HomeMy WebLinkAboutSDP202000049 Review Comments Final Site Plan and Comps. 2021-01-11Patricia "Paty" Saternye
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Friday, January 8, 2021 5:34 PM
To: Patricia "Paty" Saternye
Subject: RE: SDP202000049 Mill Creek Industrial Lot II - Final Site Plan review
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Paty,
Below are comments for SDP202000049 Mill Creek Industrial Lot II - Final Site Plan:
Add a note for contractor to reuse the existing corp stop rather than installing a new service and abandoning the existing
service.
Due to proposed geofabric separation from existing ACSA water main. ACSA would like the water main to be pot holed
to confirm the horizontal separation from the fabric. The field location should be shown on the plan. Coordinate with
ACSA to have a locator and inspector on site for this. See image below for reference.
78)
I; OU462.49/
iS' GAS LINE EASEMENT
(0.8. u2o-n4)
� I l
PROPOSED SEGMENTED
RETAINING WALL WITH
SAFETY RAILING
(MAX. HT.=io')
2 test pits along
this alignment to
MITS OF C confirm location. 1
A
on each side.
V
1 EXISTING CATCH BASIN
_ TOP= 475.08
1 jr INV OUT=473.o6
i y
ROPOSED STONE LINED TRAPEZOIDAL
f CHANNEL OUTFALL (2'WIDE AT
1