Loading...
HomeMy WebLinkAboutSDP200800006 Review Comments Letter of Revision 3 2021-01-28� AI ?"h �IRGnTF COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 229024596 Phone (434) 296-5832 Fax (434) 972-4126 Site Plan review Project: Monticello Visitor & Smith History Center (LOR3) Plan preparer: Liz Russell, Assistant Director of Facilities & Planning Thomas Jefferson Foundation, Inc. ( IrussellAmonticello.ora ] Owner or rep.: Michael Merriam / Thomas Jefferson Memorial Foundation P. O. Box 316 / Charlottesville, VA 22902 ( mmerriam(a),monticello.ora ] Plan received date: 22 Jan 2021 Date of comments: 28 Jan 2021 Reviewer: John Anderson Project Coordinator: Kevin McCollum SDP2008-00006 (LOR3) Although Engineering has no objection, it may be helpful to clarify that several exhibits depict improvements approved under plan review over a decade ago. Graphic Exhibit (excerpts) identify items included with LOR3. Remaining improvements shown with Ayers Saint Gross Architects + Planners (4/3/2006; step pools, 48" retaining wall with barrier, guardrail, etc.) may be disregarded, since not considered with current application, LOR3. LOR3 includes: 1. Installation of 2 crash gates. (Exhibit], locations; Exhibit 2, Gate) 2. Limited grading to install crash gate 1. (Exhibit 3) (Nearly all grading within roadway prism) 3. Proposed tree removal. (Exhibit 4) from Application, and Exhibits Letter, Liz Russell to Cameron Langille (Albemarle County), January 19, 2021 Enclosed with this letter please find the following: Letter of Revision Application and Fee Exhibit I. Approximate Crash Gate Locations Exhibit 2. Cutsheet_StrongArmM30 Exhibit 3. Pages CS-7 from SDP200800006 Plan - LAYOUT & GRADE MARKUP Exhibit 4. L-I from SDP200800006 Plan - TREE REMOVAL Exhibit 5. 1998 Topo_Exit Gate 2 Location — MARKUP Engineering Review Comments Page 2 of 3 xhibit 3, excerpt Asphalt and dirt removal to achieve new subgrade _ 1\ 1 \ — = elevations. Stone and , _ asphalt replacement to \� Flatten grade for match existing depths. i approximately 40' to allow - _ _ eRE{ to new crash gate to bebN¢� — i Installed near current gate DIRECTION \ aPARKING: Tie -In to existing grades at \ three termination points \� P I Tie -In to existing grades at \ three termination points \� P I Engineering Review Comments Page 3 of 3 Exhibit 4, excerpt Please feel free to call if any questions: 434.296-5832 -x3069 Thank you J. Anderson SDP2008-00006_LOR3_Monticello Visitor & Smith History Ctr 012821