HomeMy WebLinkAboutWPO202000050 Plan - E&S 2020-11-04SITE DATA:
TAX MAP PARCELS: 75-63
PARCEL AREA: 544 ACRES
LIMITS OF DISTURBANCE: 0.93 ACRES
ZONING: R-1 RESIDENTIAL
PROPOSED USES: GOLF COURSE
UTILITIES: ACSA
DRAINAGE DISTRICT: UPPER RIVANNA RIVER WATERSHED
BIRDWOOD GOLF COURSE
EROSION AND SEDIMENT CONTROL PLAN
COUNTY OF ALBEMARLE
NOVEM BER 04, 2020
PROJECT
SITE
CHARLOTTESVILLE
CITY
VICINITY MAP
SCALE 1" : 5000'
OWNER:
UNIVERSITY OF VIRGINIA FOUNDATION
PO BOX 400218
CHARLOTTESVILLE, VA 22904
ENGINEER OF RECORD:
TIMMONS GROUP
608 PRESTON AVENUE SUITE 200
CHARLOTTESVILLE, VA 22902
CONTACT: CRAIG KOTARSKI, P.E.
TELEPHONE: 434-327-1688
SIGNATURE PANEL:
APPROVAL
DEPARTMENT OF COMMUNITY DEVELOPMENT_
ENGINEERING
DATE
SHEET LIST TABLE
SHEET NUMBER
SHEET TITLE
CO.0
COVER
C1.0
EROSION AND SEDIMENT CONTROL PLAN
TOTAL: 2 SHEETS
APPROVED
by the Albemarle County
Community Development Department
Date 12/03/2020
File WP0202000050
Q CRAIG W. J. KOTARSKI
Lic. No. 0402048507
11/04/2020
am
O
oc
a IV
0 S"
ti
DATE
1012312020
DRAWN BY
A. ALLISON
DESIGNED BY
A. ALLISON
CHECKED BY
C. KOTARSKI
SCALE
W
U)
0
U
LL'
Q
J
Oow
z
n
U
w
\
J
0
2U
Ow
m
J
a
>O
DC
m
L
H
JOB NO.
SHEET NO.
C0.0
EROSION AND SEDIMENT CONTROL NARRATIVE
PROJECT DESCRIPTION
THIS PROJECT INVOLVES RESTORING THE PRE -DEVELOPED DRAINAGE PATTERN AROUND HOLE 14 OF BIRDWOOD GOLF COURSE, FROM CURRENT
CONCENTRATED FLOW TO PRE -DEVELOPED SHEET FLOW, WITH APPROXIMATELY 0.93 ACRES OF DISTURBANCE.
ADJACENT PROPERTY
THE PROPERTY IS BOUNDED BY:
EAST: RESIDENTIAL SUBDIVISION. FURTHER EAST IS ROUTE 29
NORTH, SOUTH, WEST: BIRDWOOD GOLF COURSE
EXISTING SITE CONDITIONS
THE SITE IS THE 14TH HOLE OF THE RE -DEVELOPED BIRDWOOD GOLF COURSE. THE EXISTING SITE CONSISTS OF BERMS, SWALES, AD DITCHES CREATING
CONCENTRATED STORM WATER RUNOFF TO THE RESIDENTIAL HOMES TO THE EAST.
OFF -SITE AREAS
NO OFF -SITE AREAS WILL BE DISTURBED AS A PART OF THIS PROJECT
EROSION AND SEDIMENT CONTROL MEASURES
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED
ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE
MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING
JURISDICTION.
STORMWATER RUNOFF CONSIDERATIONS
STORMWATER QUALITY REQUIREMENTS ARE BEING SATISFIED THROUGH CONSERVED OPEN SPACES AND SHEETFLOW TO VEGETEATED FILTER STRIPS. THIS IS
AN EFFORT TO RESTORE THE SITE TO PRE DEVELOPED FLOW RATES GOING FROM THE CURRENT CONDITION OF CONCENTRATED FLOW, TO THE
PRE -CONDITIONED SHEET FLOW.
EROSION AND SEDIMENT CONTROL MEASURES MAINTENANCE
ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VESCH AND THE CONSTRUCTION SEQUENCE, INCLUDING THE
INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS.
STRUCTURAL PRACTICES:
1. SILT FENCE BARRIER - 3.05 SILT FENCE SEDIMENT BARRIERS SHALL BE INSTALLED DOWNSLOPE OF AREAS WITH MINIMAL GRADES TO FILTER
SEDIMENT -LADEN RUNOFF FROM SHEET FLOW AS INDICATED. ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS AND
PREVENT SEDIMENT FROM LEAVING THE SITE.
VEGETATIVE PRACTICES:
1. TOPSOIL STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER SPREADING. STOCKPILE
( 1
LOCATIONS SHALL BE LOCATED ONSITE AND SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION.
2. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL BE SEEDED WITH FAST GERMINATING
TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR
IT IS APPLIED.
3. PERMANENT SEEDING - 3.32 FOLLOWING GRADING ACTIVITIES, ESTABLISH PERENNIAL VEGETATIVE COVER BY PLANTING SEED OR SOD TO REDUCE EROSION,
STABILIZE DISTURBED AREAS AND ENHANCE NATURAL BEAUTY.
4. SOIL STABILIZATION BLANKETS & MATTING - 3.36 A PROTECTIVE COVERING BLANKET OR SOIL STABILIZATION MAT SHALL BE INSTALLED ON PREPARED
PLANTING AREAS OF CHANNELS TO PROTECT AND PROMOTE VEGETATION ESTABLISHMENT AND REINFORCE ESTABLISHED TURF.
MANAGEMENT STRATEGIES
1. ESTABLISH PERIMTER CONTROLS AND CONSTRUCTION ENTRANCE.
2. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING, SEED AND MULCH IMMEDIATELY FOLLOWING INSTALLATION.
3. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING.
4. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE PERIMETER CONTROLS.
5. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY WITH THE CONTRACT
DOCUMENTS OR STATE LAW.
PERMANENT STABILIZATION
ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING OR SOD IMMEDIATELY FOLLOWING FINISHED GRADING.
REFER TO GOLF COURSE ARCHITECTURE PLANS FOR APPROPRIATE SEED MIX.
69d��►PL�7:�:���191:ii]►11�Iq►�1
CONTRACTOR SHALL PROVIDE A SAFE WORK ENVIRONMENT AT ALL TIMES. THE LIMITS OF WORK ARE LOCATED WITHIN AN ACTIVE GOLF COURSE AND RESORT
FACILITY. CARE SHOULD BE GIVEN TO MONITORING SAFE PERIMETER CONDITIONS AND LIMITING ACCESS INTO WORK AREAS. MAINTENANCE OF TRAFFIC,
INCLUDING CONSTRUCTION TRAFFIC, SHALL BE COORDINATED WITH UVA FOUNDATION. TRANSPORTATION PROGRAMS SHALL BE ESTABLISHED TO PREVENT
CONFLICTS WITH PASSENGER VEHICLES, PUBLIC TRANSPORTATION, PEDESTRIAN TRAFFIC, AND GOLF CARTS.
GENERAL CONSTRUCTION NOTES FOR EROSION AND
SEDIMENT CONTROL
1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE
COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND
SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND
SEDIMENT CONTROL REGULATIONS.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO,
OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW
AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND
SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.
7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND
DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING EVENT. ANY
NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA.
11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS,
WOOD, RUBBISH, AND OTHER DEBRIS.
12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28.
13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE.
14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:0013M.
15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY
HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND STRUCTURES/IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE
OF SLIDES, SINKING, OR COLLAPSE.
16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES
WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR
OTHER PORTION OF THE PROPERTY.
17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF
SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF
ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE
SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR.
18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE
APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF
A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND
0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO
APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR.
19. MAINTENANCE: ALL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT. ANY DAMAGE OR CLOGGING TO STRUCTURAL
MEASURES SHALL BE REPAIRED IMMEDIATELY. SILT TRAPS SHALL BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH
SEDIMENT. ALL SEEDED AREAS SHALL BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES
WHICH COLLECT SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY.
20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN
MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR.
21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WTIHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION
ORDINANCE SECTION 17-204G.)
22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING
ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B)
,
`� `� ,�,, , I -_ ---
NOTE:
-`----'
" CONTRACTOR TO LOCATE SILT FENCE DOWNSTREAM OF
;o3
- - -
- ;ALL CONSTRUCTION ACTIVITIES. FIELD ADJUSTMENTS MAY
-'
•`a
"-- --- --
--'- BE NECESSARY.
�'',,
/',' '-------
ED
/ _ \\` -----------D' - zn, �f- WDf3�fITVIA �TFAfI(,- \_. - = _______--__ -- ------ --- '
--- - - - Fsy / / ---- _ -
/ / a ---- --� - ---- ---- _ - - / __
,
' o
-- - - - - - - -----
_
1
/
\
\ -,
''_
EMOVp8ERd41 AND ----------- ,--
- �-_- -
-
�- -
'P'/ ROX \\ -o //\oRE E25'AREMOVE REMNANTS OF
- --- SEDIMENT -TRAP INCLUDING o - - _-____ ------
_-_
- - DISTURBAPIC`-D 93- ;/15Q}i/ i),,/ - -\`i- 'DOWNSTREAM IMP20VEMENTS -
- o -----_-
-
I1T- __-
- - ____->A RIPRARRESEED AREA. - -
------
J1
o
L
1 , _ - _
---- - - - _
REMOVE DIVER ON AND' Sl ,
-- PS _ - -
-- RESEED_ APP X. 9D' JC12' `= -- _ _ _ -- - -----
-L
_\
DQ
tv
r-ps- - - _ i
-- - � --_ - - - - --- - -- - � 'i '%,'� dFi R 36
-------- --m-' - - `` -- - - - -3�L - - - - - SF - _="_=-- = PS s - ; - 620�C.;LbCRTfEC
---- cn -------- - ''% - --------
PS
/ / SA �RANENT4�'--
-------- - :-'i ' - - -\ � - `,APPROX CATION - - '--- --__- __--_ �`- `�-.+IIR` -� - -�- --'-- -' _ '� ' / �P --
-\`------- - --- _ _ / .� - --- = ; ----=�INNfiS 0 1 I W E LIN�ItASFMEN-T -
OFRWS2Ci;DI. a_ -- -�- -- -- - - - / I / / -
` \ - - - -
U 93
r \WTERLW_E--- ------ CIINTRiK'TOIRTDRE,PC/jNT' 4---- / / (QB.5h14P&1�------
_ -- - i _ -
- --VEGETATION- j-IRU ARID. _'------- -#_ ---' -�� SF --- - � �'t-=Y_=-=o ��-_- �-`__-�.=-2C_S TOTAL_-
\�` ---- -- ----BG�S TREES_tb_RE CATEyI/HAf--- --' -�'-_-'- '--- ----` ----- _
- v -
'--' --' L1b9+TS -F-.
_ JNAS-PREVIO CY OfysliE
-APRRDX�7 SF10,MAL)
)A-21 ( ___
�4w Mir
TMP 76-OA-20
_NAD 83
SCALE 1 "=50'
0 50' 100'
TMP 76-OA-19
I FILL EXISTING DITCH AS
NECESSARY
- -
- PS ---,/ i � - _ ',► � _./�%``� , ,cam'`, �`., PS
= - RES_rQRE
SF PS ` '------------ �' / /
57012'45'W ISI5.65' _-'--___ ,' /
TMP 76-OA-18 LIMITS OF - _ ; ---`- --- '" , / '' '' '' -' / -
/DISTURBANCE =0.93 _--_____-
ACRES TOTAL
MINIMUM STANDARDS:
AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND
METHODS:
MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY
PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE
BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR
MORE THAN ONE YEAR.
MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING
MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS
WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION
SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT
EROSION.
MS-4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS
A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION.
MS-6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP
OR BASIN.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL
DRAINAGE AREAS LESS THAN THREE ACRES.
B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE
CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA.
THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION.
RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST
WHILE THE SEDIMENT BASIN IS UTILIZED.
MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING
EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE
PROBLEM IS CORRECTED.
MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL,
FLUME OR SLOPE DRAIN STRUCTURE.
MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED.
MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER
THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT.
MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY
REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND
STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE
CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER
MATERIALS.
MS-13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD A TEMPORARY VEHICULAR
STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED.
MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET.
MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED.
MS-16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND
DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS.
F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH.
MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF
SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD
SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND
TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.
THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.
MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE
TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE
DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER
EROSION AND SEDIMENTATION.
MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE
TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN
ACCORDANCE WITH THE STANDARDS AND CRITERIA LISTED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, CHAPTER 8 PAGES 20-24.
TMP 76-0
TMP 76-OA-16
1. SET POSTS AND EXCAVATE A 4"X4"
TRENCH UPSLOPE ALONG THE LINE OF
POSTS. - 6' -
- i
FLOW -IIII
3. ATTACH THE FILTER FABRIC TO
THE WIRE FENCE AND EXTEND IT
INTO THE TRENCH.
2. STAPLE WIRE FENCING
TO THE POSTS.
��Im.,•o,uur.�.uNl�
4. BACKFILL AND COMPACT THE
EXCAVATED SOIL.
EXTENSION OF FABRIC AND WIRE INTO THE TRENCH.
CONSTRUCTION OF A SILT FENCE
No Scale
EROSION CONTROL LEGEND
VESCH
LIMITS OF DISTURBANCE
SF SILT FENCE 3.05
PS PERMANENT SEEDING 3.32
PLANT SCHEDULE
SHRUBS
BOTANICAL NAME
COMMON NAME
SIZE
SPACING
16
CEPHALANTHUS OCCIDENTALIS
BUTTONBUSH
#1 CONTAINER
T O.C.
16
CORNUS AMOMUM
SILKY DOGWOOD
#1 CONTAINER
T O.C.
16
ILEX VERTICILLATA
WINTERBERRY HOLLY
#1 CONTAINER
T O.C.
16
ITEAVIRGINICA
VIRGINIA SWEETSPIRE
#1 CONTAINER
T O.C.
16
VIBURNUM DENTATUM
ARROWWOOD VIBURNUM
#1 CONTAINER
T O.C.
Q CRAIG W. I. KOTARSKI
Lic. No. 0402048507
A9„ 1110412020
2_v
L�
u
In
Lu
0 w
u
W
� U
2
O
W
a
0
w
ti
w
DATE
1012312020
DRAWN BY
A. ALLISON
DESIGNED BY
A. ALLISON
CHECKED BY
C. KOTARSKI
SCALE
1 "=50'
Q
'LU J
V / a
J
O
0 F--
U z
> 0
LL U
Jz�
O0z
O
V w LLJ
�
0 Q
w
m
J LU
0 Lf)
v 1
06
,p/ z
L.L O
I -I
00 0
L.L
Lu
JOB NO.
40490
SHEET No.
C1.0
L