Loading...
HomeMy WebLinkAboutSDP202000049 Review Comments Final Site Plan and Comps. 2021-01-11Patricia "Paty" Saternye From: Richard Nelson <rnelson@serviceauthority.org> Sent: Friday, January 8, 2021 5:34 PM To: Patricia "Paty" Saternye Subject: RE: SDP202000049 Mill Creek Industrial Lot II - Final Site Plan review Follow Up Flag: Follow up Flag Status: Flagged CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Paty, Below are comments for SDP202000049 Mill Creek Industrial Lot II - Final Site Plan: Add a note for contractor to reuse the existing corp stop rather than installing a new service and abandoning the existing service. Due to proposed geofabric separation from existing ACSA water main. ACSA would like the water main to be pot holed to confirm the horizontal separation from the fabric. The field location should be shown on the plan. Coordinate with ACSA to have a locator and inspector on site for this. See image below for reference. 78) I; OU462.49/ iS' GAS LINE EASEMENT (0.8. u2o-n4) � I l PROPOSED SEGMENTED RETAINING WALL WITH SAFETY RAILING (MAX. HT.=io') 2 test pits along this alignment to MITS OF C confirm location. 1 A on each side. V 1 EXISTING CATCH BASIN _ TOP= 475.08 1 jr INV OUT=473.o6 i y ROPOSED STONE LINED TRAPEZOIDAL f CHANNEL OUTFALL (2'WIDE AT 1