HomeMy WebLinkAboutWPO202000050 Plan - E&S 2020-11-04SITE DATA: TAX MAP PARCELS: 75-63 PARCEL AREA: 544 ACRES LIMITS OF DISTURBANCE: 0.93 ACRES ZONING: R-1 RESIDENTIAL PROPOSED USES: GOLF COURSE UTILITIES: ACSA DRAINAGE DISTRICT: UPPER RIVANNA RIVER WATERSHED BIRDWOOD GOLF COURSE EROSION AND SEDIMENT CONTROL PLAN COUNTY OF ALBEMARLE NOVEM BER 04, 2020 PROJECT SITE CHARLOTTESVILLE CITY VICINITY MAP SCALE 1" : 5000' OWNER: UNIVERSITY OF VIRGINIA FOUNDATION PO BOX 400218 CHARLOTTESVILLE, VA 22904 ENGINEER OF RECORD: TIMMONS GROUP 608 PRESTON AVENUE SUITE 200 CHARLOTTESVILLE, VA 22902 CONTACT: CRAIG KOTARSKI, P.E. TELEPHONE: 434-327-1688 SIGNATURE PANEL: APPROVAL DEPARTMENT OF COMMUNITY DEVELOPMENT_ ENGINEERING DATE SHEET LIST TABLE SHEET NUMBER SHEET TITLE CO.0 COVER C1.0 EROSION AND SEDIMENT CONTROL PLAN TOTAL: 2 SHEETS APPROVED by the Albemarle County Community Development Department Date 12/03/2020 File WP0202000050 Q CRAIG W. J. KOTARSKI Lic. No. 0402048507 11/04/2020 am O oc a IV 0 S" ti DATE 1012312020 DRAWN BY A. ALLISON DESIGNED BY A. ALLISON CHECKED BY C. KOTARSKI SCALE W U) 0 U LL' Q J Oow z n U w \ J 0 2U Ow m J a >O DC m L H JOB NO. SHEET NO. C0.0 EROSION AND SEDIMENT CONTROL NARRATIVE PROJECT DESCRIPTION THIS PROJECT INVOLVES RESTORING THE PRE -DEVELOPED DRAINAGE PATTERN AROUND HOLE 14 OF BIRDWOOD GOLF COURSE, FROM CURRENT CONCENTRATED FLOW TO PRE -DEVELOPED SHEET FLOW, WITH APPROXIMATELY 0.93 ACRES OF DISTURBANCE. ADJACENT PROPERTY THE PROPERTY IS BOUNDED BY: EAST: RESIDENTIAL SUBDIVISION. FURTHER EAST IS ROUTE 29 NORTH, SOUTH, WEST: BIRDWOOD GOLF COURSE EXISTING SITE CONDITIONS THE SITE IS THE 14TH HOLE OF THE RE -DEVELOPED BIRDWOOD GOLF COURSE. THE EXISTING SITE CONSISTS OF BERMS, SWALES, AD DITCHES CREATING CONCENTRATED STORM WATER RUNOFF TO THE RESIDENTIAL HOMES TO THE EAST. OFF -SITE AREAS NO OFF -SITE AREAS WILL BE DISTURBED AS A PART OF THIS PROJECT EROSION AND SEDIMENT CONTROL MEASURES UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION. STORMWATER RUNOFF CONSIDERATIONS STORMWATER QUALITY REQUIREMENTS ARE BEING SATISFIED THROUGH CONSERVED OPEN SPACES AND SHEETFLOW TO VEGETEATED FILTER STRIPS. THIS IS AN EFFORT TO RESTORE THE SITE TO PRE DEVELOPED FLOW RATES GOING FROM THE CURRENT CONDITION OF CONCENTRATED FLOW, TO THE PRE -CONDITIONED SHEET FLOW. EROSION AND SEDIMENT CONTROL MEASURES MAINTENANCE ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VESCH AND THE CONSTRUCTION SEQUENCE, INCLUDING THE INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS. STRUCTURAL PRACTICES: 1. SILT FENCE BARRIER - 3.05 SILT FENCE SEDIMENT BARRIERS SHALL BE INSTALLED DOWNSLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT -LADEN RUNOFF FROM SHEET FLOW AS INDICATED. ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS AND PREVENT SEDIMENT FROM LEAVING THE SITE. VEGETATIVE PRACTICES: 1. TOPSOIL STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER SPREADING. STOCKPILE ( 1 LOCATIONS SHALL BE LOCATED ONSITE AND SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION. 2. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT IS APPLIED. 3. PERMANENT SEEDING - 3.32 FOLLOWING GRADING ACTIVITIES, ESTABLISH PERENNIAL VEGETATIVE COVER BY PLANTING SEED OR SOD TO REDUCE EROSION, STABILIZE DISTURBED AREAS AND ENHANCE NATURAL BEAUTY. 4. SOIL STABILIZATION BLANKETS & MATTING - 3.36 A PROTECTIVE COVERING BLANKET OR SOIL STABILIZATION MAT SHALL BE INSTALLED ON PREPARED PLANTING AREAS OF CHANNELS TO PROTECT AND PROMOTE VEGETATION ESTABLISHMENT AND REINFORCE ESTABLISHED TURF. MANAGEMENT STRATEGIES 1. ESTABLISH PERIMTER CONTROLS AND CONSTRUCTION ENTRANCE. 2. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING, SEED AND MULCH IMMEDIATELY FOLLOWING INSTALLATION. 3. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING. 4. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE PERIMETER CONTROLS. 5. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW. PERMANENT STABILIZATION ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING OR SOD IMMEDIATELY FOLLOWING FINISHED GRADING. REFER TO GOLF COURSE ARCHITECTURE PLANS FOR APPROPRIATE SEED MIX. 69d��►PL�7:�:���191:ii]►11�Iq►�1 CONTRACTOR SHALL PROVIDE A SAFE WORK ENVIRONMENT AT ALL TIMES. THE LIMITS OF WORK ARE LOCATED WITHIN AN ACTIVE GOLF COURSE AND RESORT FACILITY. CARE SHOULD BE GIVEN TO MONITORING SAFE PERIMETER CONDITIONS AND LIMITING ACCESS INTO WORK AREAS. MAINTENANCE OF TRAFFIC, INCLUDING CONSTRUCTION TRAFFIC, SHALL BE COORDINATED WITH UVA FOUNDATION. TRANSPORTATION PROGRAMS SHALL BE ESTABLISHED TO PREVENT CONFLICTS WITH PASSENGER VEHICLES, PUBLIC TRANSPORTATION, PEDESTRIAN TRAFFIC, AND GOLF CARTS. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:0013M. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND STRUCTURES/IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 19. MAINTENANCE: ALL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES SHALL BE REPAIRED IMMEDIATELY. SILT TRAPS SHALL BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS SHALL BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH COLLECT SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WTIHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G.) 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B) , `� `� ,�,, , I -_ --- NOTE: -`----' " CONTRACTOR TO LOCATE SILT FENCE DOWNSTREAM OF ;o3 - - - - ;ALL CONSTRUCTION ACTIVITIES. FIELD ADJUSTMENTS MAY -' •`a "-- --- -- --'- BE NECESSARY. �'',, /',' '------- ED / _ \\` -----------D' - zn, �f- WDf3�fITVIA �TFAfI(,- \_. - = _______--__ -- ------ --- ' --- - - - Fsy / / ---- _ - / / a ---- --� - ---- ---- _ - - / __ , ' o -- - - - - - - ----- _ 1 / \ \ -, ''_ EMOVp8ERd41 AND ----------- ,-- - �-_- - - �- - 'P'/ ROX \\ -o //\oRE E25'AREMOVE REMNANTS OF - --- SEDIMENT -TRAP INCLUDING o - - _-____ ------ _-_ - - DISTURBAPIC`-D 93- ;/15Q}i/ i),,/ - -\`i- 'DOWNSTREAM IMP20VEMENTS - - o -----_- - I1T- __- - - ____->A RIPRARRESEED AREA. - - ------ J1 o L 1 , _ - _ ---- - - - _ REMOVE DIVER ON AND' Sl , -- PS _ - - -- RESEED_ APP X. 9D' JC12' `= -- _ _ _ -- - ----- -L _\ DQ tv r-ps- - - _ i -- - � --_ - - - - --- - -- - � 'i '%,'� dFi R 36 -------- --m-' - - `` -- - - - -3�L - - - - - SF - _="_=-- = PS s - ; - 620�C.;LbCRTfEC ---- cn -------- - ''% - -------- PS / / SA �RANENT4�'-- -------- - :-'i ' - - -\ � - `,APPROX CATION - - '--- --__- __--_ �`- `�-.+IIR` -� - -�- --'-- -' _ '� ' / �P -- -\`------- - --- _ _ / .� - --- = ; ----=�INNfiS 0 1 I W E LIN�ItASFMEN-T - OFRWS2Ci;DI. a_ -- -�- -- -- - - - / I / / - ` \ - - - - U 93 r \WTERLW_E--- ------ CIINTRiK'TOIRTDRE,PC/jNT' 4---- / / (QB.5h14P&1�------ _ -- - i _ - - --VEGETATION- j-IRU ARID. _'------- -#_ ---' -�� SF --- - � �'t-=Y_=-=o ��-_- �-`__-�.=-2C_S TOTAL_- \�` ---- -- ----BG�S TREES_tb_RE CATEyI/HAf--- --' -�'-_-'- '--- ----` ----- _ - v - '--' --' L1b9+TS -F-. _ JNAS-PREVIO CY OfysliE -APRRDX�7 SF10,MAL) )A-21 ( ___ �4w Mir TMP 76-OA-20 _NAD 83 SCALE 1 "=50' 0 50' 100' TMP 76-OA-19 I FILL EXISTING DITCH AS NECESSARY - - - PS ---,/ i � - _ ',► � _./�%``� , ,cam'`, �`., PS = - RES_rQRE SF PS ` '------------ �' / / 57012'45'W ISI5.65' _-'--___ ,' / TMP 76-OA-18 LIMITS OF - _ ; ---`- --- '" , / '' '' '' -' / - /DISTURBANCE =0.93 _--_____- ACRES TOTAL MINIMUM STANDARDS: AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. MS-4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. MS-6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. MS-13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. MS-16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE STANDARDS AND CRITERIA LISTED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, CHAPTER 8 PAGES 20-24. TMP 76-0 TMP 76-OA-16 1. SET POSTS AND EXCAVATE A 4"X4" TRENCH UPSLOPE ALONG THE LINE OF POSTS. - 6' - - i FLOW -IIII 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 2. STAPLE WIRE FENCING TO THE POSTS. ��Im.,•o,uur.�.uNl� 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. CONSTRUCTION OF A SILT FENCE No Scale EROSION CONTROL LEGEND VESCH LIMITS OF DISTURBANCE SF SILT FENCE 3.05 PS PERMANENT SEEDING 3.32 PLANT SCHEDULE SHRUBS BOTANICAL NAME COMMON NAME SIZE SPACING 16 CEPHALANTHUS OCCIDENTALIS BUTTONBUSH #1 CONTAINER T O.C. 16 CORNUS AMOMUM SILKY DOGWOOD #1 CONTAINER T O.C. 16 ILEX VERTICILLATA WINTERBERRY HOLLY #1 CONTAINER T O.C. 16 ITEAVIRGINICA VIRGINIA SWEETSPIRE #1 CONTAINER T O.C. 16 VIBURNUM DENTATUM ARROWWOOD VIBURNUM #1 CONTAINER T O.C. Q CRAIG W. I. KOTARSKI Lic. No. 0402048507 A9„ 1110412020 2_v L� u In Lu 0 w u W � U 2 O W a 0 w ti w DATE 1012312020 DRAWN BY A. ALLISON DESIGNED BY A. ALLISON CHECKED BY C. KOTARSKI SCALE 1 "=50' Q 'LU J V / a J O 0 F-- U z > 0 LL U Jz� O0z O V w LLJ � 0 Q w m J LU 0 Lf) v 1 06 ,p/ z L.L O I -I 00 0 L.L Lu JOB NO. 40490 SHEET No. C1.0 L