Loading...
HomeMy WebLinkAboutSDP202000059 Review Comments Initial Site Plan 2020-10-23Short Review Comments Report for: SDP202000059 —Brookhill - Block 18 - Initial - Digital SubApplication Type: IInitial Site Plan Date Completed: 10/23/2020 Reviewer: Cameron Langille Division: CDD Planning Review Status: Administrative Approval Reviews Comments: See SRC Action Letter dated 10/2312020 uploaded to Laserfiche for administrative approval of the initial site plan. Date Completed. -------------------------------------------------------------------------------------------- 10/08/2020 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See SRC comment letter dated 10/08/2020 uploaded to Laserfiche for Planning Division review comments. Date Completed: 09/07/2020 Reviewer: Brian Becker Division: CDD E911 Review Status: No Objection Reviews Comments: I No objection Date Completed: 09/22/2020 Reviewer: Emily Cox Division: CDD Engineering Review Status: Requested Changes Reviews Comments: Date Completed: Reviewer: Review Status: 09/23/2020 Michael Dellinger Requested Changes Division: CDD Inspections Reviews Comments: Add the following note to the general notes page: Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve. to developer: to required distances from lot lines and structures as required by the NFPA, underground ane tanks may be prohibited. Plan accordingly. Date Completed: 10/22/2020 Reviewer: Shawn Maddox Division: Fire Rescue Review Status: No Objection Reviews Comments: Fire Rescue has no objections. Please provide a copy of fire flow test results for this phase when completed to verify ISO needed fire flow is met. Date Completed: 10/07/2020 Reviewer: Richard Nelson Division: ACSA Review Status: See Recommendations Reviews Comments: I I recommend approval for SDP202000059 and SUB202000160 Brookhill Block 18 - Initial Site Plan & Page: 1 of 2 County of Albemarle Printed On: January 13, 2021 division Plat with the following conditions: emit 3 copies and a PDF of the utility forACSA review, ATTN: Alex Morrison. ity plan approval will be required prior to final site plan and final plat approval. ✓SA sewer capacity certification will be required. s Brookhill Master Plan shows a water main connection between this block and Montgomery ge. Ensure this is 1wn on the utility plan. dication of ACSA utilities for the Polo Grounds Road Water Main Improvement Phase 2 will be uired before final e plan approval. ck 16/17 utility plan approval will be required prior to Block 18 utility plan approval. A note should added that cks 16 and 17 utilities are to be constructed, tested, and dedicated to ACSA prior to services ng established for ck 18. Nelson Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 Date Completed: 09/11 /2020 Reviewer: Unassigned Division: VDOT Review Status: Requested Changes Reviews Comments: Page: 2 of 2 County of Albemarle Printed On: January 13, 2021