Loading...
HomeMy WebLinkAboutWPO202100002 Approval - Agencies 2021-01-11Graham Murray From: Yuya Ishizuka <Yuya.lshizuka@ContechLLC.com> Sent: Sunday, December 27, 2020 7:35 PM To: Graham Murray Subject: Holistic Virginia - CMP Detention System Attachments: 201223 Holistic VA SWM Sheets.pdf Hi Graham, The purpose of this email is to document Contech's review of the design and proposed application of the CMP underground detention system forthe subject project. Based on our review of the site plans provided by the FOR on 12/23/20 (attached), we believe the CMP detention system is an appropriate solution for this site and the design is acceptable. Please let me know if you have any questions, or need anything else. Thanks, Yuya Ishizuka, P.E.* Sr. Stormwater Design Engineer Contech Engineered Solutions LLC 7037 Ridge Road, Suite 350 1 Hanover, MD 21076 Off:443-457-1513 yishizuka@conteches.com www.ContechES.com *Licensed in MD