HomeMy WebLinkAboutWPO202000030 Plan - VSMP 2021-01-22GENERAL NOTES OWNER: CURRELL CORPORATION a, 35 OLD FARM ROAD CHARLOTTESVILLE, VA 22902 St. Anne 2=415 IVY ROAD COMMERCIAL@s School BelfiedsCampo DEVELOPER: HUNTER E CRAIG COMPANY 5 1900 ARLINGTON BOULEVARD CHARLOTTESVILLE,VA 22903 (434)974-4500 ENGINEER: COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE,VA 22902 (434)293-3719 TAX MAP NO.: 06000-00-00-02SAO COB17/568 TOTAL PROJECT AREA: 3.89 ACRES TOTAL NOTE: A BLA IS BEING PROPOSED WITH THIS SITE PLAN TO RELOCATE THE PROPERTY LINE THAT CURRENTLY PASSES THROUGH ONE OF THE EXISTING BUILDINGS. THE NEW PROPERTY LINE WILL BE LOCATED JUST TO THE WEST OF THE BELL -AIR MARKET BUILDING, AS SHOWN ON THIS PLAN. THE PROPOSED BLA WILL ADD AN ADDITIONAL 0.91 ACRES FROM TMP 60-25B TO THE PROPERTY (TMP 60-25A), WHEN COMPLETE. NO IMPROVEMENTS ARE PROPOSED WITHIN THIS 0.91 ACRES. THE PROPERTY LINE ADJUSTMENT (AS REQUESTED BY STAFF) IS THE ONLY MODIFICATION ASSOCIATED WITH THIS AREA. NEW TOTAL PROJECT AREA (AFTER BLA): 4.80 ACRES ZONING: C-1 COMMERCIAL ZONING. THE PROPERTY IS ALSO SUBJECT TO THE AIRPORT IMPACT AREA (AIA), ENTRANCE CORRIDOR (ARB), AND STEEP SLOPES OVERLAY DISTRICTS AS DESCRIBED IN SECTION 30 OF THE ZONING ORDINANCE. THIS PARCEL IS ALSO SUBJECT TO THE ACTION OF A SPECIAL USE PERMIT GRANTED IN 2004 WITH SP2004-00021 FOR A BALLET SCHOOL. TOPO & SURVEY: SURVEY PROVIDED BY ROGER W. RAY & ASSOCIATES IN AUGUST 2019. TOPOGRAPHY IS FIELD SURVEY PERFORMED BY ROGER W. RAY & ASSOCIATES. TOPO FIELD VERIFIED BY COLLINS ENGINEERING IN SEPTEMBER, 2019. DATUM: NAD83, NAVD 88 EXISTING CONDITIONS: RELATIVELY FLAT DEVELOPED SITE WITH (2) EXISTING COMMERCIAL BUILDING, PARKING, AND OUTSIDE GRAVEL STORAGE AREA. THE COMMERCIAL BUILDING PROPOSED TO BE RENOVATED FOR A CHANGE IN USE IS 28,960 SF AND THE EXISTING COMMERCIAL BUILDING THAT SHALL REMAIN (WITH NO IMPROVEMENTS OF CHANGES TO THE CURRENT USE) IS 17,425 SF. PROPOSED: THE EXISTING COMMERCIAL RETAIL BUILDING WILL BE RENOVATED FOR THE FOLLOWING USES: 2,500 SF RESTAURANT 51000 SF COMMERCIAL RETAIL 18,180 SF COMMERCIAL OFFICE/COMMERCIAL RETAIL 31280 SF MANUFACTURING/PROCESSING/ASSEMBLY/FABRICATION TOTAL SQUARE FOOTAGE: 28,960 SF EXISTING BUILDING TO REMAIN WITH CURRENT USES: 2,465 SF MEDICAL OFFICE 61800 SF BALLET SCHOOL 81160 SF COMMERCIAL OFFICE TOTAL SQUARE FOOTAGE: 17,425 SF WATER SUPPLY PROTECTION AREA: N/A WATERSHED / WATER RESOURCE AREA: RIVANNA RIVER DRAINAGE BASIN ALLOWABLE DENSITY: N/A PROPOSED DENSITY: N/A GREENWAY DEDICATION: N/A - EXISTING PAVED PATHWAY ON THE PROPERTY TO REMAIN BUILDING HEIGHTS: EXISTING (1) STORY BUILDING TO REMAIN. MAXIMUM BUILDING HEIGHTS SHALL NOT EXCEED 65 FEET. NOTE: HEIGHT OF BUILDING OVER 40 FEET OR 3 STORIES SHALL PROVIDE A STEPBACK PER SECTION 4.20. EXISTING BUILDING HEIGHT = 18' SETBACKS: FRONT SETBACK: 10' BLDG. MINIMUM FROM R/W OR EXTERIOR EDGE OF SIDEWALK IF SIDEWALK IS OUTSIDE R/W. 30' BLDG. MAXIMUM FROM R/W OR EXTERIOR EDGE OF SIDEWALK IF SIDEWALK IS OUTSIDE R/W. 10' MINIMUM FOR OFF-STREET PARKING OR LOADING SPACES FROM ANY PUBLIC STREET R/W. SIDE & REAR SETBACK: MINIMUM: IF THE ABUTTING LOT IS ZONED RESIDENTIAL, RURAL AREAS, OR THE MONTICELLO HISTORIC DISTRICT: I NO PORTION OF ANY STRUCTURE EXCLUDING SIGNS SHALL BE LOCATED CLOSER THAN 50 FEET FROM THE DISTRICT BOUNDARY; AND (II) NO OFF-STREET PARKING OR LOADING SPACE SHALL BE LOCATED CLOSER THAN 20 FEET TO THE DISTRICT BOUNDARY. IF THE ABUTTING LOT IS ZONED COMMERCIAL OR INDUSTRIAL ANY PRIMARY STRUCTURE SHALL BE CONSTRUCTED AND SEPARATED IN ACCORDANCE WITH THE CURRENT EDITION OF THE BUILDING CODE. MAXIMUM: NONE STEPBACKS: FRONT - FOR EACH STORY THAT BEGINS ABOVE 40 FEET IN HEIGHT OR FOR EACH STORY ABOVE THE THIRD STORY, WHICHEVER IS LESS, THE MINIMUM STEPBACK SHALL BE 15 FEET. SIDE & REAR: NONE PRIVATE TRAVELWAYS: CURB & GUTTER TRAVEL WAYS UTILITIES (WATER AND SEWER): COUNTY PUBLIC WATER AND SANITARY SEWER AGRICULTURAL/ FORESTAL DISTRICT: NONE EXISTING VEGETATION: TREES ALONG THE WESTERN PROPERTY LINE AND (3) LARGE TREES ALONG THE SOUTHERN BOUNDARY. ADDITIONAL LANDSCAPING AND VEGETATION ALONG THE NORTHERN PROPERTY LINE. LIGHTING: EXISTING LIGHT POLES AND BUILDING LIGHTING SHALL REMAIN AS IS. NO ADDITIONAL LIGHTING IS PROPOSED WITH THE SITE PLAN AMENDMENT. ANY PROPOSED LIGHTING MUST COMPLY WITH REQUIREMENTS OF SECTION 32.7.8 & SECTION 4.17 OF THE ZONING ORDINANCE. LANDSCAPING: A LANDSCAPING PLAN IS PROVIDED WITH THE FINAL SITE PLAN IN ACCORDANCE WITH ALBEMARLE COUNTY ORDINANCE SECTION 32.7.9, SEE SHEET 5. STREET TREES SHALL ALSO BE INCLUDED WITH THE LANDSCAPING DESIGN TO INCORPORATE STREET TREES EVERY 40' ALONG THE ROADWAYS. TRASH RECEPTACLES: A PROPOSED TRASH DUMPSTER IS PROPOSED ON -SITE FOR TRASH SERVICE FOR THE BUILDING. PHASING: THIS SITE SHALL BE DEVELOPED IN ONE PHASE. PARKING REQUIRED: RESTAURANT: 2,500 SF x 13 SPACES/1000 SF = 33 SPACES RETAIL: 5,000 SF x 80% x 1 SPACE/100 SF = 40 SPACES COMMERCIAL OFFICE/RETAIL: 28,805 SF x 80% x 1 SPACE/200 SF = 115 SPACES BALLET SCHOOL: 8 PARKING SPACES MANUFACTURING/PROCESSING/ASSEMBLY/FABRICATION: 1 SPACE/EMPLOYEE ON THE LARGEST SHIFT (7 EMPLOYEES) = 7 SPACES 1 SPACE/500 SF OPEN TO PUBLIC (500 SF) = 1 SPACE (2 SPACES MIN. FOR CUSTOMER PARKING) GAS STATION/RETAIL (TMP60-25113): 2,350 SF x 80% x 1 SPACE/100 SF = 19 SPACES TOTAL PARKING REQUIRED: 224 SPACES REQUIRED PARKING PROVIDED: TOTAL PARKING SPACES PROVIDED = 224 SPACES (96 EXISTING PARKING SPACES AND 128 PROPOSED PARKING SPACES - 22 PAVERS, 99 NEW ASPHALT, 7 NEW STRIPED ON EX ASPHALT) NOTE: THERE WILL BE A PARKING EASEMENT ON THE TMP60-25B PARCEL FOR THE EXISTING 15 PARKING SPACES BEHIND THE RETAIL STORE. REDEVELOPMENT PLAN �__o T.M.P 60-25 ROSSER ASSOCIA D.E.1083-50 D.B. 635-308 PI ZONING: TIC HIGHWAY C USE: COMMERCIAL VSMP a SAMUEL MILLER MAGISTERIAL DISTRICT s Club Q ALBEMARLE COUNTY VIRGINIA vNRAO Central Development Laboratory F�W+Ia'Av��r o ®. AtlantlpJResearchOro upQ SUBJECT AREA Pedo t of Chat �jn � Q a The Market at Bellair 0 QGreg Leffler -State Farm Faulcooer Construction Co., Inc ® (ND V V a° • Printing& Copying Services University of Virginia Police Department 0 VICINITY MAP - - -Gk-APHIC LAYOUT � _SHEET SCALD SCALE: 111 = l000f SCALE: 111 - 60' 60 0 30 60 120 240 LEGEND ROADS EXIS77NG CULVERT = --------_____ �-_____----'-' - ``� ( IN FEET ) 1 inch = 6" ft. ���,, � 0 DROP INLET &STRUCTURE N0. CURB Jt - - --- _--- -------------- CURB & GUTTER o --- - __ ; % ",_-, PROPOSED ASPHALT ---- -- PROPOSED CONCRETE -- PROPOSEDPAVE (IMPERVIOUS) R "' BENCHMARK VDOT STANDARD STOP SIGN oq °O �\ "' __ EXISTING CONTOUR 262 ¢y.)MFgN r _ 4 _ fq _ SHEET INDEX 4\� SHEET \ \ PROPOSE OFMANN G/ PROCESSING/ FABRIUTION ' \ v \ \ MERCIAEOxb xEIRE \ COMMERCIALOFFlCE/RETAIL \ \ r \ COMME CIALR°SF PROPOSED;S°°SF \ \\ COMMERCIAL RETAIL I RESTAURANT T.M.P. 60-24A Y OF VIRGINIA FOUNDA D.B. 5184, PG.139 ZONING: RA E; RURAL/RESIDENCE COVER SHEET 1 EXISTING CONDITIONS & DEMOLITION PLAN 2 EROSION & SEDIMENT CONTROL NARRATIVE 3 EROSION & SEDIMENT CONTROL PLAN - PHASE I 4 EROSION & SEDIMENT CONTROL PLAN - PHASE II 5 EROSION & SEDIMENT CONTROL PLAN - PHASE III 6 EROSION & SEDIMENT CONTROL PLAN DETAILS 7 STORMWATER MANAGEMENT PLAN 8 STORMWATER MANAGEMENT DETAILS 9 TOTAL SHEETS 9 �i,. EXISTING �ISTINc - •� NOTES: MEDICALOFFlCE eAutTscFlool CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND SPACE (6,9p°AF) - - `=- - -__-__ UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING °� (2,4GSSFl _ WORK. CONTACT ENGINEER IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT � oLE sJsszpo FROM THAT SHOWN ON THE PLANS, IF THERE APPEARS TO BE A CONFLICT, AND UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THE PLANS. THE CONTRACTOR MUST LOCATE ALL SURFACE AND SUB -SURFACE UTILITIES PRIOR TO ANY WORK ONSITE. -- '- -_ ANY SIDEWALK AND/OR CURB DAMAGE IDENTIFIED IN THE SITE VICINITY DUE TO PROJECT CONSTRUCTION ACTIVITIES AS DETERMINED BY THE VDOT INSPECTOR EXISTING �;,', it ' SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. SIDEWALK WILL BE OFFICE SPACE I R,-.SF Illo / REPLACED AT THE DIRECTION OF THE VDOT INSPECTOR. ANY EXISTING SIDEWALK THAT IS CURRENTLY DAMAGED AND IN NEED OF REPAIR OR NOT IN COMPLIANCE WITH CURRENT STANDARDS SHOULD BE REPLACED AS PART OF THIS PROJECT AS EXISTING o �;E WELL. IN ADDITION, ANY EXISTING CG-12S ALONG THE PERIMETER OF THE SITE GASSTATION/ A _ __ L ' SHOULD BE UPGRADED TO MEET CURRENT STANDARD IF NEEDED. CONVENIENCE STORE �•2,350SF ALL SIGNING AND PAVEMENT MARKINGS SHALL BE CONSISTENT WITH THE MUTCD \. -T---------------- r / ------------- IF ADDITIONAL NOTES: LE1. ALL GRASS AND LANDSCAPING AREAS SHALL BE PRIVATELY OWNED - 11 AND MAINTAINED. s _ -- off 2. THE STREETS IN THE DEVELOPMENT SHALL BE PRIVATE TRAVELWAY - i '1p❑{iry1tlq � IGN� I SIG AND L�VELWAYS AND WILL NOT MEET THE STANDARDS FOR ------------ ACCEPTANCE '[--' - ~ PILE °SIGN I ' ti ,- _,__ INTO THE SECONDARY SYSTEM OF STATE HIGHWAYS AND �,. - --- -y - - _ --- PEAR,'' �" WILL NOT BE MAINTAINED BY THE VIRGINIA DEPARTMENT OF - OO W19], 0 iJ POLE a L-3R].3�h-...-m - - - - - - _N= --_ _. - _ SIGN "]_'16 - - - - -- - __ TRANSPORTATION OR THE COUNTY OF ALBEMARLE. --- - - PROPOSED DEVELOPMENT SHALL BE SERVED BY PUBLIC WATER 7 77"- - -.-' - - - - - - -- -- DSEWEER ' sL, WATER LINE & AN ;- -- -..- - - IF 31r>rL-" � 4„_}� (U.S.15sb aas) _sue" �-"=�-°-` ,, � � � ' ` --' � EDITION) _-- __- _- -. _._________-- PROPOSED TRIP GENERATIONS: ITE TRIP GENERATION lOTH E N = - -: - _--= --" " 2 500 SF RESTAURANT - 280 VPD 25 VPH AM & 25 VPH PM _ _ _ _ 5,000 SF COMMERCIAL RETAIL = 534 VPD (19 VPH AM & 46 VPH PM) 18,180 SF COMMERCIAL OFFICE/RETAIL = 177 VPD (21 VPH AM & 21 VPH PM) 3,280 SF MANUFACTURING/PROCESSING/ASSEMBLY/FABRICATION = 13 VPD (2 ---- TM�P.Q�6c e,o-rA VPHP ) ----- T. -A-o1 B RR VPH AM & _ .M.P. 76C 1%EANTERBURY LLC 8, PG.378- 3 M --=� --- D.B `.1998, RESIDENTIAL _, %D B. 4648, Pc.380 - _, 2,465 SF MEDICAL OFFICE = 86 VPD _- -� --- ;ZONING. R-1 RESIDENTIAL ZONING FAMILY- ETAC IAL USE: SINGLE FAMILY DETACHED LOT usE; SINGLE FAMILY -DETACHED eTACHEp LOT 6,800 SF BALLET SCHOOL = 26 VPD (4 VPH AM & 6 VPH PM) RETAINING WALLS: NO RETAINING WALLS ARE PROPOSED WITH THIS PLAN. A STONE WALL, FOR STREAM BUFFERS/FLOODPLAIN: NO STREAM BUFFERS ARE LOCATED ON THE PROPERTY IN 2,350 GAS STATION (6 PUMPS): 1,467 VPD (96 VPH AM & 116 VPH PM) SCREENING PURPOSES ONLY, IS PROPOSED ALONG IVY ROAD ADJACENT TO THE ACCORDANCE WITH THE ALBEMARLE COUNTY WATER PROTECTION TOTAL PROPOSED TRIPS/DAY: 2,S70 VPD ORDINANCE. THE PROPERTY ALSO DOES NOT LIE WITHIN THE LIMITS EXISTING TRIP GENERATIONS: (ITE TRIP GENERATION, LOTH EDITION) PROPOSED PARKING LOT. OF A 100-YEAR FLOODPLAIN, PER FEMA MAP NUMBER 51003CO267D ADOPTED FEBRUARY 4, 2005. NO IMPACTS ARE PROPOSED FOR ANY 28,960 SF COMMERCIAL RETAIL/HARDWARE = 265 VPD (32 VPH AM & 78 VPH RECREATION: N/A STREAM BUFFERS OR 100 YEAR FLOODPLAIN LIMITS WITH THE PM) REDEVELOPMENT OF THE PROPERTY. THE PROPERTY IS NOT LOCATED 2,46S SF MEDICAL OFFICE = 86 VPD CRITICAL SLOPES: MANAGED STEEP SLOPES ARE EXISTING ON SITE AS SHOWN ON THE PLAN. NO WITHIN A STATE DAM INUNDATION ZONE OR FEDERAL DAM 6,800 SF BALLET SCHOOL = 26 VPD (4 VPH AM & 6 VPH PM) IMPACTS TO MANAGED SLOPES ARE CURRENTLY PROPOSED WITH THE DEVELOPMENT. INUNDATION ZONE. 2,350 GAS STATION (6 PUMPS): 1,467 VPD (96 VPH AM & 116 VPH PM) TOTAL EXISTING TRIPS/DAY: 1,844 VPD BURIAL SITES: NO CEMETERIES WERE FOUND DURING FIELD INVESTIGATION OF THE SITE. STORMWATER MANAGEMENT: 2.86 ACRES DISTURBED. THE SITE DECREASES IMPERVIOUS AREA TOTAL INCREASE IN TRIPS/DAY: 726 VPD LAND AREA: (TMP-6025A WITH PROPOSED BLA ADJUSTMENT) - TOTAL ACREAGE (4.80 ACRES) WITHIN THE DISTURBED ACREAGE. THE POST -DEVELOPMENT TP LOAD EXISTING BUILDINGS: 46,385 SF - 1.06 AC. (22.2%) REDUCTION FOR THE SITE IS 0.86 LB/YEAR. STORMWATER PROPOSED PAVED PARKING AND TRAVELWAYS: 48,753 SF - 1.12 AC. (23.3%) MANAGEMENT FOR THE PROPOSED IMPROVEMENTS ON THE SITE AND SIDEWALKS: 3 SF - WATER QUANTITY REDUCTION SHALL BE ACCOMMODATED WITH ,.12 ACRES (%) ONSITE FACILITIES. THESE FACILITIES, SHALL INCLUDE PERVIOUS EXISTING PARKING AREA/GRAVEL STORAGE: 46,450 SF - 1.06 ACRES (22.1%) PAVERS AND A LANDSCAPED GRASS DRY DETENTION AREA WITH OPEN AREA / LANDSCAPING AREA 62,487 SF - 1.43 ACRES (29.9%) PRETREATMENT CELLS. ADDITIONAL WATER QUALITY NUTRIENT CREDITS SHALL BE UTILIZED TO ACHIEVE THE NECESSARY REMOVAL RATES FOR THE DEVELOPMENT. THE FINAL WPO AND VSMP PLAN SHALL IMPERVIOUS AREAS: 146,601 SF (3.37 AC) TOTAL APPROVED PRIOR TO LAND DISTURBING OPERATIONS AND PRIOR TO FINAL SITE PLAN APPROVAL. PAVED PARKING AND CIRCULATION AREA: 100,216 SF NOTE: ALL ROOF DRAINS SHALL DISCHARGE IN A MANNER NOT TO CAUSE A PUBLIC NUISANCE AND NOT OVER SIDEWALKS. ;COTT /R. 'C1I!)-LLINS Z Lic. No. 035791 11�_ 01/11/21 �&InNTAT. 0 N 0 W z a Q J d Z Z w Z0 p u= O z J 0 O H V) ~ o wiy U F�1 � w \ / LU LULn LD ti M M N U) M 'II" i 1 N z 0') W W N > 0 O L J zW J w LU L9 O _ � J W C Q v Q U LULU W W LUY H O p C0 UlD U w 0 Z Q CO J w J H 0 O NI C:) N O N w J U w ,~i ~ wr-, a w � JOB NO. 192171 SCALE 1 "=60' SHEET NO. 1 / \ \ LEGEND: H \ \ / I / NOTE: SEE ESC FO ING OF E) ]STING STORM DEMOLITION AND W \ \TH OF y CLOSURE OF EXISTING D STRIAN PATHIAYADJACENTTO ROUTE 250. 1 _ \\ \\ / \ RD DU D 1 CO CLEAAP AIR PUMP �OUT \ \ _ \ \ / \ \ \ / ` ` ` \ Zo 1 DI DROP (INLET \ W _ \ \ \ / \ \ SCOTT R. LLINS� / \ \ R=2962.75 D - �3 \ FC FILLER\ CAP w \ \ vA U Lic. No. 035791� FIT FIRE HYDRANT ` � \ \ \ � 0 4 ` \ \ L=206.85 \ - \ \ AAr \ GM GAS METER��/ \ \ �� O1/11/21� \ \\ °ME MIN - \ \ J" ---- \ LP LIGHT OPOLE \\ \ \ \ ASS �lyG1 \ \ fl \\ \\ H MANH \ \ \ \ ZONAL \\ - MOIN ORR�I�G WELL = `� \� \\ \\ \\ SANIAIRY V ° v o v <�v P� POLE \ FRAME \ ! \\\ \\ _ \\ /i/ \\ \\ \\ ST \\PROPANE TANK BLDG. Q \\\ \\ - \ SEWER \ \ -- - \�SMT. \ \� \ E �-�-__ \�\\ fl �,�\ �`�. -' o` -- �� � \\\ � TELEPHONE BOX\� (D.B.A2� 6 UL UTILNY LID D / > �v � -1T8 \� \ `\ \\ �rn \\ WM TE0' METER wE fiEMP. \\ \\\ < \ W WARD VALVE \\ ON,STR. \ IRON--- \ \ \ \ / \ \ \ \ \ \ / �� \ \ \\ \ \ o (D. 506\\ \�\ SET §�` \\\ \\ CSX \\ / \\ OVER h\TILITY LINE PAV D \\ \\ //IT ENCE \ E LIGHT p ORT�Tj0� \\�\ \\ / GUA AIL \ ICE POLE �E \` \\ fl \\\ o o /� \ \ \ _ a : > PAVED \ a ¢ F- - ° GR�VEL�� PAV ELNTTOB ASS F�FCpR/' oFT�C C \\\ �`�\ "\` CONCRETE \\ • °�-°;�- ��� fl \\ U f \ \ \ \ REMOV _ C R kS -\ oqE \ \ m m \ T.M. 60 25A \ o-- / \ Z W m f �O _ � HMS C - v p En o ----- _ \ D� PS -TER--- \ \ z H E s R fl , P.-�• O o a \ \ 562.98'- 8' ,\46R)Mpq�Y d \ \\ \ �\ GRAVEL SE: G45 UMA 1 NIAE ® &A DR/EVCL/ °NF PAD \\ \ \ H w z o \\ a\ EXISTING FENCE �fA IN V.IN=° \ \ v\\ \ \ ENCLOSUREAREA 556.39 VEMENT------- -�------�\ �� a TO BE REMOVED DI TOP M. 60-25A '` ` \ \ - - - ` \ \ \ � \ \PA WOODENP - - - - NOTE: LAST (2) SPACES DO NOT - - - - - - 565.42 g E T A GRAVC CEDAR \ \ \ f - _ OCF - COUNT TOWARD THEOVERALLgA1FKIN �F FORMEi?LY / uwi \ ' / • -WALL OHE OHE - - / \ \ \ \ \ VPQ - - - - - ST7cTE- W > EXISTING III I,V IN= \ \ \ ��E \ ROUTE 754 D \ `\ \ `\, l`\ LIGHTPOLEAND N,. \ fl 1 \ MA\ AGED SLOPES °�E.e, b •..` \ \ \ \ (60' R/W) w/ u' \ TOP= 82.0 \ `� `� ,NCB OVERHEAD POWER \ \ \ \ \ PAVED # # Ili 'r \ \ CAA:°..: TO BE REMOVED °He \ \ 1 \ \ N69 \\ V=578.5 \ \ \ r \ \ \ WATER CURB -oHE_ 28.09 \ \ \ \ \ \ \ \ METER - - I GUARDRAIL \ T.M. 60-24)< - \ UNIVERSITY OF VIRGINIA kOUNDATION �0 - _I - \ / PAVED oqE \\ \\\ `D-B. 5184, PG.13� - uL�_ J GRAPHIC SCAL� \ EXISTING STORM `ZQNNG:� -\ _ \ VL ` \ \ EXISTING GATE TO USE_ RURL;�RES ONCE - 30 o u ao so ,zo TO BE DEMOLISHED \ _ 1 IVI\_ O/T�4� WAL,i,. ,RA.. \ BE REMOVED \fl cli .�• i DI �P' � �? ��,56,� \\ MANAGED vvv�v� 432 1 (cN FEING ET )ft. -- p EXISTING GRAVEL i - \ SLOPE TO \ \\ AREA TOBE 6" PIPE 'GRP'VEP,- ow'.. A REMAIN' fl REMOVED FOR . INV.IN= 556.55 PROPOSED ': i � IMPROVEMENTS ';; EXISTING STORM IRON/ DEMOLISHED AND + , -"ND REPLACED \ ` ` \ \ , \ \ INV.OUT= DI TOP= 550.18 _ LIGHT IN 556.37 V.IN= IN V.OUT= q F \ _ POLE 558.9 - \ \ \ \\ \\ TOP 578189 \ � \ � � C � �` ", -GRAVEL , ° , i 555.50 555.27 _- - - ' - - - - Lu O7 "JAL_ 15' CMP _ v ------ V 557.45 DI TOP 12 C 555.36 s,� ., :5 S; �POUNTTOLASA SPACES DO NOT v - - - .:.:: \ %< �\ ` ''' MF' INV IN COUNTTOWl�RDOVERALLPARKING ` \ C~ ^ INV.IN= - TUI INV.W- \ ` \�-- 11 V A A �- S. 55528 v �` �� ` x D� INV Ol, - INV.0 T_ 558.29 �55550 8 PLASTIC E° .ri i\�\� \�-__ t� G \ RIP ENTRANCE r��iX \ \\ \\ \ EXISTING STORM RAP ENTRANCE 562.35 NV IN.=555 4i ° ` N V / TO BE DEMOLISHED EXISTING STORM 562.42 t� U DI tie v � ` INV.IN= EXISTING STORM` `I+ 59 Fi4? fl co �'•, '� , 558.84 TO BE DEMOLISHED EXISTINGSTORM SIG \\ \\ \\ \\ \ TO BE DEMOLISHED TO BE DEMOLISHED c` 1 S�fORY ✓ \ \ - \ A STUCCO b FENGe \ 4" CONCRETE \ fl N Z TREE RAMP TO BE EASEMEN '1C� B DCK e- °' b.t `\ CSX O \ \ \ \ RECONSTRUCTED FOR BUILDIH '` Z (5,25 SF DECK / %/� Oi LLJ EXISTING GRAVEL ENCROACHMENT c� ) \ \ TO MEET ADA I ,. a.. < ' AREA TO BE NS N Z REMOVED FOR REQUIREMENTS (D.B. 3919 /Z6,'� 1 .>.<. • °rye \ ACCESS& - - - _ _ N Q po PROPOSED \ FRAME WALL \ PARKING fl RT'9/ - J \ \ ENTRANCE _-- \ /o \ ' Q LANDSCAPING 562.43 \ BLDG. \ EASEMENT Yv \\ \F, \ \ r WILLOW J Z 548x ENTRANCE CONC. / DI i.n °�E \ v \ \ EN .0 560.06 \ / POLE S \ fl \ \ \ Ln w LLJ 560 07 CASINGS / J J w \ \ \ a a x a Ln DI TOP '- - j h 1 STORY METAL PLANTER / �°HE S) E2 \ \ I -I BROOK STEPS / ENTRANCE Z P- 9.7 00 FRAME \ W J \ \ CONC. PLANTER : E6nANCE 559.80 ° r V,5 g 7LDG\ \ \\ \ \ \ \ \ 15" (28,960 SF) 5 ER5 60.07 "� m �� ,L�I_/I O I..L TRIPLE NV, UT- AUTO m \ METAL Z ` \ \ \ \ \\ ASH SPKR 1 STORY Q Q BLDG. 4.7 RAMP DI m I °bE FRAME _J L9 0 J w \ \ \ \ EXISTING \ \ ENTRANCE BRICK BLDG. \ MANAGED I `\ ` ` \ ( ) f� BOUNDARY LINE T.M.P 60-�5 \ 562.43 PAVED 12,175 SF PEA TER v QDI FOR PROPERTY § I , Z Q _�( oCJ 1 \ \ ROSSER ASSOCIATES \ SLOPES TO I \ t / I D.B. 1083-5q \ REMAIN \ \ as `�. �\ \a _ m �?.\ �\ a DB. PG 20" D.B. 635-308 PILAF \ \ \ �s WOOD ' co c O V) ZONING: (HC) HIGHWAY COMMERCIAL\ � \\ \ 1, \� RAMP � z �� r 0 I�, -ENTRANCE `� USE: COMMERCIAL O FICE ENTRANCE ENTRANCE TOP-559. 6 BOX 560.03 art V= 56 °i LID �, � � , 560.03 I". E�IST. SA \ 562.40 DI C 2 B B BOX °NE I --I "INV VIA Q H ICE RAM D � Lu 0 \ \ I�z 54 S PAVED 556.34 SEWER V I= T.M. 60-25B DITdP r T. 0PIOLE W I \ \ \` ENTRANCE l LOT B CLEANOUTPT e LIGHT ~� 562.30 DI TO = 4.80 ACRES B Q UL FENCE POLE - 0 EXISTING PAVEMENT 556 97 'B GAS U_L -s._ o EXISTING LANDSCAPING EXISTING GAS EXISTING INV OUT- io'WIDENOBUILDZONE _- 1 STORY _ O z / I ` TO BE REMOVED METER BRICK, / e O ADJACENTTO BUILDING TO METER TO BE FDIC ,\ 55h.3 EASEMENT FOR FIRE 1 ATM U BE REMOVED RELOCATED WATER ul STEPS �'. i SEPARATION BLOCP.K BLDG , �..b :. 0 UTILITY - ° I DB._PG._ I ° FR'AME ? - �' U CLEANOU BOX _ C I I ' / /n MAGNOLIAS GONG -L I ENTRANCE I m AP °B,HMS LLC w Q V OVERHANG OVERHANG / T.M' 6©�25A RAMP - - - �INNTENANCE EAG WALL & BUSHES L - - - J L - - - J � S - - - - - - � ' -. - - z Of L - RETAINING SEMENT ^° �ONPNG C1 COMME CIA O EXISTING 6 PARKING C) BOLLARD 0 uANG WALL " ' '-" USE: GAS STAT) N O d"� GRAVEL GAS PUMPS � L.L / / / \',� �� EXI6TING `SANITARY SPACES TO BE -,MW iGI GHT. / / ` , 4'� REMOVED i r _ ,•. / / ` , MAGNOLIA➢ x PORTION PIPE OLEI: ° TE �EWERLATERALTOBE / 1TE CONCREa PLACED WITH NEW. ETAL b W � I � 4'� i TEFS ° ° '� k5EWER LATERAL 21° r UPGRADE O z 15" b EXISTINGTREESTO 12 PIOLE CANOPY / �/ Lu BE REMOVED I ILLOW EXISTING C N OAK k' WI L W RAMPTOB _ =I� ° • .., °oHE° Q L.1 / REMOVED .,,w WM - - OL'E °" •°oHE SI 15" EXISTING ASPHALT " _ oHE oHE SIGN GN b LLOW n FH o' FoHE o SIGN WATER PATH TO BE DEMOLIS ED a o oHE AK \� LE �- EXISTING DI SIGN o O 0 METER 0 \\ I \ \\ PA TOREIMAITR DI T B 0 oHE \CN O MANH LE yam: NfK TOP= CURB N J (TOt�68.Oj 2 -- - _/�W_ bL-_ L-PD SEALED Fi3UND 5 y 2" W -� / /------- GO n _ N� S °� 95tJ0 PEAR / W / /� / / IRON / 4.'.;' W 197.70--D M L=387.34 Sd9 S 9 SCD Sd9 SdE / W FOUND ROCK/ J �, � \TOR=566.., N71°16 00 d3 � Sd9 Sd9 - // Sd9 Sb9 � u F_ P _oHE _ _ Lu CURB &GUTTER Sd9 / U.S. ROUT / p tu S Sd9 UPDATED TO IU D IVYR A --- K _ 6q_ / /U---------- - --- N a v1 24" WATER LINE & SHOWN AS q80' WIDE ON PLAT IN D.B. 296-432 INV.- IN56 55 S�INV UT= Sd9 SV9 (D.B. 1 56�J-435) STANDARDS / i � JOB N0. 565.54 5 o S / ---I---- -/ TOP OF DROP INLET 192171 SCALE $d9 V IN=560.28 / - - EXISTING "QL - I GRAPHIC '�CAI'�' EL VATION = 555.23 SCALE IU FZOAD� - - FIF2�LINE TO BUILDING UTE 250 Y B- 296_ 432 - - - 30 o so zo / - GAS U RO 25 D_ - / 1 "=30' \ \ GAS AS ��t~QN LATERAL c - - / SHEETNO. G N IVFAETE SHOWN <\ ( IN FEET - - - \ \ - ' 1 in - 30 ft. EROSION do SEDIMENT CONTROL MEASURES: STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. STRUCTURAL PRACTICES USED IN 7741S SEC77ON CONSIST OF 774E FOLLOWING 3.01 SAFETY FENCE.., A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY THE PUBLIC. APPLICABLE TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH CAN BE CONSIDERED UNSAFE BY VIRTUE OF P07EN77AL ACCESS BY 774E PUBLIC. 3.02 CONSTRUCTION ENTRANCE A STABILIZED CONS7RUCT70N EN7RANCE LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION S17E TO REDUCE 7HE AMOUNT OF MUD MANSPOR7ED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS SHOWN ON 7HE PLANS TO REDUCE 7HE AMOUNT SEDIMENT TRANSPORTED ONTO PUBLIC ROADWAYS. 3.03 CONSTRUCTION ROAD STABILIZATION 774E TEMPORARY STABILIZATION OF ACCESS ROADS, SUBDIVISION ROADS, PARKING AREAS, AND 077-IER SITE VEHICLE TRANSPORTATION ROUTES WI7H STONE IMMEDIATELY AFTER GRADING TO REDUCE EROSION OF TEMPORARY ROADBEDS BY CONSTRUCTION TRAFFIC DURING WET WEATHER AND TO REDUCE EROSION AND SUBSEQUENT REGARDING OF PERMANENT ROADBEDS BETWEEN THE 77ME OF INITIAL GRADING AND FINAL STABILIZATION. USE WHEREVER STONE -BASE ROADS OR PARKING AREAS ARE CONSTRUCTED, WHE7HER PERMANENT OR TEMPORARY, FOR USE BY CONSTRUCTION TRAFFIC. 3.05 SILT FENCE: A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SM7HE77C FILTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPOR77NG POSTS AND ENTRENCHED, TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING 7HE SITE, AND TO DECREASE 7HE VELOCITY OF SHEET FLOWS AND LOW -TO -MODERATE LEVEL CHANNEL FLOWS 7H£ SILT FENCE BARRIERS SHALL BE INSTALLED DOWN SLOPE OF AREAS WI77-1 MINIMAL GRADES TO FILTER SEDIMENT LADEN RUNOFF FROM SHEET FLOW AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND MAINTAINED IN ACCORDANCE K17H THE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK (VESCH). 3.07 STORM DRAIN INLET PROTECTION: A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE SYSTEMS PRIOR TO PERMANENT STABILIZA 77ON OF THE DISTURBED AREA. INLET PR07EC77ON APPLIES WHERE STORM DRAIN INLETS ARE TO BE MADE OPERATIONAL BEFORE PERMANENT STABILIZATION OF 774E CORRESPONDING DISTURBED DRAINAGE AREA. 3.09 TEMPORARY DIVERSION DIKE,• A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING DISTURBED AREA. TO DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM UNPR07ECTED DISTURBED AREAS AND SLOPES TO A STABILIZED OUTLET. TO DIVERT SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT -TRAPPING FACILITY SUCH AS A SEDIMENT TRAP OR SEDIMENT BASIN. USE WHEREVER STORMWATER RUNOFF MUST BE TEMPORARILY DIVERTED TO PR07ECT DISTURBED AREAS AND SLOPES OR RETAIN SEDIMENT ON SITE DURING CONSTRUCTION. THESE STRUCTURES GENERALLY HAVE A LIFE EXPECTANCY OF 18 MONTHS OR LESS, WHICH CAN BE PROLONGED WITH PROPER MAINTENANCE. 3.11 7EMPORARY RIGHT-OF-WAY DIVERSION: A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS DISTURBED RIGHTS -OF -WAY AND SIMILAR SLOPING AREAS. TO SHORTEN THE FLOW LENGTH WITHIN A SLOPING RIGHT-OF-WAY, THEREBY REDUCING THE EROSION P07EN77AL BY DIVER77NG STORM RUNOFF TO A STABILIZED OUTLET. GENERALLY, EARTHEN DIVERSIONS ARE APPLICABLE WHERE THERE WILL BE LITTLE OR NO CONSTRUCTION TRAFFIC WITHIN 774E RIGHT-OF-WAY. GRAVEL S7RUCTURES ARE MORE APPLICABLE TO ROADS AND 07HER RIGHTS -OF -WAY WHICH ACCOMMODATE VEHICULAR 7RAFFIC. 3.13 TEMPORARY SEDIMENT TRAP: A TEMPORARY PONDING AREA FORMED BY CONSTRUCTING AN EAR7HEN EMBANKMENT WITH A STONE OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS LONG ENOUGH TO ALLOW THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. USE BELOW DIS77JRBED AREAS WHERE THE TOTAL CON7R1BU77NG DRAINAGE AREA IS LESS 774AN 3 ACRES, WHERE THE SEDIMENT TRAP WILL BE USED NO LONGER THAN 18 MONTHS, AND IT MAY BE CONSTRUCTED EITHER INDEPENDENTLY OR IN CONJUNCTION WITH A TEMPORARY DIVERSION DIKE. 3.18 OUTLET PROTECTION: STRUCTURALLY LINED APRONS OR 07HER ACCEPTABLE ENERGY DISSIPA77NG DEVICES PLACED AT THE OUTLETS OF PIPES OR PAVED CHANNEL SECTIONS TO PREVENT SCOUR AT STORMWATER OUTLETS, TO PR07ECT THE OUTLET STRUCTURE, AND TO MINIMIZE THE P07EN77AL FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND ENERGY OF CONCENTRATED STORMWATER FLOWS APPLICABLE TO THE OUTLETS OF ALL PIPES AND ENGINEERED CHANNEL SECTIONS. 319 RIPRAP: A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR STONE WITH FILTER FABRIC OR GRANULAR UNDERLINING. TO PR07ECT 7HE SOIL FROM THE EROSIVE FORCES OF CONCENMA7ED RUNOFF SLOW THE VELOCITY OF CONCENTRATED RUNOFF WHILE ENHANCING THE P07EN77AL FOR INF7LTRA770N AND TO STABILIZE SLOPES WITH SEEPAGE PROBLEMS AND OR NON -COHESIVE SOILS USE WHEREVER SOIL AND WATER INTERFACE AND THE SOIL CONDITIONS WATER TURBULENCE AND VELOCITY EXPECTED VEGETATIVE COVER ETC., ARE SUCH THAT 7HE SOIL MAY ERODE UNDER 7HE DESIGN FLOW CONDITIONS 3.31 TEMPORARY SEEDING: 7HE ESTABLISHMENT OF A TEMPORARY VEGETA7VE COVER ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS TO REDUCE EROSION AND SEDIMENTATION BY STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 30 DAYS. TO REDUCE DAMAGE FROM SEDIMENT AND RUNOFF TO DOWNSTREAM OR OFF -SITE AREAS, AND TO PROVIDE PR07EC77ON TO BARE SOILS EXPOSED DURING CONS7RUCT70N UNTIL PERMANENT VEGETATION OR OTHER EROSION CON7ROL MEASURES CAN BE ESTABLISHED. 3.32 PERMANENT STABILIZATION: 7HE ESTABLISHMENT OF PERENNIAL WGETA7VE COVER ON DISTURBED AREAS BY PLAN77NG SEED. TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS. TO PERMANEN7Y STABILIZE DISTURBED AREAS IN A MANNER THAT IS ECONOMICAL, ADAPTABLE TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE MOST APPROPRIATE PLANT MATERIALS TO IMPROVE WILDLIFE HABITAT. TO ENHANCE NATURAL BEAUTY. UPON COMPLETION OF CONS7RUCT70N ACTVTIES, ALL AREAS WILL RECEIVE A PERMANENT VEGETATIVE COVER. 3.38 TREE PRESERVATION AND PR07EC77ON.' PR07EC77ON OF DESIRABLE TREES FROM MECHANICAL OR 07HER INJURY DURING LAND DISTURBING AND CONSTRUCTION ACTIVITY. TO ENSURE 7HE SURVIVAL OF DESIRABLE TREES WHERE THEY WILL BE EFFECTIVE FOR EROSION AND SEDIMENT CONTROL, WATERSHED PR07EC770N, LANDSCAPE BEAU77F7CA77ON, DUST AND POLLUTION CONTROL, NOISE REDUCTION, SHADE AND OTHER ENVIRONMENTAL BENEF17S WHILE THE LAND IS BEING CONVERTED FROM FOREST TO URBAN -TYPE USES. APPLIES IN TREE -INHABITED AREAS SUBJECT TO LAND DISTURBING ACTIVITIES. 3.39 DUST CONTROL: REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, DEMOLITION AND CONSTRUCTION ACTIVITIES TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR HARM ANIMAL OR PLANT LIFE DUST CONTROL MEASURES SHALL BE EMPLOYED TO PREVENT SURFACE AND AIR MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES EMPLOYED SHALL BE IN ACCORDANCE K17H THE VESCH. EROSION CONTROL NOTES 1. THE PLAN APPROVING AUTHORITY MUST BE N077FIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING AC77VITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. J. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL 77MES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMI7ED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY 774E PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLAT70N OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIW77ES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLE7ON PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7.•00 AM TO 9:00 PM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR 07HER PORTION OF THE PROPERTY. 17. TEMPORARY STABILIZA77ON SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS1100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. I& PERMANENT STABILIZA77ON SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS11000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FER7LIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 957 KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNA77VES ARE SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. 19. MAINTENANCE.* ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 507 OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLEC77NG SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. 21. THE E&S INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE E&S CONTROLS AS NECESSARY IN THE FIELD AS SITE CONDITIONS CHANGE. IN ADDITION NO SEDIMENT BASIN OR TRAP CAN BE REMOVED WITHOUT WRITTEN AUTHORIZATION. SOIL DESCRIPTION 19B-MINNIEVILLE LOAM-2 TO 79 SLOPES. SOIL IS WELL DRAINED WITH A MEDIUM RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". 36C-HAYESVILLE LOAM-7 TO 159 SLOPES. SOIL IS WELL DRAINED WITH A MEDIUM RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0- 7" THICK. THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". 91 -URBAN LAND-0 TO 257 SLOPES. MEDIUM RUNOFF CLASSIFICATION. 10" DEPTH TO DENSIC MATERIAL. REFERENCE: WEB SOIL SURVEY ONLINE DATABASE, FOUND AT h t tp: //*ebsoilsurvey nres. usda. go vlappIWebSoilSurvey.aspx EROSION CONTROL NOTES ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRAC7CES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICA77ONS OF THE WRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: 7HE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPEC770N. ES-3.-ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES-4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES-5:PRIOR TO COMMENCING LAND DISTURBING AC7077ES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), 774E CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO 774E OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADD177ONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES-7.•ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING S17E DEVELOPMENT UN77L FINAL STABILIZA77ON IS ACHIEVED. ES-8.-DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED WATER FILTERING DEVICE. ES-9: 7HE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF 774E EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. DESCRIPTION OF EROSION & SEDIMENT CONTROL MEASURES: EROSION AND SEDIMENT CONTROL MEASURES: IT IS ANTICIPATED TO USE A CONSTRUCTION ENTRANCE, RIPRAP, OUTLET PROTECTION, DIVERSIONS, SEDIMENT TRAPS, AND SILT FENCES TO CONTROL SURFACE DRAINAGE. TEMPORARY SEEDING WILL BE USED IMMEDIATELY FOLLOWING ALL LAND DISTURBANCE AC77VI77ES. TEMPORARY STOCKPILE AREAS ARE NOT BE REQUIRED WITH 774IS PROPOSED DESIGN. SHOULD FIELD ADJUSTMENTS NECESSITATE A SMALL STOCKPILE AREA, IT SHALL BE DISCUSSED WITH THE ESC INSPECTOR AHEAD OF TIME. 7HE STOCKPILE WILL NEED TO BE MAINTAINED AND STORED FOR LATER SPREADING. STOCKPILE LOCA77ONS SHALL BE ON SITE AND SHALL BE STABILIZED WITH A TEMPORARY VEGETA7VE COVER. PERMANENT SEEDING WILL BE PERFORMED FOR ALL AREAS WHICH WILL NO LONGER BE EXCAVATED AND WHERE CONSTRUCTION ACTIVITIES HAVE CEASED. PERMANENT SEEDING SHALL ALSO BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR A YEAR OR MORE. SELECTION OF SEED MIXTURE WILL DEPEND ON 7HE 77ME OF YEAR APPLIED. TEMPORARY SEEDING WILL BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN SEVEN DAYS THESE AREAS SHALL BE SEEDED WITH FAST GERMINA77NG VEGETA77ON IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELEC77ON OF SEED MIXTURE WILL DEPEND ON THE 77ME OF YEAR APPLIED. 3.01 SAFETY FENCE- TO DISCOURAGE ACCESS TO A PAR77CULAR AREA. J.02 CONSTRUCTION ENTRANCE - TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. J.03 CONSTRUCTION ROAD STABILIZAT70N - TO REDUCE THE EROSION OF TEMPORARY ROADBEDS BY CONSTRUCTION TRAFFIC AND TO REDUCE THE EROSION AND SUBSEQUENT REGARDING OF PERMANENT ROADBEDS BETWEEN THE TIME OF INITIAL GRADING AND FINAL STABILIZATON. CONSTRUCTION ROAD STABILIZATION WILL BE APPLIED TO THE CONTRACTOR PARKING & STAGING AREAS AS NEEDED. 3.05 SILT FENCE- SILT FENCE IS PROPOSED WHERE SHOWN ON THE PLANS. 3.07 STORM DRAIN INLET PRO7EC7ON- INLET PR07EC77ON IS PROPOSED ON INLETS, WHERE SHOWN ON THE PLANS. 3.09 DIVERSION- PERIMETER DIVERSIONS ARE PROPOSED WHERE SHOWN ON THE PLANS TO DIRECT RUNOFF INTOA SEDIMENT TRAPPING DEVICE. J. 13 SEDIMENT TRAP - SEDIMENT TRAPS ARE PROPOSED WHERE SHOWN ON THE PLANS. 3.18 OUTLET PR07EC77ON-0U7LET PR07EC77ON IS PROPOSED AT THE OUTLET OF PIPES. 3.19 RIPRAP- RIPRAP IS PROPOSED AROUND THE EXISTING DI, WHERE NOTED. 3.32 PERMANENT SEEDING -PERMANENT SEEDING IS REQUIRED AND PROPOSED WITH THIS PLAN. 3.38 TREE PRESERVA77ON AND PROTECTION- TREE PROTECTON IS PROPOSED WITH THIS PLAN. SEE THE ESC PLAN FOR THE REQUIRED LOCATIONS. 3.39 DUST CONTROL -DUST CONTROL IS REQUIRED AND PROPOSED WITH 7741S PLAN. MAINTENANCE.• IN GENERAL, DURING CONSTRUCTION 7HE RLD OR CONTRACTOR ON -SITE WILL CHECK ALL EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH SIGNIFICANT RAINFALL. MONITORING REPORTS WILL BE REQUIRED FROM THE RLD IF NEEDED. SPECIFIC ATTENTION WILL BE GIVEN TO THE FOLLOWING ITEMS a. SEDIMENT BASINS AND/OR TRAPS WILL BE CLEANED AND MAINTAINED IN ACCORDANCE WITH 7HE VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK. b.ALL GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP THAT WILL PREVENT PROPER DRAINAGE. IF THE GRAVEL IS CLOGGED BY SEDIMENT, THE GRAVEL WILL BE REMOVED AND CLEANED, OR IT WILL BE REPLACED. c. ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHED HALF WAY TO THE TOP OF THE BARRIER. d.ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. IN CASE OF EMERGENCY, THE PRIMARY CONTACT FOR THE PROJECT WILL BE 7HE RLD OR CONTRACTOR ON -SITE. IN ADD177ON THE OWNER MAY BE CONTACTED. UPON COMPLETION OF THE PROJECT, THE OWNER WILL BE RESPONSIBLE FOR S17E MAINTENANCE. PERMEABLE PAVER NECESSARY EROSION & SEDIMENT CONTROLS VESCH SPEC. NO 7 SEC. 81 &I Necessary Erosion & Sediment Controls • All permeable pavement areas should be fully protected from sediment intrusion by silt fence or construction fencing, particularly if they are intended to infiltrate runoff. Permeable pavement areas should remain outside the limit of disturbance during construction P 9 to prevent soil compaction by heavy equipment. Permeable pavement areas should be clearly marked on a// construction documents and grading plans. To prevent soil compaction, heavy vehicular and foot traffic should be kept out of permeable pavement areas during and immediately after construction. • During construction, care should be taken to avoid tracking sediments onto any permeable pavement surface to avoid clogging. P 99. 9 An area of the site Intended ultimately to be a permeable pavement area should generally Y Y P P 9 Y not be used as the site of a temporary sediment basin. Where locating a sediment basin on P Y 9 on area intended for pavement avement is unavoidable the invert of the sediment basin P must be a minimum of 2 feet above the final design elevation of the bottom of the aggregate reservoir course. All sediment deposits in the excavated area should be careful) P Y removed prior to Installing the subbase base and surface materials. P 9 TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion 7:1 Coarse Spray 1,200 Latex Emulsion 12.51 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion (Non -Traffic) 7:1 Coarse Spray 450 Acrylic Emulsion (Traffic) 3.5:1 Coarse Spray 350 Source: Va. DSWC EROSION CONTROL NOTES do NARRATIVE PROJECT DESCRIPTION: THE PURPOSE OF THIS LAND DISTURBANCE ACTIVITY IS TO IMPROVE THE PARKING AND CIRCULA77ON AT THE EXISTING 2415 IVY ROAD BUILDING AND REDEVELOP 7HE INTERIOR COMMERCIAL USES OF THE BUILDING TO INCLUDE RESTAURANT, COMMERCIAL RETAIL, COMMERCIAL OFFICE/COMMERCIAL RETAIL, AND MANUFACTURING/PROCESSING/ASSEMBLY/FABRICA77ON USES - SEE COVER SHEET FOR DETAILED SQUARE FOOTAGES OF EACH USE. EXIS77NG EASTERN BUILDING ON PROPERTY TO REMAIN UNCHANGED. STORM DRAINAGE AND U77LITY IMPROVEMENTS ARE PROPOSED W9774 THIS PLAN. THIS PROJECT PROPOSES TO DISTURB 286 ac. OF LAND. 774E PROJECT WILL BEGIN ITS CONSTRUCTION WITH THE PROPOSED ESC MEASURES IMMEDIATELY FOLLOWING PLAN APPROVAL, WHICH IS AN77CIPA7ED TO BE IN THE SPRING OF 2021. THE WORK IS ANTICIPATED TO BE COMPLETED WITHIN 6 MONTHS AND TO CONCLUDE IN THE FALL OF 2021. EXISTING SITE CONDITIONS: THE AREA OF THE PROPOSED DEVELOPMENT IS AN EXISTING BUILDING TO REMAIN, SURROUNDED BY A LARGE IMPERVIOUS EXISTING ASPHALT PARKING AND GRAVEL AREA, AND SOME FOUNDATION PLANTINGS. THIS S17F GENERALLY SLOPES FROM THE WEST TO 774E EAST, AND FROM THE NORTH TO THE SOUTH. THE SITE IS GENERALLY FLAT AND IS WELL DRAINED. ADJACENT AREAS, THIS SITE IS BORDERED TO THE NORTH BY THE CSX TRAIN TRACKS TO THE WEST BEYOND THE WOODED HILL IS THE EXIS77NG ATLANTIC RESEARCH GROUP BUILDING AND PARKING. TO 7HE EAST ARE EXIS77NG ON -SITE BUILDINGS NOT TO BE DISTURBED, AND THE MARKET AT BELLAIR GAS STATION, AND TO 7HE SOUTH IS IVY ROAD. SILT FENCE, DIVERSIONS, SEDIMENT ]RAPS, INLET CONTROLS AND VARIOUS OTHER ESC MEASURES ARE PROPOSED TO LIMIT THE POTENTIAL FOR CONTAMINATION OF THESE ADJACENT PROPERTIES. OFFS17E LAND DISTURBANCE, OFFSITE LAND DISTURBANCE IS LIM17ED TO PUBLIC RIGHT-OF-WAY. SOILS: SEE SOIL DESCRIPTIONS ON THIS PAGE AND THE PHASE I EROSION & SEDIMENT CONTROL PLAN FOR SOIL BOUNDARIES. CRI77CAL AREAS.• THE MANAGED STEEP SLOPES AT THE WEST OF 774E S17E ARE CONSIDERED TO BE CRl77CAL. ALSO RUNNING K177-IIN THIS AREA IS AN EXIS77NG RWSA 12" VCP SANITARY SEWER LINE WHICH SHALL NOT BE DISTURBED. THE CONTRACTOR SHALL GIVE EXTRA ATTENTION AND CAUTION IN AND AROUND THESE AREAS TO ENSURE CONSTRUCTION ACTIVITY DOES NOT DISTURB THESE EXISTING FEATURES 7R£E PR07EC77ON FENCING, SILT FENCING, DIVERSIONS AND SEDIMENT TRAPPING DEVICES SHALL ALSO BE INSTALLED AS A FIRST STEP IN LAND DISTURBANCE TO ENSURE THESE CRITICAL AREAS ARE MAINTAINED. SEQUENCE OF CONSTRUCT70N. 1. CONTRACTOR SHALL N077FY THE ALBEMARLE COUNTY COMMUNITY DEVELOPMENT ENGINEERING DEPARTMENT TO SCHEDULE A PRE -CONSTRUCTION MEETING. 2. PRIOR TO DISTURBANCES, THE LIMITS OF DIS7URBANCE SHALL BE FLAGGED AND THE 7REE PROTECTION FENCING SHALL BE INSTALLED. J. NO EROSION CON7ROL MEASURES MAY BE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT 774E APPROVAL FROM THE INSPECTOR ON THE PROJECT. 4. INSTALLAT70N OF THE PROPOSED CONSTRUCTION ENTRANCE WITH RIGHT-OF-WAY DIVERSION SHALL OCCUR NEXT. THE CONTRACTOR SHALL UTILIZE THE EXIS77NG PAVEMENT AND APPLY CONSTRUCTION ROAD STABILIZATION AS NEEDED. CONTRACTOR SHALL ENSURE THE CONSTRUCTION ENTRANCE DRAINS TO AN ADEQUATE E&S MEASURE. THE CON7RACTOR SHALL UTILIZE THE NEARBY SEDIMENT TRAP FOR VEHICULAR WASH OFF. CONS7RUCT7ON EN7RANCE TO BE INSTALLED WHERE CONSTRUCTION VEHICLE ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS 7RANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTING TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 5. THE 1N177AL ESC CONSTRUCTION MEASURES, AS SHOWN ON THE PHASE l EROSION & SEDIMENT CONTROL PLAN, SHALL BE INSTALLED NEXT. 7H£ CONTRACTOR SHALL BEGIN BY INSTALLING THE PERIMETER SILT FENCE AND THE CLEAN WATER DIVERSION. THE CWD SHALL ALLOW OFFSITE RUNOFF TO CONTINUE TO CONVEY TO THE EXIS77NG STORM SEWER ON -SITE AS UPSTREAM POR77ONS OF THE STORM SEWER ARE DEMOLISHED IN LATER PHASES. THE CWD SHALL BE PROVIDED ADD177ONAL RIPRAP AT ITS OU7FALL, EXTENDING THE EXIS77NG OFFSI7E DRAINAGE RIPRAP OUMALL TO EXIS77NG DROP INLET, EX B6. PERIMETER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE AC77WTY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 6. INSTALL INLET PR07EC77ON ON THE EXISTING INLETS. INLET PROTECTION SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS SHALL BE MADE AS NEEDED. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, THE STONE MUST BE PULLED AWAY AND CLEANED AND/OR REPLACED. Z ONCE THE PERIMETER EROSION CONTROL MEASURES HAVE BEEN INSTALLED, AND THE COUNTY INSPECTOR HAS APPROVED THESE MEASURES, THE CONTRACTOR SHALL BEGIN LIGHT CLEARING. 7HE CONTRACTOR SHALL BEGIN BY CLEARING THE AREAS REQUIRED TO ACCESS THE LOCATIONS OF SEDIMENT TRAPS 1, 2, & J. FOLLOWING 774E INSTALLATION OF THESE MEASURES, THE CONTRACTOR SHALL INSTALL DIVERSION DIKES ANY REMAINING EROSION CONTROL I7EMS AS SHOWN ON THE PHASE I EROSION CONTROL PLAN SHALL ALSO BE CONSTRUCTED AT THIS TIME. 8. NOTE, THE EXISTING SIDEWALK ALONG ROUTE 250 SHALL REMAIN IN OPERATION AS LONG AS POSSIBLE IN PHASE I & /I. SAFETY FENCING SHALL PR07ECT PEDESTRIANS FROM ACCESS TO THE WORK SITE 9. ONCE ALL 774E PHASE I EROSION CONTROL ITEMS HAVE BEEN INSTALLED & ARE OPERATIONAL, DRAINAGE IS PROPERLY CONVEYED TO THESE MEASURES, AND THE ESC INSPECTOR HAS GRANTED APPROVAL, THE CONTRACTOR CAN BEGIN CLEARING THE REMAINDER OF THE SITE TEMPORARY SEEDING, PERMANENT SEEDING AND DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. 10. AFTER CLEARING THE PROPOSED AREAS, THE CONTRACTOR CAN PROCEED TO PHASE H OF THE EROSION & SEDIMENT CONTROL PLAN. THE CONTRACTOR SHALL BEGIN DEMOLITION AND ROUGH GRADING THE SITE TO 7HE CONTOURS SHOWN ON THE PHASE II EROSION & SEDIMENT CONTROL PLAN. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONS7RUC7EO AS A FIRST STEP WITH ANY LAND DISTURBANCE AC77WTY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 11. NOTE THAT THE EXISTING STORM SEWER THAT IS UTILIZED AS AN OUTFALL FOR THE EXISTING DITCH AND SEDIMENT TRAPS SHALL BE MAINTAINED IN PHASE II AS NOTED ON THE PLANS. 12. THE CONTRACTOR SHALL INSTALL ANY REMAINING EROSION CONTROL ITEMS AS SHOWN ON THE PHASE ll EROSION CONTROL PLAN. TEMPORARY SEEDING PERMANENT SEEDING AND DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. 13. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. 14. ONCE 7HE SITE IS ROUGH GRADED, THE CONTRACTOR SHALL BEGIN PHASE Ill OF THE EROSION & SEDIMENT CONTROL PLAN. SEDIMENT TRAP 1 SHALL OUTFALL WITH A NEW RISER AND BARREL, AND THE FLOOR SHALL BE LOWERED TO 554. ONCE 7HE TRAP IS APPROVED BY THE INSPECTOR, THE CONTRACTOR CAN BEGIN INSTALLATION OF THE UTILITIES CURB AND GUTTER, AND ROADS. INLET PR07EC77ON SHALL ALSO BE INSTALLED AS 774E STORM SEWER IS CONSTRUCTED. INLET PR07EC77ON SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS SHALL BE MADE AS NEEDED. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS FUNCTI/ ON THE STONE MUST BE PULLED AWAY AND CLEANED AND OR REPLACED. 15. ONCE THE INSPECTOR GIVES APPROVAL ST 2 CAN BE REMOVED AND THE STORM SEWER INSTALLATION SHALL BE COMPLETED. 16. 7HE EXISTING SIDEWALK ALONG ROUTE 250 SHALL BE DEMOLISHED WHEN PHASE 111 GRADING AND UTILITY UPGRADE OPERATIONS IN THE VICINITY OF THE SIDEWALK CAN IMMEDIATELY COMMENCE. CONSTRUCTION OF THE PROPOSED SIDEWALK ALONG ROUTE 250 SHALL BE PRIORITIZED IN PHASE Ill, IMMEDIATELY UPON COMPLETION OF THE UTILITY UPGRADES AND NECESSARY GRADING. CONTRACTOR SHALL PROVIDE NO TRESPASSING SIGNAGE ALONG THE SAFETY FENCING, AND ADDITIONAL SIGNAGE ALER77NG PEDESTRIANS OF THE CONSTRUCTION ACTIVITY AND SIDEWALK CLOSURES WHEN APPROPRIATE. 17. ONCE PHASE 111 OF CONS7RUCTI0N IS COMPLETE, THE S17E IS STABILIZED AND 7HE INSPECTOR HAS GIVEN APPROVAL, THE CONTRACTOR CAN THEN REMOVED SEDIMENT TRAP #J, AND CONVERT SEDIMENT TRAP ,41 INTO THE PROPOSED SWM FACILITY AND INSTALL THE REMAINING DRIVE AISLE, CURB AND GUTTER NORTH OF THE SWM FACILITY.. AT THIS TIME, THE CONTRACTOR CAN REMOVE THE REMAINDER OF THE EROSION & SEDIMENT CONTROL MEASURES, AND INSTALL THE PERVIOUS PAVERS. NO ITEM SHALL BE REMOVED, THROUGHOUT ALL PHASES OF CONS7RUC77ON, UNLESS 7HE UPS7REAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES PERMISSION. 18. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE WITH 7HE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 19. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED 107HIN 30 DAYS AFTER FINAL S17E STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESUL77NG FROM THE DISPOS177ON OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENT4770N. 1992 3.05 Source: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, Sherwood and Wyant Plate 3.05-2 STONE 70' MIN. CONSTRUCTION ACCESS i�r3" SM-2A ASPHALT TOP COURSE 27t 27t STONE CONSTRUCTION ACCESS � 11 '1'. 2'A AGGREGATE BASE PROFILE 2% t1. MIN.- - ASP14ALT PAVED WASHRACK 2% 12' MIN,* � 'MUST EXTEND FUEL WIDTH A t�POSITIVE DRAINAGE I TO SEDIMENT OPERATION OF INGRESS AND EGRESS { TRAPPING DEVICE ?16N EXISTING ! PAVEMENT DRAINAGE1 12' MIN POSITIVE � TRAPPING DEVICE .��17��4 :�''•�3'+`s +ZS+'s�%:4. �`h%'/S%T j'Jli%. �'+ �:.I'iF'� •' SECTION A -A A wniuman water tap of 1 nwh nni;t be u0illed with a nwim rml 1 Mich baticock shutoff eah a iyl)Kvig a wa4r hose with a chameter of 1 ' arches for adecpate constant presa'Iue Wash water must be carried awe%' from the enhance to ari approved settlum area to renio,ve seduneru .1U �ednuerit �tiaU to pret'arted fiam eritermst stone dram,. ditches or watelconi?es- PAVED WASH RACK TABLE 3.31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS "QUICK REFERENCE FOR ALL REGIONS" Rate Planting Dates 5pecies (lbs./acre) Sept. 1 - Feb. 15 50/50 Mix of Annual Ryegrass I( Qlium multi -florin & 50 - 100 Cereal (Winter) Rye (Secale cereale) Feb. 16 - Apr. 30 Annual Ryegrass 60 - 100 (Lolium multi-florum) May 1 - Aug 31 German Millet 50 (Setaria italics) GENERAL SLOPE (11 OR LESS) PER ACRE TOTAL LBS KENTUCKY 31 FESCUE 128 LBS. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP 20 LBS. SEASONAL NURSE CROP 150 LBS FEBRUARY 16 THROUGH APRIL ANNUAL RYE MAY 1 THROUGH AUGUST 15 FOXTAIL MILLET AUGUST 16 THROUGH OCTOBER ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15 WINTER RYE NOTES: 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION OF SEED APPLICATION, IN ACCORDANCE W/ VESCH STD 3.35. OPS PERMANENT SEEDING SCHEDULE NO SCALE (STD. & SPEC. 3.32 OF VIRGINIA EROSION & SEDIMENT CONTROL HANDBOOK, 3RD ED.) FILTER FABRIC ENTRENCHED 6" COMPACTED SOH, 3' MINIMUM O O _I _ -III-III III=III-III-I I= - -III III-III-III-III=III=III-III-III-III I--1 a- I - - - I - - - - - - - - - - =III 1=1 =1 1 1- III H 1 1=1 =1 1=1 =1 =1 - =111== 1=1 1 =11=1 =1 =11 f III-1 -11 I- _ - 1I I I I 1=1 I1=1 11=1 11=1 I1=1 11=1 11 I-1 I I- I= - -I =III=III=III-III=III=III- - IIII -1 II III _��_,,��r�,t DD TEMPORARY 18" DIVERSION BERM 1992 3.38 Source: Va. DSWC Plate 3.38-2 Lic. No. 035791 01/11/21 14 0 N n 0 w z a o J o F a k z LU m Z'n wp U) O J OZ O {CQ uu O j ^ Z O tn> w K U H W a >w III LU w W c� .` w N � o �. . � lJ ti ® ce) M im O N ® 4 I N O N N W > LJ J U) w L9O z3: WI Y w F- Ul U) LU LU L.1_ IIIIIIIIIIIIIIIIIIIIIIIIIII C0 JLU r� 0/ L Q J O O _. N 0 6 0 � a- c G 0 /^/ 1 > V 0 0 m o / 3 0 0 0 W0 `J > / C z _° LJ.J _ `o NQN o L 1. e M m O � 0 J Q o w Z L J° LUO�/ � ` Q L L_ `o o Z `0 O0 J ° UL 3 HI U Z 10. LU0 0 LU 2 ` 5 ° o LU ' ) U W o o U ` 0 Z z w O w 0! z_ VJ z O z w 0� 0z NN z 0. J 0 w II I ° Ln 0 r_1 > N a U (V w J U ~ LU O w c� _ a- In JOB NO. 192171 SCALE N/A SHEET NO. 3 CLEAN WATER DIVERSION TO PROTECT SITE \ \ \ \ WORK AREA- CWD SHALL ALLOW OFFSITE \ \ I LEGEND: I \ \ SANITARY \ �SILTFEN STOCKPILE •� \ ` \ \ SEWER \ \ ` PT PROPANE TANK \, SEIZED IF LEFT UNDISTURBED -� \ � � � \ \ \ \\ fl POR�OVER7DAYS�_-- S SIGN \\ \ \ �SMT. \ O"£ \ o - - - - TELEPHONE BOX \ UL UTILNY LID \\ \ -1 T7Q) \ A � � � � � a, � \ ` (� � � WM TE� w1ETER \ \ WV WA VALVE \ TEMP. \ \ 595a': "E �fl �� \\ / YH YARD GRANT \ OIYSTR. \ V A \ v v v v S%T. A \ \ SOIL 569a =1 TP PROPOSEDTREE� �� CSX vv // \v OVERP+-tTILITY LINE -- - v \\ vrN (D. 2Q06 \ \ �� ass PROTECTION v nl \ 36C���FFNCING ENCE \V A o \\ \ \ 56975 SOIL I j 5S8 0� — \�R� R�9T/off v� �\ GUA AIL o XISTI G 12 SA V PS NIT Y V A \ A.91 ,� o"E 8��AG/�O /�� A / A Fi^ \ /� a H \ SE R SHALL N \ \ 'I fx AREA O STING \ \pp� \ I m "a _ \ T r/ w \ \ BE DI URBE \\ \\ v F x x-x X x FaAVEv(vIENTT�6 ` \ \C�CC & - \ \ \ CONCRETE \ m f \ w \ \ EMOVED e \. \2 \\\\ �_ — — — — —— - I \ 0 Ul O — °" 6\46gOM\ S� I� GRAVEL \ \ \ O ~ z > Z o \ \\ \ \ EXISTING FENCE \''q \ \ \ \ Vl U ENCLOSURE AREA °"E 'F \ \ '■■' w \ \ Y \ \ TO BE REMOVED APAVEMENT V A ° EXISTING EDAR- �� \ V < v A Ln LIGHTPOLE AND 111 -_ \ \ \ \ \ \ \ \ W > '• OVERHEAD POWEP NW IN= \ \ \ \ \ D \ ° BE REMOVED '.`\6 PROPo3€ 1 MANAGED SLOPES \ \ - - \ \ \ \ \ \ Ice \ TOP 578 50 \ � SE[31MENT�RQP#3 I \ IV v T.M. 60-24 \ UNIVERSITY OF VIRGIN(\ �UNDATION - i EXISTING STORM T \ �REMANJSHALL DB. 5184, PC.13 \ \ _ CON SITE �` \ EXISTINGGATETO 'ZONING: `R -\ h EXISTING STOR _ \ DRAINAGE USE:, RUR'A RESMEME V A \ '\ P BEUNINSTALLE�� \ \ VA TO BE DEMOLISHE 6 0<: ..°.. `'.. /, XI I TOP TO BE \ PROPOSED LOWERED P ,..56o.7o TO C_ a77 XIS \ \ p \ SEDIMENT TRAP -i A �IPRA�� S59J5 TO ALLOW POSITIVE \ PHASE I DA z o AC %;�, U SHALL B ENDED / \\V 3 , � / DRAINAGE FROM TRAP `�-�, � \� TO EXISTING D �� \ XISTINGMANAEED 1n EXISTING STORM TO SLOPES TO REMAIN- -A, \ \ \ \ \ \ \ \ I \ \ \ \ •S' ,r �•,, REMAIN SHALL \\\IROId /EXISTING BUILDING fl \ \ \ I, CONVEY SEDIMENT i \ - 'FBI / SHALL BE PROTECTED \ 000, TRAP OUTFLOW -� \ \\ ON \\ \ \ \ TOP=581.9 \\ \\ �.\ \ LIOG IP �; �\ e"-- WITHRISI EP F \ \ \ V=578.8 \ \ \•;\:, GRA'VFL L IP \ ,. r ` - SENG DI RING \ - i�5i — \\ TE: �A T (4) SPACES DO NOT W S EXl57C GGRAVEL COUNT TOWARD OVERALL PARKING TOF- EX B6 �' / - \ AREAT BE B $ I i F7 9.5C IP REMO D FOR \ - 0 r - ---- - D ✓50L O lF fl - _ _ PE`20 O ED � IMPROVEMENTS \ F, '� ----- \ \ \ ENTRANCE PROPOSEDIU \ \J \ \ \ EXISTING STORM x EXISTING BUILDING I ENTRANC 562.35 SF S 14 \ S 63.50 I' CIP SHALL BE PROTECTED 562.42 EXIS ING STORM T SILT FENCE C) DI q\ °"E \ IN BE SE III DEMOLISHED I WITH RIPRAP RING ON REMAIN SHALL \ \ \ \ IN PHASE III I I� � � '.I V�5 8.� \\ \ \ \\\ \\\ SOUTH SIDE OF LIMITS OF PROPOSED CONVEY SEDIMENT `\\` EXISTING DI & SILT DISTURBANCE 2.86 ac. fRAP OUTFLOW L _ \ \ \ \ I ( ) 1 STORY FEcE° \ \ \ FENCE cP, a o e — \\ \ 1 \ \ ROPO ED TREE \ \ I I I I° /. ST�ICCO �NRETE ° -\ \ PROTE ION \ \ \ TREE 1' { EASEMENT c & BOCK =q CS� / \ FENCI G \ \ \\ \ I MILD Nq� z (5,25\ SF) DECK TR I : I� ROACHMEMT c e < 91j 1 \ \ \ I EXISTING GRAVEL °• .B. 919- 65) I \ `Sp�R / \ \Nil\\ \ \ AREA TO BE I s ` \ FRAME - WALL \ fl Tq- \ \ / \ I REMOVED ENTRANCE I \ \ r/ON \\ \ \\ 563 75 I 562.43 0 \ BLDG. - \ 9„ INVIN= \ \ \ /Ivc \\� \ WILLOW fNV'IN= 555.3 ENTRANCE .DI e \ \ \ 1 \ .. ,. I s5d.a CONC. p / \ \\ ENTR 560.06\ POLE ` \\\ / I SF PROPOSED I 560.07 CASINGS / \ \ � 0 \ \ I SILT FENCE \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\\ \ \ \\ \ I I I III I \ / I DI TOP �I PLA TE/ FRAME ENTRANCE PLANTER NTkANCE 559.80 N DItE /B /LDG. 5(28,60 SF) 6V 0.07 TRIPLE E N \ 4 7 ?KR 1 STORY o' /�J ° \METAL FRP r / o BLDG. \ BRICK DI m \ ENTRANCE RAMPS EXISTINGI ALLOW DITCH ADJACENT TO 562. N \ \ - Il / \\ MANAGED \ \\\ \ y I \ I I J3, (12,175 SF LA TER BUILDING TO REMAIN AVEp ) NEW BOUNDARY T.M.P 60-�5 I p ROSSER ASSOCIATES SLOPESTO \ I OPERATIONAL IN PHASES I & II I �' _ LINE FOR ! / ) I D.B. 1083-5V \ \ \ 1\\ WHILE DEMOLITION & ROUGH I �: ��PROPERTY /20O D.B. 635-308 LAT \ I REMAIN I \ \ \� \ I GRADING IN PROGRESS -� o /' "E / ZONE G:HC \ �, 7 _-ENTRANCE I� ( ) HIGHWAY CMMERCIAL\ � � � � V � IP -- . ENTRANCE' ik i59 0 ° :BOX LID ICE )USE: COMMERCIAL OffICE \\\\ \ I ENTRANCE PROPOSEbSEDIMENT 56003 560.03 NVI V- 56 m - - )JV 562.40 IN 556 a H PAVE \\ \ \ TRAP � - BOX E IST. SAN\ •\ \5F\ l \1i I I PHASE i DA. o.6o AC. 596 3 SEWER T.M. 60-25B DI TOP= T OUGHT LOCATIONOF ENTRANCE 1 I LOT B 559,69 ) POL' LEAN UT POLE I 562.30 4.80 ACRES l g OL UL;, #FENCE I PORT\ -POTTIES - : _ r( 1 STORY .. \ EXISTING LANDSCAPING EXISTING GAS LOCATION OF TUT`_-- �,_ _ METER ( BRICK, ADJACENT TO BUILDING TO =3 INVOU ATM METERTOBE RAIN O,A,,: / - BLOCK BLDG BE REMOVED ,,° RELOCATED EXISTING STzSTONEWEIR E i', ( FR_AME ° OVERHANG MAGNOLIAS - OVERHAN FDCCLEANOU 0 F-vu oTroM556.s II ENTRANCE -� ) ° AP 1 .1_. y . ��a,. •, , og mg eB H� BUSHES L - - - - - - J - - M _ _ --� I J D:°B. PROPOSED '\ \ = RIGHT OF WAY DIVERSION LOCATION OF YH. ° ���;' RETAINING � °: �oNrNC:- DIVERSION D \ / W+J' CONTRACTOR TO MAINTAIN G GRA VFI CONSTRUCTION PARKIN'GL °' .l•.,ISEI / \ 4" MAGNOLIA UTI TY ExlsrwG ON Ex. Gti GHT GAS PUMPS .° \ \ \ ING SANITARY ''LE .°° °: ° ,. :CONCi / DIKE \ \ ER POSITIVE SLOPE & STAGING EPLACI �S SEWER NEW BEIREMOVEDEST� 1...., �EMOVEpTT - _ -� CANOPY E LATERAL TO BE D B X SPHALT ETAL TO " li �� TEPS ° i LIGH1� TP / POLE f \SEDIMENT TRAP( 8 / / / DRAINAGE DIVIDE MANH l (TYP.) TO-= "7 D - -(L40 SEALED 2. IRO If., eNC ROCK / ha -'_E_ I - - —oHE INU. IN SI �565.54 --- -- - ___-- - GAS— d9 _---- __— — --- \\ FAs� — ;COTT/R. Cr'LLINSZ Lic. No. 035791 01/11/21 Aj \11 � CWD RUNOFF TO CONTINUE TO CONVEY TO ~� \ EXISTINGSTORMSEWERASUPSTREAM `\\�� II AP AIR PUMP \\ IRWR \ - _ PORTIONS OF EXISTING STORM SEWER ARE -o - - - - - , I B BOLL RD \ - - DEMOLISHED IN PHASE I, II, & III ESC. y \ OU�1D \ )� \ ` CONTRACTOR SI�-ALLMODIFYTHE GRADE TO A \� I CO CLEA( OUT 1 \ \ MAINTAIN POSITIVE SLOP�ALONGCWD. 20 �� I DI DROP INLET / \ \ fl �� \ FC FILLER( CAP Pr#tOP--O ED DRAINAGE \ y \ \ FH FIRE HYDRANT �\\\ _ I \ \ \ \ GM GAS METER \ Ow \ \ - - - \ \ P LIGHT POLE - � SOILS fl PROPOSED STOCKPILE v \ _ �� H MANHOL 1 -- - �/ MONTIOR�NG WELL / \ 20� \ �\ "e LIVE \La-ATION, SURROUNDED BY \ \ < - _ P POLE O / - \ \ 15 W.,L jW \ � OA I;EX : PAy cy DUMPS 3 Sd9% v v d9 � Sd9 v n WATER LINE & LIMITS OF PROPOS 24E _ - - d EX. ASPHALT WALK 9 Sd9 SAFETY (D.B. 156p-435)Al �_ �� 3 S �� FENCE ADJACENTT PROPOSED SIL 1— - - _/ V IN=560.28 AEXIS _ EXISTING' OL - - - - l INV.IN=560.1 // 250 (EVY R01,) 32SF FENCE ADJACENT_ -FIRE-LFNETOBUILDING I u���AT D g• 296 _ - - TUftbUTE 250 - - 3 vv HOWN Ag LATERAL&METE > ( IN FEET ) I inch = 30 ft. 4 ° . ° GN n OH < .. ITV LE ° OHE SIGN S `,,y .OHE • • .. SIGN SIGN• _O dF-1''�' A FENCEADJACENT OSIGN O P= EXISTING SWK CURB \ JS� SV9 P S 9 SV"D SV9 --- �FNCF -Z ---- � llv"'= 3 12'x7O' MIN.) w/ ONSITE WASH U.S. R 6GBADIENT4=RQM-R/-W _ _ _ _ _ SHOWN AS 80'-WIDE (UTILIZE EXISTING PAVEMENT 'AVE UPON ESC PH III V) TOP OF DROP INLET IF EVATION = 555.23 / IN PLAT IN D.B. 296-432 ti w N C4 Qom. .. w 0') N N Lu � fil 0, Z LLI Lu CO JLu Of JOf r< V O O (] N u 1 z w LU U) O Lu z 0- Lu p J � Q z � O W Lu � z Oo Lu 0 z cl■ O li LU Ni N JOB NO. 192171 SCALE 1 "=30' SHEET NO. 4 CLEAN WATER DIVERSION TO PROTECT SITE \ \ \ \ \ \ WORK AREA -CWDSHALL ALLOW OFFSITE \ \ I \ \ V v TH CWD RUNOFF TO CONTINUE TO CONVEY TO \ — _ — \ EXISTING STORM SEWER AS UPSTREAM~ _ — — -PORTIONS OF EXISTING STORM SEWER ARE \ DEMOLISHED IN PHASE I, II, & III ESC. y \ \ \ CONTRACTOR SI�-A'LLMODIFY THE GRADE TO A \ \ \ \ MAINTAIN POSITIVE SLOP�ALONG CWD. 1- \ \ \ I 1 \ PROPOSED DRAINAGE \ \ \ \ \ 06.85 ` \ DIVIDE (TYP.) ONEJv \ (I PROPOSED STOCKPILE 20� �\ \ \ \ \ LOCATION, SURROUNDED BY SCOTT R. LLINS�Z U Lic. No. 035791 01/11/21 o��SSIONAL E�GN SANITARY \ \ \SILTFEN E:STOCKPILETOBE •0 \ \ - \ \ ` SEEQED IF LEFT UNDISTURBED SEWER v SMT. \ AV� v \ �� fl FOR.OVER7DAYS, —— \ \ (D.B706\\ \ \ °NE �� -178 ON,STR. \ \ SNLT. A \ v 5 TP PROPOSED TREES v v v / V v vv vV v nC�i D. 2\706 \ PROTECTION- 0 --FENCING XIP SANITz,� Y SA A \V 6 .7 �RO� �� A V \V / \ SE RSHALL N\�\\\ �\\ \ \\ \ \ w \ BE DI URBE \� \ \ ` —x—x—x—x—x—x—x)` C \ \ I U \ \ \ \ \ ------ I \ \ O z a z \ I \ \ o Z s>�� \ \ \ \ u > Z = \ ` , \ \ \ Vw/ w o \\ \\ EDAR ��` \\ \\ \\ \ \ < �\ \\�\\ \ W uwi \Y�IN6 vvv vv� \\ \\ \\ vim\ \\ 5 \\ TOP=D8 .0 \\ \\ , \ \ / POL \ V=577�.s EXINF,RM STOTO \ \\\\� \ \ PROPOSED \ \ \ \ \ \ \ \ \ \ \ \ \ \ -- \ REMAIN SHALL \ 3 / \ \ / CONVEY OFFSITE - °HE ENTTR.3 # \\ \ \ _, DRAINAGE \ `\ \ P RPzDA-o.6AC 563.0 / RAP\\ \ \��Xr \\ �\ \ \ \\ OPOSED N \ \ I vT SE IMENTTRAP#z \ \ \ \ a \ \✓ \ \ IPRA�� \ \ PH E z DA=z.z AC v \ SHALL BE ENDED \ \\ / \ // Z� \ \ 76 `S/>' \ \ \` \TO EXISTING DI E�TING STORM TO \ 000 \ \ ( �56y`\/� \ REMAIN SHALL �.� \ / / \ G- \ \ \ \ \ \ \ \\ \ ` 5 .z5 CONVEY SEDIMENT \ �� \ \ ��' / SHALL E PROTECTED40 \ \ \ \ \ \ \ \ \ \ W ) ,�/° - \ �\ WITH RIPRAP RING ON \ y TRAP OUTFLOW ,d, / \ \ \\ \ \ TOP=581.9 \ \ \\ , \ \ 1 ` ` :,... , IP IP,\�. -"" - - — SOUTH SIDE OF V A V=578.8 \ IP E ING DI \V A A A - TE: �A T 14) SPACES DO NOT v V_ - IP EX B6 \ Lu V_ rOUNT TOWARD OVERALL PARKING M � — v c fl v PROPOSED 6�° SFS�i �X�x�/\,%v �� N VJ 1� EXIS INGSTORMT DI 5 V GIP OP- / \ \ REMAIN SHALL ' I� \\ \ \ \\ \\\ \ \ I LIMITS OF PROPOSED CONVEY SEDIMENT I I r \ \ \ \ DISTURBANCE (2.86 ac.) TRAP OUTFLOW FILcE \ \ ROPO D TREE ry\ \ \ PROTE ION CD OI--I \ FENCI G0')U..� w \` \ \\ \ \ I I I °NE1 \ \ \ N /•� U) • fl \ Q \\ 563.7 / NVIN= \ // \ \ \ i O INS' iN 555.3 \ / D1 °eE \ \ \ \ \ J 554.8� V I // POLE S3 vv fl vv Ld W 1 \ \ \ \ \ \\ SF PROPOSED / / 3 4 6 S2, \ } \ \ J \ \ \ SILT FENCE / DI 00" / \ > Z DI TOP W Q / `°HE S) 62 j i \\ \ \ \0000 \ \ \ I o 56.93 / \ \ \ \ \ II 444"///, w Q w \ �6' .�DI �' °e L9 0 L.L O \ \ \ \ I ALLOW DITCH ADJACENT TO I I J J \ \ \ \ \ I ( \ \\\ \ \ 1 I BUILDING TO REMAIN \ \ \ I \ I \ I \ \ OPERATIONAL IN PHASES I & II 1 Q DI Q WHILE DEMOLITION & ROUGH GRADING IN PROGRESS o To i� .' TOP_559. 6 ° \\ \ \ \ I PROPOSED SEDIMENT IP 4 - Vv 56 /6 1 m IN F� 1lll �V..� TRAP #2 55634 DI °sE V PHASE z DA. o.58AC. / �I DITOP I- ___,0 W '55 Lu LOCATION OF / / I I \� `• �� I PORTA-POTTIES 17FENCE o 1 ems:_ _ I --I NGAUGELOCATIO F �u 1= RA _ e . INUD ul ST2STONE WEIR - I I ' ° ' > ��\— W BOTTOM 556.8 , I o T �2 W 0 MLr)Z Lu < _ _ o... e OF WAY DIVERSION LOCATION OF L ° �++ ' • e / // /' / / ( \\ R�✓ CONTRACTORTOMAINTAIN CONSTRUCTION�IPARKING �IGIJ :°1 e ',•' "°" CO L.L O POSITIVE SLOPE I II !T 'a o ")&G ON E�C. SPHALT� V) �/� 3 \ PEDESTRIAN `°- O e•> w V / ACCESS, ACROSS ' "' n : e •i �': e — L.L.. �� O / \ I TP �2 „ k ENTRANCE, �oHE OL oHE eSIGN . SI� � --- PSIGN SE—DIM—EN—T —TRA'P\ V) WAGS_: ..... DWUAELINGTS I .. 'aSIGNS d 9- -SI-GO _N— /,- C�) tp= FENCEADJACENT DRAINAGE DIVIDE EXISTING SWK N(TYP.) LLED WA �5S9 7F 4 -LAK QPl 7 °UMP N w d9 �OHE Sd9 Sd9 3 u r - 5 Sd9 NCB 12'x70' MIN. w/ ONSITE WASH - - - / _ - Sd9 WATER LINE & LIMITS OF PROPOSE DIENTR9M/NA - - - - - - - - - - - - - a Ln 24 , — d ANCE (2.86 ac.) DIVERSION (UTILIZE EXISTING PAVEMENT JOB No. S6 55 S� Sd9 D.B. 1 56(J-435) - 5 FOR CE REPAVE UPON ESC PH IIIN V. I92I7I SAFETY _ _ _ _ _ _ / - - - - - - - 565.54 5 S PROPOSED SILT -I- - - - - UT= / � / A EXIS SF _ �iASF�iI—RETAIN-ESC Epp / / / J / FENCEADJACETIT_ GRAYt1TIALE — Sd9 V IN=560.28 SCALE - - - - - - - - - - - - - - —��— — $d9 NVIN=560.1 - - - - - - TO-OUTE 250 SIDEWALK TO MAINT 30 0 6o 12o / 1 T "=30' GAS / — / GAS RQUTE-250, DEM _ — — — — / — — — _ —SID ST < J — SHEET NO. MEASURE OF PHASE II \ ( IN FEET) ' - _ _ - _ - - - _ 5 1 inch = 30 ft. ' CLEAN WATER DIVERSION TO PROTECT SITE \ \ \ \ \ \ \ WORK AREA - CWD SHALL ALLOW OFFSITE \ \ \ \ \ \ rrH ( \\ \\\ CWD RUNOFF TO CONTINUE TO CONVEY TO EXISTING STORM SEWER AS UPSTREAM \ _ - - - - - \ -PORTIONS OF EXISTING STORM SEWER ARE DEMOLISHED IN PHASE I, II, & III ESC. y \ \ \ I \ \ CONTRACTOR SI�-ALLMODIFY THE GRADE TO A \ \ \ _ MAINTAIN POSITIVE SLOPE -ALONG CWD. Zo / \ R=2962.75 �3 v A L 62.755 PROPCtED DRAINAGE DIVIDE(TYP.) °NE --------- ---\ I \ \ \ A v v A \ PROPOSED STOCKPILE \ \ \ 20� \ �\ d- _ _ \ \LOCATION, SURROUNDED BY SCOTT R. LLINS�Z CU Lic. No. 035791 01/11/21 o��SSIONAL ��G1 SANITARY \ �SILT FEN �.5TOCKPILETOBE •0 \ SEWER \ -�- SEEIZED IF LEFT UNDISTURBED SMT. \ \ \� F®R OVER7 DAYS-., _ - - \ \ \ \ Sediment Trap #1 Pipe 0uttall Design rlcORe 3.29.2 (D. B.\ 2706 \ \ \ \\ O"E - - ` \ \ PIPE RISER SEDIMENT TRAP -1 \� EX STIN R - _ ` �� \ \ \ \ \ drainage area (acres) (<3) 2.57 \ \ VC P _ ° _ S z \ \ \ ` 4DIMENT TRAP FLOOR -TO BE L ERED TO 554 IN E IiI�SC, trap volumes: OEMP. \ \\ LINE\ ® \ PROPOSED STR 12 RISER'tO.DRAIN IN PHASE III 4 QPE \ , \ elevation (ft) area (so volume(cf) ,�"E cx °" n°""°` a AIV' \ / STANDPIPE RISER WITH TRASkRACK. RIS RIM AT ELEV. 5 �\ \ 554.00 183 0.0 oEsmx xicx w" EN o SNLT. \ \ ` - - - �'' _ _ Tp PROPOSED TREE \ \ hs-M. S OPM ELL J n.,.v (D. 2706 \ �I PROTECTION / 6" ORIFICE AT 558.5 & 24" BARREL AT ELEVA N 557.19 SEE\ �\ \ \\ 556.00 927 37.6 \ \ / SWM FOR DRY RETENTION BASIN DESIGN SPECS. FENCING \ "N \ / \ \ 558.00 2170 149.1 THE LOWER PORTION OF PROPOSED STR 12 (RISER) SHALL BE \ M asEw QESf o _li W \ 560.00 3677 3632 < INSTALLED WITH SEDIMENT TRAP '1'. THIS ILL REMAIN WHEN TH cn""rz"«c a"°cE w I R \ \ TEMPORARY SEDIMENT TRAP IS CONVERTED TD A PERMANENT \ 561.00 4515 514.E 100 W. RT/ "a wn s,owu EIFI""°" z Q XISTI G 1z" SA \ \ '/ x�'r. I I// \\ \ \ / wv s+w"aE ... "®' .... \ /� FACILITY. THE UPPER PORTION OF STR 12 SHALL BE INSTALLED IN P SA NIT Y \ `\ x I ` �- _ �' SEGMENTED RINGS. THE SEGMENTED RINGS WILL ACCOMMODATE / 562.00 5410 6982 ux.n Q SE R SHALL N \ \ .�.I \ "\\\r F(F \ \ \ \ THE ESC'S TEMPORARY RISER AND WILL BE REMOVED & REPLACED \ \ 562.25 5643 749.3 uaiexr wuwur uw"nox f Z BE DI URBE \� '- '- -x CT \ ` \ WITH NEW SEGMENTED RINGS FOR THE SWM FACILITY'S RISER. THE \ (eox a wEr srcucE) ounF* w \ R/ wet storage: rm Ecnox c I f �j 7 \ \ ESC RISER SHALL HAVE A RIM ELEVATION OF 560.2\5', AND HAVE A 6" ��� , r. MC w j 0 \ \ 4q \ REP• OF CURB, GUTTER, & (Q �' PO \ \ DEWATERING ORIFICE INVERT ELEVATION AT 558.59', AND A TRASH wet storage required (cy) (67*DA) 172.2 Z o 0 AVEMENT SHALL NOT BE 'o \ .'+e � � \'e �F � \ � - lmCR AND -A RiSfR$ASE MEETING MINIMUM VESCH 3.14 \ dewatering orifice (ft) 558.5 O z � � NSTALLED UNTIL SITE IS �` _ .262 R CO REQUIREMENTS. SEE SWIM PLANS FOR DETAILS OF THE TRASH RACK \ \ wet storage provided at this elevation (co 202.6 0 Z AND ST1 CAN F 46R Mpq & THE DESIGN OF THE PERMANENT SWM RISER, ANDAISER BASE. slope of wet storage sides 3:1 design high water (ft) 561.25 H z � \ OPOSED LIMP \� \ B VERTED TO DRY/ n/Y 0, \ rw w .. 0 \ \ ® F \ \ cleanout elevation (ft) 557.19 top of dam elevation (ft) 562.25 V) U 0 ALLOW PON NG AT \ T ELATION" BASIN PER $ ONE SFM \ \ \ \ wet storage provided at cleanout c 33*DA 103.9 riser diameter (in) 48 H w \ \ I PROTE D v �� SWM PLANS FV \ \ \ g P (� ( ) barrel diameter In 24 \ pph v ` \ \ STOR EWER \�� \\ \ \ - CEDAR \ \ \ \ \ \ \\ dry storage: barrel length (ft)( ) 35.63 - / �� ti \ \ dry storage required (cy) (67*DA) 172.2 barrel slope 0.50% > riser crest (ft) 56025 top width of dam (ft) 10 D � dry storage provided at this elevation (co 1984.bottom trap dimensions 10'x36' \ TOP= 82.0 ` ',.'. ` slope of dry storage sides 3:1 bottom of dam elevation (ft) 554.0 S I \\� \ PROPOED \ v / v v� - V ` + '• oNE� SEDIMENT TRAP #g \ \ HA V V '. ': �. 'f� •i _': � RIP V �v � � / � -- ` \•. `\ ', \\ , \ '� � I7 � � RAP \ � \ �� \ � � � \ .--i - v v / V ` v PROPOSED : Q ,`; A XIS IPRA�� v > \ \/ / /< \\ `�••• ` TRAP #i 68 \ \ \ SHALL BE 'ENDED - SEDIMENT \ / - T - - - T}iFSE- DA-% AC TO EXISTING DI \ \ V A / F� `v nP4 i) (1.36 ac. OVERLAND,-- / 1.22 ac PIPED) V A voll/l/ EXISTING BUILDING6z,go_ 7./S/SHALL BE PROTECTE� WITHRIPRAPRINGON '/ - -"- - - e� SOUTH SIDE OF \ \ \ \\ TOP577RR \ \ I .'....' I\ _ - - _ -NOTE: LAST (4) SPACES DO NOT \ _ _- \ / � � \ / %�\ \\ `\ � °• \ \\ \ -. %; � ,,, I \ _../ �` _. -__ COUNT TOWARD OVERALL PARKING � � \ \ \ \ \ - - � ^ G V A V A 91 \ L9 E PROPOSED X 'r. X v` v v N V) A V A v SILT FENCE 4 '°tie v v fl v v v_ M - \ \ \ \ , • \ \ 56� LIMITS OF PROPOSED 1 \ \ \ \ \ \ DISTURBANCE (2.86 ac.) FENCE \ r ROPO DTREE \ \ \ ice\ z PR OTE ION \ � \ ••• ° ' I \ \ _ _ ^� ° t \ FIE G \ \ \\ \ l O� \ \ \\ I �a e < N W I �,1 1 PROPO ED SUMP A \ I A --- v v■ Q Q \\ TO OW NDI A \ \ ! INVIN= / DI O V A \ 555.3 \ INLET PRO ECTED , \ •• I wr \ \ ` STORM S ER \\ \\ \`� \� \ I \ / / DI ° E \ POLE S3 \ fl \ LU J \ \ \ \ \ \ I SF PROPOSED w 1 \ \ \ V � \ �v 1 V , z SILT FENCE - / �I _ �� F v v / v v v - z 62 \ O� v fl i Q c 26 - P= 9.7 Uj Q J d m ' O J � -°NE. vvvv O \ J C2 \ \ I \ PROPOSED SUMP Q DI Q \ \ I \ I TO ALLOW PONDING AT PROPOSE D SEDIMENT / \ INLET PROTECTED TRAP#zl P 1 U O STORM SEWER PHASE30A.o� 8AC. IP �� / 14� TOP-559. 6 I o ! A A 1 \ a V= 56 m r �J v v I TnT , IN �a � ��� W L _ l DI TOP I O LU z / / / / A I \ /� (\ I \ ••I vv vi�v IP LOCATION OF 0 5596�; ('S..' - Q° y FENCE LU / / \ \ '••\ . PORTA-POTTIES (PROPOSED ,v vv `v (. �I LOCATION OF F, \� V juI- / / ( D ••� v ' I 2� RAIN GAUGE 4.3 .,.. INV0UT-i / ° _ _ p, . (� U 0 / DIVERSION _ " VO T1 _ Q Ul ..ST2STONEWEIR DIKE ° m °° �°°�•� LU w BOTTOM 556.8 V, LLI m0 ° ° 0 Nm J --- - /-_ -_ 7�65.54 5 S GAS GAS RIGHTOF AYDIVERSION LOCATION NOTION ` ° •° e e _ cn p� z CONTRACTOR TO MAINTAIN 'PARKING POSITIVE SLOPE �� -`- & STAGING ON E�C.'I - - SPHALT :J ---ul W° . /v / A FENCEADIACENTT SF PROPOSED SILT ---I--- GR,A�Ir11'8"LALE v IN=560.28 / FENCE AD]ACEp1T_ - - - - - INV.IN=560.1 - - - TO -ROUTE 2250 30 0 60 120 / < _- - - - -- / ( IN FEET I inch = 30 ft. SCALE 1 rr=30' SHEET NO. 6 SEDIMENT 1 SCALE: 1"=2 SEDIMENT TRA SCALE: 1"=20' ENTRANCE 562.30 f0 I r CONC S \/ERHANG CLEAN OUT oyF \ \ \ \ °yF \ \W 563.0 5b .25 \ W EXISTINN'G BUILDING SHALL BE PROTECTED WITH RI RAP RING ON SOUTH SIDE 0� EXISTING DI \ ' \ I W RIPRAP OUTFALL WEIR (15.4'Lx8TWx2.35'D) EXISTING DI TOP TO BE LOWERED FROM 560.7 TO ��D 559.75 TO ALLOW POSITIVE DRAINAGE FROM TRAP C/ICC 1811 x . WILL W W 0 A ., . SEDII AN v v � SCALE: 1''=20' \ \ EXISTING STORM TO ` W REMAIN SHALL °yF �� Ci2.Lx OUTFACE WEIR CONVEY OFFSITE DRAINAGE \ \ (z'TL\xza'wxrD) \S WALL \ RAP �\ _ \ F EXISTING STORM TO REMAIN SHALL CONVEY SEDIMENT \ TRAP OUTFLOW D IN= NE \\ IF, A IP W I TUF B U B ° o 59.5C CQNC DI P- TQ5 I V 0 U ° ° 58.89 5 5.5 0 6"WLA TIC FNTRANC'F Sediment Trap 1 design drainage area (acres) (<3) 2.57 Y� ` trap volumes: ORCR11 CREST OF STONE WEIR CRO N0 YMO,DLE` elevation (ft) area (sf) volume(cy) ELEv. 557.19 1624 0.0 ,.o• 558.00 2170 56.7 DRY STORAGE - q VR ff 560.00 3677 270.8 561.00 4515 422.3 WET STORAGE ` 562.00 5410 605.8 (ExCAw,TD) 562.25 5643 657.0 FILTER CLOTH omuuAL wet storage: wet storage required (cy) (67*DA) 172.2 -ME PLATE 3.13-1 COARSE LCCREWIE" CUSS I RIPWP bottom of stone weir (ft) 560.00 wet storage provided at this elevation (cy) 270.8 slope of wet storage sides 31 weir length (ft) (6xDA) 15.4 dry storage: bottom of trap elevation (ft) 557.19 dry storage required (cy) (67*DA) 1722 bottom trap dimensions: 29'69' crest of stone weir 56125 top of dam elevation (ft) 56225 dry storage provided at this elevation (cy) 197.4 top width of dam (ft) 25 slope of dry storage sides 3-1 top trap dimensions 60k130' Sediment Trap 2 design drainage area (acres) (<3) 0.6 trap volumes: elevation (ft) area (sf) volume(cy) 554.00 244 0.0 555.00 443 12.5 557.00 876 60.5 558.00 1148 97.9 559.00 1444 1458 wet storage: wet storage required (cy) (67*DA) bottom of stone weir (ft) wet storage provided at this elevation (cy) slope of wet storage sides dry storage: dry storage required (cy) (67*DA) crest of stone weir dry storage provided at this elevation (cy) slope of dry storage sides ORIGINAL CREST OF STONE WEIR GROUND \ ELW.. DRY STORAGE WET STORAGE (E%GYATEOJ 40.2 wet storage: wet storage required (cy) (67*DA) bottom of stone weir (ft) wet storage provided at this elevation (cy) slope of wet storage sides dry storage: dry storage required (cy) (67*DA) crest of stone weir dry storage provided at this elevation (cy) slope of dry storage sides ORIGINAL CREST OF STONE WEIR GROUND \ ELW.. DRY STORAGE WET STORAGE (E%GYATEOJ 40.2 -ME PLATE 113-1 556.8 43.2 2:1 weir length (ft) (6xDA) bottom of trap elevation (ft) 40.2 bottom trap dimensions: 558.0 top of dam elevation (ft) 54.7 top width of dam (ft) 2:1 top trap dimensions Sediment Trap 3 design drainage area (acres)(<3) 0.36 trap volumes: elevation (ft) area (sf) volume(cy) 558.50 609 0.0 559.50 862 27.1 560.50 1142 64.1 561.50 1446 111.9 wet storage: wet storage required (cy) (67*DA) bottom of stone weir (ft) wet storage provided at this elevation (cy) slope of wet storage sides dry storage: dry storage required (cy) (67*DA) crest of stone weir dry storage provided at this elevation (cy) slope of dry storage sides a VONDLE' Ll1:L 1 FILTER CLOTH ORIGHAL G Ho CLLV. COARSE hGGREWTE" CIASS I RIPRAP ■ ORCEUL CREST OF STONE WEIR LwNIAHi CROUND .EV. ELF/. \ DRY STORAGE WET STORAGE (C=wED) 24.1 -SEE PLATE 3.13-1 559.5 27.1 2:1 weir length (ft) (6xDA) bottom of trap elevation (ft) 24.1 bottom trap dimensions: 560.5 top of dam elevation (ft) 37.0 top width of dam (ft) 21 top trap dimensions 3.6 554 7'x 33' 559 2 275E 55' vARIIlAT' �• Sl1K \ � FILTER CLOM GmcIHAL c W.o ttE V COARSE .AGGREGATE" GLASS I RpRAP 2.2 557.5 13'x51' 561.5 2 25'x62' TRAP PHASE I PHASE II PHASE III ST1 2.30 ac. 2.17 ac. 2.57 ac. ST2 0.60 ac. 0.58 ac. 0.58 ac. ST3 0.36 ac. 0.36 ac. 0.12 ac. iCOTT/R. Cr�LLINSZ Lic. No. 035791 01/11/21 Aj 0 N n .1 0 w r Z ao O � H a � Z w Z0 u=j 0 O Z O j Z o U H 3� w W ce W N \ Q ti .ti Lr ti M 0- co 0) N U\) M / � 1 N z rn W _j J Q W>oo - J > 2:J W J LLI C LU oC O L9 OJ 0� J Q z L U O W W z Y � z LLI H � W � O 0 UlC COU zLL1 Q C6 � p z CO p J U-)LU > o J�~w CD r1 O O o N N U 1- JOB NO. 192171 SCALE 1 11=20' SHEET NO. 7 / Pre -Development Impervious Areas- Water Quality \� \ \ \ \ \ \ ) / Z \ PRE;-ReDEVELOPMENT / / \ \ \ \ \ \_ / POST- ReDEVELOPMENT / \SCALE 1"=100' / / / / (Defined by the Limits of Disturbance) \ \ \ \ / / / / / / Post -Development Impervious Areas- Water Quality(1L)Lic. TH Q < V / / i - A \ V / / ( \ SCALE 1"=100' / / _ ��' / / _ Existing Dirt Parking 1,636 sf \ \ \ \ \ / ( \ I \ \ (Defined by the Limits of Disturbance) ExistingGravel Parkin 43,277 sf \\� \ I \ \ \ \ / / / / - ' Proposed Asphalt Parking & Circulation 63,484 sf Existing Concrete Parking 2,920 sf I \ \ \ / Pro osed Concrete Loadin Area 2,900 sfI\ P g R. LLIN.Existing Asphalt Parking 23,224 sf / / / \ \ / / - - Proposed Concrete Sidewalk 5,936 sf_VV No. 035791Existing Sidewalk 2,008 sf / / \ Public Road 7,549 sf / / \ \ \\\-,Public Road 6,823 sf \ 1/11/21 80,614 sf / / \ �� \ \--- -/ / /// \\ 79,143 sf p��SS g P - - / - - Overall Net Change in Impervious Area -1,471 sf �� \ \ / / / - \ \ \ \ \ - / / / . �� \ \ / / / - \ \ (Within the Proposed Limits of Disturbance) Z \\\ \\ // \ \ \ \ N . �7F / - - OFFSITE R�II OFF THfCTEYPA SES •� / \ \ \ O / A \ -PROPOSED DRAINAGE PIPE CONVE ♦ \� \ \ /�- \ J/ \\ ♦ / \ \ \ \ ♦ \�� \ \- ♦ \ w -�1� \\ \\ \\ \ - (-� \ \\ \ =\rrE ua EASA&B \\�\- --.1.\ \\ II \\ \ \ - \ z a 1 \ \ m I ) \ �' I \ _ ONSITE SUBAREAS USED ONSITE SUBAREAS USED - \ `�FORSHANNELANB- \ �� \ \� \\ \\1 \�� " FOR_CHANNELANO- FLOOD PROTECTION \ \� �\ \ \ \ \ \ \ \ \ \ \ - - - \ ) \ I / _ -�. _ •� FLOOD PROTECTION \ \� �\, \ \ \ \ \ w -ANALYSIS, TYP. O / \`� \ �\ \ \ \ \ f \per IMPERVIOUS • i� NG \V€RT\ \\ \ \ I / , • \\� \ �\ \ \ \ \ ( \ \"\ \ \ \ • J E`X NG \V€RT\ \ \ \ O Z 0 CoN FF-�- ( \ L I\ �� \ \�\\ \ . / CONVF FF-�- \ F Z OF OUT O \` ""�- `+a, \ TRA LWAY� RUNOF TH Y ES \ \ I C F OF OUT T O \ �\ RUNOF T Y ES \\ \ r ; - �Y"' ONSITE UBARE \ \ ` - \ \ SUBARE & \ \ "Z" O \\ . ) A \ / \\r� I \\ \ TH R S \V �' V� ONSITE \ A - V U \ �VI9 E .SEE SDP �p2 - `' - �'� OP�SED LIMITS OF DISTU NC 2.86ac.), v v A \ / \ \ VIA E B 2 - ,� O SED LIMITS OF DISTU NC 2.86ac.), v v \ V A A\ �0R $t1P�AR A I TI (V�✓ �O {;'� " ' �.,„� Q V - - - - - - \ E WA CITY ANA - - - - S1=WER�COM T T ri ti.: F x s . .� \ USEDOR WATER QUALITY) I \v A A A 0R / / V� V US D'FOR WATER QUA \� w I V A v v A �ax c E STING - J A ✓ v 1 S1 WER COM T T \ v v v v i A V v �a�� /' V A V y ASPHALT w \�/ I 100' OF OLF w/ A ELEV.=6' 100' OF OLF w/ A ELEV.=6' tea-- \ \ ���\ \ \ ' �• _ _ 10' OF CONC. FLOW w/ A ELEV.=t'. �\• / \' . s:. \�' '.. t \ ^ \\\ \ \ \ \ ` s, I 10' 65'OF COF CHNLO FLOW 5t ft/s �• \ ... ---- �\ 340' OF CHNL FLOW ® 5t ft s A OUTFAC4 v A v \\ \ ♦ \\ r-- \\ I \ fj _ \rF --- -- .° EXISTING I i4 i EXISTING DEVELOPMENT DEVELOPMENT TO REMAIN ■� / ( \ V AA� V A ■■�AA� ♦�\ ■ \\ v� C eq \ \ V A NO PROPOSED CHANGES TO i - / / ��.- V A \ 6 / /� A A A \ NO PROPOSED CHANGES TO THE BUILDING FOOTPRINT i� / ! /l 1 �, \ fl / / / / TWO PRE-TREATMENT CELLS ARE \ THE BUILDING FOOTPRINT o I \ fl / ■ ■ ■ r / \ 1 . \ / ■ ■ ■ slip INTERCONNECTED HYDRAULICALLY WITH - /,STING POINT OF WATER QUANTITY ANALYSIS. / / / THE PROPOSED DRY DETENTION BASIN • -� _ = POINT OF WATER QUANTITY ANALYSIS. YCH 1 - °" THE PROPOSED DEVELOPMENT's / / / / VIA THE DRAINAGE PIPES. FACILITY I • - °" THE PROPOSED DEVELOPMENT's / i _ = \ - / / RUNOFF TO OUTFALL'A'. I e I SUBAREAS ULTIMATELY DRAIN TO THIS / / // /- / 9. \ / / \y ' _ • PROPOSED &LEXIS EXISTING DRAINAGE PIPES. / // / / s� _ `� RELEASES RUNG, \ ( ' / I EXISTING PIPE VIA A SYSTEM OF EXISTING PIPE VIA A SYSTEM OF � - / / \ \ \ `/ \ \ /p / / / / / • _ _ ^ - / \ /- \ `/ \ /p �! PROPOSED & EXISTING DRAINAGE PIPES. / J / / s9� - i /i / / q/ / // i / / \ • �_ \ \� ONSITE D ' v o-^� 't I - - / / \ -� / / �s'� - \ \ i�� / q / i A -�-• _ _- -_... ____ - (�U�T - 0.5 CIN\ � sue\ L9 0i) - - - _ _ _--- - /--- t IVY Rp - --- -- ----7 / - - �' - - --- AD / -__ -- ----7 , _---- - OF OF OLF w/ A ELEV.=6- -i -W -- J - --- N 1 100' OF OLF w/ A ELEV.-6' �- Pre -Development Impervous Area Su / - - - - 18 C FLOW - -- - - - W w A ELEV.=6' - - I -- - - 21C OF CONC. FLOW w/ A ELEV.=12' \�, _ -- / I _ - - - = 0 0 \ - r Summary CONC. - - Onsite DAA Impervous Area Summary - - _ _ - = / 2 CHNL FLOW ®St ft,'- Onsite _ - - ONSITE DA B _ = 0 0.58 ac. Onsite Dirt Parking 1,500 sf - ` \ - - ' - - - - - CN=88 Post -Development Imperious Area Summary Tc=o r. Onsite DA AI i Onsite Gravel Parking 40,825 sf \ \ \ / _ _ _ _ _ / / j� Imperious Area Summary Onsite Concrete 500 sf / / / \ j � ; -, �-_- � i / _ � / I / / / Onsite Building 13,900 sf (V p / / / v v - v / / Proposed Pavement 35650 sf OnsiteAs halt 5,425 sf ,�- � � � , � \ / /' / / � Onsite Building 13,900 sf / - - / / r \ - -' Proposed Concrete 2775 sf (V / \ \ WATERSHED SUMMARY Offsite Impervious Areas 11,750 sf I \ \ WATERSHED SUMM ARY Offsite Impervious Areas 11,750 sf N CN Area, 1-year Flow, 2-year Flow, 10-year Flow, 73,900 sf - ' ' J - _ � \ � - - Area, 1-year Flow, 2-year Flow, 10-year Flow, 64,075 sf ac. cfs cfs cfs Onsite DA A Imperious Area Summary / - / / I CN ac. cfs cfs cfs Onsite DA B Imperious Area Summary > - - - Onsite DA (Pre-Dev.) 87 3.09 8.67 11.41 19.95 Onsite Concrete 1,100 sf - I I - Onsite DA (Post-Dev.) 88 3.09 5.40 8.44 15.03 Proposed Concrete Sidewalk (incl. Pavers) 6,398 sf Onsite DA B (Pre-Dev.) 81 0.58 1.22 1.68 3.17 Onsite Dirt Parking 136 sf l / I _ Onsite DA B (Post-Dev.) 88 0.58 1.72 2.24 3.87 Proposed Asphalt 5,230 sf J 86 3.67 9.89 13.09 23.12 1,236 sf - / / _ - - 88 3.67 7.12 10.68 18.90 11,628 sf J �.COUNTY OF ALBEMARLE Department of Community Developmen t Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: 1. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, culvert/pipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide sealed computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted casements with dead book references labeled Facilities and drainage must be within platted easements. Provide copies of recorded documents. 11. Guardrail, fences or other safety provisions - Display the constructed location of all safety provisions; fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material layers - biofilter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Biofrlter media must be an approved state mix. 13. Access roads - show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. STORMWATER MANAGEMENT NARRATIVE: OVERALL SUMMARY: GENERAL SWM NOTES: THE PROPOSED STORMWATER MANAGEMENT PLAN COMPLIES WITH PART IIB MINIMUM REQUIREMENTS. THE STORMWATER RUNOFF RATES, VOLUMES, z. STATE APPROVED TRASH RACKS SHALL BE INSTALLED ON ALL ORIFICE OPENINGS. SEE SHEET 9, OR EQUIVALENT, FOR DETAILS. AND VELOCITIES RESULTING FROM THIS ReDEVELOPMENT WILL BE IMPROVED PRIOR TO EXITING THE PROJECT. PLEASE SEE THE ATTACHED z. CONCRETE FOUNDATIONS SHALL BE INSTALLED ON ALL RISER STRUCTURES MEETING MINIMUM VESCH .z 3 4 SPECIFICATIONS. . CONTRACTOR SHALL HIRE A THIRD PARTY GEOTECHNICAL ENGINEER TO ENSURE THE EMBANKMENTS IMPOUNDING WATER ARE STRUCTURALLY STORMWATER MANAGEMENT CALCULATIONS PACKET FOR EVIDENCE OF THIS COMPLIANCE AND THIS SHEET FOR ADDITIONAL SUMMARIES. THE 3 PROJECT UTILIZES A DRY DETENTION BASIN WITH PRE-TREATMENT CELLS IN CONJUNCTION WITH AN OVERALL REDUCED IMPERVIOUS AREA IN THE SOUND THIS INCLUDES THE SUBGRADE LOCATED AROUND THE DETENTION BASIN LOCATED BENEATH THE PARKING LOT. ALL EXISTING AND POST -DEVELOPMENT STATE, FOR STORMWATER QUANTITY COMPLIANCE. THE PROJECT UTILIZES PERMEABLE PAVERS AND A NUTRIENT CREDIT PURCHASE PROPOSED FILL MATERIAL AND PROPOSED CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE FOR STORMWATER QUALITY COMPLIANCE. CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS, AND PRESENT DURING THE CORE SAMPLING. 4. THE DOWNSTREAM EMBANKMENT SIDE SLOPES OF ALL PERMANENT FACILITIES SHALL HAVE A MAXIMUM 3:1 SLOPE. STORMWATER QUALITY SUMMARY: S. CONTRACTOR SHALL EXCAVATE SEDIMENT LADEN MATERIAL IN THE ESC SEDIMENT TRAPPING DEVICE AT THE TIME OF THE FACILITY'S CONVERSION EQUALS TH QUALITY AREA BOUNDARY E TO A PERMANENT SWM FACILITY. AT SUCH TIME THE CONTRACTOR SHALL REGRADE THE SEDIMENT TRAPPING DEVICE TO THE PROPOSED GRADES THE VRRM SPREADSHEET FOR ReDEVELOPMENTS WAS USED FOR THIS PROJECT AND THE STORMWATER E EROSION Q Q & SEDIMENT CONTROL LIMITS OF DISTURBANCE BOUNDARY. THIS REDEVELOPMENT PROJECT REQUIRES A TOTAL PHOSPHOROUS REMOVAL OF RATE 0.86 SHOWN ON THE SWM SHEETS. THE CONTRACTOR SHALL MINIMIZE SOIL COMPACTION DURING THE CONVERSIONS. Imo. THE REMOVAL OF A PORTION OF THIS REQUIRED PHOSPHOROUS LOADING IS MET THROUGH THE BEST MANAGEMENT PRACTICE OF A LEVEL I PERMEABLE PAVEMENT PARKING LOT. SUBAREA'DA B' IS TREATED VIA THE LEVEL I PERMEABLE PAVEMENT. THE PROPOSED PERMEABLE PAVERS GENERATE A PHOSPHOROUS REMOVAL RATE OF 0.34 Ib r. THE REMAINING 0.52 Ib r PHOSPHOROUS REMOVAL WILL BE MET VIA A NUTRIENT CREDIT PURCHASE. STORMWATER QUANTITY SUMMARY: 570 570 CURRENTLY THE EXISTING SITE AREA FLOWS OFFSITE UNTREATED. THE EXISTING SITE WITHIN THE LIMITS OF DISTURBANCE CONSISTS OF A LARGE General Construction notes for Stormwater Manaaement Plans 1. All dams and constructed fill to be within 95% of maximum dry density P and 2% of optimum moisture content. All fill material to be approved b a eotechnical engineer. A eotechnical engineer is to PP Y 9 9 9 9 be resent during construction of dams. P 9 2. Pipe and riser joints are to be watertight within stormwater Management facilities. 3. For temporary sediment traps or basins which are to be converted to permanent stormwater management facilities; conversion is not to take place until the site is stabilized, and permission has been obtained from the erosion control inspector. PROPOSED DRY DETENTION BASIN DETAIL BUILDING, SPRAWLING GRAVEL PARKING AREA AND A PAVED TRAVELWAY. THE PROPOSED PLAN WILL MAINTAIN THE EXISTING BUILDING, REMOVE THE EXISTIN SCALE: 1"=20' GRAVEL AREA AND RECONFIGURE THE SITE TO PROVIDE ASPHALT TRAVELWAYS AND PARKING WHILE DECREASING THE SITE's OVERALL IMPERVIOUS GRADE 100- r PEAK WSE=56L25 C v AREA. 10-yr PEAK WSE=559,85 THE PROPOSED ReDEVELOPMENT CREATES TWO CONCENTRATED OUTFALLS, THESE ARE DENOTED ON THIS SHEET AS OUTFALL W AND OUTFALL'B'. 2-yr PEAK WSE=559.66 TOP OF DRY DETENTION \ GENTLY SLOPED DRIVE' �h'P - BASIN ELEV.= 6z.z 'TYP. OUTFACE 'A' RELEASES RUNOFF FROM ONSITE SUBAREA 'A' AND OUTFALL'B' RELEASES RUNOFF FROM ONSITE SUBAREA 'B'. BOTH OUTALLS 'A' AND 'B' 1-yr PEAK WSE-559.54 5 5, � �/ � -. AISLE CROSS SLOPE & 6" DRAIN TO THE POINT OF ANALYSIS VIA A SERIES OF DOWNSTREAM MANHOLES AND DRAINAGE PIPES. CONTRACTOR SHALL - _ - CURB TO SERVE AS INSTALL SAFETY MEASURE ABOVE THE VAST MAJORITY OF THE PROPOSED PARKING LOT IMPROVEMENTS ARE LOCATED WITHIN ONSITE DA W IN THE POST-ReDEVELOPMENT STATE. THIS EMBANKMENT IN % !� DRY DETENTION BASIN RUNOFF IS ATTENUATED IN THE DRY DETENTION BASIN AND ITS TWO INTERCONNECTED PRE-TREATMENT CELLS. FOR THE PURPOSES OF THIS i ACCORDANCE w/ THE ANALYSIS, ONSITE SUBAREA'B' DOES NOT RECEIVE ATTENUATION. THE TWO SUBAREAS' PEAK FLOWS WERE SUMMED AND ANALYZED FOR CHANNEL AND PROPOSED BASIN's FLOOR SHALL DESIGNS SHOWN ON i FLOOD PROTECTION COMPLIANCE. CHANNEL PROTECTION REQUIREMENTS ARE MET FOR THIS PROJECT VIA 9VAC25-870-66, SUBSECTION B.3.a (ENERGY PRBE OPOSED BASIOPED 's FLOOR DRAIN SHALLO THE �' SHEET 9. Oti, BALANCE). FLOOD PROTECTION COMPLIANCE FOR THIS PROJECT IS MET VIA 9VAC25-870-66, SUBSECTION C.22.b (10-YR POST FLOW < 10-YEAR PRE RISER o. %MIN. WITH POSITIVE ' M DbU \ - \ CURB CUT (TYP.) TO PROVIDE FLOW). CHANNEL AND FLOOD PROTECTION COMPLIANCE IS ACHIEVED PRIMARILY THROUGH THE OVERALL REDUCTION IN IMPERVIOUS AREAS & THE i 5 ) O STORMWATER INFLOW TO POND SLOPES THROUGHOUT. TO PREVENT FLOTATION THE RISER / ATTENUATION IN THE DRY DETENTION BASIN &ITS PRE-TREATMENT CELLS. BASE SHALL BE FIRMLY EMBEDDED 6" \ � 8 � STORMWATER MANAGEMENT FACILITY GRADING P )POSE 11 INTO AN 18" THICK REINFORCED \ FADE CONCRETE FOUNDATION THAT IS 8'x8' \ \ Southern Pre -Treatment Cell Northern Pre -Treatment Cell STR. 12 A 048" HDPE STANDPIPE WITH A 11 Elevation (ft) Area of Contours (sf) Volume (cf) 557.19 272 0 558.00 549 326 559.00 1,017 1,097 560.00 1,624 2,406 561.00 2,318 4,367 562.00 3,068 7,051 562.25 3,260 7,842 Dry Detention Basin Elevation (ft) Area of Contours (sf) Volume (cf) 557.19 0 558.00 0 559.00 - 0 560.00 11 0 561.00 60 32 562.00 332 210 562.25 - - Elevation (ft) Area of Contours (sf) Volume (cf) 557.19 0 558.00 - 0 559.00 123 0 560.00 348 226 561.00 685 733 562.00 1117 1,625 562.25 - - Total Facilitv Geometry Elevation (ft) Area of Contours (sf) Volume (cf) 557.19 272 0 558.00 549 0 559.00 1,140 0 560.00 1,983 0 561.00 3,063 0 562.00 4,517 3,767 562.25 3,260 4,734 TRASHRACK TO SERVE AS THE RISER. RISER SHALL BE SET IN THE PROPOSED REINFORCED CONCRETE 555 PROPOSED BASIN's FLOOR FOUNDATION. 048" STANDPIPE TO HAVE A RIM SHALL BE SLOPED TO DRAIN / ELEVATION OF 559.45' & TO INCLUDE (1) ONE 35.63 LF OF TO THE RISER (0.5% MIN.) WITH < 24" HDPE BARREL PERMANENT 012" LOW -FLOW ORIFICE WITH AN 24' HDPE @ 0,50% POSITIVE SLOPES THROUGHOUT. - INV. AT STR.12= 557.19 \ INVERT ELEV.=557.19. ALL ORIFICE OPENINGS ( \ \- SHALL HAVE STATE APPROVED TRASHRACKS, TO PREVENT FLOTATION THE RISER BASE SHALL BE STIR 12 - 48" HDPE STANDPIPE TYPICAL. SEE THE DETAILS ON SHEET 9, OR FIRMLY EMBEDDED 6" INTO AN i8" THICK SEE THIS SHEET FOR \SCALED - W/ TRASH RACK EQUIVALENT, FOR ADDITIONAL INFORMATION. REINFORCED CONCRETE FOUNDATION THAT IS 8'x8'. 11, PROFILES OF THE DETENTION .c RIM=559.45 (u a J _J M W W (U L7 L7 U-) U-)to Ul W L� 0+00 0+50 1+00 1+25 DETENTION BASIN CROSS SECTION PROFILE SCALES 1"=5' (V) 1"=50'(H) U) W H O J Q A6_ _ U WY F_ Ul ^ NW rr� U) J �WN L if 0 C) JQ C) N U w J L o w of Lr) JOB NO. 192171 SCALE AS SHOWN SHEET NO. 8 DRY DETENTION BASIN CONSTRUCTION NOTES: FACILITY PLANTING SPECIFICATIONS: 1. THE DETENTION BASIN SHALL HAVE TURF GROUND COVER SUCH AS GRASS OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. LANDSCAPING BEYOND THIS IS OPTIONAL AND IS NOT REQUIRED. 2. THE PROPOSED INTERIOR SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 4:1, OR 3:1 IF SAFETY BENCHES ARE PROVIDED AT THE TOP OF THE FACILITY, TO REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES SHALL BE GRADED TO PROVIDE POSITIVE DRAINAGE AT ALL TIMES TO THE RISER STRUCTURE. 3. WOODY VEGETATION SHALL NOT BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE OF THE EMBANKMENT NOR WITHIN 25 FEET OF THE PRINCIPAL SPILLWAY STRUCTURE. 4. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS, TO ENSURE STABILITY THE DENSITY OF THESE COMPACTED SOILS CAN BE SO GREAT THAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR BALL -AND -BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK. 5. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY RECOMMENDED AS A MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS. CONTRACTOR REQUIREMENTS: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS. 2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION. THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE SPECIFICATIONS MANUAL (COPIES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VIRGINIA NURSERYMEN'S ASSOCIATION, INC. AND THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS). ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF COLLINS ENGINEERING PRIOR TO THE CORRESPONDING CONSTRUCTION ACTIVITY. 3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE SOO, WASHINGTON, DC 20005. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN. 5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY AT 1-800-552-7001 BEFORE ANY EXCAVATION). 6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION. 7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES. 8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF THE STOCK. CONTAINER GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE GROWN. 9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED. 10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLYTO HOLD ITS SOIL. CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED. 11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL. 12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE INSPECTOR INITIALLY, AND THEN THE DESIGNER. 13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS (EX: ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE APPROVED BY THE DESIGNER. 14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN. 15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR ROOT MASS, WITHOUT CRAMPING ROOTSTOCK. 16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90°%CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR. 17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS. 18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM FIRE OR OTHER ACTIVITIES BEYOND THE CONTRACTOR's CONTROL. FACILITY CONSTRUCTION 1. DETENTION BASINS MAY SERVE AS SEDIMENT BASINS AND/OR TRAPS DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHALL BE BASED ON THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENTS VS. STORMWATER TREATMENT REQUIREMENTS). INSTALLATION OF THE PERMANENT RISER SHALL BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHALL BE SET WITH FINAL CLEANOUT OF THE SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION POND IN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT DISCHARGE OF TURBULENT WATERS WHEN THE BASIN IS BEING CONVERTED TO AN DETENTION BASIN. 2. THE DETENTION BASIN SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE PROPOSED POND SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE. MODIFICATIONS SHALL BE MADE TO THE RISER, ORIFICES AND BARRELS AS REQUIRED SO THAT THEY ARE CONSISTENT WITH THE FINAL CONSTRUCTION SPECIFICATIONS. 3. THE CONTRACTOR SHALL ASSEMBLE CONSTRUCTION MATERIALS ON -SITE, MAKING SURE THEY MEET DESIGN SPECIFICATIONS AND ARE PREPARED AT STAGING AREAS WHEN POSSIBLE. 4. THE CONTRACTOR SHALL CLEAR AND STRIP THE PROJECT AREA IF REQUIRED TO THE DESIRED SUB -GRADE. 5. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES. ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS, OR OTHER APPROVED METHODS OF SOIL STABILIZATION. 6. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE DURING THE ESC PHASE. 7. CONTRACTOR SHALL ALSO INSTALLTHE RISER, OUTFLOW STRUCTURE AND/OR THE BARREL(s) WITH PERMANENT COLLARS DURING THE ESC PHASE. CONTRACTOR SHALL ENSURE THE TOP INVERT OF THE OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION. 8. THE CONTRACTOR SHALL CONSTRUCT THE EMBANKMENT AND ANY INTERNAL BERMS IN 8-TO 12-INCH LIFTS, COMPACTION SHALL BE COMPLETED IN LIFTS WITH APPROPRIATE EQUIPMENT. THE CONTRACTOR SHALL ALSO ADHERE TO THE CLAY LINER SPECIFICATIONS OUTLINED IN TABLE 14.4 BELOW: Table 14.4. Clay Liner SpecmcaBons Property Test Method Unit Specification Permeability ASTM D-2434 CnI 1 x 10 Plasticity Index of Clay ASTM D-4231424 % Not less than 15 Liquid Limit of Clay ASTM D-2216 % Not less than 30 Clay Panicles Passing ASTM D-422 % Not less than 30 Clay Compaction ASTM D-2216 % 95% of standard proctor dens- source- vir Inia stormuater Mara em HandooD6 19ri 9 9em i 1 9. UPON COMPLETION OF THE EMBANKMENT GRADING THE CONTRACTOR SHALL EXCAVATE GRADE UNTIL THE APPROPRIATE ELEVATION AND DESIRED CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN. 10. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS. 11. THE CONTRACTOR SHALL THEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP -RAP APRON PROTECTION IF APPLICABLE. 12. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW. 13. THE CONTRACTOR SHALL THEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS, IF APPLICABLE. FACILITY MAINTENANCE: MAINTENANCE OF THE DETENTION BASIN IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION, AND THE OWNER THEREAFTER: 1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN. 2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANY TREES AND SHRUBS PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE. 3. INSPECTTHE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING. 4. INSPECTTHE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY. 5. INSPECT BASIN OUTFALL CHANNEL FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, etc. 6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES. 7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS AS APPLICABLE FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION OR OTHER FAILURES. 8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE OPENED AND OPERATED. 9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING. 10. OWNER OR CONTRACTOR SHALL MAKE NEEDED REPAIRS IMMEDIATELY. FACILITY INSPECTION: MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASIN(s) ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR WITH THE ENGINEER AND INSPECTOR DURING THE FOLLOWING STAGES OF THE DETENTION BASIN's CONSTRUCTION PROCESS: 1. PRE -CONSTRUCTION MEETING 2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS) 3. EXCAVATION/GRADING (e.g., INTERIM/FINAL ELEVATIONS) 4. INSTALLATION OF THE EMBANKMENT, THE RISER/PRIMARY SPILLWAY, AND THE OUTLET STRUCTURE(s). 4. DETENTION BASIN INSTALLATION (e.g., INTERIM AND FINAL ELEVATIONS) 5. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT/DIRECTING IFAPPLICABLE) 6. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE) PERMEABLE PAVER INSTALLATION GENERAL NOTES: 1. EACH LAYER/LIFT OF NO. 2 AND NO. 57 STONE REQUIRES A MINIMUM CENTRIFUGAL FORCE COMPACTION OF 53,000. 2. CONSTRUCTION &PREPARATION OF PERMEABLE PAVERS STONE BASE AND UNDERDRAIN SYSTEM SHALL BE IN ACCORDANCE w/ MANUFACTURER SPECIFICATIONS. 3. CONTRACTOR SHALL CONDUCT A GEOTECHNICAL INVESTIGATION OF THE SOIL UNDERNEATH THE PROPOSED PAVERS AFTER FINAL GRADE HAS BEEN ACHIEVED TO DETERMINE THE INFILTRATION AND CBR RATINGS. CONTRACTOR SHALL PROVIDE THE ENGINEER WITH THESE RESULTS PRIOR TO ORDERING AND INSTALLATION OF THE STONE BASE FOR THE PERMEABLE PAVERS 0 TO ENSURE AN ADEQUATE DESIGN. IF A CBR RATIO OF THE PAVERS UNDERLYING SOILS IS LESS THAN 4 /o THEN THE CONTRACTOR SHALL COMPACT THE SOIL TO AT LEAST 95% OF STANDARD PROCTOR DENSITY. 4. ALL OPEN GRADED STONE LAYERS SHALL BE CLEAN & DOUBLE WASHED IN ACCORDANCE WITH DEQ REGULATIONS. "GLEAM' STONE IS SCREENED TO SIZE AND THE BULK OF THE FINES/DUST IS REMOVED, BUT THERE IS STILL DUST ON THE STONE. "WASHED" STONE IS WASHED THROUGH THE SCREENING PROCESS AND/OR MANUALLY WASHED. S. WHERE UNDERDRAIN CLEANOUTS ARE PROPOSED WITHIN PAVED AREAS & ARE SUBJECT TO VEHICULAR TRAFFIC, CLEANOUTS SHALL BE ENCASED IN 018" CONCRETE PAD FOR THE UPPER 24". THE CLEANOUT FRAME & LID SHALL BE CONSTRUCTED OF CAST IRON, OR A SIMILAR MATERIAL THAT IS STRUCTURALLY FORTIFIED. 6. THE PERMEABLE PAVERS' STONE BASE SHALL HAVE A FILTER FABRIC UNDERLAYMENT BENEATH IT. UNDERLAYMENT SHALL BE CAPABLE OF PASSING RUNOFF THROUGH IT TO ALLOW FOR ADEQUATE INFILTRATION. CONTRACTOR SHALL WORK CLOSELY WITH THE UNDERLAYMENT's MANUFACTURER ENSURING THE SELECTED MATERIAL IS SUFFICIENT AND ALL CONSTRUCTION REQUIREMENTS ARE MET. 7. THE PERMEABLE PAVER STONE BED SHALL INCLUDE 4" UNDERDRAINS, AS SHOWN, WITH 1% MIN. WITH POSITIVE DRAINAGE. FIGURE 7.4 SITE -SPECIFIC NOTES: 1. THE 'PERMEABLE JOINT MATERIAL' SHALL BE VDOT #8, #89 OR #9 AGGREGATE IN THE OPENINGS BETWEEN THE PAVERS. 2. THE 'OPEN -GRADED BEDDING COURSE' SHALL BE 2" THICK VDOT #8 AGGREGATE. 3. THE 'OPEN -GRADED BASE RESERVOIR' SHALL BE 4" THICK VDOT #57 CLEAN STONE. RESERVOIR TO BE CRUSHED AGGREGATE. 4. THE 'OPEN -GRADED SUBBASE RESERVOIR' SHALL BE 9" THICK VDOT #2 CLEAN STONE. RESERVOIR TO BE CRUSHED AGGREGATE. 5. THE 'GEOTEXTILE UNDER SUBBASE' SHALL BE TENSAR TX-5 TRIANGULAR GRID, OR EQUIVALENT. 6. THE 'UNDERDRAIN' SHALL BE 4" PERFORATED RIGID PVC WITH A MINIMUM 1% SLOPE. NOTE, UNDERDRAINS LOCATED OUTSIDE OF THE PERMEABLE PAVERS SHALL BE RIGID NON -PERFORATED PVC PIPES WITH A MINIMUM 1% SLOPE. THE UNDERDRAINS SHALL HAVE A 12" DEEP x 24" WIDE STONE INFILTRATION SUMP LOCATED BENEATH THE PIPE. ,,­ Concrete Pavers Piarmenhlp .Joint Material -Open-graded Bedding Course -. p r,=� Open -graded Base Reservoir - Open -graded Subbase I► Reservoir -- Underdrain (as required) Optional Geotextile Under Subbase Uncompacted Subgrade Soil Figure 7.3. Typical Detail (Source: Smith. 2009) Permeable Pavement Suave Hater' Beideg Layer (as cirected ty inwu`acurer) / / Reservar Layer, Tabe i.2 � Perforated Underdra 1. Schedule 40 PVC Figure 7.4. Typical Section Permeable Pavement Level 1 StormRaxTM ROUND SERIES TRASHI RA4 (OR EQUIVALENT) CONCRETE MANHOLE STANDARD 60 INCH RACK SHOWN DIMENSIONS IN INCHES FELT: .WE S.UUEUI I 011Y rtxinc smun %M - I' r-•Ii 11 11 ` 1 It ! n n I i'' `:. a i1 I . 1- _ �_------I SIDE VIEW StormRaxTM Round Series for Concrete Manhole hrt N& D4aA Dime DMC Min ID MInOD RS-24 17% 14% 28 24 3D 0. 56 31 14 40 36 43 RS49 27 1r 54. 4e s7 ki60 37yl 18% 66% 6o 70 I'laLstic Solutions, Inc. x s1oMEa PO Box QW, H7rc itst r, YA E239 235 MOGI W, VNndh , VA 22603 167/) 977.5727 phc a PRDEC'F 450 722.221E IM htlP/A.n ;IL.Ik-.bdon.m r xf Non-Wav a (7eota de isldes enly) ISOMETRIC CONCRETE STRUCTURE DIMENSIONS INSIDE STRUCTURE DIMENSION OUTSIDE STRUCTURE DIMENSION AVAILABLE OPTIONS CROSS BRACING FOR OVERHANG HDPE ANTI -VORTEX PLATE DATE DRUIR Sr. IPPO gr DETAIL PROPOSED PERMEABLE PAVERS DETAIL SCALE: 1"= 20' Z Z Z - a i - Elemantof `.' Who Will Potential Problem E 10 How to Fix Problem Address Comments Bill• to � Problem CL a = c There is excessive Remove immediately. Owner or trash and debris professional There is evidence of Cavorter or Contributing ems ino and/or bare or Stabilize immediately. professional Drainage Area a osed soil There is excessive OWrler Or landscape waste and Remove immediately. professional yard clippings Check that tree roots have not penetrated the pavement and leaf residue has not Adjacent Trees and shrubs are dogged the pavement. flamer or Vegetation vAMin 5 feet of the Vegetation that limas access Professional pavement surface or interferes with the permeable pavement operation must be pruned or removed - There is excessive trash, debris or Remove immediately Owner Or Inlets, Pre- sediment Professional Treatment Cells accumulation and Flow There is evidence of Owner OF Diversion erosion and J or Stabilize immediately professional Structures e.Vosed soil Clean out sediment or Evidence of dogging debris- Remove and wash or Professional replace stone as needed Pavement Mosquito proliferation Eliminate standing ureter and Owner or Surface PatahllCh vA..m0ahnn' trimt for nmfoitmnal mosquitoes as needed- It sprays are considered, then use a licensed pest controller to apply an approved mosquito larvicide (only if absolutely necessa Stabilize immediately. Mow, irrigate and apply organic There is ewtlence of (not chemical) fertilizer, as erosion and: or bare needed to keep grass healthy and dense enough to Owner or OF exposed soil in grid provide filtering +vfiile professional paver areafiltering protecting the underlying soil- Remove any grass diDDinas- There is loose Remove immediately and matenal (e.g-, bark vacuum svieep the area to Professional sand, etc.) stored on prevent clogging the the pavement surface pavement pores. Pavement is stained The surface must be kept andfor clogged or dean and free of leaves, inter is ; debris, and sediment by Pavement indicatingg the e vacuum sweeping (wiltiout Surface pavement is not brooms or viater spray) draining properly immediately and, othervelse. Measure the dravedown rate in the at a frequency consistent observation %veil for with the use and loadings three (3} days encountered ataminim um, fallowing a S1txm annual dry -weather event that exceeds sweeping in the Spring). Professional 12Anch of rain. If Where paving blocks are standing water is still installed, the sweeper must observed in the well be calibrated so it does not after three days, this pick up the stones behveen s a dear sign that the the paver blocks. Follovimg pavement is Dogged. the vacuum sweeping, test There are significant pavement Sections by amounts Of sediment pouring water from 5 gallon have accumulated buckets, to ensure proper between the pavers. drainage. There is evidence of Structural surface deteriortation such as slumping, R air or replace affected P Professional Integritycraddng. spalling or areas, as necessary. broken pavers. Observation Is each observation Repair, as necessary- Professional Wells well still capped? Outlets are obstructed or erosion and soil Remove obstructions and Owner or Outlet e>posure is evident stabilize eroded or exposed Professional below the outlet. areas I ,-�-'6( I PROPOSED PERMEABLE PAVERS TO PROVIDE STORMWATER QUALITY ,I: ' CONTRACTOR SHALL INSTALL A 12" WIDE, 6" DEEP PEA TREATMENT. THE PERMEABLE PAVERS SHALL ACT AS AN INFILTRATING 'i DEVICE FOR INITIAL RUNOFF PROVIDING GROUNDWATER RECHARGE. . GRAVEL STRIP IMMEDIATELY UPLAND OF THE ' II CURB/EDGE OF PAVEMENT WHERE PERVIOUS RUNOFF ANY EXCESS RUNOFF NOT INFILTRATED SHALL BE DIRECTED TO °7. I DRAINS ONTO THE PERMEABLE PAVERS, TYPICAL. THE UNDERDRAINS AND BE SLOWLY RELEASED WHILE THE STORMWATER IS ' - 12"Wx6"D PEA GRAVEL STRIP SHALL SERVE AS DETAINED. DURING SIGNIFICANT RAINFALL EVENTS, THE TERTIARY 564'SoT PRE-TREATMENT TO AVOID SEDIMENT WASH -ON. RUNOFF WILL FLOW INTO DROP INLET 2 FOR EMERGENCY BYPASS. 564.00 P ` a \ <Ie 'I d a ° I..° ° 564.4oTC o 0 (3. oEP 3 4 \ ,: \ o n co3 564. 3TC 562.2 TC C 2II 62. EP 61. EP 5 3 5 7 62. T 3 Q C 5 7 i 563.50TC SEE NOTES DETAILS N THI $61.30EP:'. I S O. S&O S 6 .00EP L $3 SHEET FORMINIMUM PERMEABLE I D I r� I I N PAVER CATIONS TYPICAL. -562-\ ,' PROPOSED I - -- - - -_. 3 - - - `� `\ CLEANOUT, ) - 56 .20TC \ \ TYP. - _ 559. oEP I At 4 =®_ - - - ® - \ CO4 col \\ v vv CONTRACTOR SHALL CONNECT 22 ` \ PROPOSED UNDERDRAINS INTO STR. 2. \ II \ PROPOSED 04" R • °� < RIGID -- ° ° >D. PERFORATED PVC - - ��� _ _ _ >, I \ I \ UNDERDRAINS, D . - p .i o - ",i I � i i I SECTION A-9- TYPICAL GRAPHICAL DETAILS Homogeneous fill /l /. /I 4 min a'� r _• \ I Cut off trenc�h-4 below atitabb I I moteriDl Sail a rock L-----------� TYPICAL HOMOGENEOUS EMBANKMENT Lam"""" Codrs�e fi�tr�r Perforated collector orou so Foundotron drain FOUNDATION DRAIN drain Said, w ecL /4rain cutlet LW �Transilion filer CHIMNEY DRAIN ill or gravel '-lalonket droin BLANKET DRAIN l Rock a gravel drain cc o T nen roIG "o filter TOE DRAIN aoume: JC 5 kngi neerrn� 1-iciciA Jarwm Figure A-Ia. Hoalogrrreors Erribankili erits iv/Seepage Controls GENERAL EMBANKMENT NOTES: THE EMBANKMENTS SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE WITH THE DETAILS SHOWN IN THIS PLAN. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC-3 MATTING & RIPRAP AS APPLICABLE AND THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC-2 MATTING. ALL BERM FILL MATERIAL SHALL CONSIST OF ML, CL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON COMPACTING SOIL. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE MINIMUM OF 95% OF MAXIMUM DRY DENSITY AND 2%OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS. PERMEABLE PAVER CONSTRUCTION NOTES: NECESSARY EROSION & SEDIMENT CONTROL SPECIFICATIONS: 1. All permeable pavement areas shall be fully protected from sediment intrusion by silt fence or construction fencing, particularly if they are intended to infiltrate runoff. 2. Permeable pavement areas shall ideally remain outside the limit of disturbance, if possible, during construction to prevent soil compaction by heavy equipment. If it is not possible, the contractor shall take precautions to limit construction equipment over the proposed permeable pavement areas. Permeable pavement areas shall be clearly marked on all construction documents and grading plans. To prevent soil compaction, heavy vehicular and foot traffic shall be limited or kept out of permeable pavement areas during and immediately after construction. 3. During construction, care shall be taken to avoid tracking sediments onto any permeable pavement surface to avoid clogging. 4. Any area of the site intended ultimately to be a permeable pavement area shall generally not be used as the site of a temporary sediment basin. Where locating a sediment basin on an area intended for permeable pavement is unavoidable, the invert of the sediment basin must be a minimum of 2 feet above the final design elevation of the bottom of the aggregate reservoir course. All sediment deposits in the excavated area shall be carefully removed prior to installing the sub -base, base and surface materials. Lic. No. 035791 01/11/21 NOTE, THE CONTRACTOR SHALL HAVE FINAL AUTHORITY OVER THE CONSTRUCTION SEQUENCING AND THE STEPS LISTED BELOW ARE INTENDED TO SERVE AS A GUIDE. THE CONTRACTOR SHALL COMMUNICATE ALL PROCESSES AND TIMELINES WITH THE INSPECTOR AHEAD OF TIME TO ALLOW THE INSPECTOR SUFFICIENT TIME TO APPROVE OR DISAPPROVE THE PROGRESSION OF THE CONSTRUCTION, AS REQUIRED. 1. Construction of the permeable pavement shall only begin after the entire contributing drainage area has been stabilized. The proposed site shall be checked for existing utilities prior to any excavation. Do not install the system in rain or snow, and do not install frozen aggregate materials. CD 2. As noted above, temporary erosion and sediment Icontrols are needed during installation to divert stormwater away from the iz permeable pavement area until it is completed. Special protection measures such as erosion control fabrics may be needed to protect vulnerable side slopes from erosion during the excavation process. The proposed permeable pavement area most be kept free from iz sediment during the entire construction process. Construction materials that are contaminated by sediments most be removed and replaced a with clean materials. LU r 3. Where possible, excavators or backhoes should work from the sides to excavate the reservoir layer to its appropriate design depth and z a dimensions. For micro -scale and small-scale pavement applications, excavating equipment shall have arms with adequate extension so U they do not have to work inside the footprint of the permeable pavement area (to avoid compaction). Contractors can use a cell a h- F construction approach, whereby the proposed permeable pavement area is split into 500 to 1000 s . ft. temporary cells with a 10 to 15 foot PP P P P P P 9 P arY z Lu t earth bridge in between, so that cells can be excavated from the side. Excavated material shall be placed away from the open excavation m X f so as to not jeopardize the stability of the side walls. Z wQ 4. The native soils along the bottom and sides of the permeable pavement system shall be scarified or tilled to a depth of 3 to 4 inches prior � O U to the placement of the filter layer or filter fabric. In large scale paving applications with weak soils, the soil subgrade may need to be z compacted to 95% of the Standard Proctor Density to achieve the desired load -bearing capacity. (NOTE: If this density is required then it M . 1--Z effectively eliminates the infiltration function of the subgrade. In such a case the following minimum subgrades shall be installed, > Z Z beginning from the top subgrade: 2: thick No. 8 aggregate bedding course below the pavers, 4" thick VDOT No. 57 clean stone filter U.]U U course (open graded, crushed aggregate), 12' thick VDOT No. 2 clean stone reservoir course (crushed aggregate base course) with a Tensar TX-5 below M ck� a triangular grid, or equivalent, the system. 5. The filter layer shall be installed on the bottom of the reservoir layer and, where appropriate, filter fabric can be placed on the sides. 6. Provide a minimum of 2 inches of aggregate above and below the underdmins. The underdrains shall slope down towards the outlet at a w positive grade The up -gradient end of underdrams in the reservoir layer shall be capped. Where an undenlrain pipe is connected to a W I structure, there shall be no perforations within 1 foot of the structure. Ensure that there are no perforations in clean -outs and observation w wells within 1 foot of the surface. ce a' 7. Spread, with a maximum of 6-inch lifts, the appropriate clean, washed stone aggregate. Place at least 4 inches of additional aggregate above the underdrain and then compact it using a vibrato roller in static mode until there is no visible movement of the aggregate. Do P g vibratory not crush the aggregate with the roller. 8. Install over -drain if required and connect into outlet conveyance system. 9. Install the desired depth of the bedding layer as follows: For permeable pavers, the bedding layer for open -jointed pavement blocks shall consist of a minimum of 2 inches of washed ASTM D 448 No.8 stone. Install paving materials in accordance with manufacturer or industry specifications. The basic installation process is described in greater detail by Smith (2006). The basic installation process is described in greater detail by Smith (Smith 2011). Permeable paver job foremen shall successfully complete the PICP Installer Technician Course training program offered by the Interlocking Concrete Pavement Institute. The following installation method also applies to clay paving units. Contact manufacturers of composite units for installation specifications. a. Moisten, place and level the No. 2 stone sub -base and compact it in minimum 12-inch thick lifts with four passes of a 10-ton steel U.]CD N drum static roller until there is no visible movement. The first two passes are in vibratory mode with the final two passes in static H Fi `; � mode. The filter aggregate should be moist to facilitate movement into the reservoir course. 0 � b. Place edge restraints before the base layer, bedding and pavers are installed. Permeable interlocking pavement systems require edge Z- ­1 restraints to prevent vehicle loads from moving the pavers. Edge restraints may be standard concrete curbs or curb and gutters., c. Moisten, place and level the No. 57 base stone in a single lift (4 inches thick minimum). Compact it into the reservoir course beneath with at least four (4) passes of a 10-ton steel drum static roller until there is no visible movement. The first two passes are in vibratory mode, with the final two passes in static mode. d. Place and screed the bedding course material (typically No. 8 stone, 2 inches thick). e. Pavers may be placed by hand or with mechanical installers. f Fill gaps at the edge of the paved areas with cut pavers or edge units. When cut pavers are needed, cut the pavers with a paver spliner or masonry saw. Cut pavers are ideally no smaller than one-third (1/3) of the full unit size, if subject to tire movement. g. Fill the joints and openings with stone. Joint openings most be filled with No. 8, 89 or 9 stone per the paver manufactuer's recommendation. Sweep and remove excess stones from the paver surface. 0 h. Compact and seat the avers into the bedding course with a minimum low -ma litude 5 000 lbf, 75- to 95-Hz late compactor.Do not P P 8 P P P compact within 6 feet of the unrestrained edges of the pavers. i. Thoroughly sweep the surface after construction to remove all excess aggregate. 170 j. Inspect the area for settlement. Any paving units that settle must be reset and re -inspected. k. The contractor should return to the site within 6 months to top up the paver joints with stones. CONSTRUCTION INSPECTION: Inspections before, during and after construction are required to ensure that permeable pavement is built in accordance with these 14 specifications. Contractor shall use a detailed inspection checklist that requires sign -offs by qualified individuals at critical stages of construction and to ensure that the contractor's interpretation of the plan is consistent with the designer's intent.The basic elements of a permeable pavement construction checklist can be found on this sheet Once the final construction inspection has been completed, provide the report to the County Inspector for approval. I CONSTRUCTION MAINTENANCE: It is difficult to prescribe the specific types or frequency of maintenance tasks that are needed to maintain the hydrologic function of P P YP 9 Y permeable pavement systems over time, so the Contractor shall adhere to the manufacturer's requirements for the first year following construction, and the Owner thereafter. The following tasks must be avoided on all permeable pavements: 1. sanding 2. re -sealing 3. re -surfacing 4. power washing 5. storage of snow piles containing sand 6. storage of mulch or soil materials 7. construction staging on unprotected pavement A preventative maintenance task for large-scale applications involves regenerative air vacuum sweeping on a frequency consistent with the use and loadings encountered in the parking lot. Many consider an annual, dry -weather sweeping in the spring months to be important. The contract for sweeping should specify that a vacuum sweeper be used that does not use water spray, since spraying may lead to subsurface - clogging. Vacuum settings for large-scale interlocking paver applications should he calibrated so they do not pick up the small stones between pavement blocks. r II Table 7A Recommended Maintenance Tasks for Permeable Pavement Practices Maintenance Task Frequencyl . For the first 6 months following construction, the practice and contributing drainage area should be inspected at least After installation twice after storm events that exceed 1/2 inch of rainfall. Conduct an needed repairs or stabilization. . Mow grass in grid paver applications At least 1 time every 1-2 months during the grovAng season . Stabilize the CDA to prevent erosion • Remove an soil or sediment deposited on pavement Y P As needed • Replace or repair any necessary pavement surface areas that are degenerating orspalling . Vacuum pavement with a standard street sweeper to 24 times per year (depending prevent clogging on use . Conduct a maintenance inspection Annually . Spot weedin of rassapplications . Remove any accumulated sediment In pre-treatment cells Once every 2 to 3 year: and inflow points • Conduct maintenance using a regenerative street sweeper If clogged Replace any necessary joint material 1 Required frequency of maintenance will depend on pavement use, traffic loads, and surrounding land use. CONSTRUCTION MAINTENANCE INSPECTIONS: It is highly recommended that a spring maintenance inspection and cleanup be conducted at each permeable pavement site, particularly at large-scale applications. Maintenance of permeable pavement is driven by annual inspections that evaluate the condition and performance of the practice. Any permeable pavement installation that captures external drainage area (run-on) should be inspected more frequently during the first year (four seasons) to ensure that there are no unexpected loads of sediment or pavement particulates from the contributing area. If so, the property owner should assess ways to limit the contributions, or the maintenance schedule should be adjusted to ensure the pavement does not become clogged. The following are suggested routine annual maintenance inspection points for permeable pavements: 1. The drawdown rate should be measured at the observation well for three (3) days following a storm event in excess of 1/2-inch in depth. If standingwater is still observed in the well after three days, this is a clear sign that clogging is a problem. Y � 8n 88 8 2. Inspect the surface of the permeable pavement for evidence of sediment deposition, organic debris staining or ondin that may indicate P P P P , g g P 8 Y surface clogging. If any signs of clogging are noted, schedule a vacuum sweeper (no brooms or water spray) to remove deposited material. Then, test sections by pouring water from a five gallon bucket to ensure they work. 3. Inspect the structural integrity of the pavement surface, looking for signs of surface deterioration, such as slumping cracking spalling or broken pavers. Replace or repair affected areas, as necessary. 4. Check inlets, pretreatment cells and any flow diversion structures for sediment buildup and structural damage. Note if any sediment needs to be removed. 5. Inspect the condition of the observation well and make sure it is still capped. P PPe 6. Generally inspect any contributing drainage area for any controllable sources of sediment or erosion. On Ul Z t J J I, I `® 0 0 0 a ai c- > .> ti 0- U C M > N V) a, N o / 3 1 0 m F, I- c a N z rn W N (A 0 N � J w (Z 1_1 � p Q J UJ o LU I I I C J W LJ a s J \ C W 2! 0W a W (� W `o A N J V ° Q s 3 z �� a U C 73 U ��// G LL 0 ��// o W 6"L F W 0 5 � Q > 0 O 3: a U �2�/: Z LL Q z Ow w z �/� Z z O V / w 01. Z z J ` J / O U o I F1 0 0 ^ o L / o T--I > D W (V w J tu '-' w a in JOB NO. W" II SCALE AS SHOWN SHEET NO. 9