Loading...
HomeMy WebLinkAboutSDP202100007 Review Comments Minor Amendment 2021-02-11Phone (434) 296-5832 Project: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Project Coordinator: Engineering comments: COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 229024596 Fax (434)972-4126 Site Plan review 1680 Seminole Trail Auto Dealership — FSP/Minor Amendment and ARB Plan Scott Collins, Collins Engineering [200 Garrett St., Suite K, Charlottesville, VA 22902, scoff(a)collins-engineering.coml BNE Restaurant Group IV, LLC c/o Craig Worthy P.O. Box 2629, Addison, TX 75001 22 Jan 2021 11 Feb 2021 John Anderson Kevin McCollum 1. Sheet 1 a. Floodplain Information: Please revise Ef. . date to May 16, 2016 consistent with 18-30.3.2. b. Recommend Drainage Note that explains no new storm inlets or new pipes are proposed. 2. Sheet 2 a. Provide Note to Contractor re. disposition of storm pipes beneath inlet (capped /abandoned /etc.) once inlet is demolished. Especially consider obligation to preserve existing pipes that will operate in the future. � / dX courmaeae/ EX. PORTION OFF^ J'Z1 SIDEWALK TO BE REMOVED 0 00 sIDEWkL E� uu aes5 F �C JJJ EX. STREET EX. ADA HAN LIGHT TO RAMP TO RE RE I— / T///'Y/ \ HLMaa b. Clarify NE and NW parcel boundaries, via linework, which appear somewhat ambiguous. Engineering Review Comments Page 2 of 3 s.w \ LI iSL [c [x@.uv6/ act POEPa suwE ....�.GL.K,L .�.F n,i a ew c. Clarify NW/SW parcel boundaries, via linework, which appear unclear (image above, blue circle). d. Copy details of existing retaining wall demolition from sheet 4 to sheet 2. Sheet 2 displays existing conditions and demolition, while sheet 4 is a grading/drainage plan. e. If work relating to demolition occurs beyond parcel boundaries, provide easement or right of entry letter with adjacent owner/s (including RW held by Albemarle /VDOT) to perform work on off - site parcel/s. Certificate of Take at bk.-pg. 4685-642 includes description of 3,193 ftz temporary construction easement, which has expired and may not be relied upon by this project f. Show (existing) landscaping on parcel to SW (offsite vegetation must be protected). 3. Sheet 3 a. Provide details (and typ. detail) for proposed concrete drainage flume. b. Near entry from Rio Road, provide `No left / 1-way' or similar sign to prevent vehicles entering 1- way site access. c. Label CG-6. d. Label CG-2 (wherever used). e. Provide reference to sheet 7 dumpster pad detail. f. Label sidewalk widths. g. Ensure all walks >_ 5' width. Width at blue circle may be < Min. j i0 PEMxIH vx6Po �000, gr f0.PME k SNLLO y1689 wsa.L EX §oEw.ux r 10 r2Mux h. Provide bumper blocks, if needed, for spaces where parking -retaining wall railing conflicts may exist. i. Provide bumper blocks for all parking spaces along SW parcel boundary to limit incidence of vehicle overhang, protect existing on -site signs, protect existing or future landscaping on adjacent parcel, etc. See satellite image, last page. j. Ensure at least 2' between face of curb for on -site parking and sidewalks within public right-of- way (walks on Rio Road or Rt. 29 on -ramp), to ensure that customer and display vehicles do not overhang sidewalk/s within public right-of-way. Engineering Review Comments Page 3 of 3 4. Sheet 4: Show retaining wall railing in cross section #2 since plan view label states `retaining wall with railing.' 5. Sheet 5: If landscape irrigation is considered, recommend show with Site Plan, sheet 3, or Landscaping Plan, sheet 5, and install with construction to limit damage to pavement in the future. Irrigation lines crossing expanse of asphalt need not increase calculated limits of disturbance. 6. Sheet 7: Provide safety railing detail. Reference: site outlined in blue: Please feel free to call if any questions: 434.296-5832-x3069. Thank you SDP2021-00007 1680 Seminole Trail Auto Dealership FSP 021121