Loading...
HomeMy WebLinkAboutSDP202000021 Review Comments Final Site Plan and Comps. 2021-01-13County of Albemarle Department of Community Development Memorandum To: Jeff Carter, P.E. (jeff@carteren ing eering.net), Justin Headley (lustin&w4wash.com), and the Owner of Record — Allen & Allen Properties — Charlottesville, LLC 1809 Staples Mill Rd., Richmond, VA 23230 From: Kevin McCollum - Planner Division: Planning Services Date: August 11, 2020 Subject: Final Site Plan SDP202000021— W4 Development Car Wash — Final The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Applicable Comments from Initial Site Plan Action Letter (October 24, 2019) If the comment has been addressed, it has been blurred out. Additional comments are added in bold font, like this. 1. [17-403] Groundwater assessment. The applicant paid the fee for a Tier IV Groundwater Assessment, however, this assessment is not needed as the property is currently served by municipal services. Please work with the lead planner to request a refund of this fee. 2. [ZMA198700007, 32.5.1(c), 3252(a)] Setbacks a. In the project notes, revise the setbacks to those listed below. (Note: These setbacks were established by the approved rezoning plan, ZMA198700007.) This has not been addressed. Multiple sheets still include a Project Notes box that includes setback info that is incorrect. Please change the setbacks to read as follows: i. Building setback: 30ft min ii. Parking lot setback: loft min b. Depict the setback lines on the plan maps for at least the existing and proposed site plans. Setback lines have been added to Sheet 4 — Utility Plan. Please add setback lines to the Site Plan. 3. [3252(i), 3252(m), 4.12] Travehvays and easements a. Please ensure all travelways are measured from face -of -curb to face -of -curb. It appears some travelway measurements provided on the plan may be measuring from back -of -curb to back -of -curb. (Note: All navelways must be at least 12ft wide.) b. Provide deed book and page numbers for all access easements shown on the plan. c. Provide a 2-way ingress/egress from the parking lot area to accommodate employees and emergency vehicles. The current site configuration forces employees and emergency vehicles to go through the queuing area before reaching the parking lot. d. At the property's entrance/exit, provide pavement marking to indicate when 2-way vehicular travel becomes 1- way queuing for the car wash facility. This will ensure that egress from the site is not obstructed. e. Specify the direction of travel for the 12ft travelway shown between the queuing lane area and the car wash. f Adjust the moveable bollard/traffic cone label such that it accurately indicates where these improvements will be placed. g. On Sheet 3, please remove the two vehicles symbols adjacent to, but not within, the queuing area. They appear to be left over from a previous version of the plan. 4. [32.62(a), 32.5.2(a)] Application reference number. On the cover sheet, please include the initial site plan application reference number — SDP201900052. (Note: The final site plan will be given a separate reference number so it is suggested that room be reserved so this information can be easily added in the future.) Please add the Site Plan Number "SDP202000021" to the front page before or after where it reads "Site Development Plans for W4 Development Car Wash." Please also amend the front to read: Tax Map and Parcel Number: 04500-00-00-093CO instead of "tax parcel id #." Initial Site Plan Number: SDP201900052 instead of"application reference #." 5. [32.62(h)] Signature panel. Provide the following signature panel on the cover sheet. This has been addressed, but please enlarge the box if you can so that the signatures and the dates can fit more easily. 6. [Comment, 32.5.2(a)] Sheets. The sheet index provided on the cover sheet suggests that several sheets may still be in process. Please be aware that any sheet included in the Table of Contents must be provided before final site plan approval can be granted. 7. [3252(a)] Magisterial District. Include in the project notes or on the cover sheet that this property is in the Rio magisterial district. 8. [3252(a)] Zoning. Revise the following. a. In the project notes, combine both "Current Zoning" and "Proposed Zoning" line items into one line item that is simply labelled "Zoning". Site plans do not typically distinguish between current and proposed zoning districts unless a change to the zoning classification is being proposed. b. As part of the zoning notes, include the overlay districts to which this parcel subject. This can be done in parenthesis following the zoning district. (Note: This parcel is subject to the following overlay districts: Airport Impact Area, Entrance Corridor, and Managed Steep Slopes.) 9. [3252(b)] Building height Note that the maximum building height for this district is 65ft. 10. [3252(f)] Watershed. Indicate on the cover sheet or in the project notes whether the property is located within a watershed of a public water supply reservoir. (Note: The property is located in the South Fork Rivanna watershed which is not a water supply watershed, however this information must be noted on the plan.) 11. [3252(a)] Owner. Similar to the "Developer" and "Engineer" information provided in the project notes, include information regarding the parcel owner as well. Not addressed. Please include the owner information. If there are concerns about the owner changing you can simply put "current owner as of xx/xx/xxxx." The current owner is in the title of this comment letter above. 12. [3252(a)] Information Sources. Provide both the source of the topography and source of the survey. 13. [Albemarle County Engineering Policy] Benchmarks. Reference the benchmarks used for surveys. 14. [3252(a)] Abutting parcel information. Please include the zoning district and present uses within the abutting parcel information label(s). There is technically only one abutting parcel —TMP 04500-00-00-094A0, you only have to include this reference once as opposed to twice on several of the sheets. The current use can also be simply identified as "shopping center." 15. [3252(a)] Departing lot lines. Depict the departing lot line for tax map parcel TMP 45-94A (SCT Rio Hill LLC) along U.S. Route 29. 16. [3252(a)] Parcel boundary. Provide curve data for C 1, C2, and C3. 17. [32520), 32 52(1), Albemarle County Engineering Policy] Utility easements. Indicate the deed book and page reference for all existing utility easements located on the property. 18. [3252(d)] Slopes. Demonstrate where managed steep slopes areas are located on the property. Not addressed. 19. [32.5.Ile)] Dimensions. Show the dimensions of the building footprint on the plan. Not fully addressed. Add dimensions to Sheet 3. It would be also helpful to show how the 3,739 feet used in the parking calculation were measured for the retail sales area. 20. [3252(n), Albemarle County Engineering Policy] Retaining wall. Label the maximum height of the retaining wall. 21. [Albemarle County Engineering Policy] Sight distance. Indicate the available sight distance for left turn lanes. 22. [3252(b), 4.12] Parking schedule. a. The required parking for this application is 30 parking spaces. Anything over a whole number rounds up to the next whole number, as the use requires more than [insert lesser number] of parking spaces. Please revise. b. Indicate which spaces will be used as employee parking spaces. Staff recommends providing at least one parking space per employee, being mindful of parking needs during overlap times if shift work is anticipated. 23. [3252(n)] Paving materials. Indicate the proposed paving materials for the parking lots and driveways. 24. [32.5.2(n), 4.12.19] Dumpster pad. Provide a detail for the dumpster pad in accordance with Sec. 4.12.19. This comment appears to be addressed. Approval pending from ARB. Response: dumpster detail on sheet 14 25. [3252(q)] Traffic generation figures. Provide traffic generation figures for the property in accordance with Sec. 32.5.2(q). Refer to VDOT's comment letter to see if this is needed. 26. [3252(n), 4.15.5] Proposed sign. If the applicant plans to locate a sign on the property, the intended location of the sign must be shown on the site plan. Please be aware that signs are not approved with the approval of site plans, they are approved through separate permits. See Sec. 4.15 for more information. Not addressed. 27. [3252(e), 32.7.9.4] Landscape features to remain. On Sheet 2, provide a note/label regarding the general composition of the vegetated area at the rear of the property (i.e. evergreen, deciduous, mix of type). For the portion of the wooded area that will remain, provide a Conservation Checklist (attached). (Note: If ARB agrees, preserving this wooded area may act as a substitute for providing an additional large tree along Woodbrook Dr. See review comment #28b below). It doesn't appear that any landscaping is to remain and therefore a conservation checklist isn't needed. Is this correct? 28. [3252(p)] Landscape Plan a. It appears the symbology for the large trees species may have been accidental switched in the legend. Revise. b. Like parking, when calculating the number of street trees needed, if more than "x" (whole number) of trees are needed, please round up to the next whole number. You only need to round up any number that has a decimal between .5-.99. c. Due to the presence of an overhead power line across the front of the site, the applicant may also need to work with Dominion Power to ensure that the proposed placement of street trees along U.S. Route 29 does not interfere with power line maintenance. d. Staff recommends removing from the plan proposed sodding that falls outside the property boundary. e. See comments from the ARB review regarding other landscaping -oriented comments. 29. [3252(n)] Outdoor lighting. Please be aware that if lighting over 3,000 lumens will be provided onsite, an outdoor lighting plan and schedule, in accordance with Sec. 4.17, will need to be provided as part of the final site plan per Sec. 32.6.2(k). 30. [Comment] Will off -site, temporary easements be needed for construction4 Final Site Plan Review Comments 1. [32.4.3.2(c), SDP201900052] On December 18, 2019 the Board of Supervisors took action on your special exception to vary the application plan associated with TW 45-93C. The Special Exception provides conditional approval to the application plan, SDP201900052. Those conditions require a shared use path along Route 29 and Woodbrook Drive. The Final Site Plan must meet these conditions before final approval. Please revise the Site Plan to include the two shared use paths and the landscape strips separating them from the vehicular travel way. The conditions of the special exception have been met, buffers and shared use paths are now provided along Woodbrook Drive and Route 29 and meet the required dimensions. However, a X-4' portion of the shared use path along Route 29, and the entire width of the shared use path along Woodbrook Drive are located outside of public right-of-way. Public access needs to be permitted over these paths. One of the following options must be done prior to final site plan approval: • Provide an access easement over the 10' path along Woodbrook Drive and the portion of the 14' path along Route 29 that is currently outside of the Route 29 right-of-way. Easements must be provided through submittal of an Easement Plat Application. Once the easement plat is approved and recorded, this comment will be addressed. Response: access easement applied for • Provide an access easement over the 10' path along Woodbrook Dr. and dedicate land along the property's Route 29 frontage so that the 14' path is entirely within VDOT right-of-way. Easements and land dedication can be accomplished through submittal of an Easement Plat Application. Once the easement plat is approved and recorded, this comment will be addressed. Attached is the Easement Plat Application available on our website. 2. [32.6.l(e)] Please provide the dimensions for the proposed building (tunnel) and the shared use paths once they are included on the Final Site Plan. Additionally, please provide the dimensions for the "Retail Sales Area" used in the parking data calculation. The parking requirement is based on this square footage and I need to confirm that this calculation is correct for the total number of required parking spaces. 3. [32.6.20) and 32.7.9] Landscape Plan a. Along Route 29 there should be one large street tree for every 50' of frontage or one medium street tree for every 40' of frontage. Given 249.25' of frontage there should either be 5 large street trees or 6 medium street trees. The applicant has proposed 13 small trees which does not meet this requirement. This comment appears to have been addressed, awaiting ARB approval. Response: 6 medium trees shown on the ] to sca plan b. Please edit/remove landscaping that is located in easements (see ACSA comments aR� overtop of storm pipes (engineering). Response: Trees moved away from storm sewer pipes. See ACSA comments are pending. Please see Engineering comments. landscape plan for location c. [32.7.9.6] Please indicate that the parking area will have at least 5% of landscaping. It appears the current calculation of 80% is for the entire site and not just the parking area. The correct area would include all of the landscaping within the impervious area (parking and circulation). d. [32.7.9.7] All shrubs must be at least 18" when planted. There are some on the plant schedule that are listed as being 12". 4. [32.6.2(k) and 4.17] Outdoor Lighting e. [4.17] Provide a luminaire schedule identifying outdoor lighting type, manufacture/model number, quantity proposed, pole height, lumens, wattage, and light loss factor (LLF) used to calculate the footcandles for each luminaire type. Albemarle County requires lighting plans to use a LLF of L0. f. [4.17 (a)] Provide manufacturer cut sheets demonstrating that each light emitting 3,000 lumens or more will have a full -cutoff fixture. Cut -sheets should be provided as exhibits on the lighting plans. This has not been addressed. Response: we sheet 1110013 and the sheet immediately following for cut sheets and outdoor light' g. [4.17.4 (b)(1)] Footcandle measurements adjacent to Route 2 Woodbrook Drive exceed 0.5 footcandles. Please revise lighting locations or luminaire types so that maximum footcandle measurements do not exceed 0.5 footcandles along property lines adjacent to public roads. The measurements meet our standards, but please refer to VDOT's comments regarding spillover onto public roads. Response: noted h. [4.17] Please add a note to the lighting plan which states each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle." 5. [32.7.3, 4.12.13, 4.12.18] Parking — Please provide 1 loading space. If the applicant doesn't want to provide a loading space, please provide a justification for not providing one in accordance with 4.12.13(f). This comment has not been addressed. Please provide a loading space that meets the requirements of 4.12.13 and 4.12.18 or provide justification of why the Applicant doesn't need one. Response: all deliveries are made during non -business hours and therefore does not justify the need for a designated space 6. [31T8, 4.15] Please show the location and dimensions of any proposed signage. Other General Review Comments In the Project Notes box please change it from "Parcel No.: #04500-00-00-093C0" to either: a. Tax Map and Parcel Number: 04500-00-00-093CO b. TMP:04S00-00-00-093CO In the Project Notes box add SDP201900052 to the Conditional Approval section that lists ZMA198700007 and SDP 19880000 L Other SRC Reviewers: Albemarle County Engineering Services (Engineer) Emily Cox, ecox2(a),albemarle.ora — Requests Changes, see comments attached. Albemarle County Building Inspections Michael Dellinger, mdellinaer(a),,albemarle.ora — No Objection 7/23/2020. Albemarle County Department of Fire Rescue Shawn Maddox, smaddox(a( ,albemarle.ora — No Objection 8/6//2020 Albemarle County Service Authority Richard Nelson, melsonAserviceauthoritv.ora — Requested Changes, see comments below. Response: ermeter to be uwd for irrigation. see note at the bottom of sheet 4 1. Abandon existing 1" water meter if it is not being used. Include water service abandonment detail. 2. Provide max flow demand, to Confirm water meter size. Response: see top left comer of sheet 4 for flow information. 125 gpm w/o reclaim system and 82 span with reclaim system operating 3. Show proposed water meter. Response: see sheet 4 for new meter location 4. Water meters larger than 1" will need to have a meter vault installed. Include standard meter and vault details once meter size is confirmed. Response: we requested details on sheet 9.1 5. Additional water and sewer connection fees will need to be paid (for anything larger than a 1" water meter) prior to setting the new water meter during construction. 6. Contact Tim Brown at tbrownAserviceauthority.orfor information on ACSA's car wash program. 7. It appears proposed grading may reduce the amount of cover over the existing water main. The existing water main will need to be lowered to meet minimum depth where cut is more than 6". Response: see sheet 4 for Undo; of water line that will need to 8. Plantings are to be placed outside of existing ACSA easements. be lowered Response: water and sewer easement shown on the landscape plan (see shaded areas). 9. Show water and sewer utilities on landscaping plan. There are no trees placed within the easement areas Virginia Department of Transportation Adam Moore, adam.moore(awdot.virginia.sov — Request changes; see comments attached. Albemarle County Architectural Review Board Margaret Maliszewski, MMaliszewski@aibemarle.org —Requested Changes; see comments below. 1. Review of the March 9, 2020 ARB submittal was deferred to allow time for the submittal of missing information, much of which was architectural. That information has not been submitted but is required. ARB review and approval of both site and architectural designs is required prior to final site plan approval. � AI ?"h �IRGINtP County of Albemarle Department of Community Development Memorandum To: Kevin Mccollum From: Emily Cox Date: 31 March 2020 Rev. 1: 04 Aug 2020 Subject: W4 Development Car Wash — Final Site Plan (SDP20200021) The final site plan for W4 Development Car Wash has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO201900067 plan must be approved before final site plan can be approved. Rev. 1: Comment not addressed. 2. Remove sheets that are not applicable to the site plan, such as E&S. Those only need to be in the WPO Plan. Rev. 1: Comment addressed. 3. Show all existing easements along with their deed book and page. Rev. 1: Comment addressed. 4. According to county GIS, there appears to be managed slopes on the property. Please show the managed slopes. Rev. 1: Comment addressed. 5. Proposed grading should show the top and bottom elevations of the retaining walls. A building permit will be necessary for walls over 3 ft. in height. Rev. 1: Comment addressed. 6. Provide detail for retaining wall. It appears to be touching the property line. How will this be built without disturbing the adjacent property? In general, grading should be tied in to contours 5 ft from property lines whenever possible. This prevents construction from happening offsite. Rev. 1: Comment addressed. 7. Please label the curbing (CG-6, etc). Rev. 1: Comment addressed. 8. Please remove landscaping items that are shown directly over storm pipes. Rev. 1: Trees still appear very close to storm pipes. They should be at least 5 ft away unless they are small shrubs. Response: All trees have been moved at least 5' from storm sewer pipes. See landscape plan for tree lowtlons with dimensions from storm sewer 9. The entrance radii should be a minimum of 12.5 ft. The plans current show 12 ft at the entrance. Rev. 1: Comment addressed. 10. Please label the dumpster pad dimensions and ensure the heavy duty concrete detail meets the following: dumpster pad detail or specification to be a minimum 4" stone base and 6" concrete of 3000psi at 28 days, or stronger, reinforced with a minimum grid of wire reinforcing or #4 bars at 12" on center. Rev. 1: Comment addressed. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street (804) 7862701 Commissioner Richmond, Virginia 23219 Fax: (804) 786.2940 July 29, 2020 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Kevin McCollum Re: SDP-2020-00021- W4 Development Car Wash- Final Site Plan Review# 2 Dear Mr. McCollum: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Carter Engineering, Consultants, dated August 21, 2019, revised June 22, 2020 and offer the following comment. Land Use 1. The maximum foot-candles cannot exceed 0.3fc, at public roadway. If further information is desired, please contact Willis C. Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right of way. The owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING