From: Yuya Ishizuka <Yuya.lshizuka@ContechLLC.com>
Sent: Sunday, December 27, 2020 7:35 PM
To: Graham Murray
Subject: Holistic Virginia - CMP Detention System
Attachments: 201223 Holistic VA SWM Sheets.pdf
Hi Graham,
The purpose of this email is to document Contech's review of the design and proposed application of the CMP
underground detention system forthe subject project.
Based on our review of the site plans provided by the FOR on 12/23/20 (attached), we believe the CMP detention
system is an appropriate solution for this site and the design is acceptable.
Please let me know if you have any questions, or need anything else.
Thanks,
Yuya Ishizuka, P.E.*
Sr. Stormwater Design Engineer
Contech Engineered Solutions LLC