018 at 3:55:50 PM EDT To: Ana Kilmer <akilmer(a�albemarle.org> Cc: "Justin Shimp, P.E." <justinnshimp-engineering.com> The Review for the following application has been completed: Application Number = WP0201700040 Reviewer = John Anderson Review Status = See Recommendations Completed Date = 05/29/2018 This email was sent from County View Production. Ana, Attached please find ESC and Mitigation bond estimates —a SWM Plan bond is not required. (Estimates also in CV.) Project Name: VSMP Plan for Kapp Driveway - Stream Crossing, WPO201700040 TMP# confirmed: 984C & 98-14. <image002.jpg> <image003.jpg> Please let me know if you have any questions. Thank you -best J. Anderson 434.296-5832 —0069 Scott Gongaware From: Scott Gongaware <sagtrustee@gmail.com> Sent: January 07, 2021 9:29 AM To: Scott Gongaware Subject: Fwd: Payment Submitted ---------- Forwarded message --------- From: Albemarle County - VA - Tax <no-reply@sturxiswebservices.com> Date: Thu, Jan 7, 2021 at 9:24 AM Subject: Payment Submitted To: <sagtrustee@gmail.com> PAYMENT SUBMITTED! Transaction ID 95U47978AY031605A Total Paid $256.72 Item Amount Item Number: A7A9 FS $250,00 Type: Community Development WPONSMP Notes: WPO-2017-00040 VSMP Plan for Kapp Driveway -Stream Crossing. Bond inspection/release fee Transaction Fee $6.72 Total $256.72 This email ha-s been sent to you by Albemarle County VA - Tax (or its subsidiary)- 1