Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO202000050 Bond Estimates 2021-01-12
Project Name: Birdwood Golf Course Erosion and Sediment Control Plan WPO file #: WP02020-00050 TM P(s): 07500-00-00-06300 Date Estimate Completed: 01/12/21 Erosion and Sediment Control Bond Estimate Item Item Number r stablization (PS, TS) 2 silt fence (SF) 3 safety fence (SAF) 4 diversion (DID, FD, RWD) 5 temporary slope drain (TSD) pipe length pipe diameter 0 in 6 shrubs, #1 container, sheet CC1.0 -ft , 7 Sediment Basin - N/A ( No traps or basins ) 28 silt fence inlet protection (IP) 29 stone inlet protection (IP) 30 outlet protection (OP)-Trap#1 length ft width 0 ft 31 outlet protection (OP)-Trap#2 length ft width 0 ft 32 outlet protection (OP) length ft width 0 ft 33 channel (SCC, matted) length ft width 0 ft 34 check dam depth in channel ft channel width 0 ft 35 construction entrance (CE) 36 wash rack 37 paved construction entrance 38 rip -rap, placed depth -ft length -R 39 width (tons) 0 tons 40 41 survey and layout (price per 0.1 mi.) acres traps and basins - 42 mobilization 43 Temporary Access road WP0202000050 Birdwood Goff Course ESC Plan_011221 No. Unit Unit Cost Cost (installed) 0.9 acres $5,000.00 $4,650.00 900.0 ft $5.00 $4,500.00 0.0 ft $5.00 $0.00 0.0 ft "' ^ 00 $0.00 $0.00 Mea $50.00 $4,000.00 $100.00 $0.00 $200.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $200.00 $0.00 $2,0,000.00 $0.00 $3,500.00 $0.00 $60.00 $0.00 $465.00 $2,500.00 cost sum $16,115.00 contingency $1,611.50 Total $17,730 1/12/2021