Loading...
HomeMy WebLinkAboutWPO201700004 Other 2021-01-21VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR10) NOTICE OF TERMINATION 2019 Permit Coverage Number (VAR10####): VAR10M529 Section 1. Operator/Permittee Information. The person or entity that has active permit coverage approval and operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section VI (per Part III. K. of the VAR10 Permit). Construction Activity Operator Name: Seven Development LLC Contact Person: Edward Carrington Address: 310 Old Ivy Way, Suite 204 City, State, Zip Code: Charlottesville VA 22903 Phone Number: 434-962-1449 Primary Email: edward@sevendevelopment.com CC Email: Section II. Construction Activity Location Information. Project site information. Construction Activity Name: Commonwealth Apartments Address: City and/or County and Zip Code: 2118 Commonwealth Drive Charlottesville VA 22901 Latitude and Longitude (6-digit, decimal degrees format): 38.070720,-78.492123 Section III. Reason for Terminating Coverage under the General Permit. The operator shall submit a Notice of Termination within 30 days after meeting one or more of the following conditions (select one or more): 17 A. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long-term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a Notice of Termination; ❑ B. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; ❑ C. Coverage under an alternative VPDES or state permit has been obtained; or ❑ D. For residential construction only, temporary soil stabilization has been completed, the operator has provided written notification to the homeowner about the importance of final stabilization and incorporating a cony of the notification and signed certification statement into the SWPPP, and the residence has been transferred to the homeowner. Rev 04/2019 PAGE 1 1 6 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 Section IV. Participation in a Regional Stormwater Management Plan. If your site discharges to a regional stormwater management facility, provide information related to the regional stormwater management plan. Attach a separate list if discharging to multiple regional facilities. Regional Stormwater Management Facility Type: Address: City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): - Total Acres Treated by Regional Facility (report to one -hundredth of an acre): Impervious Acres Treated by Regional Facility (report to one -hundredth of an acre): Section V. Perpetual Nutrient Credits. If your site is utilizing nutrient credits, provide information related to the perpetual nutrient credits that were acquired in accordance with § 62.1-44.15:35 of the Code of Virginia. Attach a separate list if needed. Nonpoint Nutrient Credit Generating Entity (Bank Name): Gold Hill Nutrient Offset Credit Bank, Buckingham County, VA Perpetual Nutrient Credits Acqed 34 Ibs/ac/yr (1.6 Ibs nitrogen) (pounds/acruir es/yea r): include the affidavit of sale for all nutrient credits acquired. Is the affidavit of sale of nutrient credits attached? [EYES ONO Section VI. Permanent Control Measures. If applicable, list the post -development stormwater management facilities or best management practices (BMPs) that were constructed and installed as part of this activity to comply with the stormwater management technical criteria (structural and nonstructural, on -site and off -site). Attach a separate list if needed. If you have permanent control measures, the following items are required to be included with this form in order to complete your Notice of Termination submittal: ,wit. Engineer's Certification Statement As -built plans (construction record drawings) — digital As -built plans (construction record drawings) —full-sized, paper StormwaterManagementPlans— digital E. BMP Maintenance Agreement —notarized original, for public and private projects under DEQ's VSMP Authority S Stormwater Management Facility Tvoes (please choose from the followina bma types): Bioretention 1 Bioretention 2 Bioretention basin Bioretention filter Constructed Wetland 1 Constructed Wetland 2 Constructed wetlands Dry Swale 1 Dry Swale 2 Extended detention (2 x WQ Vol) Extended Detention Pond 1 Extended Detention Pond 2 Extended detention -enhanced Filtering Practice 1 Filtering Practice 2 Grass Channel Grassed swale Infiltration (1 x WQ Vol) Infiltration (2 x WQ Vol) Infiltration 1 Infiltration 2 Other IIB (manufactured treatment device, etc.) Other IIC (manufactured treatment device, etc.) Permeable Pavement 1 Permeable Pavement 2 Rainwater Harvesting Retention basin 1 (3 x WQV01) Retention basin II (4 x WQ Vol) Retention basin III (4 x WQVOI with aquatic bench) Sand filter Sheetflow to Vegetated Filter or Conserved Open Space 2 Soil Amendments Urban Bioretention Vegetated filter strip Vegetated Roof 1 Vegetated Roof 2 Wet Pond 1 Wet Pond 2 Wet Swale 1 Wet Swale 2 Rev 04/2019 PAGE 2 ) 6 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 Stormwater Management Facility #1 BMP Type: Date BMP Became Functional: Address (if available): City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one -hundredth of an acre): Impervious Acres Treated (report to one -hundredth of an acre): Stormwater Management Facility #2 BMP Type: Date BMP Became Functional: Address (if available): City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one -hundredth of an acre): Impervious Acres Treated (report to one -hundredth of an acre): Stormwater Management Facility #3 BMP Type: Date BMP Became Functional: Address (if available): City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one -hundredth of an acre): Impervious Acres Treated (report to one -hundredth of an acre): Rev 04/2019 PAGE 3 16 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 Section VII. Certification. This Certification must be signed by a person representing the operator identified in Section I. and meeting the requirements of 9VAC25-880-70 Part III K. Certification: N certify under penalty of law that I have read and understand this Notice of Termination and that this document and all attachments were prepared In accordance with a system designed to assure that qualified personnel properly gathered and evaluated the Information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Edward CarrinalAn Printed Name: 1 Signature (signed in ink): Date: 1/21/21 Section Vill. Submittal Instructions. Please submit this form to the Virginia Stormwater Management Program (VSMP) Authority that has jurisdiction for your construction activity. If the locality is the VSMP Authority, please submit your form directly to the locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities. If DEC. is the VSMP Authorityplease send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructionep to d ea.virgin ia.eov If the locality is the VSMP Authority, please send to: The Local VSMP Authority (insert address below) Permit terminations may be delayed if there are outstanding annual permit maintenance fee balances due. Rev 04/2019 PAGE 4 16 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 INSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT A complete and accurate Notice of Termination is required for terminating coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. Termination shall become effective upon notification from the department that the provisions of termination have been met or 60 days after submittal of a complete and accurate Notice of Termination, whichever occurs first. Authorization to discharge terminates at midnight on the date that the Notice of Termination is submitted unless otherwise notified by the VSMP authority or the department. Permit Coverage Number. Include your existing, active permit coverage number. Example: VAR10####. Section I. Operator/Permittee Information. The construction activity operator (permittee). The permittee with active permit coverage and that has operational control over the construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project (the party with control of project plans and specifications), or general contractor (the party with day-to-day operational control of the activities at the project site that are necessary to ensure compliance with the general permit). If an individual person is named as the operator, that person (or a representative of) must sign the certification in Section VII. Section 11. Construction Activity Location Information. Project site information. Complete this section with the same Information as listed on the current registration statement. A list of active permits and corresponding location information is available on our website. Section Ill. Reason for Terminating Coverage under the General Permit. The operator shall submit the Notice of Termination no later than 30 days after one or more of the termination conditions being met. Authorization to discharge terminates at midnight on the date that the Notice of Termination is submitted to the VSMP Authority, unless otherwise notified by the VSMP authority or the Department. Termination of authorizations to discharge for the conditions shall be effective upon notification from the Department that the provisions of termination have been met or 60 days after submittal of the Notice of Terminations, whichever occurs first. The operator of the construction activity shall submit a Notice of Termination within 30 days after meeting one or more of the following conditions (you may select one or more of these conditions): • [A] Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible has operational control. When applicable, long-term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a complete and accurate Notice of Termination; • [B] Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; • [C] Coverage under an alternative VPDES or state permit has been obtained; or • [D] For individual lots in residential construction only, temporary soil final stabilization as defined in 9VAC25-880-1, has been completed and the residence has been transferred to the homeowner. Section IV. Participation in a Regional Stormwater Management Plan. Where applicable, include information for each regional stormwater management facility to which this site contributes. If your site is contributing to more than one regional facility, please include the information for each facility in a separate list. The following information shall be included for each regional stormwater management facility installed: • the type stormwater management facility (see the list of facility types on page 2 of the Notice of Termination); • the physical location of the facility, including city or county, and latitude and longitude in decimal degrees; • the receiving water to which the regional facility is discharging; and • the number of total and impervious acres treated by the regional stormwater management plan to the nearest one -hundredth of an acre. The total of the impervious acreage may equal but not exceed the total acreage. Section V. Perpetual Nutrient Credits. If your site is utilizing nutrient credits, provide information related to all perpetual nutrient credits acquired in accordance with § 62.1-44.15:35 of the Code of Virginia. Attach a separate list if needed. Attach the affidavit(s) of sale for the purchase of all nutrient credits acquired for this activity. Rev 04/2019 PAGE 5 16 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 INSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT Section VI. Permanent Control Measures. If applicable, list all post -development stormwater management facilities or best management practices (BMPs) that were constructed and installed as part of this activity to comply with the stormwater management technical criteria (structural and nonstructural, on -site and off -site). Choose the type from the list provided in the Notice of Termination form Section VI. If you have multiple BMPs, attach a separate list if needed. The following information shall be included for each permanent control measure installed: • the type of permanent control measure receiving the discharge (choose from list provided); • the date that it became functional as a permanent control measure (MM/DD/YYYY); • the location of the BMP, including city or county, and latitude and longitude in decimal degrees; • the receiving water(s) to which the permanent control measure discharges; and • the number of total and impervious acres treated by the permanent control measures to the nearest one -hundredth of an acre. The total of the impervious acreage may equal but not exceed the total acreage. The following items are required to be submitted with the Notice of Termination if you have permanent control measures: • Engineer's Certification Statement. Signed by a professional registered in the Commonwealth of Virginia, certifying that the stormwater management facilities were constructed in accordance with the approved plan. • Construction record drawing(s) (as -built plan) in a format as specified by the VSMP authority for permanent stormwater management facilities in accordance with 9VAC25-870-55 D appropriately sealed and signed. One digital and one full-sized paper copy. • Stormwater management plans (digital) • BMP Maintenance Agreement. Submit an original, signed and notarized BMP Maintenance Agreement for all public and private permits where DEQ is the VSMP Authority. Termination is not final until you submit the local court record of receipt to DEQ showing that the signed Stormwater Management Maintenance Agreement was recorded with the land deed. Section VII. Certification. This Certification must be signed by a person representing the operator identified in Section I. and meeting the requirements of 9VAC25-880-70. Part III. K. Section Vlll. Submittal Instructions. Submit this form to the VSMP Authority that has jurisdiction for your construction activity. The VSMP Authority may be either DEQ or your locality depending on the location and type of project. If your project is under the jurisdiction of a Local VSMP Authority, please contact the locality for additional submittal instructions. A blank area is provided for the Local VSMP Authority to include their mailing address. Who is the VSMP Authority for my arofect? DEQ or the locality? • DEQ: DEQ is the VSMP Authority and administers permit coverage for land -disturbing activities that are: ➢ within a locality that Is not a VSMP Authority; ➢ owned by the State or Federal government; or ➢ utilizing approved Annual Standards and Specifications. • The Locality: The local government (locality) is the VSMP Authority and administers permit coverage for all other projects not covered by DEQ as listed above. For these projects, please submit permit forms directly to the Local VSMP Authority. Mist of Local VSMP Authorities is available on DEQ's website here: Local VSMP Authority List. DEQ'S CONSTRUCTION GENERAL PERMIT WEBSITE http•//www dea virginia gov/Programs/Water/StormwaterManastement/VSMPPermits/ConstructionGeneralPermit aspx Rev 04/2019 PAGE 6 16