Loading...
HomeMy WebLinkAboutARB202100012 Correspondence 2021-01-19® COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434 93 2813 FX www.coll ns-engineers n g.com January 19, 2020 Margaret Maliszewski County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 1680 Seminole Trail Auto Dealership- Final ARB application The applicant is seeking to redevelop the existing commercial site at the comer of Rio Road and Seminole Trail (currently a Hardees fast food restaurant) for an auto dealership with display parking. A special use permit was approved by the Board of Supervisors on January 60' 2021 for the special use permit for display parking. The site improvements include moving the existing parking spaces away from Rio Road and Seminole Trail to create a landscaping buffer area to screen the site at this prominent corner of Albemarle County. The landscaping buffer created with the modifications to the existing parking lot will help create an attractive pedestrian streetscape for the improvements that were installed along Rio Road and Seminole Square with the VDOT improvements to the corridor. The landscaping buffer will also help mitigate the proposed use on the property from the intersection and the entrance corridor, providing a separation zone between the property and the roadway. The proposed landscaping and buffer area will help enhance the Pedestrian Zone along the Route 29 and Rio Road corridors adjacent to the site. In addition, approximately 40 feet of the existing retaining wall along Rio Road will be removed with the regrading of the site and added greenspace area. The existing building will be re -used for the Auto Dealership, with minimal improvements. The drive-thru canopy will be removed, and the metal roof and awning will be repaired, matching the existing materials on the building. The (2) sheds on the southwest side of the site will be removed, and the refrigeration building behind the restaurant will be removed. The free standing sign in front of the building that is no longer in compliance with the ARB regulations will be removed, and replaced with a sign that meets current ARB requirements. No new mechanical units are proposed for the building at this time. Any new units or equipment shall be hidden from views from the entrance corridor. The existing dumpster enclosure will remain and added landscaping will be planted around the dumpster enclosure. All landscaping shall conform to the landscaping standards as specified in the Albemarle County Zoning Ordinance Section 32.7.9. Street trees and landscaping are provided along Rio Road and Seminole Trail in the proposed buffer area. Grass planting areas have been created in the location where the existing pavement is proposed to be removed, and the existing parking spaces have been shifted back from the roadway along the frontage of the property. These planting areas are shown on the site plan. Spacing of street trees are planted in accordance with Section 32.7.9 of the Albemarle County Code for Landscaping and Screening requirements. Screening and interior landscaping are also part of the landscaping plan to provide a visual barrier and site landscaping as required the Albemarle County Ordinance along Route 29 and Rio Road within the parking lot areas for the auto dealership, and along the perimeter of the parking areas. Landscaping islands have been incorporated into the parking lot envelopes as noted on the site plan. The (3) existing lights on the site are shown to be removed and replaced with new lights that meet ARB and Albemarle County guidelines and requirements. All new lighting shall conform with the Albemarle County ordinance and shall be full -cutoff lighting, screened to the extent possible, and limited to 0.5 footcandles at the property lines. The proposed site plan reduces the impervious area on the site by 31%. The limits of disturbance on the site is also limited to less than 10,000 SF of total disturbance. No additional stormwater management is needed for the site design. Existing drainage patterns have been preserved on the site, as shown on sheet 4. On the attached sheets are existing photos of the site and the building. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE Site Frontage, looking North along Route 29 Site Frontge, looking North along Route 29 Site Frontage, looking South along Rio Road Front of existing building to remain. Signage to be removed. Al :=' 1F "I 1. �. _. _ ram. ��i L '+ :� ��� � _ X �L -�1. •, it �I • �.. y �� j � . �.. Drive-thru canopy to be removed