HomeMy WebLinkAboutSDP202000076 Review Comments Initial Site Plan 2021-01-29Christopher Perez From: Dyon Vega <dvega@rivanna.org> Sent: Friday, January 29, 2021 9:48 AM To: Christopher Perez Cc: vfort@rivanna.org; Richard Nelson Subject: River's Edge Comments Attachments: NRW_PHASE2_04A_33.pdf CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Chris, RWSA has reviewed the River's Edge initial site plan dated 21/7/2020 and has the following comments: Sheet 8: 1. Please show size of connection to RWSA 12" Cl waterline. 2. Waterline is shown on wrong side of road. I have attached a drawing showing where the waterline should appear. 3. Coordinate WL connection with RWSA and include RWSA connection notes below. 4. There is likely a gas line in close proximity with the 12" Cl WL. Wet Tap on RWSA Waterline Add the following note to the utility plan sheet that shows the proposed connection: "Contractor shall coordinate with RWSA and ACSA for the connection to the existing RWSA 12" waterline. Contractor shall use due diligence to protect the RWSA 12" waterline during construction and tapping. Contractor shall verify the horizontal and vertical location, the outside diameter and the pipe material of the 12" waterline prior to ordering the tapping sleeve. RWSA shall be contacted 3 business days in advance of the test pit and shall be present during the test pit. The tapping sleeve shall be approved by RWSA prior to being ordered. The tapping contractor shall be approved by RWSA prior to the tap. A minimum of 3 business days notice shall be given prior to installation of the tapping sleeve. The XX"xXX" tapping sleeve and valve shall be installed plumb. Following the placement and testing of the XX"xXX" tapping sleeve and valve, a concrete pad and thrust block shall be placed under and behind the tapping sleeve and allowed to set prior to making the tap. Add the following note to the waterline profile sheet that shows the proposed connection: "A minimum of 3 business days notice shall be given to RWSA prior to installation of the tapping sleeve. Please see the note on sheet "XX- reference utility plan sheet" for more information regarding the connection to the RWSA waterline' Let me know if you have any questions. Thanks, Dyon Vega Civil Engineer RIVANNA WATER 6 SEWERAUTHORI�� Rivanna Water & Sewer Authority (434) 977-2970, Ext. 170 695 Moores Creek Lane Charlottesville, VA 22902 www.rivanna.ore 7