WPO201900027 Plan - VSMP 2021-02-03
GENERAL NOTES OWNER: SM CHARLOTTESVILLE LLC 11710 PLAZA AMERICA DR. SUITE 1100 RESTON, VIRGINIA 20190 VUE REALTY PARTNERS LLC 1821 AVON ST. SUITE 200 CHARLOTTESVILLE, VA 22902 DEVELOPER: STANLEY MARTIN HOMES 404 PEOPLE PLACE, SUITE 303 CHARLOTTESVILLE, VA 22911 ENGINEER., COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE, VA 22902 (434)293-3719 TAX MAP NO.: 056A1-01-00-02600 (4.400 AC) 05600-00-00-11500 (21.854 AC) 055CO-03-00-000Al (1.340 AC) 05600-00-00-00700 (3.190 AC) TOTAL AREA: 30.784 ACRES (PORTION OF) ZONING R-6 RESIDENTIAL, STANDARD LEVEL - CLUSTER DEVELOPMENT WITH APPROVED SP2019-02 SPECIAL USE PERMIT CONDITIONS (LISTED BELOW) PROPOSED USE. PROPOSED PUBLIC ROAD TO SERVE AS THE ENTRANCE INTO THE PLEASANT GREEN NEIGHBORHOOD. PRESERVED/MANAGED SLOPES: NO PRESERVED SLOPES OR MANAGED SLOPES ARE IMPACTED WITH THIS ROADWAY CONNECTION. PROPOSED AND MANAGED SLOPES ARE SHOWN ON THE EXISTING CONDITIONS PLAN SHEET. SUBDIVISION STREETS- CURB & GUTTER WATERSHED: LICKINGHOLE CREEK WATER SUPPLY WATERSHED AGRICULTURAL/ FORESTAL DISTRICT.- NONE TOPO & SURVEY. THE BOUNDARY LINE, PARCEL INFORMATION AND TOPOGRAPHY WERE PROVIDED BY ROUDABUSH, GALE AND ASSOCIATES IN JANUARY OF 2019. INFORMA7ION WAS FIELD VERIFIED BY COLLINS ENGINEERING IN SEPTEMBER OF 2020. DATUM: NAD 83 EXIS77NG VEGETATION. PARTIALLY WOODED WITH (2) RESIDENCES ON THE PROPERTY AND EXIS77NG GRAVEL DRIVEWAYS. BURIAL SITES: A CEMETERY EXISTS ON THE RESIDUE PROPERTY (PARCEL TMP 56A-1-26). THE CEMETERY SHALL REMAIN AND WILL BE PRESERVED WITH THE DEVELOPMENT. STREAM BUFFERS: THE 100' STREAM BUFFERS SHOWN HEREON SHALL BE MANAGED IN ACCORDANCE WITH THE ALBEMARLE COUNTY WATER PR07EC77ON ORDINANCE FLOODPLAIN: A PORTION OF THE RESIDUE PROPERTY IS LOCATED WITHIN A FLOODPLAIN ZONE AS SHOWN ON FEMA MAP#51003CO229D, DATED FEBRUARY 4, 2005. RETAINING WALLS. NO RETAINING WALLS ARE PROPOSED WITH THIS PLAN. IMPERVIOUS AREAS., PROPOSED SIDEWALK WI7H THIS PLAN: 10,600 sf PROPOSED ROADWAY WITH THIS PLAN: 14,250 sf OFFSITE EASEMEN T• ALL PROPOSED GRADING SHALL BE CONSTRUCTED ON SITE OR 107HIN EXIS77NG RIGHT-OF-WAY. NO OFFSI7E EASEMENTS ARE PROPOSED WITH THIS DEVELOPMENT. TMP-56-115 IS NOT PART OF THE PLEASANT GREEN NEIGHBORHOOD, BUT ARE PROVIDING THE EASEMENT AND RIGHT-OF-WAY FOR THE PROPOSED PUBLIC ROAD. NOTES.• 1) THIS PROPERTY DOES NOT LIE WITHIN AN AGRICULTURAL AND/OR FOREST DISTRICT. 2) ONLY (1) DWELLING PER LOT SHALL BE PERMITTED. 3) ALL PROPOSED EASEMENTS SHALL BE DEDICATED TO PUBLIC USE. 4) STREET TREES SHALL BE PROVIDED ALONG ALL THE PUBLIC STREETS 40' O.C. IN ACCORDANCE WITH VDOT AND ALBEMARLE COUNTY STANDARDS 5) ITE TRIP GENERATION: TRAFFIC IMPACT NUMBERS ARE BASED ON THE ITE TRIP GENERATION MANUAL, 8TH EDITION. CODES 230 WERE USED FOR THE DEVELOPMENT. SEE SHEET 4 OF THE ROAD PLAN FOR TRAFFIC DISTRIBUTIONS. 6) THIS PROPERTY IS NOT LOCATED WITHIN A DAM INUNDATION ZONE. SP2019-02 Pleasant Given Special Use Permit Conditions 1. The culverts under the proposed Connector Road extension over Powell's Creek must be in general accord with the attached Concept Plan titled "Pleasant Green Subdivision Special Use Permit Plan" (the "Plan") prepared by Collins Engineering with a revision date of March 2, 2020. To be in general accord with the plan, development must reflect the general size, arrangement, and location of the culverts, as well as maintaining no increase of the 100 year flood elevation outside of the Pleasant Green property. Modifications to the plan that do not conflict with the elements above may be approved subject to the review and approval of the County Engineer. 2. Prior to final road plan approval or permitting of a land disturbance in the floodplain, the applicant must obtain from the Federal Emergency Management Agency (FEMA) a conditional letter of map revision (CLOMR, or CLOMA), and prior to road acceptance the applicant must obtain from FEMA a letter of map revision (LOMR or LOMA). In addition, the applicant must copy the County Engineer on all correspondence with FEMA. Construction and installation of the culverts must be in compliance with approved road plans and FEMA approved CLOMR or CLOMA. 3. Any residential lots and associated streets resulting from the subdivision of the property, with the exception of the stream crossing and roadway identified on the attached plan as Connector Road, must be located outside of the 100 foot stream buffer, Flood Hazard Overlay and preserved slopes on the property. Lots may be permitted to be located within the landward 10 feet of the 100 foot stream buffer only if the lots are adjacent to approved stormwater management facilities located within the landward 50 feet of the stream buffer. Approval of lots located within the stream buffer must be subject Subdivision Agent approval. 4. The net density of the property must not exceed 6 units per acre, in accordance with the Crozet Master Plan. Net density must be calculated by subtracting the area within the Flood Hazard Overlay District, the 100-foot stream buffer, and areas of preserved slopes from the total acreage of the property subject to the special use permit. 5. Prior to issuance of a grading permit to allow installation of the stream crossing or with submittal of the final subdivision plat, whichever comes first, the applicant must submit an easement plat dedicating to the county the area identified for a greenway trail on the attached plan. 6. If the construction of the stream crossing for which this Special Use Permit is issued is not commenced by September 16, 2025, the permit will be deemed abandoned and the authority granted thereunder will thereupon terminate. 7. Prior to approval of the first final Virginia Stormwater Management Program (VSMP) plans or the first final subdivision plat, whichever comes first, the applicant shall conduct aPhase 11 Environmental Site Assessment (ESA) in accordance with ASTM standards. The Phase 11 ESA shall include sampling and testing of accumulated sediment behind the dam that exists on the Property. The applicant shall be required to comply with all recommendations of the Phase II ESA prior to issuance of the first building permit on the Property. The applicant shall also be required to remove accumulated sediment from behind the dam prior to demolition of the dam and dispose of the sediment, either on site or off site, in accordance with the Phase II ESA recommendations. PLEASANT GREEN CONNECTOR ROAD VSMP PLAN (WPO 201900027) WHITEHALL DISTRICT ALBEMARLE COUNTY, VIRGINIA EXISTING RALROAu ------ --- — -- ----- -- -- -- ------------ - - _ a _ r _- SM CHARLOTTESrL ,-LLC TMP 056A1-01-0Q-02�A0�A 0.900 ac. �� /T vESRneo�oifi au v DB 5127, PG 677 Q _ i SIL EMILV \ � A TMP 056 1-01-00- 3 Oe aa3 2 \ \ PIRKEY EPH L O A F --PLEASANTGREEN �T TMP056A1-01-o0 CRITZ MIS DARNE 0.57AO PHASE II FUTURE TMP 6A1-0100-03500 IDS 2143,PG200 P DEVELOPMENT DB B162, 1B182,G z \ afrR,,TM JAMES L OR DELOR-033AO S J A OS0520 ac. 033A0 \ _.� i V/,� 0.520ac. A � 1980, PG 534 \ - �- I R A HEA, DANIEL OR �F.R \ / - — -- PLEASANT GREEN PHASE I ,' -MIES ANGELA 56A64 ac. 56A1L R J TM 300 — - 0 13, P T 0-03200 ' O DEVELOPMENT za1a,P a - osz M CHARIDS 1222. LOTTESVILLE, LLC \ \ (SDP72'1 -0000 ) J B E AMES L\ R DELORES J -TMP056A1-01-00-02600 /, i \ O 8.833ac. -V �;; - i / r ps0001-bo-03zeo 8v /- 0.-aoy v \ DB 5104, PG 510 \ y/ 1222, PG �94/ ZELLER ORYW \ TMP 056A1- 1- A I \ 0.2 c. OB 2194, 658 J� \ - - - - \ , - RESIDUE LAND FROM \ / VUE REALTY PARTNERS LLC PLEASANT GREEN ', / TMP 05600-00-00-11500 PHASE I SUBDIVISION v / 21.854 ac. TO BE COMBINED WITH DB 4856, PG 582 ` TMP 056A1- 1-00,02600 I \\ I �J� _ VUE REALTY PARTNERS LLC J \ \ TMP 05600-00-00-11500 ;: Y \ , / MALONE, MICHAEL A. 21.854 ac. O \ / TMP055CO-00-OC-00400 \ DB 4856, PG 582 .'; 0 '\ 349 ac. J _.\ m DB WB 1, PG 313 / \ � � 'MCDANIEL, BRENDAS /TMP 55C0-)0-OC-00300 0.288 ac. l CAMPBELL, GORDON R SM CHARLOTTESVILLE LLE LLC / F9 & MADELINE IN 055C003-0003-00-000A1 - �\ TMP 055CO-O0-0C-00100 I 1.340 ac. J, CAMPBELL, GORDON R ` 0.390ac. I DB 5127, PG 677 B MADELINEN IDS 416, PG 227 TMP 055CO-00-OC-OO200 0630.. .p DB 332, PG 323 y / SM CHAR O LL,�O�JTTESVILLE LLC TMP 0,5600-00-00-00700 ` 3.190 ac. w LOUNSBU Y,K VIN ANNA 5112, PG 348 TMP 0 -00 OA 00200 / �.IJ7 / , Q \ (] 0660 ac LUDWIG, DALE& CHRIS MINE�:` / O OP \ O OB 989, PG 389 TMP 655CO-00-OA-00100 ,.j; Q" C../ JORDAN. ROSE M \ TMP 055Cb00-OA-00.600 ac. 0.520 ac.0400 �I IDS 5132, PG 760 �'"� �' Q, ` IDS 4037, PG 681 �\v\ MP CKLER, GLORIA Q \�(' \ �MP 055C0-00-OA-00500, \ V B 1153, PG 735 O `( / THE HOUSING LAB LLC �P \ TMP 05500-00-00-068DO 0.670 ac. IDS 5079. PG 303 / \ THE HOUSING LAB LLC ♦ r \ O TMP O500-00-068C0 0.53` \ 0.ac. D85079,79, PG 303 \ \ / HALLOCK, LVIA / \ ROSAJIMEN O \ TMP 055 0-00- Bo .4 `\ 43 1,. G 360 \ \ SHEET LAYOUT SCALE: 1" = 100' VICINITY MAP SCALE: 1° = 20 LAUREL HILLS CROZET rrd CROSSING GRAYROCK WAYLANDS WAYLAND PARK I GRANT , SITE Crozet x� titarrHill Bre� sae RA PARKSIDE VILLAGE orris 12p4 PARK VIEW Old Trail Golf Club B K W O ( Sheet List Table Sheet Number Sheet Title 1 COVER 2 EXISTING CONDITIONS & DEMOLITION PLAN 3 EROSION & SEDIMENT CONTROL NOTES & DETAILS 4 PHASE I EROSION & SEDIMENT CONTROL PLAN 5 PHASE 11 EROSION & SEDIMENT CONTROL PLAN 6 STORMWATER MANAGEMENT PLAN 7 MITIGATION PLAN 7 TOTAL NUMBER OF SHEETS LEGEND SCOTT/R. C17LLINS7 No. 35791 ,a:- 1/27/21 p01`SIOArei. M N W � � J_ LL u�T O_ w w m o a a = Z J KzZU- 0 0 F- O II� E W J Q X O X O O z J W 0 a a > > W Z r > UJ > > W OfW a W a W ce 0 W - W EDGE OF PAVEMENT o O o N N CURB SOIL BOUNDARY EROSION CON TROL BUILDING . w SA SAFETY FENCE 3.01 PROPOSED ASPHALT CR CONSTRUCTION ROAD 3.03 STREAM BANKS O STABILIZATION 100' WPO BUFFER 7 f` CE CONSTRUCTION ENTRANCE 3.02 _ PROPOSED EASEMENT, CY) VARIES WITH SHEET CY) SF SILT FENCE 3.05 m DRAINAGE PIPE N lP INLET PROTECT70N 3.07 BENCH MARK ODD TEMPORARY DIVERSION DIKE 3.09 VDOT STANDARD STOP SIGN J d�l PROPOSED HANDICAP N DI TEMPORA Y RIGHT—OF—WAY J. 11 PARKING SPACE STRIPING O INLET PROTECTION W O ST TEMPORARY SEDIMENT TRAP 3.13 N Ozoo EXIS77NG CONTOUR LL! Q SB SEDIMENT BASIN 3.14 200 PROPOSED CONTOUR OP OUTLET PROTECTION 3.18 > l SEDIMENT TRAP OR BASIN LLJ RR RIPRAP 3.19 J Q DRAINAGE DIVIDE J Q RR UTILITY STREAM CROSSING 3.25 LIMITS OF CLEARING/GRADING ® % O SA TEMPORARY SEEDING 3.31 LIMITS OF DISTURBANCE T LUPERMANENT SEEDING 3.32 DIVERSION DIKE TREE PRESERVAT70N J. RIGHT—OF—WAY DIVERSION 0 elfO AND PROTECTION TREE PROTECTION —J O L� DC DUST CONTROL 3.39 ° ° SAFETY FENCE Z Q U O —X—X—X� SILT FENCE = Lu U * ORGINIA EROSION & SEDIMENT CONTROL PROPERTY LINE U 2: HANDBOOK SPECIFICA77ON NUMBER z PROPOSED CONCRETE Y O Oo OO OO OO OO OO OO 100 YR. FLOODPLAIN F- U RIPRAP, OUTLET PROTECTION OR CONSTRUCTION ROAD U z STABILIZATION Ul LU LU l[ c LU (D U z J LU V) J �� Q I..L w Q J O 0— APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNER/ZONING ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION HEALTH DEPARTMENT W d � Ir JOB NO. 182154 SCALE 1 BM uNE To 6E - ' a � � - -_ \\ TOP MH-72 53 PIRKEY, JOSEPH L OR TEBESA F D REEN - vTMP 056A1- - 0- 340 f T SE I CONSTRU ON. CONTRA ORSHALLIIJOR ATE THE RELOCA --7" \ O 0ac. $4' IN UTILITYG rT90._ \ 143, PG 200 _ CRITZE MISTY DA ELL �TMP S6A1-01-00-03 00/---SCEXISTING -GARAGE SHALL — - - - - r vV A R, JAMES L ORREMAIN DURING-PLEASANTELORES /j /.- - —.�rI 1 P 0 A1-01-00-033A0 \ `�,¢, GREEN PHASE I CONSTAU ION/ - -- ---------------— / /' ''I \ /'/� /\ 1: " _ `-r_ \�\ B0.520 ac.�� DB 1980, PG 534�PHnsE a �- ' \ - \_- I' ( IITOP OF 585 -EXISANGTENCE To 6E� ,� ,/ REMOVED DURING RIFASAM _ y - L / PHASE I CONSTRUCTION / '�� / / / PHASE II GREEN vHgsu roNsrnu-o _ / _ v v -- \ -1v I / A A CRIMP AND ROLL END OF COPPER PIPING I I EXISTING SHED-SHEDRE_M_AIN � _ \ \ \ I DURING PLEASANT GREEN \ ,' I �-I / A, DANIEL F OR\I / ' '-P� _ 1 \ 056A1-01-00- EXISTINGRFTANINGWA(LS/ L/L' r' r ' y �Tr - II( I I ,� 0.464ac. \ REMAIN DURING-PLEASANT�!;,% / / - I T I - _ -� ��I �\ DB 2413, PG 214 42' MIN. PHASE ;EOrySTRUCTiby / / \ REMAINING COPPER PIPE TO BE VERTICAL O - /vv — — / _ - P EASAN7 GRE HA�S> �� �` �� / / / ' - - / 24" LAIN. �\ / --- -- _____--/DEVELOPMENT ` \ BAB DELORESJ OR r EXISTING�GEMETERY \\ \ / r / ___ ,'' / ,' ,- \ f-� \ (/ m i TlNbut IN I ` `� ' _ __�' / /� \ ' °�_ 'W - (SDP-2019-00009) 'A- \ ` `}`n/ ( / TMP 056A1-01-00-03200 / SHUT-OFF CORPORATION STOP / r _ ,-- XISTING TREE LIMTS (TYP.) / "_ - __\ - \' \ 0.520 ac. / _ _ 66B --__� \-_-' /' -'' / ,' \ /' _ < _ O `� \\ \ ABER, JAMES L OR DB 1222, PG 397 DELORE� J \ 4 , i/ \ `.c - - r �\ `\/ P 056A1-01-0 -032B0 / /°'. n�i / \ T- ,\ j SI�hCH6N�LOTTESVILLE lk� / % w iTMP 056A1_01_00-02600 1222, PG 3 / ti J I_ Y! ZELLER ORY W LL 8.833 ac. /\ /4� \ `\` \ >` ' r TMP 056A1 1-00-0 / / ~ O -- _ + '--- -�--- _ �B-51Of G 510 �j i o o m ,, \ , r I \ v A 0.26 _ \ \ \ \ /\ i \ Z F F w _ \ > J"� I v y/ v ' v v DB 2194, 0 r EXISTING PROPERTY LINE (TYP.) �V 111 II i \ z z s I rl/ rt U w w Q \ V \ TYPICAL SERVICE TAP ABANDONMENT (n In DO X X , o o f EXISTING FENCE TO BE REMOVED r. WITH PHASE I CONSTRUCTION OF THE p a a a /PROPOSED PLEASANT GREEN PROJECT `~ in F m w w Z > > EXISTING 100' VVPO BUFFER (TYP. r \ ` ' _ \ \\ y� W WWW �' � � a ce FIG V-6H -- --- _ k\ \ \ / RESI Ut LAND FRO ---- / NTs - I To-u �\ \ \ \ PLEASANT GREEN // i VUE REALTY PARTNERS LLC -- -- " - \--- O�\' XO� 1 PHASE I SUBDIVISION TMP 05600-00-00-11500 , - _ \�� ` TO BE COMBINED WITH' '� /' � I 21.854 ac. -------- __ \ \ _,\\` \ !- DB 4856, PG 582 - \ - _ TMP Q56A1 01-00 02 OQ y,!„ - x \ _4 `\ \ \ \ \ I ''1 ,' /\ _ O\ \ � N I I �1� \ \ 1 \ \ \ i / �\ \ \ Q W ------ ,� ��REALTY-PARTNERS L4C� i i I ��`_ 1\ \ _ / �' STORM SEWER PROPOSED WITH THE _ ~ 00 (I I I \ I '� PLEASANT GREEN PHASE I PROJECT \TMT- 05600 00-00 41500\ \I I (; I \ , ,' / EXISTING FENCE TO BE REMOVED , \ y\, - \ 'i I \,; \ \\\\ WITH PHASE I CONSTRUCTION OF THE f `\DB 4856,P�582 --' \ I \ PROPOSED PLEASANT GREEN PROJECT �� ---- --_ _ - ---- EXISTING 100-YEAR FLOODPLAIN LIMITS ��O 0 \ \ \' \'IN _ PER HEC-RAS ANALYSIS PERFORMED BY — X ----- //I COLLINS ENGINEERING IN APRIL 2019 (TYP.) \ I G !� \ EXISTING 100-YEAR FLOODPLAIN LIMITS \ \ PER HEC-RAS ANALYSIS PERFORMED BY \ ; — — --------- / XISTING 100' WPO BUFFER (TYP.).----- COLLINS ENGINEERING IN APRI - 2019 (TYP.) �' i / — vv `� vV ___-- \ - - 1 v , MAL CHAE .v , \ v `v, v \ VN,v , v A _ XISTING 100' WPO BUFFER (TYP.) SANITARY SEWER PROPOSE[) WITH PLEASANT GREEN PHASES II PROJECT HE _ MP 55CO-00- 400 v ` v \ v v A � �� / i A I I v 0.349a. v v v` v vvvvAvv v VA v I --- \ r DBWB161 313 v `� `vvA`v`�v`�vvvv vv vv v Av Avv— /`v\\vvv � v v vvv v v v v ` \\ \ \ r vvv vv ;; N MCDANIEL, BRENDA S `\ \`� \\\\\\\`� ` \ \ �- \\ \y \ I �� — ---------- N LL TMP ossco-oo-oC-oo3o0 ` \ `\ \\\`` \ ` ` \ EXISTING STREAM TYP. -- \ ` 0.288ac. �v �\ `�`�� vv `v vI v Av �� I Ivv vv I ' �� _____' -_ �- - / Z \ . r �._------ O D 900,PG079 O \\�. _------ % A \ \ �� V�`v A` 11 w\ III V\ y\\ V�\S O \\\\\V AV A \V A A\ — _ _- �� II II 1 \Vmq, �I , I A W O \\\ \\ \\\\�\\\, --- ,\I / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ — — r \ . . \ + / --'--------------- -'"' _ - - J \ /I ^. \ \ \ \ \ \ \ \ \ \ \ \ ` i �� / \`. \`\ \ \ \ ` `�� � /_ ------ ---- ----_--- --- ' ` / ' Q EXISTING PRESERVED ; \\=`\ \, z _---------- _ __ \\ S \OSTEEP SLOPES - ,SM-CWARLOTTESVLLL�LLC, \ \\ \ _, _____---- C Ell\ OO o 0 JMP Ora G0-03-00-00 1 \� \ _ _ __'' \ r _ --_- �\ - /' r W G \INV ` \ \ \ \ \ \ \ \ -----' r / 1.340-ac \ `\\\\ \\ \ `/ \ r / \ / EXISTING 8' 4"W X 8'-4„ H LJJ .vv v v vAv v v v v r ' v . A v v `/ v v /� \� \ /DOUBLE BOX CULVERT O O � CAMPBELL, GORDON R \ AMPBELL, GOR O �x & MADELINE N W & MADELINE ' O TMP 055CO-00-OC-00200 \ MP 055CO-00-0000100 SEE UTILITY NOTE ON -THIS SHEET \ ' I , \ 0.630 ac. 0.390 as O ` DB 332, PG 323 \`\\ _ — ---_� = -� - _ \ \ \ \ \ \ \ _ _,_G�'r % / l l ( y �i , / \ -�\\ r LV DB 416. PG 227 \ \ \. _ /� 1 \ \ �\ / \ / ,, r l ( ' / , /' r • `\ \ ` \ \ �� O %� \I I = Z NNN \ r' EXISTING 30' RWSA 'C /'�' '' i //' / SANITARY SEWER \ � 90 W 0 EASEMENT � \ \\ \ \\ \\ \� O � \ ` 9C �w / �C�✓ / / D.B. 3878, PG. 688. /R rl (------' / ,' / / D.B. 828, PG. 131 TO ''` ) ' HYDRANT TO REM IN r ul � L UNDISTURBED ` - \\\ \\ \ \ / 4 i / 'N.� /' y/ / / �r r , / 'SCHQcf�2 \\I \\\ ( \ ` / \O C, LL-� O / / / TMP )W00--00- 70Q \ \\ \\ 1 \ 11 '. O, l9 ,' F_ L�u/ O ,• �GF ` II \`\\ , \\1 ,,'/ , '.� �r ?� /// /i ,'iii ' , \ \ \\ \ \ \\ \ \ I �i-P� LL Lu pB 5112, PG 348 a \ \ \ Q EXISTING CONDITIONS NOTES: rr nn I ' ' .TST , i 1. A PORTION OF THIS PROJECT IS LOCATED WITHIN V Z LOUNSBURY, KEVIN G OR ANN A / \ , I , , \ TMP 055CO-00-OA-00200 / LUDWIG, DALE 8 CHRIS ANNE `= — — — O / / , \ y FLOODPLAIN LIMITS BASED ON FEMA MAP NUMBER O o TMP 055C0 00-OA-00100 - s s / �' r / ' EXISTING TREE LIMTS (TYP ) i /s " F \ 0.560 ac. / /' �, \ \ r , r , \ / r �� Ny O 0 51003CO229D ADOPTED FEBRUARY 4, 2005. Z JORDAN, ROSEM DB 989, PG 389 / 0.600 ac. / --` * .Q� `\ �',' ,�,',/ ,' ,' - _ \`\ \I `` I /' �P '(001` 2. THE BOUNDARY LINE, PARCEL INFORMATION AND F_ \ \ \ TMP 055C0-00-OA-00400 �I DB 5132, PG 760 O < SANITARY SEW )r / J O TOPOGRAPHY WERE PROVIDED BY ROUDABUSH, GALE AND J W \ \ O O 0.520 ac. I O DB 4037, PG 681 ASSOCIATES IN JANUARY OF 2019. INFORMATION WAS FIELD LL� \ STRICKLER,GLORIA\\ �` / / If VERIFIED \ s� O �/ / \ I''%%�- VERIFIED BY COLLINS ENGINEERING IN SEPTEMBER OF 2020. Q TMP 055CO-00-OA-00500 \ ` (2) EXISTING 60" CMP CULVERTS `09��0 , / / ) O / j; ' �Q \\� 3. PRESERVED STEEP SLOPES ARE LOCATED ON THE PROPERTY < LL.I O 0.370 ac. \\ �O - --' / / 'i \ / \ ','/ ` \ \\ AS SHOWN ON THE PLANS. 100' WPO STREAM BUFFER IS /mi a�II�� J O DB 1153, PG 735 \ O O EXISTI G FIRE / (j _ / ` / r / V \ O \ \ \ \' / THE HOUSING LAB LLC HYDRANT TO REVAIN ,' 1 O % I ,� ( , , / ,' / \ \ C % / SHOWN. \ , TMP 05500-00-0o-068D0 UNDTSTURBED " 1' ; / ( r / O / / , / x\ EXISTING CONCRETE SIDEWALK � O / vO �� DB5079,PG303 ��---�' l'�1 THE HOUSING LAB LLC TMP 05500-00-00-o68C0 O D65079,PG303 (� I'+ \I (/ /,��/\G P Ii SCAL / F I, 0 30 60 / 120 ,' 40 \ ' w w lA O O , \ O O (IN FEET) JOB NO. \ HALLO SY IA O O \w `\ , ` O 1 Inn = 60 fL � O 182154 O ROSA NEZ-V QUEZ \ O / /' `\ /' TM 500-00 0-068B0 \ �� \ / ' ' \ SCALE \ \ 0.4 ac. 10, UTILITY NOTE: 1 n _ 60N O O O 4 1, PG 364 \ FO THE FIVE VACANT WATER METERS ALONG ORCHARD DRIVE SERVING TMP t \ 055Co-03-oo-000l AS SHOWN ON THIS SHEET, SHALL BE ABANDONED IN ACCORDANCE SHEET NO. 'L�; WITH MINIMUM ACSA STANDARDS, TYPICAL. SEE THIS SHEET FOR ACSA DETAIL TD-ii. 2 EROSION & SEDIMENT CONTROL EROSION CONTROL NOTES DESCRIPTION OF EROSION & EROSION CONTROL NOTES & NARRATIVE MEASURES: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE SEDIMENT CONTROL MEASURES: PROJECT DEscR/PTION: PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TTHE COMMENCEMENT OF LAND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN DISTURBING ACTIVITY, AND ONE WEEK PRIOR THE FINAL INSPECTION THE PURPOSE OF THIS LAND DISTURBANCE ACTIVITY IS TO CONSTRUCT RAMBLING BROOK LANE, CONNECTING THE PLEASANT GREEN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND SUBDIVISION PROJECT TO EXISTING ORCHARD DRIVE. THIS PROJECT PROPOSES TO DISTURB AN ADDITIONAL 1.99 oc. OF LAND OUTSIDE STRUCTURAL PRACTICES USED IN THIS SECTION CONSIST OF THE FOLLOWING: MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL MEASURES: OF THE THE PREVIOUSLY APPROVED AND PERMITTED AREAS, AS SHOWN AND LABELED ON SHEETS 3 & 4. THE PROJECT WILL BEGIN EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR ITS CONSTRUCTION WITH THE PROPOSED ESC MEASURES IMMEDIATELY FOLLOWING PLAN APPROVAL, WHICH IS ANTICIPATED TO BE IN 3.01 SAFETY FENCE: 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. IT IS ANTICIPATED THAT THE CONTRACTOR WILL USE A CONSTRUCTION ENTRANCE, THE SPRING OF 2021. THE WORK IS ANTICIPATED TO BE COMPLETED WITHIN 12 MONTHS A PROTEC77VE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL J. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR RIPRAP, OUTLET PROTECTION, DIVERSIONS, A UTILITY STREAM CROSSING, INLET EXISTING S17E COND177ONS.- MEASURE. TO PROHIBIT 774E UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY AS THE FIRST STEP IN CLEARING. PROTECTIONS AND SILT FENCES TO CONTROL SURFACE DRAINAGE. TEMPORARY SEEDING THE EXISTING SITE IS WOODED WITH LIGHT UNDERBRUSH. POWELLS CREEK EXISTS ON THE PROPERTY, FLOWING NORTH TO SOU774 ON THE PUBLIC. APPLICABLE TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH 4. A COPY OF 774E APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE WILL BE USED IMMEDIATELY FOLLOWING ALL LAND DISTURBANCE ACRIITlES. STOCKPILE THE SITE. CAN BE CONSIDERED UNSAFE BY VIRTUE OF P07EN77AL ACCESS BY THE PUBLIC. MAINTAINED ON THE SITE AT ALL TIMES. ADJACENT AREAS: 5. PRIOR TO COMMENCING LAND DISTURBING AC7IVITIES IN AREAS OTHER THAN LOCA7IONS SHALL BE ON SITE AND SHALL BE STABILIZED WITH A TEMPORARY THIS SITE IS BORDERED NORTHEAST BY THE PROPOSED PLEASANT GREEN SUBDIVISION, AND ON THE EAST BY EXIS77NG RESIDEN77AL 3.02 C0NS7RUC77ON ENTRANCE.* INDICATED ON THESE PLANS (INCLUDING BUT NOT LIM17ED TO, OFF -SITE BORROW OR VEGETATIVE COVER. TEMPORARY STOCKPILE AREAS THAT ARE USED FOR STORING SOIL LOTS. SOUTH OF THE PROPOSED S17E IS ✓ARMANS GAP ROAD, AND ORCHARD DRIVE EXISTS TO THE WEST. SILT FENCE W77H WIRE A STABILIZED GRAVEL CONSTRUCTION ENTRANCE LOCATED AT POINTS OF VEHICULAR WASTE AREAS), 774E CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION UNTIL A LATER TIME FOR SPREADING WILL REQUIRE MAINTENANCE & SHALL BE BACKING, A U77LITY STREAM CROSSING, RIPRAP, INLET CONTROLS AND VARIOUS 07HER ESC MEASURES ARE PROPOSED TO LIMIT THE INGRESS AND EGRESS ON A CONSTRUCTION SITE TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. CONTROL PLAN TO THE OWNER FOR RE14EW AND APPROVAL BY THE PLAN APPROVING SURROUNDED BY SILT FENCE AT ALL TIMES. PERMANENT SEEDING WILL BE PERFORMED POTEN7AL FOR CONTAMINATION OF THESE ADJACENT PROPERTIES AND WATERWAYS. CONS7RUC77ON ENTRANCES SHALL BE INSTALLED AS SHOWN ON THE PLANS TO REDUCE 6. AUTHORITY THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION FOR ALL AREAS WHICH WILL NO LONGER BE EXCAVATED AND WHERE CONSTRUCTION OFFS17F LAND DISTURBANCE.• 774E AMOUNT SEDIMENT TRANSPORTED ONTO PUBLIC ROADWAYS OFFSIDE LAND DISTURBANCE IS LIMITED TO PUBLIC RIGHT-OF-WAY AND AREAS LOCATED WITHIN THE OVERALL PLEASANT GREEN CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS ACTIVITIES HAVE CEASED. PERMANENT SEEDING SHALL ALSO BE PERFORMED FOR ALL BOUNDARY. CONSTRUCTION ROAD STABILIZATION: DETERMINED BY THE PLAN APPROVING AUTHORITY. DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR A YEAR OR MORE. SELECTION OF SOILS,• THE THE TEMPORARY STABILIZATION OF ACCESS ROADS, SUBDIVISION ROADS, PARKING 7 ALL DISTURBED AREAS ARE DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. TEMPORARY SEEDING WILL SEE SOIL DESCRIPTIONS ON THIS PAGE AND THE PHASE l EROSION &SEDIMENT CONTROL PLAN FOR BOUNDARIES, SOIL TYPES AND AREAS, AND OTHER SITE VEHICLE 7RANSPORTA770N ROUTES WITH STONE IMMEDIATELY AFTER GRADING. TO REDUCE EROSION OF TEMPORARY ROADBEDS BY CONSTRUCTION UN77L FINAL STABILIZA7ON IS ACHIEVED. BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE GENERAL SOIL DETAILS TRAFFIC DURING WET WEATHER AND TO REDUCE EROSION AND SUBSEQUENT REGARDING B. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED THAN SEVEN DAYS THESE AREAS SHALL BE SEEDED WITH FAST GERMINATING CRI77CAL AREAS: OF PERMANENT ROADBEDS BETWEEN THE TIME OF IN177AL GRADING AND FINAL FILTERING DEVICE. POWELLS CREEK AND ITS IMMEDIATELY ADJACENT WETLANDS ARE LOCATED ON THE PROPERTY. THESE ARE CONSIDERED CRI77CALLY STABILIZATION. USE WHEREVER STONE -BASE ROADS OR PARKING AREAS ARE 9• 774E CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF SEED SENS177VE AREAS. 774E CONTRACTOR SHALL GIVE EXTRA ATTENTION AND CAUTION IN AND AROUND THESE CRITICAL AREAS TO ENSURE CONSTRUCTED, WHETHER PERMANENT OR TEMPORARY, FOR USE BY CONSTRUCTION AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. SEDIMENT IS NOT DEPOSITED ON THEM. TREE PR07EC77ON FENCING, SILT FENCING, DIVERSIONS AND SEDIMENT TRAPPING DEVICES TRAFFIC. CLEANUP TO MAINTAIN THE EFFECTIVENESS OF 774E EROSION CONTROL DEVICES SHALL SHALL ALSO BE INSTALLED AS A FIRST STEP IN LAND DISTURBANCE TO ENSURE THESE CRI77CAL AREAS ARE MAINTAINED. BE MADE IMMEDIATELY. 3.01 SAFETY FENCE - SAFETY FENCE IS PROPOSED AROUND THE SEDIMENT BASIN AND SEQUENCE OF CONSTRUCTION: 305 SILO FENCE: 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 1. CONTRACTOR SHALL NOTIFY THE ALBEMARLE COUNTY COMMUNITY DEVELOPMENT ENGINEERING DEPARTMENT TO SCHEDULE A A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHE77C FILTER FABRIC 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SEDIMENT TRAP. PRE -CONSTRUCTION MEETING. STRETCHED ACROSS AND ATTACHED TO SUPPOR77NG POSTS AND EN7RENCHED, TO SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS STUMPS WOOD, RUBBISH, AND 302 CONSTRUCTION ENTRANCE - TO REDUCE THE AMOUNT OF MUD TRANSPORTED 2. PRIOR TO DISTURBANCES, 774E LIMITS OF DISTURBANCE SHALL BE FLAGGED AND 774E TREE PROTECTION FENCING SHALL BE INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING OTHER DEBRIS INSTALLED. CONSTRUCTION OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE SITE 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLE77ON ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. (2) CONSTRUCTION J. NO EROSION CONTROL MEASURES MAYBE REMOVED DURING THE CONSTRUCTION PROCESS WITHOUT THE APPROVAL FROM THE AND TO DECREASE THE VELOCITY OF SHEET FLOWS AND LOW -TO -MODERATE LEVEL PER ZONING ORDINANCE SEC77ON 5.1.28. ENTRANCES ARE PROPOSED. INSPECTOR ON THE PROJECT. CHANNEL FLOWS. THE SILT FENCE BARRIERS SHALL BE INSTALLED DOWN SLOPE OF 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-JOI 303 CONSTRUCTON ROAD STABILIZATION - TO REDUCE THE EROSION OF TEMPORARY 4. INSTALLATION OF THE PROPOSED CONSTRUCTION ENTRANCES SHALL OCCUR NEXT. THE CONTRACTOR SHALL APPLY AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT LADEN RUNOFF FROM SHEET FLOW OF THE CODE OF ALBEMARLE. AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL-T)PE POWER EQUIPMENT ROADBEDS BY CONSTRUCTION TRAFFIC AND TO REDUCE THE EROSION AND SUBSEQUENT CONSTRUCTION ROAD STABILIZATION AS NEEDED TO THE CONSTRUCTION ENTRANCES AND CONTRACTOR PARKING STAGING / MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION & SEDIMENT CONTROL SHALL BE LIMITED TO 774E HOURS OF 7:00 AM TO 9.00 PM. REGARDING OF PERMANENT ROADBEDS BETWEEN THE TIME OF INITIAL GRADING AND AREA. CONSTRUCTION ENTRANCE TO BE INSTALLED WHERE CONSTRUCTION VEHICLE ROUTES INTERSECT PAVED PUBLIC ROADS, HANDBOOK (VESCH). 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT FINAL STABILIZATION. CONSTRUCTION ROAD STABILIZATION WILL BE APPLIED TO THE (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY ( MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF 3.07 STORM DRAIN INLET PROTECTION: PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY CONTRACTOR PARKING & STAGING AREAS AS NEEDED. EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTING TO A SEDIMENT A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN PUBLIC S7REET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 3.05 SILT FENCE- SILT FENCE IS PROPOSED, WHERE SHOWN ON THE PLANS. CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. DROP INLET OR CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE 16. THE DEVELOPER SHALL RESERVE 774E RIGHT TO INSTALL, MAINTAIN, REMOVE OR 3.07 STORM DRAIN INLET PROTECTION- STORM DRAIN INLET PROTECTION IS SHOWN ON 5. THE lNIPAL ESC CONSTRUC770N MEASURES, AS SHOWN ON THE PHASE l EROSION &SEDIMENT CONTROL PLAN, SHALL BE SYSTEMS PRIOR TO PERMANENT STABILIZATION OF THE DIS7URBED AREA. INLET CONVERT TO PERMANENT STORMWATER MANAGEMENT FACIL177ES WHERE APPLICABLE INSTALLED NEXT. THE CONTRACTOR SHALL BEGIN BY INSTALLING THE PERIMETER SILT FENCE AND TREE PROTECTION. PERIMETER PR07EC77ON APPLIES WHERE STORM DRAIN INLETS ARE TO BE MADE OPERATIONAL ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE THE PLANS WHEN INLETS ARE CONSTRUCTED BUT THEIR S/7E's CONTRIBUTING DRAINAGE MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP WITH ANY LAND DISTURBANCE AC77WTY AND BEFORE PERMANENT STABILIZA7ON OF THE CORRESPONDING DISTURBED DRAINAGE SALE OF ANY LOT, UNIT, BUILDING OR 07HER PORTION OF THE PROPERTY. AREA IS S77LL BEING STABILIZED. SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. AREA. 17. TEMPORARY STABILIZAT70N SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING 3.08 CULVERT INLET PROTEC7ON - PROPOSED AT THE INLET OF THE TEMPORARY 6. ONCE THE PERIMETER EROSION CONTROL SILT FENCE AND TREE PR07EC77ON HAVE BEEN INSTALLED, AND THE COUNTY 3.11 TEMPORARY RIGHT-OF-WAY DIVERSION: IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSTRUCTION ENTRANCE CULVERT. INSPECTOR HAS APPROVED THESE MEASURES, LIGHT CLEARING AND LAND DISTURBANCE MAY BEGIN FOR THE REMAINING A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS CONSIST A 50/50 MIX OF ANNUAL RYGRASS AND CEREAL WINTER RYE, OR IN MARCH 3.18 OUTLET PROTECTION -OUTLET PROTECTION IS PROPOSED AT THE OUTLET OF THE PERIMETER CONTROLS, INCLUSIVE OF SEDIMENT TRAP #1. THE CONTRACTOR SHALL FOLLOW THE TRAP INSTALLA7ION WITH THE DISTURBED RIGHTS -OF -WAY AND SIMILAR SLOPING AREAS. TO SHORTEN THE FLOW AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF STREAM DIVERSION IN ACCORDANCE WITH THE PLAN AND DETAILS SHOWN ON THE PHASE l ESC PLAN. AFTER DIVER77NG THE LENGTH WITHIN A SLOPING RIGHT-OF-WAY, THEREBY REDUCING THE EROSION POTENTIAL GERMAN MILLET. S7RAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNA77VES BOX CULVERT CROSSING. SEE THE ESC PLAN FOR THE DESIGN LOCA770N. STREAM AND OBTAINING THE ESC INSPECTORS PERMISSION, THE CONTRACTOR CAN INSTALL THE PROPOSED TRIPLE BOX CULVERT BY DIVERTING STORM RUNOFF TO A STABILIZED OUTLET. GENERALLY EARTHEN ARE SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. .1 RIPRAP- RIPRAP l PROPOSED AT THE OUTLET OF THE CULVERT CROSSING AND 3 9 S 0 OSED AND ASSOCIATED WING WALLS AND RIPRAP. ONCE THE TRIPLE BOX CULVERT IS INSTALLED AND THE ESC AND VDOT DIVERSIONS ARE APPLICABLE WHERE THERE WILL BE LITTLE OR NO CONSTRUCTION 18. PERMANENT STABILIZA7ON SHALL BE LIME AND FER77LIZER, PERMANENT SEEDING AND TEMPORARY CONSTRUCTION ENTRANCE CULVERT INSPECTORS HAVE GIVEN APPROVAL, THE STREAM DIVERSION MAY BE REMOVED AND THE NORMAL FLOW CONDITION THROUGH THE 7RAFFIC WITHIN THE RIGHT-OF-WAY. GRAVEL STRUCTURES ARE MORE APPLICABLE TO MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, PROPOSED TRIPLE BOX CULVERT CAN BE ESTABLISHED. FOLLOWING THIS, THE CONTRACTOR SHALL INSTALL ANY REMAINING ROADS AND OTHER RIGHTS -OF -WAY WHICH ACCOMMODATE VEHICULAR TRAFFIC. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FER77LIZER SHALL BE APPLIED AT 3.25 UTILITY STREAM CROSSING- A UTILITY STREAM CROSSING IS PROPOSED FOR THE EROSION CONTROL 17EMS AS SHOWN ON THE PHASE I EROSION CONTROL PLAN. TEMPORARY SEEDING, PERMANENT SEEDING AND 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING BOX CULVERTS AT THE RAMBLING BROOK LANE CROSSING. DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. 312 DIVERSION: SHALL BE APPLIED AT 1BOLBS/ACRE AND CONSIST OF 959 KENTUCKY 31 OR TALL 3.32 PERMANENT SEEDING -PERMANENT SEEDING IS REQUIRED AND PROPOSED NTH THIS 7 ONCE ALL THE PHASE l EROSION CONTROL ITEMS HAVE BEEN INSTALLED & ARE OPERATIONAL, DRAINAGE IS PROPERLY A CHANNEL CONSTRUCTED ACROSS A SLOPE WITH A SUPPORTING EARTHEN RIDGE ON FESCUE AND 0-57 PERENNIAL RYGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS PLAN. CONVEYED TO THESE MEASURES, AND THE ESC INSPECTOR HAS GRANTED APPROVAL, THE CONTRACTOR CAN BEGIN PHASE l7 OF THE LOWER SIDE. TO REDUCE SLOPE LENGTH AND TO INTERCEPT AND DIVERT TO BE APPLIED AT 80LBS/10OSF. ALTERNA77VES ARE SUBJECT TO APPROVAL BY THE THE EROSION AND SEDIMENT CONTROL PLAN. STORMWATER RUNOFF TO STABILIZED OUTLETS AT NON -EROSIVE VELOCITIES. APPLIES 338 TREE PRESERVA77ON AND PROTECTION- TREE PROTECTION IS PROPOSED WITH THIS 8. AFTER CLEARING THE PROPOSED AREAS, THE CONTRACTOR CAN BEGIN ROUGH GRADING THE S17E TO THE CONTOURS SHOWN ON WHERE RUNOFF FROM AREAS OF HIGHER ELEVATION MAY DAMAGE PROPERTY, CAUSE EROSION CONTROL INSPECTOR. PLAN. SEE THE ESC PLAN FOR THE REQUIRED LOCATIONS BE THE PHASE ll EROSION &SEDIMENT CONTROL PLAN. MEASURES INTENDED TO TRAP SEDIMENT SHALL CONSTRUCTED AS A E EROSION, OR INTERFERE WITH THE ESTABLISHMENT OF VEGETATION ON LOWER AREAS, 19. MAINTENANCE., ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH FIRST STEP WITH ANY LAND DISTURBANCE ACTIN7Y AND SHALL BE MADE FUNCTIONAL BEFOREUPSLOPEALB LAND DISTURBANCE WHERE SURFACE AND/OR SHALLOW SUBSURFACE FLOW IS DAMAGING SLOPING UPLAND, RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED 3.39 DUST CONTROL -DUST CONTROL IS REQUIRED AND PROPOSED WITH THIS PLAN. TAKES PLACE. AND WHERE THE SLOPE LENGTH NEEDS TO BE REDUCED TO MINIMIZE SOIL LOSS. IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 507 OF THE WET STORAGE 9. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TBE RESEEDED WHEN 313 TEMPORARY SEDIMENT TRAP: E AND DIVERSION NECESSARY TO ACHIEVE A G000 STAND OF GRASS. SILT FENCE GRADE IS REACHED ON ANY PORTION OF THE SITE TEMPORARY SOIL STABILIZATION SHALL BE APPLIED W17HIN SEVEN DAYS TO A TEMPORARY PONDING AREA FORMED BY CONSTRUC77NG AN EARTHEN EMBANKMENT DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. WITH A STONE OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AND REPAIRED IMMEDIATELY. PERMANENT STABILIZA7ON SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. AREAS LONG ENOUGH TO ALLOW THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED 10. ONCE THE SITE IS ROUGH GRADED, THE CONTRACTOR SHALL BEGIN INSTALLATION OF THE PROPOSED ROADWAY. INLET USE BELOW DISTURBED AREAS WHERE 7H TOTAL CONTRI TIN DRAINAGE AREA /S B E E E BU G D G E WITHIN 30 DAYS OF FINAL SITE STABILIZATION WHEN MEASURES ARE NO LONGER MAINTENANCE. PR07EC77ON SHALL BE INSTALLED ON ALL INLETS IMMEDIATELY FOLLOWING THEIR CONSTRUCTION. THE INLET PROTECTIONS SHALL LESS THAN 3 ACRES, WHERE 774E SEDIMENT TRAP WILL BE USED NO LONGER THAN 18 NEEDED, SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS SHALL BE MADE AS NEEDED. IF THE STONE FILTER BECOMES• MONTHS, AND IT MAY BE CONSTRUCTED EITHER INDEPENDENTLY OR IN CONJUNCTION 21. THE E&S INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE E&S CONTROLS AS IN GENERAL, DURING CONSTRUCTION THE RLD OR CONTRACTOR ON -SITE WILL CHECK ALL CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, THE STONE MUST BE PULLED AWAY WITH A TEMPORARY DIVERSION DIKE. NECESSARY IN THE FIELD AS SITE COND177ONS CHANGE. IN ADDITION, NO SEDIMENT EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH SIGNIFICANT AND CLEANED AND/OR REPLACED. THE CONSTRUCTED STORM SEWER SHALL OUTFALL INTO SEDIMENT TRAP #1 UN77L THE S17E /S BASIN OR TRAP CAN BE REMOVED WITHOUT WRITTEN AUTHORIZATION. RAINFALL. MONITORING REPORTS WILL BE REQUIRED FROM THE RLD IF NEEDED. SPECIFIC COMPLETELY STABILIZED. THIS SHALL BE COMPLETED BY INSTALLING STR. C14 (STORM SEWER MH) W17H SEGMENTAL RINGS A TEMPORARY 3.14 TEMPORARY SEDIMENT BASIN: ATTEN77ON WILL BE GIVEN TO THE FOLLOWING ITEMS: RING SHALL BE INSTALLED DURING CONSTRUCTION TO OU7LET THE 7EMPORARY ESC 15" CUP INTO ST pi (SHOWN ON ESC PHASE l7). DURING A TEMPORARY BARRIER OR DAM WITH A CONTROLLED STORMWATER RELEASE STRUCTURE FORMED BY CONSMUC77NG AN EMBANKMENT OF COMPACTED SOIL ACROSS SOIL DESCRIPTION o. SEDIMENT BASINS AND/OR TRAPS WILL BE CLEANED AND MAINTAINED IN CONS7RUCTION 7HE LOWER, PERMANENT OU7FALL SHALL BE BLOCKED WAI ER77GHT TO ENSURE RUNOFF ENTERS ST 11 & IS NOT DISCHARGED A DRAINAGEWAY. TO DETAIL SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS ACCORDANCE WITH THE VIRGINIA EROSION &SEDIMENT CONTROL HANDBOOK. INTO THE STREAM. ONCE THE STORM SEWERS SUBAREA IS STABILIZED &THE ESC INSPECTOR GRANTS PERMISSION, THE CONTRACTOR CAN IN "WET" AND `DRY" STORAGE LONG ENOUGH FOR THE MAJORITY OF THE SEDIMENT TO 7B- BRADDOCK LOAM-2 TO 79 SLOPES. SOIL IS WELL DRAINED WITH A MEDIUM RUNOFF &ALL GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP THAT REMOVE 7HE TEMP. 15" ESC PIPE & 7HE LOWER BLOCKAGE TO ALLOW SIR. C14 TO DISCHARGE INTO 7HE STREAM. SETTLE OUT. APPLIES BELOW DISTURBED AREAS WHERE THE TOTAL CONTRIBU77NG CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE WILL PREVENT PROPER DRAINAGE. IF THE GRAVEL IS CLOGGED BY SEDIMENT, THE 11. AFTER THE SITE /S FULLY STABILIZED, AND THE ESC INSPECTOR GRANTS APPROVAL, THE CONTRACTOR SHALL REMOVE DRAINAGE AREA IS EQUAL TO OR GREATER THAN THREE ACRES. THERE MUST BE Q DEPTH THE WATER TABLE IS GENERALLY MORE THAN ' GRAVEL WILL BE REMOVED AND CLEANED OR lT WILL BE REPLACED. TEMPORARY ESC SEDIMENT TRAP 1. # SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY FOR THE CONSTRUCTION OF A 17- ED CRAIGSVILLE LOAM-0 TO 29 SLOPES. SOIL /S WELL DRAINED WITH A VERY LOW IL c.ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR 12. ONCE PHASE ll OF CONSTRUC770N IS COMPLETE THE SITE IS STABILIZED AND THE INSPECTOR HAS GIVEN APPROVAL THE TEMPORARY IMPOUNDMENT. RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" DETERIORATION OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL BE CONTRACTOR CAN REMOVE THE EROSION & SEDIMENT CON7ROL MEASURES. NO 17EM SHALL BE REMOVED, THROUGHOUT ALL THICK. THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHED HALF WAY TO THE PHASES OF CONSTRUCTION, UNLESS THE UPSTREAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES PRIOR PERMISSION. 318 OUTLET PROTECTION: 258-DYKE SILT LOAM-2 TO 7Z SLOPES. SOIL IS WELL DRAINED WITH A MEDIUM RUNOFF TOP OF THE BARRIER. 13. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION AND SEDIMENT STRUCTURALLY LINED APRONS OACCEPTABLE ENERGY DISSIPATING DEVICES d.ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE K17H THE PLACED AT THE OUTLETS OF PIPES OOR R PAVED CHANNEL SECTIONS. TO PREVENT CLASSIFICATION. SURFACE LAYER IS TYPICALLY SILT LOAM AND ABOUT 0-8'" THICK. MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. SCOUR AT STORMWATER PROTECT THE OUTLET STRUCTURE, AND TO THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". IN CASE EMERGENCY, THE PRIMARY CONTACT FOR THE PROJECT WILL BE THE RLD 14. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE FOR DO; S MINIMIZE THE POTENTIAL FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND 37D3-HAYESVC LOAM-15 70 259 SLOPES. SOIL WELL DRAINED WITH A HIGH OR CONTRACTOR ON -SITE. THE CONTRACTOR AT THIS TIME IS DIGS BROOK WOOD W17H A STABILIZA7ON OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS 07HERWSE AUTHORIZED BY THE LOCAL ENERGY CONCENTRATED FLOWS. APPLICABLE TO THE OUTLETS OF ALL A RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-7" T PROGRAM ADMINIS7RATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESUL77NG FROM THE DISPOS177ON OF D CHANNEL S C77O PIPES AND ENGINEERED CHANNEL SEC710NS• THICK. THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". DIGS MAY BE REACHED AT (434) 978-4435. IN ADDIT70N THE OWNER MAY BE TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. CONTACTED. UPON COMPLET70N OF THE PROJECT, THE OWNER WILL BE RESPONSIBLE 319 RIPRAP: REFERENCE: WEB SOIL SURVEY ONLINE DATABASE, FOUND AT FOR SITE MAINTENANCE. A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR http://websoilsurvey.nres.usda.gov/app/Web SoilSurvey.aspx STONE WITH FILTER FABRIC OR GRANULAR UNDERLINING. TO PR07ECT THE SOIL FROM THE EROSIVE FORCES OF CONCENTRATED RUNOFF, SLOW THE VELOCITY OF CONCENTRATED RUNOFF WHILE ENHANCING THE POTEN7AL FOR INFILTRATION, AND TO EROSION CONTROL NOTES STABILIZE SLOPES WITH SEEPAGE PROBLEMS, AND/OR NON -COHESIVE SOILS. USE ---- WHEREVER SOIL AND WATER INTERFACE AND THE SOIL CONDITIONS, WATER TURBULENCE - ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETA77VE AND STRUCTURAL AND VELOCITY, EXPECTED VEGETA77VE COVER, ETC., ARE SUCH THAT THE SOIL MAY �+ T FENCE CULVERT INLET EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED ERODE UNDER THE DESIGN FLOW COND177ONS JILT AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND PROTECTION SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL 3.25 UTILITY S7REAM CROSSING: HANDBOOK AND VIRGINIA REGULATIONS V R 625-02-00 EROSION A SMA7EGY FOR CROSSING SMALL WATERWAYS WHEN IN-S7REAM U77LITY AND SEDIMENT CONTROL REGULATIONS CONSTRUCTION IS INVOLVED. TO HELP PROTECT SEDIMENT FROM ENTERING THE ENDWALL ES-2: THE PLAN APPROVING AUTHORITY MUST BE N077FIED ONE WEEK STREAM FROM CONSTRUCTION WITHIN APPROACH AREAS. TO MINIMIZE THE AMOUNT OF PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR DISTURBANCE WITHIN THE STREAM ITSELF. GENERALLY APPLICABLE TO FLOWING STREAMS W17H DRAINAGE AREAS LESS THAN ONE SQUARE MILE. 3.31 TEMPORARY SEEDING THE ESTABLISHMENT OF A TEMPORARY VEGETA77VE COVER ON DISTURBED AREAS BY SEEDING W1774 APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS. TO REDUCE EROSION AND SEDIMENTATION BY STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO ___ _________ __------------------------ L T---T-' TOE OF FILL I I CULVERT I TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES-3:ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES-4: A COPY OF 774E APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES GENERAL SLOPE (3:1 OR LESS) PER ACRE ES-5: PRIOR TO COMMENCING LAND DISTURBING ACT7VITTES IN AREAS TOTAL LBS I I FINAL GRADE FOR A PERIOD OF MORE THAN 30 DAYS. TO REDUCE DAMAGE FROM 6 OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT KENTUCKY 31 FESCUE 128 UPS. SEDIMENT AND RUNOFF TO DOWNSTREAM OR OFF -SITE AREAS, AND TO PROVIDE LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CON7RACTOR RED TOP GRASS 2 LBS. PR07EC77ON TO BARE SOILS EXPOSED DURING CONSTRUC7ON UN77L PERMANENT i SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE SEASONAL NURSE CROP 20 LBS. VEGETATION OR OTHER EROSION CONTROL MEASURES CAN BE ESTABLISHED. I i OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. SEASONAL NURSE CROP 150 LBS 3.32 PERMANENT STABILIZATION: ES-6: THE CONTRACTOR IS RESPONSIBLE FOR IS OF ANY THE ESTABLISHMENT OF PERENNIAL VEGETA77VE COVER ON DISTURBED AREAS BY __________ __ ______ _ ___ _________ ___ _ AR7ON ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT FEBRUARY Ts THROUGH APRIL ANNUAL RYE NECESSARY PLANTING SEED. TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM `-- --- EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN MAY 1 THROUGH AUGUST 15 FOXTAIL MILLET DISTURBED AREAS TO PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER THAT APPROVING AUTHORITY. AUGUST 16 THROUGH OCTOBER ANNUAL RYE IS ECONOMICAL, ADAPTABLE TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE TOE OF FILL ES-7.•ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT NOVEMBER THROUGH FEBRUARY 15 WINTER RYE MOST APPROPRIATE PLANT MATERIALS. TO IMPROVE WILDLIFE HABITAT. TO ENHANCE CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING NOTES: NATURAL BEAUTY. UPON COMPLET70N OF CONSTRUC7ON AC77Vl77ES, ALL AREAS WILL ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL RECEIVE A PERMANENT VEGETATIVE COVER. SILT FENCE DISTANCE IS e• MINIMUM IF ROW STABILIZATION IS ACHIEVED. 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL IS TOWARD EMBANKMENT ES-8-DURING DEWA7FRING OPERATIONS, WATER WILL BE PUMPED INTO AN TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 3.38 TREE PRESERVATION AND PROTECTION: APPROVED WATER FILTERING DEVICE. P F MECHANICAL INJURY A PR07EC77ON OF DESIRABLE TREES FROM MECH NlC L OR 07HER N✓UR DURING LAND FLOW ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION DISTURBING AND CONSTRUC7ON ACTIVITY. TO ENSURE THE SURVIVAL OF DESIRABLE PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL OF SEED APPLICATION, IN ACCORDANCE W/ VESCH STD 3.35. TREES WHERE THEY WILL BE EFFECTIVE FOR EROSION AND SEDIMENT CONTROL, * * EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE WATERSHED PROTECTION, LANDSCAPE BEAU77FICARON, DUST AND POLLUTION CONTROL, NOISE REDUCTION, SHADE AND OTHER ENVIRONMENTAL BENEFITS WHILE THE LAND IS OPTIONAL STONE COMBINATION EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE O PERMANENT SEEDING SCHEDULE PS IMMEDIATELY. BEING CONVERTED FROM FOREST TO URBAN -TYPE USES. APPLIES IN TREE -INHABITED NO SCALE AREAS SUBJECT TO LAND DISTURBING ACTIVITIES. (STD. & SPEC. 3.32 OF VIRGINIA EROSION & 3.39 DUST CONTROL: °' S' SEDIMENT CONTROL HANDBOOK, 3RD ED.) REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, A A DEMOLITION AND CONSTRUCT70N ACTIVITIES. TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT HEAL7H HAZARDS, TRAFFIC SAFETY PROBLEMS OR Source: Va. DSWC HARM ANIMAL OR PLANT LIFE. DUST CONTROL MEASURES SHALL BE EMPLOYED TO FLOW _v' PREVENT SURFACE AND AIR MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES 2.51 EMPLOYED SHALL BE IN ACCORDANCE WITH THE VESCH _ w VDCT I/3, #357 OR #5 COARSE TO REPLACE SILT FENCE IN - HOKc nmt wren HIGH VELOCITY OF FLOW IS EXPECTED I RIPRAP CD C INLET BLOCK WIRE SCREEN OR BLOCKCOARSE AGGREGATE 0 1. SET POSTS AND EXCAVATE A 4 X4 2. STAPLE WIRE FENCING TO TRENCH UPSLOPE ALONG THE LINE THE POSTS. OF POSTS FLOW STONE 70' MIN, CONSTRUCTION ACCESS 3 SM-2A ASPHALT T TOP L COURSE STONE CONSTRUCTION ACCESS � 2% 1 2% MIN. 21A AGGREGATE BASE MIN. ASPHALT PAVED WASHRACK CK 1 2% 12' MIN.' I _^ t-POSITIVE DRAINAGE 'MUST EXTEND FULL WIDTH TO SEDIMENT OF INGRESS AND EGRESS OPERATION TRAPPING DEVICE PLAN MIN. FILTER CLOTH EXISTING PAVEMENT EXISTING PAVEMENT S17NE DRAINA! I SEDIMENT APPING DEVICLL A ninaumn water tap of 1 inch mast be installed with a nniniama 1 ihch baltcock shutoff vaI suppling a wash hose with a diameter of 1.5 inches for adequate constant pressure. Wash water mast be carried away L'onr the enhance to an approved settling area to remove sediment. All sedinent shall be prevented 5 ow enter* storm drains, ditches 01 watercourses. PAVED WASH RACK NO SCALE TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive(Adhesive: Water) Nozzle Gallons Acre Anionic Asphalt Emulsion 7:1 Coarse Spray 1,200 Latex Emulsion 12.5:1 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion (Non -Traffic) 7:1 Coarse Spray 450 Acrylic Emulsion (Traffic) 3.5:1 Coarse Spray 350 Source: Va. DSWC J. ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE THE WIRE FENCE AND EXTEND EXCAVATED SOIL. IT INTO THE 7RENI r- ,5UPER SILT FENC,5 (WITH WIRE -BACK NO SCALE FLOW IIIIII� IIIII,II' �/� �IIIIIIIIII, I. IIII=1 11- " EXTENSION OF FABRIC AND (- WIRE INTO THE TRENCH. SCOTT/R. M6LLINS'Z No. 35791 ,� 1/27/21 r�4� 0 0 LU .--I ry w V L 1 ~ 0 0 LU 0 m w w Z Q Q 2 Z Ou 0 oc z z w J to CIOw a In Z J U U w CC UI F- w > z > > ° www CW w In w In w In CI CI Of r co C'7 N z M a __' � J J I N O rn W N 0 N > v > �06 I J J J Q O > O z LU O LL O O L z Q LLJ O C) z CU LU O Z U W D z 2 Ul C/) W w 0nn () LU V W ~ `z � z IIIIJ w U J Q O Q J LLJ 0 O O N F- 0 w w a Ln 182154 SCALE NONE 3 3.25 SOILTYPE � -\ / / — — — — 36D-� PROPOSED STOCKPILE / SURROUNDED BY SILT FENCE / I \ \ / PROPOSED 18" DIVERSION PROPOSED WITH PLEASANT — i / — / \i / DD PROPOSED WITH PLEASANT GREEN PHASE IC STRUCT19N' /I — \ DC / / \ GREEN PHASE I CONSTRUCTION / I / V I X PS iY ' / / I / / / / EXISTING FENCE \ \ \ \ / ✓ / / / TO BE REMOVED \ \ / /✓ / / I I / / WITH PLEASANT GREEN PHASE I \ \ \ CONSTRUCTION X / X T WIDE VDOT CL. Al, EC-1 STONE OUTLET / PROTECTION PROPOSED WITH PLEASANT y / / X GREEN PHASE I CONSTRUCTION SAFETY FENCE & SIGNS SAF "WARNING QUICK SAND, KEEP S01 TH PLEASANT 1JYPE / GREENPHASEPROPOSED II CONSTRUCTION / 2 / / /SOIL BOUNDARY LINE (TYP.) PROPOSED BAFFLES l � / Bi / PROPOSED IT' Or \ / / / _ / / / / SEDIMENT BASIN \�\ ; , FLOW BARRIER \ SHALL REMOVE THE TYPE C DIVERSION (RIPRAP OR SANDBAGS), /y 0 0 p m DID PROPOSED WITH PLEASANT / \ PROPOSED WITH <RPRAP• sANDeAcs• ANY SEDIMENT LADEN MATERIAL LOCATED WITHIN THE TEMPORARY i� LU LU LU c / I _ / _ PLYWOOD. JERSEY GREEN PHASE I COJVST UCTION /'- / WPO 201900003 WPO 201900003 BARRIERS OR SHEET T°�"G DIVERSION AND THE TEMPORARY DIVERSION's EMBANKMENT ° / I - FILING) OPERATION (INCLUSIVE OF A NON -ERODIBLE, WATERTIGHT MATERIAL IF W W w AMENDMENT #1 LIMITS AMENDMENT #1 FORMER LOCATION PLACE RIPRA➢ • 6' MINIMUM OR WIDTH OF EXISTING STREAM WHICHEVER IS LESS APPLICABLE). THE CONTRACTOR SHALL REPLACE THE TEMPORARY °C OF DISTURBANCE _ — of slow IYAREA AT TRANSITION DIVERSION WITH COMPACTED STRUCTURAL FILL PRIOR TO -O SILT FNCE w/ WIRE _ p •• ENTRENCH SILT FENCE AID FILTER CLOTH IN SAME TRENCH PERSPECTIVE VIEW INSTALLING THE ROAD's EMBANKMENT. ° L BACKIN PROPOSED-- - -- / / SILT FENCE w/ WIRE '� /\ / / / / X-� SFWITH PLE SANTNT GREEN N BACKING PROPOSED / / SOIL TYPE PHASE I CO STRUCTION // Source: Va. DSWC Plate 325-] Source: Adapted from VDOT Standard Sheets Plate 3.25-2 WITH PLEASANT GREEN SF \ / / / \ _ PHASEICONSTRUCTION ' ��� -k / V / / EXISTING FENCES , / / / / V / / / / A o V A ( ) 1 I \ TO BE REMOVED -� f� w/ WIR +v-� / CONTRACTOR SHALL INSTALL THE (3) 8'(H)x10'(W) CONCRETE / ACKI BOX CULVERTS PROPOSED WITH THE CONNECTOR ROAD PLAN AFTER THE DIVERSION CHANNEL HAS BEEN INSTALLED AND IS / � — / � / / � •, / TP TR@E PROTECTIO J /\ \ OPERATIONAL. AFTER THE PROPOSED CULVERTS, WING PR POSED WITH I -� \ WALLS, AND CULVERT RIPRAP HAVE BEEN INSTALLED AND / / / I ) / / // / — — — _ ' f r o 7wPO/ / `pLEAS/1�.NT GREEN PHASE I I i /�L THE ESC INSPECTOR HAS GIVEN APPROVAL, THE DIVERSION_ — BUFFER, TYP. / I CHANNEL CAN BE REMOVED AND NORMAL FLOW CONDITIONS / / I / / / / _ — / / o o CON STRUCTION I � �\ / I / CAN RESUME THROUGH THE PROPOSED BOX CULVERTS. / \ / — — LU LIMITS OF TREE ( / � �� I I � PHASE II GRADING OPERATIONS FOR THE CONNECTOR ROAD � \ / EXIS NG 100-YR FLOODPLAIN PER / / / _ � � � � � / ' � // / � � o 174 C CLEARING ASSOCIATED J ` /C SHALL NOT BEGIN UNTIL THE PERIMETER ESC MEASURES AND HEC- ANALYSIS PERFORMED BY / J _ ' /_ _ — / EXISTING 100-YR FLOODPLAIN PER11� I PROPOSED WING WALL \ THE PROPOSED BOX CULVERTS HAVE BEEN INSTALLED. \\ / COLLINS ENGINEERING IN APRIL 2019, TYP. / / ° WITH WPO 201900003 I HEC-RAS ANALYSIS PERFORMED B+ / / I I ) c -AMENDMENT #1 I COLLINS ENGINEERING IN APRIL 200, TYP. � I � � I � ` W/ WIRE / / / / // — �— —L ` — _ , �— / PROPOSED TRIPLE I I ACKING \ /X\ / / / / — N WIRE f\ / BOX CULVERT I PROPOSED IN-STREA RIPRAP / _ \ BACKING (3) 8'(W)x10'(H) I RR AT TRANSITIONS (BEGINNING / & ENDING OF UTILITY STREAM CONCRETE BOX ) CULVERTS ,�I. _ -�F / CROSSING DIVERSION y�y�^ / � LIMITS OF TREE Yr� \ � � — / / / — � / � � — \ CLEARING (TYP.) / 'F yry _ — \ \ ) / / / / /_ �� _ \ �\ / PROPOSED WING WALL /\y / LIITS OF — 7 \\ J PROPOSED VDOT STD. EC-1, CLASS I U, �' / / / _ ' \ \ I I 0 / SOILTYPE \ RIPRAP WITH ATYPE B INSTALLATION TO RR ` \ \ STRAM, TYP. \ SOIL TYPE / �/ 1 \ / ��/ // / / / \ \ / I l� (�I o 17 \ BE INSTALLED BETWEEN THE PROPOSED \\ \ 17 I — \ — A / « I D. V \ / / 1 (n — V A a WING WALLS FOR INLET PROTECTION / \ PROPOSED VDOT STD. EC-1-, \ \\ \ \ \ / \ \ /-/ / / / — \ \ / l— co < > WIRE F RR CLASS I RIPRAP WITH A TYPE \ \ \ \ \ / / / -� \m / / / i \ \ \ \ \ \ \ / I J o \ \ SERVE B INSTALLATION TO BACKING / \ _ — \ \ \ \ L AS OUTLET PROTECTION \ / / \ � / / "��' g / / — � \ \ \ \ (� o (L=60', W=60', D=2') \ \ ~ \ \ / % \ / / / / \ \ \ \ \ O LIMITS OF \ "" - — — / / \ \ \ �\ d \ - - T TREE PROTECTION \ \ \� _ \ \ � / / // ^ \ � \ / / / / / / \ % \ \ \ \ � 0- A V A STREAM, TYP. �n A A \ �, ( / % A A / Cl) / / / l \ \ \ 00 WPO 20190002 L MITS OF� / / / / / / / V A A \ o v A �4 "," \ \ v / // / DISTURBANCE V A \ \ V \ PROPOSED FLOW BARRIER \ \ �8p / // A I I / I / / / / �- y- V A� \ V A , , — — Q R � a � L.L L, \ \ \ \ \ / / ii / / l / LI ITS OF TREE a "BANDBAG$P DOD, JERSEY ^ \ ) CLEARING (TYP.) /✓ /T ) l \\ --BAR RS, R EQUIVALENT) SILT FENCE w/ WIRE BA CKIN \ �. /jII /n I /G y I \ \ I SOIL TYP \ \ �- \ \ \ \ \ r ,— — w L ° / \ \ PROPOSEDIN RIPRAP \ \ PROPOSED WITH PLEASANT EN / / /`� I / ( \ t \ \ \ _J 1 PHASE I CONSTRUCTI % / / / \ / I / \ \ i \ T AT TRANSITIONS (BEGINNING USC \ \ 686 / / / / I TR E \ 37D3 \ S Div/ WIRB\ \ \ J / \ & ENDING) - UTILI STREAM / I \ / \\\_ �} BAiSKING \ 1 I O I/ I v __ _— I / / I �ROTcT� i U \ \ CROSSING DIVERSION / \ ` — \ / / / / / / / I I ( \ \ \ I O I \ � � THE FUELING TANK SHALL BE COMPLETELY SURROUNDED BY A / / / I II I I I I � / / _ \ �- \ \ I� (J) L =1 I \ \ \ \ PROPO�ED ALIGNMENT OF ' \ `>' .� — 2' DEEP, 2' WIDE EARTHEN BERM WITH A HEAVY MIL ,.�,/ / / / / // I I (n I I I I �- / \ 1 w r `o \ \ STREAM DIVERSION WHILE \ \ \ — — — — POLYETHYLENE LINING, OR BE PLACED IN AN IMPERVIOUS I �' °j / / / // / / \ \ I I •. CULVERT IS INSTALLED. DETAILS ` I I OPEN -TOP DUMPSTER WITH A SIDE DOOR. THE PROPOSED / / / I \ I w \ & NOTES d THIS SHEET. \ / \ \ \ I C BERM OR DUMPSTER SHALL CONTAIN FUEL IN THE EVENT OF A / WPO 201900603 / / / / I / / / / �` / \ I i - - — ~ 3 \\ \WAIM I I I \� I I f �X SPILA L CONTRACTOR SHALL ENSURE VOLUME CAPACITY IS / / / / / / TS \ \ \ \ �- \ O 0 \\\ \ \\ \ \ \ \ I I I _ `I I I I I / �� 10% LARGER THAN THE MAXIMUM VOLUME OF STORED FUEL. / AMENDMENT #1 LIMITS I / / / I / 1 / / / / / \ III ' - _J RAN 00TREE OF ISTURBANCE 0 \\ _ \V PROTECTION TP /� // / ��/ _ i/ l (q / / / / / / I Q / � o \ \\\ \ \ \ \ \ �� \ km UTILITY STREAM DIVERSION NOTE: _ SOILTYPE _ _ — _ — — \ yY \ / i _ / / I I I I )C / / I / \ \ I I I j. Q_ w W n \ \� \ 17 CONTRACTOR SHALL REMOVE PROPOSED / _ _ Y / SILT F NC w/ WTRE / I I / / I 1 Q U z m \ / / / / — — _ — — — — _ _ STa � �C �Y / / SF BIL I G P OPOSEDo / I I / /� ( / / SOIL TYPE \ I ■ ■ P L a FLOW BARRIER &STREAM DIVERSION ONLY / _ I \ \ i��" / / — — — — PHASE IICOt�STRUCTION —'- — / I .1• (�7 AFTER THE TRIPLE BOX CULVERT — _ F 25B / \ 06 o INSTALLATION HAS BEEN COMPLETED, AND THE ESC INSPECTOR GRANTS APPROVAL. / / / / — a / / / / I . z 0 \ — \ U E v v— v v / 0 v 2 \ ( J ( / / ✓ I ) / l V \\ _�`��_\ \V AAV A�\\ V \� A—� \ �.- \� A\ V / ✓/ ��' _ A \\ V / / / �— / I / / / / 5 ACKINP z Ul LU / AREA T BE CUT AND US D I / � / -_ � LLJ � EE / / / / // �/ / I �,/ 0 ' PRO ECTION / r / - LLln�%� w/ WIRE / ♦ � � � � / / % / � / AS FILL FOR THE CONNECTOR / IuJ z BA kIN ♦ v A / / " //� / I / �/ / ROAD CONSTRUCTION. ¢ w '' nn z PROPOSED LIMITS OF DISTURBANCE EXPANSION �i / _ / / \ _ A�NE / // / I \ / `� / / / / / / / EXISTING STRUCTURES AND \ V W w / BE REMOVE ASSOCIATED WITH THIS PLAN. TOTAL AREA=1.99 C. // / / s \ Y k \ / / // / /// \ // /// /// I i R / / / } -- A v \ _ / / ON / /� / / / IVEAY 0 VE U o 7 xl \ \ \ \ \ `\ ESC PHASE I T �1 / v /// / / 1, G� / / l I 1 / Z W c� yBAREA=1,9 ac/ LOCATION OF PORTA-POTTIES _ W / // / / / / ~ o LOCATION OF FUELING AREA _ QRCy ���� �/ / / I � \ / PROP ED 1b'x Q / /-'� - --- j w (J) BOUNDARY LINE (TYP.) LOCATION OF 15cy DUMPSTER MARD PROPOSED CONC. WASHOUT AREA — _ F �V'�, I I / / �/ a PROPOSEb CL. AlRi�RAP OU#ALL �- 3 / i l \ \ \ w o / _ I / / / (W1=3', W2``=7', L�-6', DD=2')�� \�� J OPOSED ' CE PROPOSED 12'x70' MYNIMU AVEM� D CONTRACTOR \ CONSTRUCTION E NC ITH WASHRACK. STAGING AREA - PROPOSED TEMPORARY CULVERT 1,5 INV. IN=705.0, INV. OUT=704.0 / / / / `- \ W / '\'80 / / t 12" CMP, L=16', =6.25% EXISTING FIRE HYDRANT I /y0 li U EXISTING FIRE HYDRANT \ W / \ 0O w / w / \ / // I \ \ \ /PR PAVED CONSTRUCTION UM CE W <<O JOB NO. m GRAPHIC SGAL / / / \ r M ENTRANCE WITH WASHRACK. \ R 182154 � FF ° 0 20 40 80 \ ii80 l ' ' I ' y \ c \ SCALE ° 1TI=40' o ( IN FEET) / \ 4 m SHEET NO. � 1 O = ft. / \ \ 3.25 STREAM FLOW DIVERSION EMBANKMENT TO BE EXISTING UNDISTURBED EARTH, DIVERSION CHANNEL CROSSING OR NON -ERODIBLE, ,TH Q�i� ACCEPTABLE LININGS SF TRIPLE Box SF (CROSS SECTION A —A OF PLATE 3.25-1) CULVERT I� _ ¢ �SCOTT R. LINSZ Ex. GROUND F U No. 35791 ,� SLT FENCE POST POST SILT ff]ICE DIVERTED STREAM "6,p 1/27/21k,4' TYPE A DIVERSION CHANNEL WITH TYPE O� Po_YETHYLENE (6 NIL uIN .) C LINING (SEE DETAIL (LOOKING SOUTH) �S'SIONAL F'�Gti. oR 3.25-2 THIS SHEET) N.T.S. / GR 56 LINER STREAM DIVERSION DURING CULVERT INSTALLATION DETAILS EXISTING GROUND ? "' EXISTING GROUND TRIPLE CULVERT INSTALLATION NOTES: 1. CONTRACTOR SHALL INSTALL AND MAINTAIN A STREAM FLOW DIVERSION PER DIVERSION CHANNEL CROSSING VESCH DETAIL 3.25-1 AND 3.25-2 DURING ENTIRE TRIPLE CULVERT CONSTRUCTION OPERATION. 2. SILT FENCE SHALL BE INSTALLED ON BOTH SIDES OF THE PROPOSED STREAM DIVERSION CHANNEL. THE CONTRACTOR SHALL TYPE B DIVERSION INSTALL AND ADJUST SILT FENCE AS NECESSARY TO PREVENT SOIL FROM ENTERING THE STREAM. STREAM DIVERSION TO BE A TRAPEZOIDAL DITCH WITH 2:1 SIDE SLOPES, A 5.5' DEPTH AND A LRIPRAP FILTER CLOTH 6' WIDE CHANNEL BOTTOM. RIPRAP SHALL BE PROVIDED WITHIN ON THE EXISTING STREAM BED AT THE TRANSITION FROM THE N LU GROUND z. EXISTING STREAMBED TO THE PROPOSED DIVERSION CHANNEL, In F EXISTING GR VND �' EXISTING ,y \ J _ AND AT THE TRANSITION BACK FROM THE DIVERSION CHANNEL TO THE EXISTING STREAMBED. AN APPROVED FLOW BARRIER Ln °-' p (SANDBAGS, PLYWOOD, JERSEY BARRIER, OR EQUIVALENT) SHALL LU LU m BE INSTALLED BEHIND THE RIPRAP TRANSITION. THE DIVERSION z Q Q = SHALL BE A TYPE C DIVERSION (i.e. IT SHALL HAVE A ROCK OR Z O w 0 0 H SANDBAG LINER). Q w 3. THE DIVERSION CHANNEL CROSSING MUST BE OPERATIONAL O r I- I- O TYPE C DIVERSION BEFORE WORK IS PERFORMED IN THE STREAM (CONSTRUCTION OF U � LU LU Q DIVERSION SHALL BE PERFORMED "IN THE DRY"). H w m O 4. UPON COMPLETION OF THE TRIPLE BOX CULVERT CONSTRUCTION, p cn RIPR/J FlLTCR LLO1N V, O O � AND WITH ESC AND VDOT INSPECTORS' APPROVALS, THE R� z w U U w ROCK OR swoeAc UNER CONTRACTOR SHALL REMOVE THE STREAM DIVERSION AND ALLOW X1 O Q a a CC STREAM FLOW TO RESUME THROUGH THE EXISTING CHANNEL & un ,~. f f uJ TRIPLE BOX CULVERT. > > ? j j H EXISTING GROUND v EXISTING GROUND 5. ONCE THE STREAM RETURNS TO ITS NATURAL ALIGNMENT AND w w w w PASSES THROUGH THE TRIPLE BOX CULVERT, THE CONTRACTOR Of PROPOSED STOCKP / SURROUNDED BY SILT PROPOSED WITH PLE S, GREEN PHASE I C9N T i / 1 / / / w= — IP / / ��I� �� ���►���SiI'e�� III iyI I PROPOSED 20'WIDE VDOT CL. Al RIP SEDIMENT TRAP #1 DETAIL A TION OF TYPICAL ORIENT 1 • f `iLINED EMERGENCY SPILLWAY WITH 4:1 k��- TREA TMENT SIDE SLOPES, CREST ELEV.=697' OIL �urn/—all !� •�0�3s�,�!� �.h ..;� STABILIZATION `TW ® �� �1 I eke �' �� • _�I . PROPOSED • • • .. , 1,' ` To CIVIP ESC ,1,.,,SHALLOW I ► I 1 _ ;t?,, �, �• a • • r -u • _ •.SLOPES, ED TOP OF DAM ELEV.�69: NETTING PROTECTIVE COVERINGS THE SLOPE. MAY BE APPLIED ACROSS �I III - ' bn�Al• BERM - 1 hlhu i �� � � s � � �•Y• 1/,.9 • I� Ii. lu_II, a • �.•THE gilll911�11 II�1•. i -- BERM.-� 1 ,OR11=1=11"IIF-' -1e �IANCHOR STEEP f )�il� �.' y�0� � ... _,p '' ���l H9� _� � �—�—♦ .yi�iiiO��i ON 5IELE SLOPES, APPLY II lei © ;.: � • • • • ill , • •- III �LIL Illll �iiiiiii•• •• PROTECTIVE _ r ]lclt• Opp THE DIRECTION OF FLOW AND ANCHOR SECURELY. it. �•^^ r . SIGNS SAF "WARNING • ■ .. , �.- • PROPOSED CONSTRUCTIONSAFETY FENCE • •• 1 • ,. ,.. :�,``:1 - It ➢. II-1[=1f .II=1I • • • GREEN PHASE I • 1 • II 11 .IIRII 11. II=1 . . Ltd • ✓•I•y - �/ ' / �ia� it •••• •• , BRING WN • PROPOSED BAFFLES TERMINATING THE INSTALLATION. TURN THE END UNDER e AND STAPLE AT 127 INTERVALS. SILT FENCE w/ WIRE ' '� `LJ .,r........ ... ......-,- ...y... -- w, r 1... -1 .i ...............v � . ,., X �' • WITH PLE SANT GREEN J BACKING PROPOSED crest of stone weir 697.0 top of dam elevation (ft) 698 WITH PLEASANT GREEN SF / / , PHASEICO STRUCTION / Y 9 p (y) p ( ) 10, _ dry storage provided at this elevation c 155.7 to Width of dam ft PHASE ICONSTRUCTION / k �` +� / / slope of dry storage sides 3:1 top trap dimensions 1OTx43' TP TRfE PROTECTIO 1007wP0 I PROPOSED WITH Os ; ' ` - �- PROPOSED 100JYR FLOODPLAIN PER ' / I /) BUFFER / / \PLEASANT GREEN PHASE I F \�` l HEC-RSE ANA YSIS PERFORME� / / \ I / / / / — — — o o .-. �CpNSTRUCTION O� oO K i \ C 'k / Sf \ Oo oO rJ COLLINS ENGINEERING IN APRIL 2019, TYE<. / \ — — LIMITS OF ifREE A Oo o 00 Oo Oo o — — — / / p I *" ' ° I , OoI Oo 00 00 00 00 O Oo po Oo o \ EXIS�NG 100-YR FLOODPLAIN PER / / \ \ N CLEARING ASSOCIATED G� Oo \ Oo o \ 0OO QO � � � / HEC-WC5 ANALYSIS PERFORMED BY WITH WPO 201900003 \ EXISTING 100-YR FLOODPLAIN PE ` G `, O O 00 oO Oo p o OO \ o 00 / COLLINS ENGINEERING IN APRIL 2019, TYP. / / / j HEC-RAS ANALYSIS PERFORMED B' % I �\ \--ANLEND1�lENT # 1 COLLINS ENGINEERING IN APRIL 200, TYP. ♦ � `rj� w/ WIRE—L BACKINGL9 'Y� \ / 0 IP //--------\ LIMITS OFTREE �\\ / V_ / — \ CLEARING (TYP.) O�� t 8r \ \ \ /' / / / / / �/ /= S — — — — — �� — \ \ — \ --- — — — \ mil/ PROPOSED VDOT STD. EC-1, CLASS I c \ \ LI(•1ITS OF / RIPRAP WITH A TYPE B INSTALLATION TO RR \ \ \ \ STRkCn.M, TYP. / / 1 \ / / / / / / \ / 1 N z \ \ \ BE INSTALLED BETWEEN THE PROPOSED�\ / / — \ WING WALLS FOR INLET PROTECTION / PROPOSED VDOT STD. EC-T, \\ \ \ \ \ \ / % ,-/ / / — \ \ \ ' > / / co Q L (J RR CLASS I RIPRAP WITH A TYPE \ B INSTALLATION TO SERVE OUTLET PROTECTION \ \ \ \ \ \ I \ \ LIMITS OF \ \ \ i 1 \ \ \� \ \ // / \ / I / / / / \ \ \ \ \ \ \ — — 0— \ \ (L=60', W=60', D=2�) I / 0 \ \ 1 \ STREAM, TYP. \ \) j Ip _ T TREE PROTECTION \ \ \ / // \ 1T CONTRACTOR SHALL INSTALL STR. C14 (STORM SEWER MH) WITH SEGMENTAL RINGS. A TEMPORARY RING SHALL BE INSTALLED DURING / \\ \ \ \\ 1 / / / / / / / l \ l \ \\ \ \ \ CV \ CONSTRUCTION TO OUTLET THE TEMPORARY ESC 15" CMP INTO ST #1 (193.5 LF @ 0.50%, II=694.05', IO 693.08'). DURING CONSTRUCTION WPO 2019�0027 L MITS OF� / / \ \ \ \ \ \ N , ^ THE LOWER, PERMANENT OUTFALL SHALL BE BLOCKED WATERTIGHT TO ENSURE RUNOFF ENTERS ST #1 & IS NOT DISCHARGED INTO THE \ DISTURBANCE \ \ `\v. V I \ \ \ \ STREAM. ONCE THE STORM SEWER'S SUBAREA IS STABILIZED &THE ESC INSPECTOR GRANTS PERMISSION, THE CONTRACTOR CAN REMOVE \ I i I / I / / / / I / �}- \ \ \/I \ \ \ \ — — W Q �2�. THE TEMP. 15' ESC PIPE, MH RING(5) & THE LOWER BLOCKAGE TO ALLOW STR. C14 TO DISCHARGE INTO THE STREAM. �\ \ / I LIMITS OF TREE I I ( �` / —702 \ \ \ \ % F"' O 61 V v �� I r / /T V / / / 1 \\ \ A \\ \ \ A V — I / I \ ��2 C h^- ) SPF v \♦ Op oo\ O\vv / / �' \ \� —_\\`�—g_///,%// / / LCLEARING(TYP.) SILT FENCE w/ WIRE BACKIN (JJ 1 OROPOSED WITH PLEASANT EN PHASE I CONSTRUCT[ 686\ W/WRE\ �ROTBA1NG > _ Oo Oo OO THE FUELING TANK SHALL BE COMPLETELY SURROUNDED BY I f� _ 2' DEEP, 2' WIDE EARTHEN BERM WITH A HEAVY MIL I Z — — — POLYETHYLENE LINING, OR BE PLACED IN AN IMPERVIOUS °j / / / / / I I I / \ \ \ \ \ �- \ � W 1 \ \ p OO OPEN -TOP DUMPSTER WITH A SIDE DOOR. THE PROPOSED ,k BERM OR DUMPSTER SHALL CONTAIN FUEL IN THE EVENT OF A / / / •/ / // / /I lI l // p5 \ \�I' \ I I — — \ SPILL. CONTRACTOR SHALL ENSURE VOLUME CAPACITY IS WPO �01900603 / / // / �/ / / / \ \ \ \ O \ \ OO J� • ,.� - -_-- - o OO P 10% LARGER THAN THE MAXIMUM VOLUME OF STORED FUEL. AMENDMENT #1 LIMITS / / ITREE �1 \\\ \\ \ \ \ \\ \ \\\\\ \\\��\ �\� \V �\ \��\\\�\\ \\A �\\ \\ \\ \\ \\ \` \ — \ —\\ `—\ \\ \ \\\ —/ / _/A —/ �\ �\ \ \ \ \ rnOno 0 \►\l �—\--- C/ OF /ISTURBAN-C3CE PROTECTION� QY 7z VLuUTILITY STREAM DIVERS I A / I LU IN NOTE: �SILT wWIR/ SHALL `ST #1 I I U16 FLOW BARRIER & STREAM DIVERSION ONLYSUBAREA=1.10 ac. SI Pt0POSED ESC PHASE I7 AFTER THE TRIPLE BOX CULVERT WITH P EAS AT GREEN INSTALLATION HAS BEEN COMPLETED, AND low iPHASE I/CONSTRUCTION (V) O THE ESC INSPECTOR GRANTS APPROVAL. PROPOSED 1bOYR FLOODPLAIN\PR DOO\\ill HEC-RAS ANALYSIS PERFORMED OJ COLLIN�NGINEERING IN-APRIL 2019, TYP\ 5 7L / \ WIRF /KINul v A vvVv� vvv v v v / 000 / v / U) 11J OovOO /I / AREA TO BE CUT AND USED Lu oo/ A( �� / / I l / l III IRE TP EE // / / % / I /// / // AS FILL FOR THE CONNECTOR III Y W PRO ECTION , 4 / / ROAD CONSTRUCTION. W uj \PROPOSED LIMITS OF DISTURBANCE EXPANSION / / w//MIRE // / I l / / / j / / / _ i I � . � ACK[N / / / / EXISTING STRUCTURES AND / / � ASSOCIATED WITH THIS PLAN. TOTAL AREA=1.99 ac. / / / / / DRIVE AY TO BE REMOVED. (' ♦— 1--I \\ / // X \V /��/ � V/ \ / LOCATION OF PORTA POTTIES W / - / / / / W / \� \ \ \ ------ �/ / / ® — / i / / / / \ Boa J / LOCATION OF FUELINGPROPOSED Lil'x / / -- ---- W V / v I %\ \ \ \\ \ \ � \ \\ �\ \\ \ \ \ \ / / / / � I ' / LOCATION OF 15cy DUMPSTER � _ MARS �RI C� Y / / % Q Q \ — \ \ �V -� CONC. WASHOUT AR PROPOSED CONC. WASHOUT AREA r LuILI = `\\ Q ED J OPOSED \ CE PROPOS12'x70' MINIMU AVE� — CONTRACTOR CONSTR CTION ENTRANCE ITH WASHRACK. // \ M \��Wy�a� / O .y1�5TAGING AREA / // )`. �- \\ ..� -��/ / C) — / EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT ` W/ / -1 \ \ 0 Lu _ In PROPOSED 12'x70' MINIMUM Hr \ \ JOB NO. GRAPHIC A / / / \ / PAVED CONSTRUCTION CE OFF ENTRANCE WITH WASHRACK. \ 182154 to 0 20 ao eo \ '160 SCALE / \ \ / IN FEETSHEET NO. ( ) / j / / \ I / 5 40 \ - - - - PRE -DEVELOPMENT SWM PLAN: SCALE 1 "=50' / / EXISTING 100-YEAR FLOODPLAI"ER HEC-RAS ANALYSIS PERFORMED BY COLLINS ENGINEERING IN�PRIIL 2019, TYP. < I 100, WPO BUFFER, T�P. - -_ - - PROPOSED�ESC LIMITS OF LAND DI TURBANV / ASSOCIATED WITH THIS PLAN (1.99 cJ NCEOT PREVIOUSLY COVERED UNDER A SEPARATE PERM . THIS ESC LIMITS I ` - - - \ \ OF DISTURBAfQCE BOUNDARY IS USED TO DEFINE THE QUALITY, TYPICAL. \ / LOCATION OF PROPOSED \ _ CONCENTRATED OUTFALL \ LIMITS OF STREAM, TYP. '�/��-----PRE-DEV. S -V tl92ac���� L----CR---55 -Te-0.}5 hrs. 00'OFQ�\VERLAND LOW -w7A,E6�V.=18 14D' _nF CQNC-FLOW w/ / �C Pre -Development Impervious Area Summary DA A (Water Quantity) \ / Existing Impervious Areas 0 sf \ S' L o \ LIMITS OF \ �\ STREAM, TYP. \ I A \ ®0 coca / o I ZZ / ® 0 POST -DEVELOPMENT SWM PLAN: SCALE 1 "=50' / / \ / / EXISTING 100-YEAR FLOODPLAI" R HEC-RAS ANALYSIS PERFORMED BY \ ) / / COLLINS ENGINEERING IN�PR1L 2019, TYP100, WPO J (/ PROPOSED 100-YEAR FLOODPLAIN PER BUF ER, TliP. / HEC-RAS ANALYSIS�PERFORMED BY / / COLLINS ENGINEERING IN APRIL 2019, TYP. INT OF ANALYSIS (OCATION IN / l ®�POWELLS CREEK WHER4MANMADE 60 OOO�OO® OOO \ � 8IPP AP IMPROVEMENTS A \PR ®POSOFINO / \ \ 0006P 1 \ PROPOSED�ESC LIMITS OF LAND DI TURBANCE V \ ASSOCIATED WITH THIS PLAN (1.99 C.) NOT PREVIOUSLY `e 84- COVERED UNDER A SEPARATE PERM. THIS ESC LIMITS \ OF DISTURBANCE BOUNDARY IS USED TO DEFINE THE RM - 1 II BOUNDARY FOR WATER QUALr7, TYPICAL. POST-DEV. SUBAREA A 0.92 ac. CN-90 \ Tc-0.10 hrs. ®�\ O®® / \ CPO =---_-s94,,\ C � / 30' OF OVERLAND F OW w/ A ELEV.=2', - - - - 10' 0 NC. FLOW w/ A ELEV.< 1' & - 275' OF CHA N TTER & PIPES - Post -Development Impervious Area Summary M f / DA A (Water Quantity) Existing Orchard Drive (Outside this Plan's VRRM Boundary) 1,875 sf Proposed Sidewalk (Within this Plan's VRRM Boundary) 9,225 sf / / I Proposed Sidewalk (Outside this Plan's VRRM Boundary) 1,225 sf / Approved Sidewalk (Outside this Plan's VRRM Boundary) 1,100 sf / Proposed Roadway (Within this Plan's VRRM Boundary) 12,250 sf Proposed Roadway (Outside this Plan's VRRM Boundary) 1,225 sf Approved Roadway (Outside this Plan's VRRM Boundary) 5,025 sf 31,925 sf COUNTY OF ALBEMARLE 8 WATERSHED SUMMARY *14"�!011 Department of Community Development STORMWATER MANAGEMENT NARRATIVE: Area, 1-year Flow, 2-year Flow, 10-year Flow, cN OVERVIEW: Construction Record Drawings (As -built) for VSMP ac. cfs Cfs Cf5 THE PROPOSED STORMWATER MANAGEMENT PLAN COMPLIES WITH PART IIB SWM DA A (Pre-Dev.) 55 0.92 0.17 0.33 1.73 REQUIREMENTS. ADDITIONALLY, THE CHANNEL & FLOOD PROTECTION REQUIREMENTS FOR DA A ((Pre-De 90 0.92 3.05 3.92 6.53 THIS PROJECT ARE MET. PLEASE SEE THE ATTACHED STORMWATER MANAGEMENT The following is a list of information required on construction record drawings for CALCULATIONS PACKET FOR ADDITIONAL DETAILS PERTAINING TO THIS PLAN's WATER stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the QUALITY AND QUANTITY COMPLIANCE. construction record drawingbe prepared b someone other than the designer. Please o not P 1� y di d g WATER QUALITY SUMMARY THIS PROPOSED PLAN REQUIRES A TOTAL PHOSPHOROUS REMOVAL RATE OF 0.92 Ibs/yr. provide design drawings as construction record drawings. General Construction notes for Stormwater Marta ement Plans THE STORMWATER QUALITY REQUIREMENTS FOR THIS PLAN ARE MET WITH THE PLEASANT Q Q Post -Development VRRM Impervious Area Summary 1. All dams and constructed fill to be within 95% of maximum dry GREEN DEVELOPMENT. THE PHOSPHOROUS REMOVAL RATES PROVIDED IN THE PHASE I A A si d and dated rofessional seal of the a arin en ineer or surve o[ densit and 2% of o timum moisture content All fill material to PLAN (WPO 201900003) AND THE PHASES II & III PLAN (WPO 202000053) EXCEED THE � P P P g g Y B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility,and the inspection records to verify Pe Y proper dimensions, materials and installation. The items include, but are not limited to the following: I. Inspection Records and photographs for pipe trenches and bedding, including underdrains. be approved by a g otechnical engineer. A geotechnical engineer is OVERALL MINIMUM REQUIRED PHOSPHOROUS REMOVAL RATE FOR ALL OF PLEASANT GREEN. PORTION OF THIS SURPLUS IN PHOSPHOROUS REMOVAL CREDIT IS APPLIED TO THIS PLAN to be present during construction of dams. / 2. Pipe and riser joints are to be watertight within stormwater THE PLEASANT GREEN DEVELOPMENT. PLEASE SEE THE'PLEASANT GREEN WATER QUALITY management facilities. MASTER PLAN' SUMMARY SHOWN ON THIS SHEET FOR DETAILS. ADDITIONAL CALCULATIONS 3. For temporary sediment traps or basins which are to be converted ARE PROVIDED WITH THIS PLAN's SWM PACKET. P Y P 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 25150 sf o permanen s ormwo er managemen ac i ies, conversion is no , to take place until the site is stabilized, and permission has been PLEASE NOTE, THE PROPOSED IMPACTS ASSOCIATED WITH THIS PLAN TO AN 3. Updated Location with o-coordinates of all facilities. obtained from the County erosion control inspector. EXISTING/RECORDED OFFSITE SWM FOREST & OPEN SPACE EASEMENT WILL BE MITIGATED 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. UNDER A SEPARATE PLAN (WPO 201600069 AMENDMENT #2). 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey WATER QUANTITY SUMMARY of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required THE PROPOSED PLAN CREATES ONE CONCENTRATED OUTFALL. THIS OUTFALL IS DIRECTED INTO A ROBUST MANMADE RIPRAP LINED OUTLET PROTECTION INSTALLED IN THE BED OF for alterations from the design. POWELLS CREEK. 6. Plants, location and type. PLEASANT GREEN WATER QUALITY MASTER PLAN THE PROPOSED STORM SEWER AND THE RIPRAP LINED OUTFALL PROTECTION ARE 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the SUMMARY OF PHOSPHOROUS REMOVAL RATE REQUIRED DESIGNED FOR THE 10-YEAR DESIGN STORM. THE STORM SEWER AND RIPRAP CONVEY THE installed of drainage structures, culvert/ 1 size, weirs, materials, inlets or end treatments , type g P Pe �) Total Phos horous Removal Rate Re wired for Pro Proposed Pleasant Green Phases I II III and the Connector Road P Q P 24.56 Ibs r /Y 10-YEAR AND 2-YR 24-HOUR POST -DEVELOPMENT STORM EVENTS WITHOUT CAUSING EROSION OF THE SYSTEM. BECAUSE OF THIS CHANNEL PROTECTION COMPLIANCE IS MET inlet and outlet protection, alignment and invert elevations compared to design. P � � P g (See this plan's report &the WPO 202000053 for the Overall Pleasant Green Water Quality Analysis) FOR THE PROJECT VIA 9 VAC 25-870-66, SECTION B.l.a. THE LIMITS OF ANALYSIS FOR 8. Computations: For significant deviations from design, provide sealed computations verifying that Portion of Phosphorous Removal Rate Provided (By Others) for Connector Road's Impacts to SWM Forest & Open Space Esmt. 0.27 Ibs/yr CHANNEL PROTECTION IS SET BY SECTION B.4.a, OR WHEN THE SITE'S CONTRIBUTING the as built condition is equivalent OC better than design. �I g (See WPO 201600069 Amendment #1) DRAINAGE AREA (SUBAREA A) IS LESS THAN OR EQUAL TO 1.0 /o OF THE TOTAL WATERSHED AREA TO THE RIPRAP LINED BED OF POWELLS CREEK (3.18 SQUARE MILES). 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical Total Phosphorous Removal Rate Required for the Proposed Pleasant Green 24.29 Ibs/yr sections and finings. THE PROPOSED STORM SEWER OUTFACES DIRECTLY INTO THE RIPRAP LINED OUTLET 10. g Easements -Show all platted easements with dead book references labeled Facilities and drainage SUMMARY OF PHOSPHOROUS REMOVAL RATE PROVIDED PROTECTION, AS DESCRIBED ABOVE. THIS RIPRAP LINED OUTLET PROTECTION IS PROPOSED TO BE INSTALLED IN THE BED OF POWELL's CREEK. THE STORM SEWER must be within platted easements. Provide copies of recorded documents. Approved Phase I (WPO 201900003) Phosphorous Removal Rate Achieved from Nutrient Credits 6.97 Ibs/yr CONFINES THE POST -DEVELOPMENT PEAK FLOW RATE FROM THE 10-YEAR 24-HOUR STORM It. Guardrail, fences or other safety provisions - Display the constructed location of all safety Proposed Phosphorous Removal Rate Achieved from Phases II & III (WPO 202000053) Level II Wet Pond Outfalling to Conservation Area (Subarea B) 7.59 Ibs/yr EVENT WITHOUT AN OVERTOPPING, AVOIDING LOCALIZED FLOODING, PRIOR TO BEING RELEASED INTO POWELLS CREEK. BECAUSE OF THIS, FLOOD PROTECTION COMPLIANCE I5 provisions; fences, guardrail, including the type, length and applied end treatments, compared to Proposed Phosphorous Removal Rate Achieved from Phases II & I I I (WPO 202000053) Outfall to a Vegetated Filter Strip (Subarea C) 5.07 Ibs/yr MET FOR THIS PROJECT VIA 9 VAC 25-870-66 SECTION C.2.a. THE LIMITS OF ANALYSIS FOR design. g Proposed Phosphorous Removal Rate Achieved from Phases II & III (WPO 202000053) Outfall to a Vegetated Filter Strip (Subarea D) P P 3.06 Ibs/yr FLOOD PROTECTION IS SET SECTION C.3. c, OR WHEN THE STORMWATER CONVEYANCE SYSTEM ENTERS A MAPPED FLOODPLAIN. 12. Material layer's - biofilter media, stone layers, sand layers, keyways and core& must be verified as to Approved Phase I (WPO 201900003) Phosphorous Removal Rate Achieved from the Level II Bioretention Basin (Subarea E) 1.42 Ibs/yr material types and depths. Include inspection reports, boring or test pit reports and materials Proposed Phosphorous Removal Rate Achieved from Phases II & III (WPO 202000053) SWM Forest & Open Space Easement 1.59 Ibs/yr PLEASE SEE THE ATTACHED STORMWATER MANAGEMENT CALCULATIONS PACKET FOR certifications. Biofilter media must be an approved state mix. ADDITIONAL DETAILS. 13. Access roads - show location of access roads, surface treatment, drainage, etc, as applicable. Total Phosphorous Removal Rate Provided 25.70 Ibs/yr 14. Compaction reports are required to verify fill compaction in dams. Total Phosphorous Removal Rate Provided Onsite 18.73 Ibs/yr 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning Percentage of the Required Phosphorous Removal Rate Treated Onsite (18.73 / 24.30 x 100) 77 % EXCERPT FROM APPROVED SUB 201600238 SHEET 1 WITH THIS PLAN's LIMITS OF DISTURBANCE OVERLAID: ILE 1 "=100' q y :` G��Q\� P y Q���1 THE PLEASANT GREEN DEVELOPMENT V \0 d' IMPACTS A SWM FOREST & OPEN SPACE J r NQQ k 1��QS,j\� h AREA PRESERVED UNDER AN EASEMENT N\• RECORDED IN SUB 201600238. THE �6 4 `p*Q k9 IMPACTED AREA IS HATCHED BELOW. �' NQ• THE RESULTANT LOSS IN WATER QUALITY rl, �.h V Q'• o' CREDITS WILL BE MITIGATED VIA WPO 0 0 $2 N 201600069 AMENDMENT #2 SEE THAT PLAN FOR ADDITIONAL DETAILS. 8•p2•g6'E o 288; Pv 6'0� M '� f 73.02 5 ti 5G \0 Qi _ gf 1�35'S0"E . 2= _ CT--� 10 nM 90 7 \ cF������i P6550� i o y \��ytiP P /.. ^� •• s k G W L S S� EL J f � J F Paver •�, � �\' -/ i•' .� 4 <? e`o F of �g � \�Q 6 _ Qom•. � ' 1y;y qJ,Q�S,'S1�k0 0 � O h G�ti 9O RiV Otj 56r, F s tK TT/R. CI?LLINSZ No. 35791 a 1/27/21 M 0� N F ti 0 O m w w QWM Z 0 J ❑ ❑ H- O Y k z z❑ J ❑ N C) O O V/ Z J w y ¢ a a W Z w >0 w Z > > F- LUa w a a V) V) U) iY iY � O (D co LU.-I N C n an ❑ co O N r-I r-I r-I 0 f� M N z J :� NC) � W C)CN N U) z W; > ® J_ 0 O LU U-1 O Q U z C)LU< W z LU LU O W U Q D z Ul U) W W Z W (`Jprr[�� pC O U) z J w V) J Q � W Q J CD 0 CD N U 0 w w x N JOB NO. 182154 SCALE AS SHOWN SHEET NO. 6 PROPOSED MANMADE CONCRETE DAM REMOVAL DETAIL: SCALE 1-=50' TMP 55C/03-A / S S-- S \\ / // /100'WPO // // /BUFFER, TYP. COUNTY DEFINEDPRESERVED ��O EPPES TOO REMAIN (TYP.) / / p.FiOPBRTI�LIMITS � ^ \ EXISTING C NCRETE DAM PROPOSED TO BE REMOVED. GI EN ITS, CLOSE PR0IITY TO THE PROPERTY LIMITS, THE CONTRACTtlR SHALL— STAKE,k cbNFIRM T)HEPROPOSED DEVELOPMENT's PROPERTY LIMITS & \ \ i �THE EXISTING DAM PRIOR TO CONSTRUCTION. CONSTRUCTION \ i \ LIMITS OF POWELLS \ — � ASSOCIATED WITH THE DAM REMOVAL 5HZDE,LIMITED TOI � -- - AcrlylrY Assoc THE ONSITE TAX MA%PARCELS 56-114 & 55C-03-A. \ CREEK, TYP.\ \ \ \ TMP 55C-03-BJ I / / \ / i \ TMP 56-115 CONCRETE DAM REMOVAL PLAN & SEQUENCING: A PHASE II ENVIRONMENTAL SITE ASSESSMENT (ESA) WAS COMPLETED IN ACCORDANCE WITH MINIMUM ASTM STANDARDS. THE i PHASE II ESA INCLUDES, BUT IS NOT LIMITED TO, SAMPLING AND TESTING OF ACCUMULATED SEDIMENT BEHIND THE DAM THAT EXISTS ON THE PROPERTY. THE CONTRACTOR SHALL COMPLY WITH ALL RECOMMENDATIONS OF THE PHASE II ESA PRIOR TO / ISSUANCE OF THE FIRST BUILDING PERMIT IN PLEASANT GREEN's PHASE II. THE CONTRACTOR SHALL ALSO REMOVE / ACCUMULATED SEDIMENT FROM BEHIND THE DAM PRIOR TO DEMOLITION OF THE DAM AND DISPOSE OF THE SEDIMENT, EITHER ON SITE OR OFF SITE, IN ACCORDANCE WITH WITH THE PHASE II ESA RECOMMENDATIONS. _ �S THE TIMING OF THE CONCRETE DAM's REMOVAL WILL BE DETERMINED BY THE CONTRACTOR SINCE THE SCHEDULE WILL BEST BE KNOWN BY HIM OR HER. THE CONTRACTOR SHALL INFORM THE COUNTY ESC INSPECTOR AND THE COUNTY ENGINEERING DEPARTMENT A MINIMUM OF 5 BUSINESS DAYS PRIOR TO COMMENCING WORK. THE INSTALLATION OF THE TRIPLE BOX CULVERT AND ITS RIPRAP PLACED IN THE STREAM BED MAY LIMIT FLASH RUNOFF FROM EXISTING THE PROPERTY DOWNSTREAM, BUT THIS / IS NOT A PREREQUISITE TO THE DAM's REMOVAL. THE DAM's DEMOLITION SHALL OCCUR FROM THE TOP TO BOTTOM SO THAT / \ IMPOUNDED WATER MAY BE RELEASED MORE SLOWLY OVER A PERIOD OF TIME AND WILL NOT OCCUR ALL AT ONCE. THE DAM's DEMOLITION SHALL OCCUR AFTER A PERIOD OF 3 CONSECUTIVE DRY WEATHER DAYS. CONSTRUCTION EQUIPMENT & TRAFFIC / \ SHALL REMAIN ONSITE AT ALL TIMES AND SHALL ORIGINATE FROM THE PROPOSED RAMBLING BROOK LANE ROAD CROSSING / UNDER CONSTRUCTION. CONSTRUCTION VEHICULAR TRAFFIC SHALL ONLY TRAVERSE POWELL CREEK AT THIS PLAN's APPROVED / CROSSING. CONSTRUCTION DEBRIS RESULTING FROM THE DEMOLITION OF THE DAM SHALL BE COLLECTED AND REMOVED FROM / THE STREAM BUFFER. UPON THE COMPLETION OF THE DAM's DEMOLITION AND REMOVAL, THE CONTRACTOR SHALL STABILIZE THE CHANNEL BANKS WHERE DISTURBANCES OCCURED IN ACCORDANCE WITH DETAIL 1.1 SHOWN ON THIS SHEET. / P OPOSED IMPACTS (44,175sf) TO 1 Tt WPO BUFFER RESULTTNC FROM I / I Ix / PROPOSED IMPACTS TO STREAM BUFFER: SCALE I"=50' 100' WPO— BUFFER, TYP. NPpO ��VJI �GOF QJgYl Y,l .NIO� I The Virginia Stream Restoration & Stabilization Best Management Practices Guide DETAIL 1.1: CEDAR TREE REVETMENT Cedar Tree Clamp (2/3 bank height typ.) 12' Max. 5' Min. Cable Clamp Anchor SECTION End Treatment in a Stable Area of the Streambank 1� 0� Trunk End Of Tree Facing Flow, Stablize ' Upstream , End with ! Riprap ' ! ' ------ Anchor Both Ends of Each ♦ 1 1 Revetment Tree ' Into Streambank : PLAN End Treatment in a Stable Area of the Streambank ADAPTED FROM MISSOURI DEPT. OF CONSERVATION TREE REVETMENTS FOR STREAMBANK STABILIZATION BANK PROTECTION T—DECEMBER 2003 VIRGINIA DEPARTMENT Or CONSERYATION RECREATION GL'IDELINKS THE SOURCE FOR DETAIL 1.1 SHOWN ABOVE, CEDAR TREE REVETMENT, WAS TAKEN FROM THE VRGINIA STREAM RESTORATION & STABILIZATION BEST MANAGEMENT PRACTICES GUIDE. THIS GUIDE WAS FUNDED BY DEO THROUGH GRANT NUMBER NA17OZ2355 OF NOAA, AND THE PROJECT WAS ADMINISTERED BY DCR. MITIGATION PLAN VICINITY MAP: I l //� ✓ — / /j // — \ \ \ \ \ \ \ SCALEI"=100' J PROPO ED TRI E BOX CULVERT (NOT PART \\ _ \OF THIS PLAN) AT IjOWELL CREEK CROSSING THC PROPOSED RAMBLING BROOK LAN ��/// / ///// /�!•6i/ \ / / \? —1,-__ r�/jam � � — — — \� � �\�\��� \ � \ �-- � \\ — —\-- — � O _ w �f" \ I F TIER f PLEQSA T �V CR /FN PHASES N6T—/// / j //// J /� j /// / \ / — — — — — PA TbF/THfS/P \ \ \ \ \ \\ \ — \ \ �I//// Ill / ///.•.'� ` //// I �,` __�\��\\�\\�---�� /// c V Ge\\\ \ rNP 10 —i / 4 I \ l / STREAM BUFFER MITIGATION NOTES: / \ / / / / / / / / / / / // .� •'.`�;': ` — / — / // / / \ ( THE EXISTING STREAM BUFFER ON -SITE IS HEAVILY WOODED, SO TRADITIONAL MITIGATION / / PLANTING CAN NOT BE ACCOMPLISHED. THIS PLAN PROPOSES THE FOLLOWING MEASURES TO WPO STREA/WBUFFER' / 1 / /� / // !�/� / MITIGATE IMPACTS TO THE EXISTING STREAM BUFFER AND FILLING IN THE FLOODPLAIN: 1. THE CONTRACTOR SHALL REMOVE THE EXISTING CONCRETE DAM IN POWELLS CREEK, AS SHOWN AND NOTED ON THIS SHEET. THIS PLAN PROPOSES TO REMOVE THE CONCRETE DAM THAT IMPOUNDS WATER IN POWELLS CREEK (NORTH OF THE PROPOSED TRIPLE BOX CULVERT CROSSING). WITH THE REMOVAL OF THIS DAM, THE NATIVE STREAM FLOW PATTERNS WILL BE RESTORED. THIS WILL HELP RESTORE THE RIPARIAN HABITAT THAT HAS BEEN ALTERED DUE TO THE DAM CONSTRUCTION AND ALLOW AQUATIC LIFE TO TRAVEL UP AND DOWN THE STREAM PLANTING SCHEME FOR EVERY 400sf SECTIONI SHALL CONTAIN THE FOLLOWING: - / BED, RESTORING THE NATURAL PROCESSES CURRENTLY IMPACTED BY THE DAM. ONCE THE (OR 20'x20' DAM IS REMOVED, THE CONTRACTOR SHALL STABILIZE THE STREAM BANKS THAT WERE ' _ —7 — — THE WATERSIDE 50% OF THE BUFFER: DISTURBED BY THE DAM's REMOVAL IN ACCORDANCE WITH THE DETAIL SHOWN ON THIS / / / \i•� / / ! — _ ONE (1) 1j" — 2" CALIPER NATIVE CANOPY TREE OR LARGE EVERGREEN AT 6' SHEET, OR AN EQUIVALENT METHOD ACCEPTABLE TO BOTH THE OWNER AND THE ESC INSPECTOR. TWO (2) J"— 14" CALIPER NATIVE UNDERSTORY TREES OR EVERGREENS AT 4' OR ONE (1) NATIVE UNDERSTORY TREE AND 2. IN CONJUNCTION WITH ITEM #1 ABOVE, THE STREAM BUFFER SHALL BE RESTORED IN AREAS TWO (2) LARGE SHRUBS AT 3'-4' ALONG POWELLS CREEK WHERE TREE COVER IS MORE SPARSE OR WHERE INVASIVE SPECIES THREE 3 SMALL NATIVE SHRUBS OR WOODY GROUNDCOVER AT 15"-18" ( ) HAVE OVERTAKEN AREAS THE TOTAL MAXIMUM MITIGATION PLANTING AREA FOR THIS I ( / / 1 / / / / / j ��% — \ \ THE LANDWARD 50% OF THE BUFFER: DEVELOPMENT IS 88,350sf (EQUAL TO 2x THE PROPOSED IMPACTS). MITIGATION PLANTINGS NATIVE BARE ROOT SEEDLINGS OR WHIPS AT 1,210 STEMS/ACRE, APPROXIMATELY 6' O.C. SHALL FIRST OCCUR ONSITE IN THE STREAM BUFFER WHERE VEGETATION IS MORE SPARSE. IF (600 MINIMUM PLANT SURVIVAL REQUIRED AFTER TWO GROWING SEASONS) OR A TOTAL PLANTING AREA OF 88,350sf CAN NOT BE LOCATED WITHIN THE SITE's STREAM CONTAINER GROWN NATIVE SEEDLING TUBES AT 700 PER ACRE, APPROXIMATELY 5' O.C. BUFFER WHERE AREAS ARE LESS VEGETATED, THEN THE CONTRACTOR SHALL HIRE AN EXi TING CON6R DAI ` \ / ��l / l C — / // ail O \ \ (490 MINIMUM PLANT SURVIVAL REQUIRED AFTER TWO GROWING SEASONS) ARBORIST TO PROVIDE A REPORT DEPICTING THE PRESENCE, IF ANY, OF INVASIVE SPECIES PROPO ED TO BEMOVE9 2 / ) ) / / WITHIN THE SITE's STREAM BUFFER. THE ARBORIST's REPORT SHALL INCLUDE A PLAN FOR THE �� — \ / // \ ��\\ ^\ PLANTING NOTES: REMOVAL OF THE INVASISVE SPECIES AND FOR THE AREAS' REPLANTING. THE REPLANTING OF 1. ALL MITIGATION PLANTINGS SHALL COMPLY WITH THE RIPARIAN BUFFERS GUIDANCE MANUAL BY CBLAD. THESE AREAS SHALL BE IN ACCORDANCE WITH THE 400sf MITIGATION PLANTING SCHEME / / MITIGATION MAINTENANCE PLAN: / _ N THIS SHEET. THE TOTAL MITIGATION PLANTINGS & REPLANTIN AREA HALL 2. ALL MITIGATION PLANTINGS SHALL BE NATIVE TO ALBEMARLE COUNTY, VA. THE FOLLOWING ARE NATIVE TO ALBEMARLE SHOWN 0 0 0 GS S S NOT BE REQUIRED TO EXCEED 88,350sf. NON-GROWINGSEASONSTHEWINTERS. COUNTY AND ARE PROPOSED WITH THIS PLAN, BUT MAY BE SUBSTITUTED WITH ANOTHER NATIVE PLANT: 111 / rr TI — / DOUBLE \ \ \ \ — INSPECTION ON SHALLC RUGGER AMAIN MAINTENANCE OPERATIONS, AS REQUIRED. MAINTENANCE DURING OPERATIONSFALINCLUDE, BUMONT IS NOT LIMITED LIQUIDAMBAR STYRACIFLUA "ROTUNDILOBA" OR "ROTUNDILOBA SWEETGUM (CANOPY TREE) 3. THE CORRECTIVE MEASURES DESCRIBED ABOVE WILL RESULT IN PLANTINGS THROUGHOUT EX V RT x 8JELL / \ \ ` ILEX X AQUIPERNYI "DRAGON LADY" OR "DRAGON LADY" HOLLY LARGE EVERGREEN THE ONSIDE CONSTRUCTION. CREEK STREAM BUFFER AND WILL MITIGATE THE IMPACTS FROM THE ORCULVERTAJPOWELLgREEK \ \ � � — T0, RASH REMOVAL AND ENSURING A DENSE, HEALTHY GRASS /FOREST GROUNDCOVER. MOWING &BUSH HOGGING MAY BE ALLOWED ( ) OSSING WITH EXISTING C NG LANE WITHIN THE STREAM BUFFER AND MITIGATION AREAS FOR THE SOLE PURPOSES OF REMOVING OVERGROWN INVASIVE SPECIES AND FOR ACER PALMATUM OR JAPANESE MAPLE (UNDERSTORY TREE) PROPOSED CONSTRUCTION. i \ 4. A BOND SHALL BE PROVIDED PRIOR CONSTRUCTION ACCOUNTING FOR THE COST OF CLEARING THE TRAIL. HOWEVER THE MOWING &BUSH HOGGING SHALL BE LIMITED TO A MAXIMUM OF FOUR TIMES A YEAR. THE MYRICA CERIFERA & CVS OR SOUTHERN WAX MYRTLE (UNDERSTORY EVERGREEN) REMOVING THE MAXIMUM 88,350sf OFF INVASIVE SPECIES AND FOR PROVIDING NEW CONTRACTOR SHALL CONDUCT THE ANNUAL INSPECTION FOLLOWING THE FIRST YEAR THE PROJECT IS COMPLETED, AND THE OWNER BUXUS SEMPERVIRENS & CVS OR AMERICAN BOXWOOD (LARGE SHRUB) MITIGATION PLANTINGS OF THE MAXIMUM 88,350sf. IN THE EVENT THE ARBORIST's REPORT SHALL CONDUCT THE ANNUAL INSPECTIONS THEREAFTER. 3. ALL MITIGATION AREAS SHALL BE PROTECTED BY A MAINTENANCE AGREEMENT. i IDENTIFIES LESS THAN 88,350sf OF AREA AVAILABLE FOR MITIGATION PLANTINGS / MITIGATION SCHEDULE: 4. DCR's RIPARIAN BUFFERS MODIFICATION & MITIGATION GUIDANCE MANUAL DEFINES A CANOPY TREE AS A TREE THAT REPLANTINGS, THEN THE AREA OF INVASIVE SPECIES REMOVAL AND MITIGATION THE CONTRACTOR SHALL SCHEDULE A MEETING ONSITE WITH THE COUNTY ENGINEER AND THE OWNER PRIOR TO ANY MITIGATION REACHES 35' IN HEIGHT OR LARGER WHEN MATURE. THE MANUAL DEFINES AN UNDERSTORY TREE AS A TREE THAT DUE TO S SHALL BE EQUAL TI THAT VI THE LESSER AREA DETERMINED BY THE ARBORIST PLANTINGS TO FINALIZE THE LOCATION AND QUANTITIES. IN THIS MEETING THE CONTRACTOR SHALL PROVIDE AN APPROXIMATE DATE MATURES TO A HEIGHT OF 12' TO 35'. A LARGE SHRUB IS DEFINED AS A SHRUB THAT REACHES P OF HEIGHT OR DUE ON THE STATE OF THE EXISTING HEAVILY FORESTED STREAM BUFFER. FOR THE MITIGATION PLANTINGS, WHICH SHALL OCCUR IN THE FALL OR SPRING. PLANTINGS SHALL ONLY OCCUR AFTER INITIAL UPLAND GREATER AT MATURITY, AND A SMALL SHRUB IS DEFINED AS A WOODY PLANT THAT CAN REACH UP TO 10' OF HEIGHT AT 5. THE ONSIDE STREAM BUFFER'S MITIGATION SHALL BE COMPLETED PRIOR TO THE FULL RELEASE / \ ESC MEASURES ARE IN PLACE. MITIGATION PLANTINGS SHALL BE COMPLETED PRIOR TO THE FULL RELEASE OF THE MITIGATION BOND. MATURITY. OF THE MITIGATION BOND. TT/R. CI LU No. 35791 1/27/21 M 0� N F 0 O m W W zo a a F- Z J ❑ ❑ H- O I --I E U')J k z X z X a ❑ M O O O z J w III O ¢ a a U) w W Z > > F- W Lu a Lu a wa U) o o w ❑ � O N � 0 ry 0 N 0 N W" LU J J U) UM, z LLU U U) JLU J< ®CD 0 N U Q G I oC O U LU O z LU LU V z I..0 0— w w a Ln JOB NO. 182154 SCALE AS SHOWN SHEET NO. 7