To: Kevin McDermott, Albemarle County
From: Steve Schmidt, PE, PTOE
RE: 2231 Seminole Lane Traffic Assessment
Date: January 15, 2021
Copy: Craig Kotarski, PE (TG)
As requested, Timmons Group has prepared a traffic assessment for the proposed redevelopment
of 2231 Seminole Lane in Albemarle County, Virginia. The site is generally located in the
southeast quadrant of the US Route 29/Hilton Heights Road/Seminole Lane intersection as shown
on Figure 1 (all figures are located at the end of this memorandum).
The site is currently occupied with a vacant office building. The proposed redevelopment will
consist of a 1,132 S.F. coffee shop with drive thru service. Access to the site will be provided via
the existing site entrance on Seminole Lane. For purposes of this analysis, the redevelopment
was assumed to be complete by 2022.
This assessment analyzes the impact of the proposed redevelopment on the US Route 29/Hilton
Heights Road/Seminole Lane intersection.
Existing Conditions
US Route 29 (Seminole Trail) is an eight -lane, divided principal arterial with a posted speed limit
of 45 mph. According to the VDOT 2019 count book, US Route 29 carries 54,000 AADT with 3%
heavy vehicles.
US Route 29 serves as a north -south corridor in the area connecting multiple residential and
commercial areas.
Hilton Heights Road is a two lane, partially divided major collector with a posted speed limit of 35
mph and an AADT of 4,500 vehicles per day with 3% heavy vehicles, according to the VDOT 2019
count book.
Seminole Lane is a two-lane undivided local roadway which serves as a frontage road to US Route
29. Seminole Lane runs north -south and provides access to commercial properties along the east
side of US Route 29.
The existing roadway geometry surrounding the site is shown on Figure 2.
2231 Seminole Lane Traffic Assessment
January 15, 2021
Page 2 of 9
Existing Traffic Volumes
%
TIMMONS GROUP
Existing AM and PM peak hour traffic counts were conducted on Thursday December 3, 2020
between 7-9 AM (AM peak hour) and 4-6 PM (PM peak hour). The counts included heavy vehicles
by movement, pedestrian, and bicycle counts and are included in Appendix A.
The existing AM and PM peak hour counts are shown on Figure 3 and indicate the AM peak hour
occurs from 7:30-8:30 AM and the PM peak hour occurs from 4:30-5:30 PM.
Due to the change in traffic patterns associated with the ongoing pandemic, the counts on Figure
3 were compared to traffic counts taken in 2019 at the nearby US Route 29/Westfield Road
intersection. When compared to the 2019 counts, the 2020 traffic counts were 37% lower in
the AM peak hour and 19% lower in the PM peak hour. Therefore, the counts shown on Figure
3 were increased by 36% and 19% in the AM and PM peak hours, respectively to yield the existing
adjusted volumes which are shown on Figure 4.
2022 Background Traffic Volumes
2022 Background traffic volumes were developed based on a 1% annual growth in existing traffic
over the two (2) year period for project buildout.
The 1% annual growth rate was compounded annually over the two (2) year period and was
applied to all movements from the existing traffic counts. The resulting 2022 background traffic
volumes are shown on Figure 5.
Trio Generation/Distribution
The trips that will be generated by the proposed redevelopment were based on trip generation
information provided in the loth edition of the Institute of Transportation Engineers' (ITE's) Trip
Generation Manual.
As shown in Table 1, the proposed coffee shop with drive thru will result in an additional 928
daily trips, 101 trips during the AM peak (52 in and 49 out) and 49 trips during the PM peak (25
in and 24 out).
Table 1:
Site -Generated Traffic for Seminole Lane
LAND USE
IIE CODE
AMOUNT
UNITS
WEEKDAY
AM PEAK HOUR
PM PEAK HOUR
ACT
IN OUTTOTAL
IN OUT TOTAL
Rrture Use
Coffee Donut Shop with Drive-Thru
1 937
1 1,132
S.F.
928
1 52
1 49
1 101
25
1 24
1 49
TOTAL
928
1 52
1 49
1 101
25
24
49
2231 Seminole Lane Traffic Assessment
January 15, 2021
Page 3 of 9
%
TIMMONS GROUP
Based on the nature of the use, it was assumed the site trips would follow the existing travel
patterns in the area and primarily be oriented to/from the south and the City of Charlottesville.
Therefore, it was assumed that 60% of site traffic would be oriented to/from the south on US
Route 29 and 40% to/from the north on US Route 29 as shown on Figure 6.
The site generated trips shown on Table 1 were distributed to the local roadway network
according to the distributions shown on Figure 6. The resulting site generated trips are shown
on Figure 7.
2022 Future Traffic Volumes
The site trips shown on Figure 7 were added to the background traffic volumes shown on Figure
5 to yield the 2022 future traffic volumes which are shown on Figure 8.
Operational and Oueuina Analysis
Capacity analysis allows traffic engineers to determine the impacts of traffic on the surrounding
roadway network. The Transportation Research Board's (TRB) Highway Capacity Manual (HCM)
methodologies govern how the capacity analyses are conducted and how the results are
interpreted. There are six letter grades of Levels of Service (LOS) from A to F, with LOS A
representing the best operating conditions and LOS F the worst operating conditions. Table 2
shows in detail how each of these levels of service are interpreted.
2231 Seminole Lane Traffic Assessment
January 15, 2021
Page 4 of 9
Table 2: Level of Service Definitions
Level of Roadway Segments or
Service Controlled Access Highways Intersections
A Free Bow, low traffic
density.
B Delay is not unreasonable,
stabletrafgc Row.
C Stableconcloon,
movements somewhat
restricted due to higher
volumes, but not
objectionable for motorists.
D Movements more restricted,
queues and delays may
occur during short peaks,
but lower demands occur
often enough to perntlt
clearing, thus preventing
excessive backups.
Actual ca pacity of the
roadway In cloves delay to
all moorism due to
congestion.
F Forced gowwithdemand
volumes greater than
capacity resulting in
compl ea, congestion.
Volumes drop to zero in
extreme cases.
No vehicle waltz longer than
one signal indication.
On a rareoccaslon motorists
wetthrough morethan one
signal indication.
Intermittently drivers wait
through morethan onesignal
Indication, and occasionally
backups may develop behind
left turning vehicles, traffic
Rowstill stableand
acceptable.
Delays at I ntersections may
Warne extensive with some,
especial ly left -turning
vehicles waiting two or more
signal i ndicati ons, but
enough cycles with lower
demand occur to permit
periodic clearance, thus
preventing excessive backups.
Very long queues may create
lengthily delays, especially for
left-turningvehicles.
Backups from locations
downstream restrict or
prevent movement of vehicl es
out of approach creating a
storage ares during part or
all of an hour.
SOURCE: "A Policy on Design o/Design of Urban Highways andArtedol
Streets"-AASHTO, 1973 based upon material published in "Highway
[opacity Manual", National Academy of 5clences, 1965.
y
C
F
%
TIMMONS GROUP
2231 Seminole Lane Traffic Assessment
January 15, 2021
Page 5 of 9
%
TIMMONS GROUP
For signalized and unsignalized intersections, level of service is defined in terms of delay, a
measure of driver discomfort, frustration, fuel consumption and lost travel time. Table 3
summarizes the delay associated with each LOS category:
Table 3: Signalized and Unsignalized Intersection Level of Service Criteria
Signalized Intersections
Unsignalized Intersections
Level of
Service
Control Delay per
Vehicle (sec/veh)
Level of
Service
Average Control
Delay (sec/veh)
A
<_10
A
0to10
B
>10to<_20
B
>10to<_15
C
>20to<_35
C
>15to<_25
D
>35to<_55
D
>25to<_35
E
>55to<_80
E
>35to<_50
F
>80
F
>50
Source: Exhibit 16-2 and Exhibit 17-2 from
TRB'; 'Highway Capacity Manual2000"
Operational Analysis for 2020 Existing Traffic Volumes
Table 4 summarizes the 2020 existing intersection LOS, delay, 95th percentile queue lengths
(Synchro), and maximum queue lengths (SimTraffic) based on the adjusted 2020 existing peak
hour traffic volumes shown on Figure 4, the existing lane geometry shown on Figure 2, and the
existing traffic signal timings provided by VDOT. The corresponding analysis worksheets are
included in Appendix B.
In order to accurately represent the field conditions where the southbound approach exiting the
gas station does not stop as there is no northbound conflicting traffic, the southbound approach
was modeled as the westbound approach, as is reflected in the tables below.
As shown in Table 4, the signalized intersection of US Route 29 and Hilton Heights
Road/Seminole Lane operates at an overall Level of Service (LOS) C in the AM peak with a delay
of 28.7 seconds/vehicle and a LOS C in the PM peak with a delay of 29.2 second/vehicle.
The eastbound approach operates at LOS D in the AM peak with a delay of 52.4
seconds/vehicle in the AM peak and LOS E in the PM peak with a delay of 60.6 seconds/vehicle.
The westbound approach operates at LOS E in the AM and PM peak, with a delay of 78.8
seconds/vehicle in the AM peak and 67.3 seconds/vehicle in the PM peak.
The mainline northbound approach operates at LOS C in the AM and PM peak with a delay of
23.1 seconds/vehicle in the AM peak and a delay of 22.9 seconds/vehicle in the PM peak.
2231 Seminole Lane Traffic Assessment f 'ta
January 15, 2021
Page 6of9 TIMMONS GROUP
The mainline southbound approach operates at LOS C in the AM and PM peak with a delay of
29.6 seconds/vehicle in the AM peak and 29.5 seconds/vehicle in the PM peak.
The 95th percentile and maximum queues are all contained within the available storage with the
exception of the southbound left queue.
At the Seminole Lane/Gas Station/Site Entrance intersection, there is no opposing volume from
the site in 2020 Existing conditions. Therefore, there is no delay for the approaches.
Table 4: 2020 Existing Conditions Level of Service and Queues
Intersection and
Type of Control
Movement and
Approach
Turn
lane
Storage
(R)
AM PEAK HDUR
PM PEAK HOUR
Delays
(sec/veh)
lD5'
SYNCHRO 95th5th
Percentile
Queue Length
(ft)
SimTraffic
perceantile
Queue
Length (ft)
Delay'
(sec/veh)
lD5'
SYNCHRO9
Percentile
Queue
Length (it)
SimTraffic
Max
Percentile
Queue
Length (ft)
1. Seminole Trail (FFS) & Fitton heights
Road/Seminole Lane (EW)
Siganlized
EB Left
54.5
D
68
108
66.4
E
152
183
EB Left-Thru
54.6
D
71
67
66.5
E
154
163
EB Right
205
51.1
D
0
79
54.6
D
51
105
EBApproach
52.6
O
--
--
60.6
E
--
--
WE Left
184
84.6
F
#87
74
1 71.7
1 E
100
72
WBThru-Right
53.2
D
23
59
59.6
E
51
67
WBApProach
78.8
E
--
--
67..3
E
--
--
NB Left (2)
420
76.8
E
#181
206
50.3
D
200
336
NBThru
14.1
B
219
276
18.9
B
466
415
NBThru-Right
14.1
B
219
99
18.9
B
466
222
IWAPProach
23.1
C
--
--
22.9
C
--
--
SB Left
270
136.5
F
#125
270
68.7
E
50
269
SBThru
28.1
C
579
640
29.6
C
351
483
SB Right
335
14.2
B
25
114
22.3
C
19
93
SBApproach
29.6
C
--
--
29.5
C
--
--
overall LOS
28.7
C
--
--
29.2
C
--
--
2. Seminole Lane (N-S) & Site
Entrance/Gas Station Entrance (E-W)
Unsignalized
EB Left -Right
t
t
t
t
t
t
t
t
EBAPProadi
t
t
--
--
t
t
--
--
WBThru-Right
t
t
t
86
t
t
t
81
WBAPP2Nrh
t
t
__
t
t
NB Left-Thru
t
t
t
t
t
t
t
t
AOAPProach
t
t
--
--
t
t
--
--
1 Orerall inferseciion LOS and delaympoited fors&mlizediniersecuons only.
t SYNCHRO does not provide level of service or delay for unsignalized movements with no conflicting volumes.
Operational Analysis for 2022 Background Volume Conditions
Table 5 summarizes the 2022 background intersection LOS, delay, 95th percentile queue lengths
(Synchro), and maximum queue lengths (SimTraffic) based on the 2022 background peak hour
traffic volumes shown on Figure 5, the existing lane geometry shown on Figure 2, and the existing
traffic signal timings provided by VDOT. The corresponding analysis worksheets are included in
Appendix C.
2231 Seminole Lane Traffic Assessment • •: ���
January 15, 2021
Page 7of9 TIMMONS GROUP
Table 5: 2022 Background Conditions Level of Service and Queues
Intersection and
Type of Control
Movement and
Approach
Turn
Lane
Storage
(ft)
AM PEAK HOUR
PM PEAK HOUR
Delay'
(sec/veh
LO51
SYNCHRO 95th
Percentile
Queue RLength
SimTraffic
Per)centile
Queue
Length (ft)
Delay
(sec/veh)
LO5'
SYNCHRO9
Percentile
Queue
Length (ft)
SimTraffic
Percentile
Queue
Length (ft)
1. Seminole Trail (N-S) & Hilton Heights
Road/Seminole Lane (E-W)
Signalized
EB Left
350
54.4
D
68
108
66.5
E
154
190
EB Left-Thru
54.3
D
70
74
67.1
E
157
168
EB Right
51.1
D
0
74
54.5
D
54
106
ESApproach
525
O
--
--
60.7
E
-
--
WB Left
184
82.4
1 F
1 #87
72
1 72.7
1 E
102
72
WBThru-Right
53.1
D
20
62
59.6
E
51
67
WBApproach
77,7
E
-
-
67,9
E
-
--
NB Left(2)
420
74.8
E
#182
215
50.6
D
204
374
NB Thru
13.9
B
219
275
19.3
B
481
439
NB Thru-Right
13.9
B
219
84
19.3
B
481
240
NSApproach
227
C
--
--
23.3
C
--
--
SB Left
270
123.7
F
#122
257
68.7
E
50
268
SB Thru
26.9
C
579
607
30.0
C
361
509
SB Right
335
14.1
B
25
104
22.3
C
20
90
SSApproach
28.1
C
-
-
29.6
C
-
--
Overall LOS
27.7
C
--
--
29.5
C
--
--
2. Seminole Lane (N-S) & Site
Entrance/Gas Station Entrance (E-W)
Unsignalized
EB Left -Right
t
t
t
3
t
t
t
t
ESApproach
t
t
-
-
t
t
--
--
WBThru-Right
t
t
t
96
t
t
t
96
"Approach
t
t
-
-
t
t
-
--
NB Left-Thru
t
t
t
t
t
t
t
t
NHAPProachl
t
t
-
-
t
t
-
--
1 Owrall intersection LOS and delayreportedforsi9mlized intersecb'ons only.
t SYNCHRO does not provide level of service or delay for unsignalized movements with no conflicting volumes.
As shown in Table 5 above, the signalized intersection of US Route 29 and Hilton Heights
Road/Seminole Lane will operate at an overall Level of Service (LOS) C in the AM peak with a
delay of 27.7 seconds/vehicle and a LOS C in the PM peak with a delay of 29.5 seconds/vehicle.
The eastbound approach will operate at LOS D in the AM peak with a delay of 52.5
seconds/vehicle in the AM peak and LOS E in the PM peak with a delay of 60.7 seconds/vehicle.
The westbound approach will operate at LOS E in the AM and the PM peak, with a delay of 77.7
seconds/vehicle in the AM peak and 67.9 seconds/vehicle in the PM peak.
The mainline northbound approach will operate at LOS C in the AM and PM peak with a delay of
22.7 seconds/vehicle in the AM peak and a delay of 23.3 seconds/vehicle in the PM peak.
The mainline southbound approach will operate at LOS C in the AM and PM peak with a delay of
28.1 seconds/vehicle in the AM peak and 29.5 seconds/vehicle in the PM peak.
The 951h percentile and maximum queues will all be contained within the available storage with
the exception of the southbound left queue.
At the Seminole Lane/Gas Station/Site Entrance intersection, there is no opposing volume from
the site in 2022 Background conditions. Therefore, there is no delay for the approaches.
2231 Seminole Lane Traffic Assessment f ' as
January 15, 2021
Page 8of9 TIMMONS GROUP
Operational Analysis for 2022 Future Volume Conditions
Table 6 summarizes the 2022 future intersection (with the redevelopment) LOS, delay, 95th
percentile queue lengths (Synchro), and maximum queue lengths (SimTraffic) based on the 2022
future peak hour traffic volumes shown on Figure 8, the existing lane geometry shown on Figure
2, and the existing traffic signal timings provided by VDOT. The corresponding analysis
worksheets are included in Appendix D.
Table 6: 2022 Total Future Conditions Level of Service and Queues
Intersection and
Type of Control
Movement and
Approach
Turn
lane
Storage
(R)
AM PEAK HOUR
PM PEAK HOUR
Delay `
(seaveh)
Los ,
SYNCHRO 95th
Percentile
Queue Length
(R)
SimTraffic
Ix
Pencentile
QUeue
Len ft
Delay r
(sec/veh)
LOS `
SYNCHRO9
5th
Percentile
Queue
Len ft
SimTraffic
Max
Percentile
Queue
Length R
1. Seminole Trail (N-S) & Hilton Heights
Road/Seminole lane (E-W)
Siganiized
EB Left
350
54.4
D
68
108
66.5
E
154
188
EB Left-Thru
54.3
D
70
60
67.1
E
157
165
EB Right
51.1
D
0
74
54.5
D
54
103
E6Approach
52.5
O
-
--
60.7
E
--
--
WB Left
184
124.0
F
#155
95
70.2
E
#131
73
WBThru-Right
51.9
1 D
35
72
1 57.9
1 E
56
71
WeAPproach
103.5
F
-
--
65.6
E
--
--
NB Left (2)
420
76.6
E
#182
227
50.6
D
204
363
NBTIru
15.6
B
225
287
20.6
C
486
469
NBTiru-Right
15.6
B
225
156
20.6
C
486
223
116APProach
14.2
C
--
--
24.4
C
--
-
SBLeft
270
133.1
F
#171
270
94.3
F
65
269
SBTIru
28.5
C
579
651
31.4
C
361
483
SB Right
335
14.7
B
25
91
23.3
C
20
92
SBAPProach
30.6
C
--
--
31.9
C
--
--
Overal LOS
30.6
C
--
--
30.9
C
--
--
2. Seminole Lane (N-S) & Site
Entrance/Gas Station Entrance(E-W)
Onsgnalized
EB Left -Right
t
t
t
19
t
t
t
3
ESAPProach
t
t
-
--
t
t
--
--
WBThru-Right
t
t
t
120
t
t
t
132
WeAPProach
t
t
--
--
t
t
--
-
N13 fit-Thru
10.0
A
5
124
9.8
A
2
54
ABAPP1111h
10.0
A
--
--
9.8
A
--
--
1 Overall intevseaNan LOS and deiayreporied forsignalmed inlermctrom only.
t SYNCHRO does not provide level of service or delay for unsignalized movements with no conflicting volumes.
As shown in Table 6, the redevelopment of 2231 Seminole Lane will have minimal to no impact
on the operations of the study intersections.
The signalized intersection of US Route 29 and Hilton Heights Road/Seminole Lane will continue
to operate at overall LOS C in both peak hours. The mainline approaches will continue to
operate at LOS C or better in both peak hours.
The side street approaches will continue to operate at similar LOS to Background conditions. It
is noted the westbound approach will operate at an overall LOS F with 103.5 sec/vehicle of
delay in the AM peak hour. The AM peak hour cycle length is 115 seconds which indicates that
2231 Seminole Lane Traffic Assessment • •: ���
January 15, 2021
Page 9of9 TIMMONS GROUP
although the westbound approach operates at LOS F, on average, westbound vehicles will clear
the signal within one cycle length.
The 951h percentile and maximum queues will all be contained within the available storage with
the exception of the southbound left queue as noted under existing and background conditions.
At the unsignalized intersection of Seminole Lane and Site Entrance/Gas Station Entrance the
northbound approach operates at LOS A in both the AM and PM peaks.
Conclusions
The 2231 Seminole Lane redevelopment will have minimal to no impact on the adjacent US Route
29/Hilton Heights Road/Seminole Lane intersection. The intersection will continue to operate at
the same LOS with minimal increase in delay and queuing.
No improvements are required at the study intersections to accommodate the vehicular traffic
generated by the development.
W� f
0
� o
I M E
29
Hilton Heights Road Seminole Lane
S'=2os o
in
v
a w
C Y
I�.. ..�' co
D
C F Fw
e
NOT TO SCALE
�• I
LEGEND:
Existing Road
_ Proposed Site
S• Effective Storage (in feet)*
i— Lane Configuration
fSignalized Intersection
Stop Controlled Intersection
f Stop Sign Location
*Per TOSAM guidelines, effective storage equals the full
width storage length plus 1/2 the taper length
R0000000
Existing Geometry Figure
• ' 2231 Seminole Lane
TIMMONS GROUP Albemarle County, Virginia 2
YOUR VISION ACHIEVED THROUGH OURS.
W�
f
��
mo
29
ry m QI m L. 4 (14)
3(16)
J l
] OI
J +
Y
Hilton Heights Road + Y lJ ` 31(51) Seminole
Lane
0
(158) 44 o n 1
(85) 103
(12)10,
'^
(0) 0
(166) 74 .... rn .�'.
o 0
ri �n �o in
rvrn
o 0
F
N
u
c
�
w
o
C
w
c
°Y'
D
C ( Fw
e
NOT TO SCALE
LEGEND:
Existing Road
_
Proposed Site
Lane Configuration
Signalized Intersection
Stop Controlled Intersection
h
Stop Sign Location
00
AM Peak Hour Volumes
(00)
PM Peak Hour Volumes
NOT TO SCALE
2020 Existing Volumes (Unadjusted)
Figure
.000000�
0 %
2231 Seminole Lane
TIMMONS
GROUP
3
YOUR VISION ACHIEVED THROUGH OOR$.
Albemarle County, Virginia
11
LEGEND:
Existing Road
_
Proposed Site
j—
Lane Configuration
Signalized Intersection
Stop Controlled Intersection
f
Stop Sign Location
00
AM Peak Hour Volumes
(00)
PM Peak Hour Volumes
N
�N
�O �O
vP
Hilton Heights Road
(188) 60 -1' a
(14) 14 �
(198) 101 --iF
n
m O_
rJ (1%) I
� 4(19) i
42 (61) Seminole Lane a
(101) 142 -r
(0) 0
M
NOT TO SCALE
0000000 2020 Existing Volumes (Adjusted) Figure
0 2231 Seminole Lane
TIMMONS GROUP 4
YOUR VISION ACHIEVED THROUGH OURS. Albemarle County, Virginia
W�
f
�P
Po
GI�Ii
?g
5 17
tiNlnv �4(19)
1 '
IOI
Yi
Hilton Heights Road ` 43 (62)
Seminole Lane
0
(192) 61 � 1 (*
(102) 144 --A
(14) 14 + o ry M v
(202) 103 M
(0) 0 o 0
P"PD
PP�I�D
0 0 �
M VI
" M
00
U
C
C
�
O
C
C
W
NIn
Y
!T
N
h:
_I
A
f
wl �
i
Ate"
LEGEND:
Existing Road
_
Proposed Site
j—
Lane Configuration
Signalized Intersection
Stop Controlled Intersection
j
Stop Sign Location
00
AM Peak Hour Volumes
(00)
PM Peak Hour Volumes
NOT TO SCALE
2022 Background Volumes
Figure
R000000•
0 '
2231 Seminole Lane
TIMMONS
GROUP
5
YOUR VISION ACHIEVED THROUGH OURS.
Albemarle County, Virginia
W� f
0
29
P
Hilton Heights Road `(60°/)
Seminole Lane
0
° C*
100% y
o
�
0
0
F
U
C
c
A
°J
o
c
c
w
°Y
N
h:
_I Z
f
�'Y
Ate.,
LEGEND:
Existing Road
_ Proposed Site
j--- Lane Configuration
Signalized Intersection
Stop Controlled Intersection
j Stop Sign Location
00% Entering Site Trips
(00%) Exiting Site Trips
NOT TO SCALE
Site Trip Distribution
Figure
R000000•
• '
2231 Seminole Lane
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
Albemarle County, Virginia
6
W� f
--
I
2J
IN �- 20 (t0)
~11
Hilton Heights Road
jrr--29(14)
Seminole Lane
m
(25) 52 -y
v
..
v
ry
�
F
N
u
C
A
ji
O
Cy
C
w
N
�
co
ck
N
(A
NOT TO SCALE
LEGEND:
Existing Road
_ Proposed Site
Lane Configuration
s Signalized Intersection
Stop Controlled Intersection
f Stop Sign Location
00 AM Peak Hour Volumes
(00) PM Peak Hour Volumes
NOT TO SCALE
Site Generated
Trips
Figure
.0000000
0 0
2231 Seminole
Lane
TIMMONS GROUP
7
YOUR VISION ACHIEVED THROUGH OOR$.
Albemarle County,
Virginia
W�
f
25 27)
vNlIi o
29
.rv.Ni. IPf �4(19)
1 '
Y1
Hilton Heights Road ` 72 (76)
Seminole Lane
0
(192) 61 (� 1
(102) 144
(14)14 � +orvMm
m o D o
(26) 62
(202) 103
O O m
�.N
Q
U
C
A
�
O
C
W
C
NIn
Y
N
h:
_I
Z
f
wl �
i
E�
JIM
LEGEND:
Existing Road
_
Proposed Site
j—
Lane Configuration
Signalized Intersection
Stop Controlled Intersection
f
Stop Sign Location
00
AM Peak Hour Volumes
(00)
PM Peak Hour Volumes
NOT TO SCALE
2022 Total Volumes
Figure
R000000•
0 '
2231 Seminole Lane
TIMMONS
GROUP
8
YOUR VISION ACHIEVED THROUGH OURS.
Albemarle County, Virginia
APPENDIX A
Traffic Count Data
Peggy Malone & Associates
(888)247-8602
File Name : US 29 & Hilton Heights -Seminole Ln AM
Site Code
Start Date : 12/3/2020
Page No :1
Groups Printed- Cars
US 29
Seminole Ln
US 29
Hilton Heights Rd
Southbound
Westbound
Northbound
Eastbound
SI2R Time
Bight
-
left
u-Tav
wpp. Taw
Right
-
-tt u-Tav
npp. row
Siglrc
T
I
u-Tav
;4-, Taw
Right
Thw IrR LL11uv
npp. Tow
ld. Tdd
07.00 AM
27
299
3
0
329
3
1
3
0 7
15
171
20
9
215
11
0 4 0
15
566
07'15 AM
35
401
4
1
441
0
0
6
0 6
9
211
30
13
263
20
1 10 0
31
741
07.30 AM
28
484
11
1
524
3
0
9
0 12
9
206
25
16
256
16
4 9 0
29
821
07:45 AM
34
533
14
0
581
1
1
4
0 6
16
247
30
12
305
19
2 12 0
33
925
Total
124
1717
32
2
1875
7
2
22
0 31
49
835
105
50
1039
66
7 35 0
108
3653
08:00 AM
28
377
11
1
417
0
2
5
0 7
17
242
25
14
298
13
3 11 0
27
749
0815 AM
19
341
5
3
368
1
0
11
0 12
10
259
34
I1
314
I6
2 20 0
38
732
08.30 AM
29
304
3
2
338
0
1
6
0 7
10
181
37
17
249
20
2 10 0
32
626
08:45 AM
29
290
6
5
330
1
1
12
0 14
9
226
43
10
288
15
2 10 0
27
659
Total
105
1312
25
11
1453
1 2
4
34
0 40
1 46
912
139
52
1149
1 64
9 51 0
124
1 2766
Grand Total
229
3029
57
13
3328
9
6
56
0 71
95
1747
244
102
2118
130
16 86 0
232
5819
Appreh %
6.9
91
1.7
0.4
12.7
8.5
78.9
0
4.3
79.8
11.2
4.7
56
6.9 37.1 0
Total%
3.9
52.1
1
0.2
57.2
0.2
0.1
t
0 1.2
1.6
30
4.2
1.8
37.6
2.2
0.3 1.5 0
4
US 29
Southbound
Seminole Ln
Westbound
US 29
Northbound
Hilton Heights Rd
Eastbound
$!M Time
N I nna I > ft I A . To
Ri t TMt Lefl A . Total
Ri t TMt Icfi . Total
Ri t I T6ru I I -eft I A . Total
Peak How Analysis From 07:00 AM to 08:45 AM -Peak t of 1
Peak How for Entire Inlerseetion Begins at 07:15 AM
ImTota
07:15 AM
35
401
4
440
0
0
6
6
9
211
30
250
20
1
10
31
727
M:30 AM
28
4M
11
523
3
0
9
12
9
206
25
240
16
4
9
29
804
07:45 AM
M
533
14
Sal
1
1
4
6
16
247
30
293
19
2
12
33
913
08:00 AM
28
377
11
416
0
2
5
7
17
242
25
284
13
3
11
27
7M
TotalVolome
125
1795
40
1960
4
3
M
31
51
906
110
1067
68
10
42
120
3178
%App. Total
6.4
91.6
2
12.9
9.7
77.4
4.0
84.9
56.7
8.3
35
PHF
.893
.842
.714
.843
.333
.375
.W
.646
.750
.917
.9
.917
.910
.850
.625
.875
.909
.870
Peggy Malone & Associates
(888)247-8602
File Name : US 29 & Hilton Heights —Seminole Ln AM
Site Code
Start Date : 12/3/2020
Page No :1
Groups Printed- Trucks
US 29
Seminole Ln
US 29
Hilton Heights Rd
Southbound
Westbound
Northbound
Eastbound
SI2R Time
Right
Thtu
Taft u--
a Taw
Right
Thtu Taft u-Tav
A- Tow
Right
Tina
Les
H-Tav
Ap Tm
Right
Thtu IrR LLl1uv
AITmal
In. INaal
07.00 AM
0
19
0
0 19
0
0 0
0 0
0
16
0
0
16
0
0 0 0
0
35
07.15 AM
0
18
0
0 18
0
0 0
0 0
0
18
3
0
21
1
0 1 0
2
41
07:30 AM
0
18
0
0 18
0
0 4
0 4
2
20
0
0
22
2
0 0 0
2
46
07:45 AM
1
26
0
0 27
0
0 1
0 1
0
13
0
0
13
1
0 1 0
2
43
Total
1
81
0
0 82
0
0 5
0 5
2
67
3
0
72
4
0 2 0
6
165
OS:00 AM
0
20
0
0 20
0
0 2
0 2
0
18
3
2
23
2
0 0 0
2
47
0815 AM
1
19
0
0 20
0
0 0
0 0
0
20
3
0
23
0
0 0 0
0
43
08:30 AM
0
21
0
0 21
0
0 0
0 0
0
20
0
1
21
0
0 2 0
2
44
08:45 AM
1
14
0
0 15
0
0 1
0 1
0
21
1
t
23
0
0 1 0
1
40
Total
1 2
74
0
0 76
1 0
0 3
0 3
1 0
79
7
4
90
1 2
0 3 0
5
1 174
Grand Total
3
155
0
0 158
0
0 S
0 8
2
146
10
4
162
6
0 5 0
11
339
Apprch %
1.9
98.1
0
0
0
0 100
0
1.2
90.1
6.2
2.5
54.5
0 45.5 0
Total %
0.9
45.7
0
0 46.6
0
0 2.4
0 2.4
0.6
43.1
2.9
1.2
47.8
1.8
0 1.5 0
3.2
US 29
Southbound
Seminole Ln
Westbound
US 29
Northbound
Hilton Heights Rd
Eastbound
$!M Time
ht I nnu I lefl I A . To
Ri t TMt Lefl A .Total
Ri t TMt Icfi .Total
Ri t I T Left I A . Total
Peak How Analysis From 07:00 AM to 08:45 AM -Peak t of 1
Peak How for Entire lnlerseetion Begins at 07:30 AM
W. Tota
07:30 AM
0
18
0
18
0
0
4
4
2
20
0
22
2
0
0
2
46
07:45 AM
1
26
0
27
0
0
1
1
0
13
0
13
1
0
1
2
43
08:00 AM
0
20
0
20
0
0
2
2
0
18
3
21
2
0
0
2
45
08:15 AM
1
19
0
20
0
0
0
0
0
20
3
23
0
0
0
0
43
Total Volume
2
83
0
85
0
0
7
7
2
71
6
79
5
0
1
6
177
%App. Total
2.4
97.6
0
0
0
100
2.5
89.9
7.6
63.3
0
16.7
PHF
.500
.798
.000
.787
.000
.000
.438
.438
.250
.666
.500
.859
.625
.000
.250
.750
.962
Peggy Malone & Associates
(888)247-8602
File Name : US 29 & Hilton Heights —Seminole Ln AM
Site Code
Start Date : 12/3/2020
Page No :1
Groups Printed- Pedestrians
US 29
Seminole Ln
US 29
Hilton Heights Rd
Southbound
Westbound
Northbound
Eastbound
SI2R Time
Right
—
Icft u--
MP. Taw
Right
Tan Icft ILTum
A- TOW
Right
Tina
IrR
H-Tuv
Ap Toat
Right
Tan IrR LLl1uv
AITnul
hn. Td
07.00 AM
0
0
0
0 0
0
0 0 0
0
0
0
0
0
0
0
0 0 0
0
0
07.15 AM
0
0
0
0 0
0
0 0 0
0
0
0
0
0
0
0
0 0 0
0
0
07:30 AM
0
0
0
0 0
0
0 0 0
0
0
0
0
0
0
0
0 0 0
0
0
07:45 AM
0
0
0
0 0
0
0 0 0
0
0
0
0
0
0
0
0 0 0
0
0
TOW
0
0
0
0 0
0
0 0 0
0
0
0
0
0
0
0
0 0 0
0
0
08:00 AM
0
0
0
0 0
0
0 0 0
0
0
0
0
0
0
0
0 0 0
0
0
08:15 AM
0
0
0
0 0
0
0 0 0
0
0
0
0
0
0
0
0 0 0
0
0
08:30 AM
0
0
0
0 0
0
0 0 0
0
0
0
0
0
0
0
0 0 0
0
0
08:45 AM
0
0
0
0 0
0
0 0 1
1
0
0
0
1
1
0
0 0 0
0
2
Total
1 0
0
0
0 0
1 0
0 0 1
1
1 0
0
0
t
1
1 0
0 0 0
0
1 2
Grand Total
0
0
0
0 0
0
0 0 1
1
0
0
0
1
1
0
0 0 0
0
2
Appreh %
0
0
0
0
0
0 0 100
0
0
0
100
0
0 0 0
TOW %
0
0
0
0 0
0
0 0 50
50
0
0
0
50
50
0
0 0 0
0
US 29
Southbound
Seminole Ln
Westbound
US 29
Northbound
Hilton Heights Rd
Eastbound
$!M Time
ht I nan I Left I A . Total
Ri t 11mt Lefl A .Total
Ri t 11mt Icfi .Total
Ri t I Thta I Left I A . Total
Peak How Analysis From 07:00 AM to 08:45 AM -Peak t of 1
Peak How for Entire lnletseelion Begins at 07:00 AM
W. Tota
07:00 AM
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
07:15 AM
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
07:30 AM
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
07:45 AM
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Vol.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
% .ToW
0
0
0
0
0
0
0
0
0
0
0
0
PHP
.000
.000
.000
.000
.000
.000
.000
.000
.000
A00
.000
.000
.000
.000
.000
.000
.000
Peggy Malone & Associates
(888)247-8602
File Name : US 29 & Hilton Heights -Seminole Ln AM
Site Code
Start Date : 12/3/2020
Page No :1
Groups Printed- Cars - Trucks
US 29
Seminole Ln
US 29
Hilton Heights Rd
Southbound
Westbound
Northbound
Eastbound
S12R Time
Right
T&u
U11
u-Tau
MP. Taw
Right
T1au
U11
u-Tuu
A- Tow
Rig&
T&u
Ir.R
u-Tuv
Ap Ttl
Right
T1au
IrR
LLl1uv
AITO
! .'Total
07.00 AM
27
318
3
0
348
3
1
3
0
7
15
187
20
9
231
11
0
4
0
15
601
07'15 AM
35
419
4
1
459
0
0
6
0
6
9
229
33
13
284
21
1
11
0
33
782
07.30 AM
28
502
11
1
542
3
0
13
0
16
11
226
25
16
278
18
4
9
0
31
867
07:45 AM
35
559
14
0
608
1
1
5
0
7
16
260
30
12
318
20
2
13
0
35
968
Total
125
1798
32
2
1957
7
2
27
0
36
51
902
108
50
1111
70
7
37
0
114
3218
08:00 AM
28
397
11
1
437
0
2
7
0
9
17
260
28
I6
321
15
3
11
0
29
796
08:15 AM
20
360
5
3
388
1
0
11
0
12
10
279
37
11
337
I6
2
20
0
38
775
08.30 AM
29
325
3
2
359
0
1
6
0
7
10
205
37
18
270
20
2
12
0
34
670
08:45 AM
30
304
6
5
345
1
1
13
0
15
9
247
44
11
311
15
2
11
0
28
699
Total
107
1386
25
11
1529
1 2
4
37
0
43
1 46
991
146
56
1239
1 66
9
54
0
129
1 2940
Grand Total
232
3184
57
13
3486
9
6
64
0
79
1 97
1893
254
106
2350
136
16
91
0
243
6158
Apprch %
6.7
91.3
1.6
0.4
11.4
7.6
81
0
4.1
80.6
10.8
4.5
56
6.6
37.4
0
Total%
3.8
51.7
0.9
0.2
56.6
0.1
0.1
1
0
1.3
1 1.6
30.7
4.1
1.7
38.2
2.2
0.3
1.5
0
3.9
Cars
229
3029
57
13
3328
9
6
56
0
71
95
1747
244
102
2188
130
16
86
0
232
5819
%Cars
98.7
95.1
100
100
95.5
100
100
87.5
0
89.9
97.9
92.3
96.1
96.2
93.1
95.6
100
94.5
0
95.5
94.5
Tracks
3
155
0
0
158
0
0
8
0
8
2
146
10
4
162
6
0
5
0
11
339
%Trucks
1.3
4.9
0
0
4.5
0
0
12.5
0
10.1
2.1
7.7
3.9
3.8
6.9
4.4
0
5.5
0
4.5
5.5
US 29
Southbound
Seminole Ln
Westbound
US 29
Northbound
Hilton Heights Rd
Eastbound
$[art Time
1a I Thm I I -eft I AM,
Right I TMt I > ft I
RiRht I TMt I r .Total
Ri t I TMt I > ft I AM, Total
Peak How Aoaly k Prom 07:00 AM to 08:45 AM - Peak 1 of 1
Peak How for Entire Intersection Begins at 07:15 AM
Ira. Total
07:15 AM
35
419
4
458
0
0
6
6
9
229
33
271
21
1
11
33
768
07:30 AM
28
502
11
541
3
0
13
16
11
226
25
262
IS
4
9
31
850
07:45 AM
35
559
14
608
1
1
5
7
16
260
30
306
20
2
13
35
956
08:00 AM
28
397
11
436
0
2
7
9
17
260
28
305
15
3
11
29
779
Total V.I.
126
1877
40
2043
4
3
31
38
53
975
116
1144
74
10
44
128
3353
%App. Total
6.2
91.9
2
10.5
7.9
81.6
4.6
85.2
10.1
57.8
7.8
34.4
P7
.900
.839
.714
.M
.333
.375
.596
.594
.779
.938
.879
.935
.881
.625
.846
.914
.877
Peggy Malone & Associates
(888)247-8602
File Name : US 29 & Hilton Heights -Seminole Ln PM
Site Code
Start Date : 12/3/2020
Page No :1
Groups Printed- Cars
US 29
Seminole Ln
US 29
Hilton Heights Rd
Southbound
Westbound
Northbound
Eastbound
S12R Time
Right
Thw
Icft
u-Tav
wpp. raw
Right
TLw
Icft u-Tav
npp. row
Right
Ttnu
IrR
u-Tav
wpp. raw
gists
TurnIrR LL11uv
npp. row
In. Totd
04:00 PM
23
258
1
0
282
6
1
9
0 16
17
398
60
16
491
33
2 23 0
58
847
04'15 PM
23
323
7
0
353
2
2
10
0 14
14
434
72
15
535
46
1 25 0
72
974
04:30 PM
38
337
4
0
379
3
4
12
0 19
12
446
61
5
524
40
2 34 0
76
998
04.45 PM
40
344
3
2
389
3
5
9
0 17
15
451
70
12
548
47
3 35 0
85
1039
Total
124
1262
15
2
1403
14
12
40
0 66
58
1729
263
48
2098
166
8 117 0
291
3858
05:00 PM
24
310
6
1
341
4
6
14
0 24
13
472
59
10
554
38
4 46 0
88
1007
05:15 PM
20
318
3
0
341
2
1
16
0 19
15
524
64
9
612
37
3 42 0
82
1054
05:30 PM
20
294
2
0
316
2
1
12
0 15
13
458
61
12
544
44
3 34 0
81
956
05:45 PM
23
272
6
0
301
2
0
8
0 10
6
394
58
18
466
36
5 27 0
68
845
Total
1 87
1194
17
1
1299
1 10
8
50
0 68
1 47
1838
242
49
2176
1 155
15 149 0
319
1 3862
Grand Total
211
2456
32
3
2702
24
20
90
0 134
105
3567
505
97
4274
321
23 266 0
610
7720
Apprch %
7.8
90.9
1.2
0.1
17.9
14.9
67.2
0
2.5
83.5
11.8
2.3
52.6
3.8 43.6 0
Total %
2.7
31.8
0.4
0
35
0.3
0.3
1.2
0 1.7
1.4
46.2
6.5
1.3
55.4
4.2
0.3 3.4 0
7.9
US 29
Southbound
Seminole Ln
Westbound
US 29
Northbound
Hilton Heights Rd
Eastbound
$tart Time
W Thw >efl A .Total
Ri t I Torn I Left I A .Total
Ri t I Torn I Ic0 I App.Total
lti t I Toni I 1<fl I A .Total
Peak How Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak How for Entire Inlerseelion Begins at 04:30 PM
Im. Total
04:30 PM
38
337
4
379
3
4
12
19
12
446
61
119
40
2
34
76
993
04:45 PM
40
344
3
387
3
5
9
17
is
451
70
536
47
3
35
85
1025
05:00 PM
24
310
6
340
4
6
14
24
13
472
59
544
38
4
46
88
996
05:15 PM
20
318
3
M1
2
1
16
19
15
524
64
603
37
3
42
82
1045
Total Volans,
122
1309
16
1447
12
16
51
79
55
1893
254
2202
162
12
157
331
4059
%App. Total
9.4
90.5
1.1
15.2
20.3
M.6
2.5
86
11.5
48.9
3.6
47.4
PRF
.763
.951
.667
.935
.750
.667
.797
.0
.917
.903
.907
.913
.862
.750
.853
.940
.971
Peggy Malone & Associates
(888)247-8602
File Name : US 29 & Hilton Heights —Seminole Ln PM
Site Code
Start Date : 12/3/2020
Page No :1
Groups Printed- Trucks
US 29
Seminole Ln
US 29
Hilton Heights Rd
Southbound
Westbound
Northbound
Eastbound
S12R Time
Right
TLw
Icft u-Tav
app. r—
Right
-lan Icft u-Tav
MP. TOW
Right
TLm
IrR u-Tav
app. T-n
Right
-lan IrR LLl1uv
Al. TOW
In Tdd
04.00 PM
0
12
0
0 12
0
0 0
0 0
2
8
1
0 11
0
0 0 0
0
23
04.15 PM
0
19
0
0 19
0
0 0
0 0
1
12
0
0 13
0
0 0 0
0
32
04.30 PM
1
14
0
0 15
0
0 0
0 0
1
17
1
0 19
1
0 0 0
1
35
04:45 PM
0
8
0
0 8
1
0 0
0 1
0
10
0
0 10
1
0 0 0
1
20
Total
1
53
0
0 54
1
0 0
0 1
4
47
2
0 53
2
0 0 0
2
110
05:00 PM
0
19
0
0 19
1
0 0
0 1
1
8
0
0 9
2
0 1 0
3
32
05.15 PM
0
13
0
0 13
0
0 0
0 0
0
8
0
0 8
0
0 0 0
0
21
05.30PM
0
8
0
0 8
0
0 0
0 0
0
6
0
0 6
0
0 2 0
2
16
05:45 PM
0
11
0
0 11
0
0 0
0 0
1
8
0
0 9
0
0 0 0
0
20
Total
1 0
51
0
0 51
1 t
0 0
0 1
1 2
30
0
0 32
1 2
0 3 0
5
1 89
Grand Total
1
104
0
0 105
2
0 0
0 2
6
77
2
0 85
4
0 3 0
7
199
Apprch %
1
99
0
0
100
0 0
0
7.1
90.6
2.4
0
57.1
0 42.9 0
Total %
0.5
52.3
0
0 52.8
1
0 0
0 1
3
38.7
1
0 42.7
2
0 1.5 0
3.5
US 29
Southbound
Seminole Ln
Westbound
US 29
Northbound
Hilton Heights Rd
Eastbound
$tM Time
N I Thw I lefl I A .To
aght I T Left I A .Total
Peak How Analysis From 04:00 PM to 05:45 PM - Peak 1 of t
Peak How forEntire Inletseetion Begins at 04:15 PM
W. Tota
04:15 PM
0
19
0
19
0
0
0
0
1
12
0
13
0
0
0
0
32
04:30 PM
1
14
0
15
0
0
0
0
1
17
1
19
1
0
0
1
35
04:45 PM
0
8
0
8
1
0
0
1
0
10
0
10
1
0
0
1
20
05:00 PM
0
19
0
19
1
0
0
1
1
8
0
9
2
0
1
3
32
Total Volans:
1
60
0
61
2
0
0
2
3
47
1
51
4
0
1
5
119
%App. Total
1.6
98.4
0
100
0
0
5.9
92.2
2
80
0
20
PRF
.250
.789
.000
.803
.500
.000
.000
.500
.750
.691
.250
.671
.500
.000
.250
.417
.850
Peggy Malone & Associates
(888)247-8602
File Name : US 29 & Hilton Heights —Seminole Ln PM
Site Code
Start Date : 12/3/2020
Page No :1
Groups Printed- Pedestrians
US 29
Seminole Ln
US 29
Hilton Heights Rd
Southbound
Westbound
Northbound
Eastbound
SI2R Time
Bight
Thm
Icft u-Tav
wpp. Taw
Rigla
Tlae Icft u-Tav
npp. row
Right
Ttw
IrR u-Tav
wpp. Taut
Right
Tlae IrR LLnuv
npp. Tow
ld. Tdd
04.00 PM
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
04.15 PM
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
04.30 PM
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
04:45 PM
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
Total
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
05:00 PM
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
05.15 PM
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
05.30 PM
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
05:45 PM
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
Total
1 0
0
0
0 0
1 0
0 0
0 0
1 0
0
0
0 0
1 0
0 0 0
0
0
Grand Total
0
0
0
0 0
0
0 0
0 0
0
0
0
0 0
0
0 0 0
0
0
Appreh %
0
0
0
0
0
0 0
0
0
0
0
0
0
0 0 0
Total %
US 29
Southbound
Seminole Ln
Westbound
US 29
Northbound
Hilton Heights Rd
Eastbound
$tart Time
N I nna I > ft I A .Total
Ri t 11mt Lefl A .Total
Ri t 11mt Icfi .Total
Ri tI TInu I Leff I A .Total
Peak How Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak How forEntire Intersection Begins at 04:00 PM
ImTota
04.00 PM
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
04.15 PM
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
04:30 PM
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
04:45 PM
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Volume
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
% App. Total
0
0
0
0
0
0
0
0
0
0
0
0
PHP
.000
.000
.000
.000
.000
.000
.000
.000
.000
.000
.000
.000
.000
.000
.000
.000
.000
Peggy Malone & Associates
(888)247-8602
File Name : US 29 & Hilton Heights -Seminole Ln PM
Site Code
Start Date : 12/3/2020
Page No :1
Groups Printed- Cars - Trucks
US 29
Seminole Ln
US 29
Hilton Heights Rd
Southbound
Westbound
Northbound
Eastbound
S12R Time
Right
TLtu
Icft
u-Tau
MP. r-
Right
TLru
Icft
u-Tav
MP. TOW
Right
TLtu
IrR
u-Tav
MP.TmI
Right
TLru
IrR
LL11uv
MP. TOW
In Tdd
04:00 PM
23
270
1
0
294
6
1
9
0
16
19
406
61
16
502
33
2
23
0
58
870
04'15 PM
23
342
7
0
372
2
2
10
0
14
15
446
72
15
548
46
1
25
0
72
1006
04:30 PM
39
351
4
0
394
3
4
12
0
19
13
463
62
5
543
41
2
34
0
77
1033
04.45 PM
40
352
3
2
397
4
5
9
0
18
15
461
70
12
558
48
3
35
0
86
1059
Total
125
1315
15
2
1457
15
12
40
0
67
62
1776
265
48
2151
168
8
117
0
293
3968
05:00 PM
24
329
6
1
360
5
6
14
0
25
14
480
59
10
563
40
4
47
0
91
1039
05:15 PM
20
331
3
0
354
2
1
16
0
19
15
532
64
9
620
37
3
42
0
82
1075
05:30 PM
20
302
2
0
324
2
1
12
0
15
13
464
61
12
550
44
3
36
0
83
972
05:45 PM
23
283
6
0
312
2
0
8
0
10
7
392
58
18
475
36
5
27
0
68
865
Total
1 87
1245
17
1
1350
1 11
8
50
0
69
1 49
1868
242
49
2208
1 157
15
152
0
324
1 3951
Grand Total
212
2560
32
3
2807
26
20
90
0
136
111
3644
507
97
4359
1 325
23
269
0
617
7919
Appreh %
7.6
91.2
1.1
0.1
19.1
14.7
66.2
0
2.5
83.6
11.6
2.2
52.7
3.7
43.6
0
Total %
2.7
32.3
0.4
0
35.4
0.3
0.3
1.1
0
1.7
1.4
46
6.4
1.2
55
1 4.1
0.3
3.4
0
7.8
Cont
211
2456
32
3
2702
24
20
90
0
134
105
3567
505
97
4274
321
23
266
0
610
7720
%Cars
99.5
95.9
100
100
96.3
92.3
100
100
0
98.5
94.6
97.9
99.6
100
98.1
98.8
100
98.9
0
98.9
97.5
Tracks
1
104
0
0
105
2
0
0
0
2
6
77
2
0
85
4
0
3
0
7
199
%Trucks
0.5
4.1
0
0
3.7
7.7
0
0
0
1.5
5.4
2.1
0.4
0
1.9
1.2
0
1.1
0
1.1
2.5
US 29
Southbound
Seminole Ln
Westbound
US 29
Northbound
Hilton Heights Rd
Eastbound
$[art Time
In I Thw I Left I AM,
[ I 1 Left I
ftht I Torn I Icft I
Eignt I Era I fefl I AM, TOW
Peak How Avalysis From 06:00 PM to 05:45 PM - Peak 1 of I
Peak How for Entire Intersection Begins at 04:30 PM
Ira. Total
04:30 PM
39
351
4
394
3
4
12
19
13
463
62
138
41
2
34
77
1028
04:45 PM
40
352
3
395
4
5
9
18
15
461
70
546
48
3
35
86
1045
05:00 PM
M
329
6
359
5
6
14
25
14
480
59
553
40
4
47
91
IM8
05:15 PM
20
331
3
354
2
1
16
19
15
532
M
611
37
3
42
82
1066
Total V.I.
123
1363
16
15M
14
16
51
81
57
1936
215
2248
166
12
158
336
4167
%App. Total
82
90.7
1.1
17.3
19.8
63
2.5
86.1
11.3
49.4
3.6
47
P1�
.769
.968
.667
.951
.700
.667
.797
.810
.950
.910
.911
.920
.865
.750
.840
.923
.977
APPENDIX B
2020 Existing Conditions Analysis Reports
Queues
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
Lane Group
EBL
EBT
EBR
WBL
WBT
NBL
NBT
SBL
SBT
SBR
Lane Group Flow(vph)
41
43
115
48
11
270
1601
68
2922
197
v/c Ratio
0.41
0.42
0.34
0.58
0.13
0.89
0.43
0.74
0.86
0.21
Control Delay
63.8
64.0
2.6
80.0
40.6
82.1
13.7
95.6
27.1
2.0
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
63.8
64.0
2.6
80.0
40.6
82.1
13.7
95.6
27.1
2.0
Queue Length 50th (ft)
31
32
0
35
4
104
196
51
548
0
Queue Length 95th (ft)
68
71
0
#87
23
#181
219
#125
579
25
Internal Link Dist (ft)
476
97
545
662
Turn Bay Length (ft)
205
420
270
335
Base Capacity (vph)
109
112
349
85
87
304
3694
92
3382
935
Starvation Cap Reductn
0
0
0
0
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
0
0
0
0
Reduced v/c Ratio
0.38
0.38
0.33
0.56
0.13
0.89
0.43
0.74
0.86
0.21
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
2231 Seminole Lane Starbucks 12/02/2020 2020 Existing AM Synchro 10 Report
Timmons Group Page 1
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
7
f-
~
it
4\
I
/r
IJ*
1*
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBU
NBL
NBT
NBR
SBU
SBL
Lane Configurations
+1
r
T+
M
tttT*
A
Traffic Volume (vph)
60
14
101
42
4
5
78
159
1336
73
4
55
Future Volume (vph)
60
14
101
42
4
5
78
159
1336
73
4
55
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
Total Lost time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
0.97
0.86
1.00
Frt
1.00
1.00
0.85
1.00
0.92
1.00
0.99
1.00
Fit Protected
0.95
0.97
1.00
0.95
1.00
0.95
1.00
0.95
Satd. Flow (prot)
1618
1651
1524
1530
1478
3273
6061
1736
Fit Permitted
0.95
0.97
1.00
0.95
1.00
0.95
1.00
0.95
Satd.Flow (perm)
1618
1651
1524
1530
1478
3273
6061
1736
Peak -hour factor, PHF
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
0.88
Adj. Flow (vph)
68
16
115
48
5
6
89
181
1518
83
5
62
RTOR Reduction (vph)
0
0
108
0
6
0
0
0
6
0
0
0
Lane Group Flow (vph)
41
43
7
48
5
0
0
270
1595
0
0
68
Heavy Vehicles (°/u)
6%
6%
6%
18%
18%
18%
7%
7%
7%
7%
4%
4%
Turn Type
Split
NA
Perm
Split
NA
Prot
Prot
NA
Prot
Prot
Protected Phases
3
3
4
4
5
5
2
1
1
Permitted Phases
3
Actuated Green, G (s)
7.2
7.2
7.2
5.1
5.1
10.7
66.9
4.9
Effective Green, g (s)
7.2
7.2
7.2
5.1
5.1
10.7
66.9
4.9
Actuated g/C Ratio
0.06
0.06
0.06
0.04
0.04
0.09
0.58
0.04
Clearance Time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
4.5
3.0
Lane Grp Cap (vph)
101
103
95
67
65
304
3525
73
v/s Ratio Prot
0.03
c0.03
c0.03
0.00
c0.08
0.26
0.04
v/s Ratio Perm
0.00
v/c Ratio
0.41
0.42
0.08
0.72
0.08
0.89
0.45
0.93
Uniform Delay, d1
51.8
51.9
50.8
54.2
52.7
51.6
13.7
54.9
Progression Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Incremental Delay, d2
2.7
2.7
0.3
30.4
0.5
25.3
0.4
81.6
Delay (s)
54.5
54.6
51.1
84.6
53.2
76.8
14.1
136.5
Level of Service
D
D
D
F
D
E
B
F
Approach Delay (s)
52.6
78.8
23.1
Approach LOS
D
E
C
Intersection Summa
HCM 2000 Control Delay 28.7 HCM 2000 Level of Service C
HCM 2000 Volume to Capacity ratio 0.83
Actuated Cycle Length (s) 115.0 Sum of lost time (s) 31.6
Intersection Capacity Utilization 80.8% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
2231 Seminole Lane Starbucks 12/02/2020 2020 Existing AM Synchro 10 Report
Timmons Group Page 2
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
j r
LaneXonfigurations
tttt
r
Traffic Volume (vph)
2571
173
Future Volume (vph)
2571
173
Ideal Flow (vphpl)
1900
1900
Total Lost time (s)
5.7
5.7
Lane Util. Factor
0.86
1.00
Frt
1.00
0.85
Fit Protected
1.00
1.00
Satd. Flow (prot)
6285
1553
Fit Permitted
1.00
1.00
Satd. Flow (perm)
6285
1553
Peak -hour factor, PHF
0.88
0.88
Adj. Flow (vph)
2922
197
RTOR Reduction (vph)
0
94
Lane Group Flow (vph)
2922
103
Heavy Vehicles (°/u)
4%
4%
Turn Type
NA
Perm
Protected Phases
6
Permitted Phases
6
Actuated Green, G (s)
60.4
60.4
Effective Green, g (s)
60.4
60.4
Actuated g/C Ratio
0.53
0.53
Clearance Time (s)
5.7
5.7
Vehicle Extension (s)
4.5
4.5
Lane Grp Cap (vph)
3300
815
v/s Ratio Prot
c0.46
v/s Ratio Perm
0.07
v/c Ratio
0.89
0.13
Uniform Delay, d1
24.2
13.9
Progression Factor
1.00
1.00
Incremental Delay, d2
3.9
0.3
Delay (s)
28.1
14.2
Level of Service
C
B
Approach Delay (s)
29.6
Approach LOS
C
Intersection Summary -
2231 Seminole Lane Starbucks 12/02/2020 2020 Existing AM Synchro 10 Report
Timmons Group Page 3
HCM Unsignalized Intersection Capacity Analysis
6: Site Entrance & Seminole Lane 01/05/2021
--I�
7
f�
~
4N
/01
Movement
EBT
EBR
WBL
WBT
NBL
NBR
Lane Configurations
'+
Traffic Volume (veh/h)
142
0
0
51
0
0
Future Volume (Veh/h)
142
0
0
51
0
0
Sign Control
Free
Free
Stop
Grade
0%
0%
0%
Peak Hour Factor
0.88
0.88
0.88
0.88
0.92
0.92
Hourly flow rate (vph)
161
0
0
58
0
0
Pedestrians
Lane Width (ft)
Walking Speed (ftls)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
177
pX, platoon unblocked
vC, conflicting volume
161
219
161
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
161
219
161
tC, single (s)
4.3
6.4
6.2
tC, 2 stage (s)
tF (s)
2.4
3.5
3.3
p0 queue free %
100
F
100
100
cM capacity (veh/h)
1326
769
884
114MERTAI
Volume Total
161
58
0
Volume Left
0
0
0
Volume Right
0
0
0
cSH
1700
1700
1700
_
Volume to Capacity
0.09
0.03
0.00
Queue Length 95th (ft)
0
0
0
_
Control Delay (s)
0.0
0.0
0.0
Lane LOS
A
Approach Delay (s)
0.0
0.0
0.0
Approach LOS
A
Intersection Summary
i
Average Delay
Intersection Capacity Utilization
10.8%
ICU Level of Service
Analysis Period (min)
2231 Seminole Lane Starbucks 12/02/2020 2020 Existing AM
Timmons Group
IG
Synchro 10 Report
Page 4
Queuing and Blocking Report
2020 Existing AM 01/05/2021
Intersection: 1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane
Movement
EB
EB
EB
WB
WB
NB
NB
NB
NB
NB
NB
SB
Directions Served
L
LT
R
L
TR
UL
L
T
T
T
TR
UL
Maximum Queue (ft)
108
67
79
74
59
190
206
276
256
183
99
270
Average Queue (ft)
43
13
26
39
12
90
118
154
126
61
23
86
95th Queue (ft)
90
44
57
77
42
168
192
254
217
143
62
228
Link Distance (ft)
464
464
55
55
585
585
585
585
Upstream Blk Time (%)
15
1
Queuing Penalty (veh)
4
0
Storage Bay Dist (ft)
205 420
420
270
Storage Blk Time (%)
0
Queuing Penalty (veh)
0
Intersection: 1: US 29-Seminole Trail & Hilton Heiqhts Road/Seminole Lane
Movement SB SB SB SB SB
Directions Served
T
T
T
T
R
Maximum Queue (ft)
640
566
436
293
114
Average Queue (ft)
391
347
245
132
40
95th Queue (ft)
579
518
392
266
85
Link Distance (ft)
689
689
689
689
Upstream Blk Time (°/u)
0
0
Queuing Penalty (veh)
0
0
Storage Bay Dist (ft)
335
Storage Blk Time (%)
20
0
0
Queuing Penalty (veh)
19
0
0
Intersection: 6: Site Entrance & Seminole Lane
ovemen
Directions Served T
Maximum Queue (ft)
Average Queue (ft) 12
95th Queue (ft)
Link Distance (ft) 343
Upstream Blk Time (°/u)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
MinCe79WN1i, IF
Network wide Queuing Penalty: 17
2231 Seminole Lane Starbucks SimTraffic Report
Timmons Group Page 1
Queues
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
f-
~
4\
T
`►
1
Lane Group
BL
WBT
NBL
NBT
SBL
SBT
SBR
Lane Group Flow(vph)
102
104
202
62
36
353
2420
23
1655
149
v/c Ratio
0.65
0.66
0.57
0.54
0.28
0.67
0.61
0.28
0.56
0.18
Control Delay
76.2
76.6
10.8
75.7
41.6
59.1
18.2
68.8
27.1
1.6
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
76.2
76.6
10.8
75.7
41.6
59.1
18.2
68.8
27.1
1.6
Queue Length 50th (ft)
88
89
0
51
15
146
425
19
309
0
Queue Length 95th (ft)
152
154
51
100
51
200
466
50
351
19
Internal Link Dist (ft)
977
97
545
662
Turn Bay Length (ft)
205
420
270
335
Base Capacity(vph)
180
181
374
127
140
525
3965
83
2936
827
Starvation Cap Reductn
0
0
0
0
0
0
0
0
0
0
Spillback Cap Reducln
0
0
0
0
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
0
0
0
0
Reduced v/c Ratio
0.57
0.57
0.54
0.49
0.26
0.67
0.61
0.28
0.56
0.18
Intersection Summary
2231 Seminole Lane Starbucks 12/02/2020 2020 Existing PM Synchro 10 Report
Timmons Group Page 1
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane * 01/05/2021
Lane Configurations
4
r
to
M
tttT*
A
Traffic Volume (vph)
188
14
198
61
19
17
43
303
2304
68 4
19
Future Volume (vph)
188
14
198
61
19
17
43
303
2304
68 4
19
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900 1900
1900
Total Lost time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
0.97
0.86
1.00
Frt
1.00
1.00
0.85
1.00
0.93
1.00
1.00
1.00
Fit Protected
0.95
0.96
1.00
0.95
1.00
0.95
1.00
0.95
Satd. Flow (prot)
1698
1713
1599
1770
1731
3433
6380
1736
Fit Permitted
0.95
0.96
1.00
0.95
1.00
0.95
1.00
0.95
Satd.Flow (perm)
1698
1713
1599
1770
1731
3433
6380
1736
Peak -hour factor, PHF
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98 0.98
0.98
Adj. Flow (vph)
192
14
202
62
19
17
44
309
2351
69 4
19
RTOR Reduction (vph)
0
0
183
0
16
0
0
0
3
0 0
0
Lane Group Flow (vph)
102
104
19
62
20
0
0
353
2417
0 0
23
Heavy Vehicles(%)
1%
1%
1%
2%
2%
2%
2%
2%
2%
2% 4%
4%
Turn Type
Split
NA
Perm
Split
NA
Prot
Prot
NA
Prot
Prot
Protected Phases
3
3
4
4
5
5
2
1
1
Permitted Phases
3
Actuated Green, G (s)
12.0
12.0
12.0
7.3
7.3
23.1
76.0
3.8
Effective Green, g (s)
12.0
12.0
12.0
7.3
7.3
23.1
76.0
3.8
Actuated g/C Ratio
0.09
0.09
0.09
0.06
0.06
0.18
0.58
0.03
Clearance Time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
4.5
3.0
Lane Grp Cap (vph)
156
158
147
99
97
610
3729
50
v/s Ratio Prot
0.06
c0.06
c0.04
0.01
0.10
c0.38
0.01
v/s Ratio Perm
0.01
v/c Ratio
0.65
0.66
0.13
0.63
0.21
0.58
0.65
0.46
Uniform Delay, d1
57.0
57.0
54.2
60.0
58.6
49.0
18.1
62.1
Progression Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Incremental Delay, d2
9.5
9.5
0.4
11.7
1.1
1.3
0.9
6.6
Delay (s)
66.4
66.5
54.6
71.7
59.6
50.3
18.9
68.7
Level of Service
E
E
D
E
E
D
B
E
Approach Delay (s)
60.6
67.3
22.9
Approach LOS
E
E
C
Intersection Summary
HCM 2000 Control Delay
29.2
HCM 2000
Level of Service
C
HCM 2000 Volume to Capacity
ratio
0.68
Actuated Cycle Length (s)
130.0
Sum
of lost
time (s)
31.6
Intersection Capacity Utilization
76.1 %
ICU
Level of Service
D
Analysis Period (min)
15
c Critical Lane Group
2231 Seminole Lane Starbucks 12/02/2020 2020 Existing PM Synchro 10 Report
Timmons Group Page 2
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
j r
Movement
SBT
SBR
LaneXonfigurations
tttt
r
Traffic Volume (vph)
1622
146
Future Volume (vph)
1622
146
Ideal Flow (vphpl)
1900
1900
Total Lost time (s)
5.7
5.7
Lane Util. Factor
0.86
1.00
Frt
1.00
0.85
Fit Protected
1.00
1.00
Satd. Flow (prot) 6285 1553
Fit Permitted 1.00 1.00
Satd. Flow (perm) 6285 1553
Peak -hour factor, PHF
0.98
0.98
Adj. Flow (vph)
1655
149
RTOR Reduction (vph)
0
85
Lane Group Flow (vph)
1655
64
Heavy Vehicles (°/u)
4%
4%
Turn Type
NA
Perm
Protected Phases
6
Permitted Phases
6
Actuated Green, G (s)
56.0
56.0
Effective Green, g (s)
56.0
56.0
Actuated g/C Ratio
0.43
0.43
Clearance Time (s)
5.7
5.7
Vehicle Extension (s)
4.5
4.5
Lane Grp Cap (vph)
2707
668
v/s Ratio Prot
c0.26
v/s Ratio Perm
0.04
v/c Ratio
0.61
0.10
Uniform Delay, d1
28.6
22.0
Progression Factor
1.00
1.00
Incremental Delay, d2
1.0
0.3
Delay (s)
29.6
22.3
Level of Service
C
C
Approach Delay (s)
29.5
Approach LOS
C
Intersection Summary
2231 Seminole Lane Starbucks 12/02/2020 2020 Existing PM Synchro 10 Report
Timmons Group Page 3
HCM Unsignalized Intersection Capacity Analysis
6: Site Entrance & Seminole Lane 01/05/2021
--I�
7
f�
~
4N
/01
Movement
EBT
EBR
WBL
WBT
NBL
NBR
Lane Configurations
'+
Traffic Volume (veh/h)
101
0
0
97
0
0
Future Volume (Veh/h)
101
0
0
97
0
0
Sign Control
Free
Free
Stop
Grade
0%
0%
0%
Peak Hour Factor
0.98
0.98
0.98
0.98
0.98
0.98
Hourly flow rate (vph)
103
0
0
99
0
0
Pedestrians
Lane Width (ft)
Walking Speed (ftls)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
177
pX, platoon unblocked
vC, conflicting volume
103
202
103
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
202
103
tC, single (s)
4.1
6.4
6.2
tC, 2 stage (s)
_
IF (s)
2.2
3.5
3.3
p0 queue free %
M
100
100
cM capacity (veh/h)
1489
787
952
Direction, Lane #
EB 1
WB 1
Volume Total
103
99
0
Volume Left
0
0
0
Volume Right
0
0
0
cSH
1700
1700
1700
_
Volume to Capacity
0.06
0.06
0.00
Queue Length 95th (ft)
0
0
0
_
Control Delay (s)
0.0
0.0
0.0
Lane LOS
A
_
Approach Delay (s)
0.0
0.0
0.0
Approach LOS
A
_
Intersection Summary
i
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
ICU Level of Service
IG
2231 Seminole Lane Starbucks 12/02/2020 2020 Existing PM Synchro 10 Report
Timmons Group Page 4
Queuing and Blocking Report
2020 Existing PM 01/05/2021
Intersection: 1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane
Movement
EB
EB
EB
WB
WB
NB
NB
NB
NB
NB
NB
SB
Directions Served
L
LT
R
L
TR
UL
L
T
T
T
TR
UL
Maximum Queue (ft)
183
163
105
72
67
234
336
415
394
330
222
269
Average Queue (ft)
110
69
46
45
27
135
188
267
255
188
104
43
95th Queue (ft)
168
146
83
83
61
227
285
385
365
301
199
160
Link Distance (ft)
964
964
57
57
587
587
587
587
Upstream Blk Time (°/u)
14
7
Queuing Penalty (veh)
7
3
Storage Bay Dist (ft)
205
420
420
270
Storage Blk Time (%)
0
0
0
0
0
Queuing Penalty (veh)
0
0
0
0
0
Intersection: 1: US 29-Seminole Trail & Hilton Heiqhts Road/Seminole Lane
Movement SB SB SB SB SB
Directions Served
T
T
T
T
R
Maximum Queue (ft)
483
449
311
198
93
Average Queue (ft)
344
296
199
70
38
95th Queue (ft)
452
410
292
178
75
Link Distance (ft)
686
686
686
686
Upstream Blk Time (°/u)
Queuing Penalty (veh)
Storage Bay Dist (ft)
335
Storage Blk Time (°/u)
16
Queuing Penalty (veh)
Intersection: 6: Site Entrance & Seminole Lane
ovemen
Directions Served
T
Maximum Queue (ft)
8
Average Queue (ft)
12
95th Queue (ft)
5
Link Distance (ft)
366
Upstream Blk Time (°/u)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
MinCe79WN1i, IF
Network wide Queuing Penalty: 14
2231 Seminole Lane Starbucks SimTraffic Report
Timmons Group Page 1
APPENDIX C
Background Traffic Conditions Analysis Reports
Queues
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
--*
f-
~
4\
T
`►
1
Lane Group
EBL
EBT
EBR
WBL
WBT
NBL
NBT
SBL
SBT
SBR
Lane Group Flow(vph)
40
41
112
47
9
263
1562
65
2851
191
v/c Ratio
0.40
0.40
0.33
0.57
0.11
0.88
0.42
0.71
0.84
0.20
Control Delay
63.5
63.4
2.5
78.9
41.0
80.4
13.6
91.3
26.0
1.8
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
63.5
63.4
2.5
78.9
41.0
80.4
13.6
91.3
26.0
1.8
Queue Length 50th (ft)
30
31
0
35
3
101
190
48
524
0
Queue Length 95th (ft)
68
70
0
#87
20
#182
219
#122
579
25
Internal Link Dist (ft)
476
97
545
662
Turn Bay Length (ft)
205
420
270
335
Base Capacity(vph)
109
111
349
85
86
300
3696
92
3391
937
Starvation Cap Reductn
0
0
0
0
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
0
0
0
0
Reduced v/c Ratio
0.37
0.37
0.32
0.55
0.10
0.88
0.42
0.71
0.84
0.20
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
2231 Seminole Lane Starbucks 12/02/2020 2022 Background AM Synchro 10 Report
Timmons Group Page 1
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
_--*
__p,
7
f-
~
it
4\
I
/r
L*
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBU
NBL
NBT
NBR
SBU
SBL
Lane Configurations
+1
r
T+
M
tttT*
A
Traffic Volume (vph)
61
14
103
43
4
5
80
162
1363
74
4
56
Future Volume (vph)
61
14
103
43
4
5
80
162
1363
74
4
56
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
Total Lost time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
0.97
0.86
1.00
Frt
1.00
1.00
0.85
1.00
0.92
1.00
0.99
1.00
Fit Protected
0.95
0.97
1.00
0.95
1.00
0.95
1.00
0.95
Satd. Flow (prot)
1618
1650
1524
1530
1476
3273
6061
1736
Fit Permitted
0.95
0.97
1.00
0.95
1.00
0.95
1.00
0.95
Satd.Flow (perm)
1618
1650
1524
1530
1476
3273
6061
1736
Peak -hour factor, PHF
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
Adj. Flow (vph)
66
15
112
47
4
5
87
176
1482
80
4
61
RTOR Reduction (vph)
0
0
105
0
5
0
0
0
6
0
0
0
Lane Group Flow (vph)
40
41
7
47
4
0
0
263
1556
0
0
65
Heavy Vehicles (°/u)
6%
6%
6%
18%
18%
18%
7%
7%
7%
7%
4%
4%
Turn Type
Split
NA
Perm
Split
NA
Prot
Prot
NA
Prot
Prot
Protected Phases
3
3
4
4
5
5
2
1
1
Permitted Phases
3
Actuated Green, G (s)
7.2
7.2
7.2
5.1
5.1
10.6
66.9
4.9
Effective Green, g (s)
7.2
7.2
7.2
5.1
5.1
10.6
66.9
4.9
Actuated g/C Ratio
0.06
0.06
0.06
0.04
0.04
0.09
0.58
0.04
Clearance Time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
4.5
3.0
Lane Grp Cap (vph)
101
103
95
67
65
301
3525
73
v/s Ratio Prot
0.02
c0.02
c0.03
0.00
c0.08
0.26
0.04
v/s Ratio Perm
0.00
v/c Ratio
0.40
0.40
0.07
0.70
0.06
0.87
0.44
0.89
Uniform Delay, d1
51.8
51.8
50.8
54.2
52.7
51.5
13.5
54.8
Progression Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Incremental Delay, d2
2.5
2.5
0.3
28.2
0.4
23.3
0.4
68.9
Delay (s)
54.4
54.3
51.1
82.4
53.1
74.8
13.9
123.7
Level of Service
D
D
D
F
D
E
B
F
Approach Delay (s)
52.5
77.7
22.7
Approach LOS
D
E
C
Intersection Summa
HCM 2000 Control Delay 27.7 HCM 2000 Level of Service C
HCM 2000 Volume to Capacity ratio 0.81
Actuated Cycle Length (s) 115.0 Sum of lost time (s) 31.6
Intersection Capacity Utilization 81.8% ICU Level of Service D
Analysis Period (min) 15
c Critical Lane Group
2231 Seminole Lane Starbucks 12/02/2020 2022 Background AM Synchro 10 Report
Timmons Group Page 2
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
j r
Movement
SBT
SBR
LaneXonfigurations
tttt
r
Traffic Volume (vph)
2623
176
Future Volume (vph)
2623
176
Ideal Flow (vphpl)
1900
1900
Total Lost time (s)
5.7
5.7
Lane Util. Factor
0.86
1.00
Frt
1.00
0.85
Fit Protected
1.00
1.00
Satd. Flow (prot)
6285
1553
Fit Permitted
1.00
1.00
Satd. Flow (perm)
6285
1553
Peak -hour factor, PHF
0.92
0.92
Adj. Flow (vph)
2851
191
RTOR Reduction (vph)
0
91
Lane Group Flow (vph)
2851
100
Turn Type
NA
Perm
Protected Phases
6
Permitted Phases
6
Actuated Green, G (s)
60.5
60.5
Effective Green, g (s)
60.5
60.5
Actuated g/C Ratio
0.53
0.53
Clearance Time (s)
5.7
5.7
Vehicle Extension (s)
4.5
4.5
Lane Grp Cap (vph)
3306
817
v/s Ratio Prot
c0.45
v/s Ratio Perm
0.06
v/c Ratio
0.86
0.12
Uniform Delay, d1
23.6
13.8
Progression Factor
1.00
1.00
Incremental Delay, d2
3.2
0.3
Delay (s)
26.9
14.1
Level of Service
C
B
Approach Delay (s)
28.1
Approach LOS
C
Intersection Summary
2231 Seminole Lane Starbucks 12/02/2020 2022 Background AM Synchro 10 Report
Timmons Group Page 3
HCM Unsignalized Intersection Capacity Analysis
6: Site Entrance & Seminole Lane 01/05/2021
--I�
7
f�
~
4\
/01
Movement
EBT
EBR
WBL
WBT
NBL
NBR
Lane Configurations
'+
Traffic Volume (veh/h)
144
0
0
52
0
0
Future Volume (Veh/h)
144
0
0
52
0
0
Sign Control
Free
Free
Stop
Grade
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
Hourly flow rate (vph)
157
0
0
57
0
0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
177
pX, platoon unblocked
vC, conflicting volume
157
214
157
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
157
214
157
tC, single (s)
4.3
6.4
6.2
tC, 2 stage (s)
tF (s)
2.4
3.5
3.3
p0 queue free %
100
100
100
cM capacity (veh/h)
1331
774
889
Direction, Lane #
EB 1
WB 1
Volume Total
157
57
0
Volume Left
0
0
0
_
Volume Right
0
0
0
cSH
1700
1700
1700
_
Volume to Capacity
0.09
0.03
0.00
Queue Length 95th (ft)
0
0
0
_
Control Delay (s)
0.0
0.0
0.0
Lane LOS
A
_
Approach Delay (s)
0.0
0.0
0.0
Approach LOS
A
_
Intersection Summary
i
Average Delay
Intersection Capacity Utilization
10.9%
ICU Level of Service A
Analysis Period (min)
2231 Seminole Lane Starbucks 12/02/2020 2022 Background AM Synchro 10 Report
Timmons Group Page 4
Queuing and Blocking Report
2022 Background AM 01/05/2021
Intersection: 1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane
Movement
EB
EB
EB
wB
wB
NB
NB
NB
NB
NB
NB
SB
Directions Served
L
LT
R
L
TR
UL
L
T
T
T
TR
UL
Maximum Queue (ft)
108
74
74
1
72
62
192
215
275
234
176
84
257
Average Queue (ft)
41
14
26
40
13
94
120
150
135
68
23
85
95th Queue (ft)
87
47
56
1
77
44
176
196
249
223
153
62
223
Link Distance (ft)
464
464
55
55
585
585
585
585
Upstream Blk Time (%)
j
17
2
Queuing Penalty (veh)
4
0
Storage Bay Dist (ft)
420
420
270
Storage Blk Time (%)
0
Queuing Penalty (veh)
sirr�a��� A WerarnFAMInn•.m:ram110:.,.r��mraWrr
Movement SB SB SB SB SB
Directions Served
T
T
T
T
R
Maximum Queue (ft)
607
541
453
309
104
Average Queue (ft)
396
356
255
135
41
95th Queue (ft)
562
513
400
262
80
Link Distance (ft)
689
689
689
689
Upstream Blk Time (%)
0
Queuing Penalty (veh)
0
Storage Bay Dist (ft)
335
Storage Blk Time (%)
21
0
Queuing Penalty (veh)
Intersection: 6: Site Entrance & Seminole Lane
ovemen
Directions Served
TR
T
Maximum Queue (ft)
3
96
Average Queue (ft)
0
14
95th Queue (ft)
3
60
Link Distance (ft)
55
343
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Sum
Network wide Queuing Penalty: 18
2231 Seminole Lane Starbucks SimTraffic Report
Timmons Group Page 1
Queues
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
---*
--I,
--*
f-~
4\
T
`►
1
r
Lane Group
EBL
EBT
EBR
WBL
WBT
NBL
NBT
SBL
SB
Lane Group Flow(vph)
104
106
206
63
36
360
2468
23
1689
152
v/c Ratio
0.66
0.67
0.58
0.54
0.28
0.69
0.62
0.28
0.58
0.18
Control Delay
76.7
77.3
11.5
76.2
41.5
59.6
18.5
68.9
27.4
1.7
Queue Delay
0.0
0.0
0.0 1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
76.7
77.3
11.5
76.2
41.5
59.6
18.5
68.9
27.4
1.7
Queue Length 50th (ft)
89
91
w9mm
52
15
150
438
19
318
0
Queue Length 95th (ft)
154
157
54
102
51
204
481
50
361
20
Internal Link Dist (ft)
977
97
545
662
Turn Bay Length (ft)
205
420
270
335
Base Capacity(vph)
180
181
374
127
140
525
3961
83
2931
826
Starvation Cap Reductn
0
0
0
0
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
0
0
0
0
Reduced v/c Ratio
0.58
0.59
0.55
0.50
0.26
0.69
0.62
0.28
0.58
0.18
Intersection Summary
2231 Seminole Lane Starbucks 12/02/2020 2022 Background PM Synchro 10 Report
Timmons Group Page 1
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
--,*
--I,
7
t`
~
t
it
41
I
/0�
L
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBU
NBL
NBT
NBR
SBU
SBL
Lane Configurations
«j
r
A
M
ttt't+
A
Traffic Volume (vph)
192
14
202
62
19
17
44
309
2350
69
4
19
Future Volume (vph)
192
14
202
62
19
17
44
309
2350
69
4
19
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
Total Lost time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
0.97
0.86
1.00
Frt
1.00
1.00
0.85
1.00
0.93
1.00
1.00
1.00
Flt Protected
0.95
0.96
1.00
0.95
1.00
0.95
1.00
0.95
Satd. Flow (prot)
1698
1713
1599
1770
1731
3433
6381
1736
Flt Permitted
0.95
0.96
1.00
0.95
1.00
0.95
1.00
0.95
Satd.Flow (perm)
1698
1713
1599
1770
1731
3433
6381
1736
Peak -hour factor, PHF
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
Adj. Flow (vph)
196
14
206
63
19
17
45
315
2398
70
4
19
RTOR Reduction (vph)
0
0
187
0
16
0
0
0
2
0
0
0
Lane Group Flow (vph)
104
106
19
63
20
0
0
360
2466
0
0
23
Heavy Vehicles (%)
1%
1%
1%
2%
2%
2%
2%
2%
2%
2%
4%
4%
Turn Type
Split
NA
Perm
Split
NA
Prot
Prot
NA
Prot
Prot
Protected Phases
3
3
4
4
5
5
2
1
1
Permitted Phases
3
Actuated Green, G (s)
12.1
12.1
12.1
7.3
7.3
23.1
75.9
3.8
Effective Green, g (s)
12.1
12.1
12.1
7.3
7.3
23.1
75.9
3.8
Actuated g/C Ratio
0.09
0.09
0.09
0.06
0.06
0.18
0.58
0.03
Clearance Time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
4.5
3.0
Lane Grp Cap (vph)
158
159
148
99
97
610
3725
50
v/s Ratio Prot
0.06
c0.06
c0.04
0.01
0.10
c0.39
0.01
v/s Ratio Perm
0.01
v/c Ratio
0.66
0.67
0.13
0.64
0.21
0.59
0.66
0.46
Uniform Delay, d1
57.0
57.0
54.1
60.1
58.6
49.1
18.3
62.1
Progression Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Incremental Delay, d2
9.5
10.1
0.4
12.6
1.1
1.5
0.9
6.6
Delay (s)
66.5
67.1
54.5
72.7
59.6
50.6
19.3
68.7
Level of Service
E
E
D
E
E
D
B
E
Approach Delay (s)
60.7
67.9
23.3
Approach LOS
E
E
C
Intersection Summa
HCM 2000 Control Delay
29.5 HCM 2000 Level of Service C
HCM 2000 Volume to Capacity ratio
0.70
Actuated Cycle Length (s)
130.0 Sum of lost time (s) 31.6
Intersection Capacity Utilization
77.1% ICU Level of Service D
Analysis Period (min)
15
c Critical Lane Group
2231 Seminole Lane Starbucks 12/02/2020 2022 Background PM Synchro 10 Report
Timmons Group Page 2
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
j r
Movement
SBT
SBR
Lanegonfigurations
tttt
r
Traffic Volume (vph)
1655
149
Future Volume (vph)
1655
149
Ideal Flow (vphpl)
1900
1900
Total Lost time (s)
5.7
5.7
Lane UBI. Factor
0.86
1.00
Frt
1.00
0.85
Flt Protected
1.00
1.00
Satd. Flow (prot) 6285 1553
Flt Permitted 1.00 1.00
Satd. Flow (perm) 6285 1553
Peak -hour factor, PHF
0.98
0.98
Adj. Flow (vph)
1689
152
RTOR Reduction (vph)
0
87
Lane Group Flow (vph)
1689
65
Heavy Vehicles (%)
4%
4%
Turn Type
NA
Perm
Protected Phases
6
Permitted Phases
6
Actuated Green, G (s)
55.9
55.9
Effective Green, g (s)
55.9
55.9
Actuated g/C Ratio
0.43
0.43
Clearance Time (s)
5.7
5.7
Vehicle Extension (s)
4.5
4.5
Lane Grp Cap (vph)
2702
667
v/s Ratio Prot
c0.27
v/s Ratio Perm
0.04
v/c Ratio
0.63
0.10
Uniform Delay, d1
28.9
22.0
Progression Factor
1.00
1.00
Incremental Delay, d2
1.1
0.3
Delay (s)
30.0
22.3
Level of Service
C
C
Approach Delay (s)
29.8
Approach LOS
C
Intersection Summary
2231 Seminole Lane Starbucks 12/02/2020 2022 Background PM Synchro 10 Report
Timmons Group Page 3
HCM Unsignalized Intersection Capacity Analysis
6: Site Entrance & Seminole Lane
Lane Configurations
Traffic Volume (veh/h)
Future Volume (Veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
--I� � 4� ~
H
T
'1
102
0
0
98
0
0
102
0
0
98
0
0
Free
Free
Stop
0%
0%
0%
0.98
0.98
0.98
0.98
0.98
0.98
104
0
0
100
0
0
None
177
None
104
204
104
104
204
104
4.1
6.4
6.2
2.2
3.5
3.3
AM
100
100
1488
784
951
01/05/2021
Volume Total
104
100
0
Volume Left
0
0
0
_
Volume Right
0
0
0
cSH
1700
1700
1700
-
Volume to Capacity
0.06
0.06
0.00
Queue Length 95th (ft)
0
0
0
,
Control Delay (s)
0.0
0.0
0.0
Lane LOS
A
Approach Delay (s)
0.0
0.0
0.0
Approach LOS
A
Intersection Summary
Average Delay
Intersection Capacity Utilization
8.7%
ICU Level of Service A
Analysis Period (min)
2231 Seminole Lane Starbucks 12/02/2020 2022 Background PM Synchro 10 Report
Timmons Group Page 4
Queuing and Blocking Report
2022 Background PM 01/05/2021
Intersection: 1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane
Movement
EB
EB
EB
wB
wB
NB
NB
NB
NB
NB
NB
SB
Directions Served
L
LT
R
L
TR
UL
L
T
T
T
TR
UL
Maximum Queue (ft)
190
168
106
72
67
230
374
439
394
337
240
268
Average Queue (ft)
110
69
46
44
27
132
189
261
248
182
105
40
95th Queue (ft)
175
146
85
81
61
221
289
393
361
295
202
144
Link Distance (ft)
964
964
57
57
587
587
587
587
Upstream Blk Time (%)
13
6
Queuing Penalty (veh)
7
3
Storage Bay Dist (ft)
205
420
420
270
Storage Blk Time (%)
0
0
0
0
0
Queuing Penalty (veh)
0
0
0
1
0
Intersection: 1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane
Movement
SB
SB
SB
SB
SB
Directions Served
T
T
T
T
R
Maximum Queue (ft)
509
473
346
217
90
Average Queue (ft)
347
299
196
75
38
95th Queue (ft)
461
416
295
177
73
Link Distance (ft)
686
686
686
686
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
aV5
Storage Blk Time (%)
17
Queuing Penalty (veh)
Intersection: 6: Site Entrance & Seminole Lane
Directions Served
T
Maximum Queue (ft)
96
Average Queue (ft)
13
95th Queue (ft)
59
Link Distance (ft)
366
Upstream Blk Time (%)
-
Queuing Penalty (veh)
Storage Bay Dist (ft)
-
Storage Blk Time (%)
Queuing Penalty (veh)
Network Sum
Network wide Queuing Penalty: 15
2231 Seminole Lane Starbucks SimTraffic Report
Timmons Group Page 1
APPENDIX D
Total Traffic Conditions Analysis Reports
Queues
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
Lane Group
@BL
EBT
EBR
WBL
WBT
NBL
NBT
SBL
SBT
SBR�
Lane Group Flow (vph)
40
41
112
78
31
263
1596
88
2851
191
v/c Ratio
0.40
0.40
0.33
0.92
0.30
0.88
0.47
0.96
0.88
0.21
Control Delay
63.5
63.4
2.5
131.9
29.2
80.9
15.5
137.8
28.8
1.8
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
63.5
63.4
2.5
131.9
29.2
80.9
15.5
137.8
28.8
1.8
Queue Length 50th (ft)
30
31
0
59
3
101
194
66
524
0
Queue Length 95th (ft)
68
70
0
#155
35
#182
225
#171
579
25
Internal Link Dist (ft)
476
97
545
662
Turn Bay Length (ft)
205
420
270
335
Base Capacity(vph)
109
111
349
85
103
299
3395
92
3240
905
Starvation Cap Reductn
0
0
0
0
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
0
0
0
0
Reduced v/c Ratio
0.37
0.37
0.32
0.92
0.30
0.88
0.47
0.96
0.88
0.21
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
2231 Seminole Lane Starbucks 12/02/2020 2022 Total AM Synchro 10 Report
Timmons Group Page 1
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane * 01/05/2021
, --I, 7 t` 4--- t it 4\ I /� L
Lane Configurations
#T
r
T+
M
tttt+
A
Traffic Volume (vph)
61
14
103
72
4
25
80
162
1363
105 4
77
Future Volume (vph)
61
14
103
72
4
25
80
162
1363
105 4
77
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900 1900
1900
Total Lost time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
0.97
0.86
1.00
Frt
1.00
1.00
0.85
1.00
0.87
1.00
0.99
1.00
Flt Protected
0.95
0.97
1.00
0.95
1.00
0.95
1.00
0.95
Satd. Flow (prot)
1618
1650
1524
1530
1400
3273
6043
1736
Flt Permitted
0.95
0.97
1.00
0.95
1.00
0.95
1.00
0.95
Satd.Flow (perm)
1618
1650
1524
1530
1400
3273
6043
1736
Peak -hour factor, PHF
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92 0.92
0.92
Adj. Flow (vph)
66
15
112
78
4
27
87
176
1482
114 4
84
RTOR Reduction (vph)
0
0
105
0
25
0
0
0
10
0 0
0
Lane Group Flow (vph)
40
41
7
78
6
0
0
263
1586
0 0
88
Heavy Vehicles (%)
6%
6%
6%
18%
18%
18%
7%
7%
7%
7% 4%
4%
Turn Type
Split
NA
Perm
Split
NA
Prot
Prot
NA
Prot
Prot
Protected Phases
3
3
4
4
5
5
2
1
1
Permitted Phases
3
Actuated Green, G (s)
7.2
7.2
7.2
6.4
6.4
10.5
64.4
6.1
Effective Green, g (s)
7.2
7.2
7.2
6.4
6.4
10.5
64.4
6.1
Actuated g/C Ratio
0.06
0.06
0.06
0.06
0.06
0.09
0.56
0.05
Clearance Time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
4.5
3.0
Lane Grp Cap (vph)
101
103
95
85
77
298
3384
92
v/s Ratio Prot
0.02
c0.02
c0.05
0.00
c0.08
0.26
0.05
v/s Ratio Perm
0.00
v/c Ratio
0.40
0.40
0.07
0.92
0.07
0.88
0.47
0.96
Uniform Delay, d1
51.8
51.8
50.8
54.0
51.5
51.6
15.1
54.3
Progression Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Incremental Delay, d2
2.5
2.5
0.3
70.0
0.4
24.9
0.5
78.8
Delay (s)
54.4
54.3
51.1
124.0
51.9
76.6
15.6
133.1
Level of Service
D
D
D
F
D
E
B
F
Approach Delay (s)
52.5
103.5
24.2
Approach LOS
D
F
C
Intersection Summary
HCM 2000 Control Delay
30.6
HCM 2000
Level of Service
C
HCM 2000 Volume to Capacity
ratio
0.84
Actuated Cycle Length (s)
115.0
Sum of lost
time (s)
31.6
Intersection Capacity Utilization
81.8%
ICU Level of Service
D
Analysis Period (min)
15
c Critical Lane Group
2231 Seminole Lane Starbucks 12/02/2020 2022 Total AM Synchro 10 Report
Timmons Group Page 2
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
j r
Lanegonfigurations
tttt
IN
Traffic Volume (vph)
2623
176
Future Volume (vph)
2623
176
Ideal Flow (vphpl)
1900
1900
Total Lost time (s)
5.7
5.7
Lane USI. Factor
0.86
1.00
Frt
1.00
0.85
Flt Protected
1.00
1.00
Satd. Flow (prot)
6285
1553
Flt Permitted
1.00
1.00
Satd. Flow (perm)
6285
1553
Peak -hour factor, PHF
0.92
0.92
Adj. Flow (vph)
2851
191
RTOR Reduction (vph)
_
93
Lane Group Flow (vph)
2851
98
Turn Type
NA
Perm
Protected Phases
6
Permitted Phases
6
Actuated Green, G (s)
59.3
59.3
Effective Green, g (s)
59.3
59.3
Actuated g/C Ratio
0.52
0.52
Clearance Time (s)
5.7
5.7
Vehicle Extension (s)
4.5
4.5
Lane Grp Cap (vph)
3240
800
v/s Ratio Prot
c0.45
v/s Ratio Perm
0.06
v/c Ratio
0.88
0.12
Uniform Delay, d1
24.7
14.4
Progression Factor
1.00
1.00
Incremental Delay, d2
3.8
0.3
Delay (s)
28.5
14.7
Level of Service
C
B
Approach Delay (s)
30.6
Approach LOS
C
Intersection Summary
2231 Seminole Lane Starbucks 12/02/2020 2022 Total AM Synchro 10 Report
Timmons Group Page 3
HCM Unsignalized Intersection Capacity Analysis
6: Site Entrance & Seminole Lane
Lane Configurations
'#
+
Traffic Volume (veh/h)
144
0
0
52
49
0
Future Volume (Veh/h)
144
0
0
52
49
0
Sign Control
Free
Free
Stop
Grade
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
Hourly flow rate (vph)
157
0
0
57
53
0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
177
pX, platoon unblocked
vC, conflicting volume
157
214
157
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
157
214
157
tC, single (s)
4.3
6.4
6.2
tC, 2 stage (s)
tF (s)
2.4
3.5
3.3
p0 queue free %
100
93
100
cM capacity (veh/h)
1331
774
889
01 /05/2021
Direction, Lane#
EB 1
WB 1
INS 1-
Volume Total
157
57
53
Volume Left
0
0
53 -
Volume Right
0
0
0
cSH
1700
1700
774 _
Volume to Capacity
0.09
0.03
0.07
Queue Length 95th (ft)
0
0
5
Control Delay (s)
0.0
0.0
10.0
Lane LOS
A
Approach Delay (s)
0.0
0.0
10.0
Approach LOS
A
Intersection Summary
Average Delay
Intersection Capacity Utilization 17.6% ICU Level of Service A
Analysis Period (min)
2231 Seminole Lane Starbucks 12/02/2020 2022 Total AM Synchro 10 Report
Timmons Group Page 4
Queuing and Blocking Report
2022 Total AM 01/05/2021
Intersection: 1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane
Movement
EB
EB
EB
wB
wB
NB
NB
NB
NB
NB
NB
SB
Directions Served
L
LT
R
L
TR
UL
L
T
T
T
TR
UL
Maximum Queue (ft)
108
60
74
1
95
72
196
227
287
263
206
156
270
Average Queue (ft)
43
13
26
56
20
100
124
172
149
76
34
122
95th Queue (ft)
88
43
56
90
56
183
205
262
237
166
106
275
Link Distance (ft)
464
464
55
55
585
585
585
585
Upstream Blk Time (%)
41
2
Queuing Penalty (veh)
20
1
Storage Bay Dist (ft)
205
420
420
270
Storage Blk Time (%)
1
Queuing Penalty (veh)
5
sirr�a��� A WerarnE:ju:nn•.m:ram110:.,.r��mraWrr
Movement SB SB SB SB SB
Directions Served
T
T
T
T R
Maximum Queue (ft)
651
580
467
290 91
Average Queue (ft)
425
380
273
149 39
95th Queue (ft)
598
542
411
270 75
Link Distance (ft)
689
689
689
689
Upstream Blk Time (%)
1
0
Queuing Penalty (veh)
0
0
Storage Bay Dist (ft)
395
Storage Blk Time (%)
24
0
Queuing Penalty (veh)
Intersection: 6: Site Entrance & Seminole Lane
ovemen
Directions Served
TR
T
L
Maximum Queue (ft)
19
120
124
Average Queue (ft)
2
24
40
95th Queue (ft)
21
90
113
Link Distance (ft)
55
343
258
Upstream Blk Time (%)
2
1
Queuing Penalty (veh)
3
0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Sum
Network wide Queuing Penalty: 49
2231 Seminole Lane Starbucks SimTraffic Report
Timmons Group Page 1
Queues
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
Lane Group
EBL
EBT
EBR
WBL
WBT
NBL
NBT
SBL
SBT
SBR+
Lane Group Flow(vph)
104
106
206
78
47
360
2484
34
1689
152
v/c Ratio
0.66
0.67
0.58
0.65
0.33
0.69
0.65
0.41
0.61
0.19
Control Delay
76.7
77.3
11.5
83.2
36.1
59.6
19.7
75.2
29.1
1.8
Queue Delay
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Total Delay
76.7
77.3
11.5
83.2
36.1
59.6
19.7
75.2
29.1
1.8
Queue Length 50th (ft)
89
91
0
65
15
150
443
28
318
0
Queue Length 95th (ft)
154
157
54
#131
56
204
486
65
361
20
Internal Link Dist (ft)
977
97
545
662
Turn Bay Length (ft)
205
420
270
335
Base Capacity(vph)
180
181
374
127
148
525
3806
84
2781
794
Starvation Cap Reductn
0
0
0
0
0
0
0
0
0
0
Spillback Cap Reductn
0
0
0
0
0
0
0
0
0
0
Storage Cap Reductn
0
0
0
0
0
0
0
0
0
0
Reduced v/c Ratio
0.58
0.59
0.55
0.61
0.32
0.69
0.65
0.40
0.61
0.19
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
2231 Seminole Lane Starbucks 12/02/2020 2022 Total PM Synchro 10 Report
Timmons Group Page 1
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
--,*
--I,
7
t`
~
t
it
41
I
/0�
L
Movement
EBL
EBT
EBR
WBL
WBT
WBR
NBU
NBL
NBT
NBR
SBU
SBL
Lane Configurations
«j
r
t+
M
ttt't+
A
Traffic Volume (vph)
192
14
202
76
19
27
44
309
2350
84
4
29
Future Volume (vph)
192
14
202
76
19
27
44
309
2350
84
4
29
Ideal Flow (vphpl)
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
1900
Total Lost time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Lane Util. Factor
0.95
0.95
1.00
1.00
1.00
0.97
0.86
1.00
Frt
1.00
1.00
0.85
1.00
0.91
1.00
0.99
1.00
Flt Protected
0.95
0.96
1.00
0.95
1.00
0.95
1.00
0.95
Satd. Flow (prot)
1698
1713
1599
1770
1696
3433
6375
1736
Flt Permitted
0.95
0.96
1.00
0.95
1.00
0.95
1.00
0.95
Satd.Flow (perm)
1698
1713
1599
1770
1696
3433
6375
1736
Peak -hour factor, PHF
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
0.98
Adj. Flow (vph)
196
14
206
78
19
28
45
315
2398
86
4
30
RTOR Reduction (vph)
0
0
187
0
26
0
0
0
3
0
0
0
Lane Group Flow (vph)
104
106
19
78
21
0
0
360
2481
0
0
34
Heavy Vehicles (%)
1%
1%
1%
2%
2%
2%
2%
2%
2%
2%
4%
4%
Turn Type
Split
NA
Perm
Split
NA
Prot
Prot
NA
Prot
Prot
Protected Phases
3
3
4
4
5
5
2
1
1
Permitted Phases
3
Actuated Green, G (s)
12.1
12.1
12.1
8.9
8.9
23.1
74.3
3.8
Effective Green, g (s)
12.1
12.1
12.1
8.9
8.9
23.1
74.3
3.8
Actuated g/C Ratio
0.09
0.09
0.09
0.07
0.07
0.18
0.57
0.03
Clearance Time (s)
9.2
9.2
9.2
7.6
7.6
9.1
6.2
7.9
Vehicle Extension (s)
3.0
3.0
3.0
3.0
3.0
3.0
4.5
3.0
Lane Grp Cap (vph)
158
159
148
121
116
610
3643
50
v/s Ratio Prot
0.06
c0.06
c0.04
0.01
0.10
c0.39
0.02
v/s Ratio Perm
0.01
v/c Ratio
0.66
0.67
0.13
0.64
0.18
0.59
0.68
0.68
Uniform Delay, d1
57.0
57.0
54.1
59.0
57.1
49.1
19.5
62.5
Progression Factor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Incremental Delay, d2
9.5
10.1
0.4
11.2
0.7
1.5
1.0
31.8
Delay (s)
66.5
67.1
54.5
70.2
57.9
50.6
20.6
94.3
Level of Service
E
E
D
E
E
D
C
F
Approach Delay (s)
60.7
65.6
24.4
Approach LOS
E
E
C
Intersection Summa
HCM 2000 Control Delay
30.9 HCM 2000 Level of Service C
HCM 2000 Volume to Capacity ratio
0.71
Actuated Cycle Length (s)
130.0 Sum of lost time (s) 31.6
Intersection Capacity Utilization
77.1% ICU Level of Service D
Analysis Period (min)
15
c Critical Lane Group
2231 Seminole Lane Starbucks 12/02/2020 2022 Total PM Synchro 10 Report
Timmons Group Page 2
HCM Signalized Intersection Capacity Analysis
1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane 01/05/2021
j r
Movement
SET
SBR
Lanegonfigurations
tttt
r
Traffic Volume (vph)
1655
149
Future Volume (vph)
1655
149
Ideal Flow (vphpl)
1900
1900
Total Lost time (s)
5.7
5.7
Lane UBI. Factor
0.86
1.00
Frt
1.00
0.85
Flt Protected
1.00
1.00
Satd. Flow (prot) 6285 1553
Flt Permitted 1.00 1.00
Satd. Flow (perm) 6285 1553
Peak -hour factor, PHF
0.98
0.98
Adj. Flow (vph)
1689
152
RTOR Reduction (vph)
0
89
Lane Group Flow (vph)
1689
63
Heavy Vehicles (%)
4%
4%
Turn Type
NA
Perm
Protected Phases
6
Permitted Phases
6
Actuated Green, G (s)
54.3
54.3
Effective Green, g (s)
54.3
54.3
Actuated g/C Ratio
0.42
0.42
Clearance Time (s)
5.7
5.7
Vehicle Extension (s)
4.5
4.5
Lane Grp Cap (vph)
2625
648
v/s Ratio Prot
c0.27
v/s Ratio Perm
0.04
v/c Ratio
0.64
0.10
Uniform Delay, d1
30.1
23.0
Progression Factor
1.00
1.00
Incremental Delay, d2
1.2
0.3
Delay (s)
31.4
23.3
Level of Service
C
C
Approach Delay (s)
31.9
Approach LOS
C
Intersection Summary
2231 Seminole Lane Starbucks 12/02/2020 2022 Total PM Synchro 10 Report
Timmons Group Page 3
HCM Unsignalized Intersection Capacity Analysis
6: Site Entrance & Seminole Lane
--I� 7 f< ~ 4\ /111
Lane Configurations
'*
+
Traffic Volume (veh/h)
102
25
0
98
24
0
Future Volume (Veh/h)
102
25
0
98
24
0
Sign Control
Free
Free
Stop
Grade
0%
0%
0%
Peak Hour Factor
0.98
0.98
0.98
0.98
0.98
0.98
Hourly flow rate (vph)
104
26
0
100
24
0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (ft)
177
pX, platoon unblocked
vC, conflicting volume
130
217
117
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
130
217
117
tC, single (s)
4.1
6.4
6.2
tC, 2 stage (s)
tF (s)
2.2
3.5
3.3
p0 queue free %
100
97
100
cM capacity (veh/h)
1455
771
935
01 /05/2021
Direction, Lane #
EB 1
WB 1
NB 1 -
Volume Total
130
100
24
Volume Left
0
0
24
Volume Right
26
0
0
cSH
1700
1700
771 -
Volume to Capacity
0.08
0.06
0.03
Queue Length 95th (ft)
0
0
2
Control Delay (s)
0.0
0.0
9.8
Lane LOS
A
Approach Delay (s)
0.0
0.0
9.8
Approach LOS
A
Intersection Summary
Average Delay 0.
Intersection Capacity Utilization 16.9% ICU Level of Service A
Analysis Period (min)
2231 Seminole Lane Starbucks 12/02/2020 2022 Total PM Synchro 10 Report
Timmons Group Page 4
Queuing and Blocking Report
2022 Total PM 01/05/2021
Intersection: 1: US 29-Seminole Trail & Hilton Heights Road/Seminole Lane
Movement
EB
EB
EB
wB
wB
NB
NB
NB
NB
NB
NB
SB
Directions Served
L
LT
R
L
TR
UL
L
T
T
T
TR
UL
Maximum Queue (ft)
188
165
103
1
73
71
246
363
469
426
327
223
269
Average Queue (ft)
109
70
46
57
32
134
188
278
261
195
110
51
95th Queue (ft)
171
147
84
88
68
229
298
410
377
307
206
174
Link Distance (ft)
964
964
57
57
587
587
587
587
Upstream Blk Time (%)
33
10
Queuing Penalty (veh)
20
6
Storage Bay Dist (ft)
205
420
420
270
Storage Blk Time (%)
0
0
0
0
0
Queuing Penalty (veh)
0
0
0
1
0
mrallf"F MInn•.m:ram110:.,.r��mraWrr
Movement SB SB SB SB SB
Directions Served
T
T
T
T
R
Maximum Queue (ft)
483
451
324
213
92
Average Queue (ft)
350
302
202
77
39
95th Queue (ft)
457
410
293
187
76
Link Distance (ft)
686
686
686
686
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
335
Storage Blk Time (%)
17
Queuing Penalty (veh)
S
Intersection: 6: Site Entrance & Seminole Lane
ovemenOEM—
Directions Served
TR
T
L
Maximum Queue (ft)
3
132
54
Average Queue (ft)
0
31
17
95th Queue (ft)
3
100
44
Link Distance (ft)
57
366
259
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Sum
Network wide Queuing Penalty: 34
2231 Seminole Lane Starbucks SimTraffic Report