Loading...
HomeMy WebLinkAboutSDP202100012 Architectural Drawings 2021-02-12GENERAL ELEVATION NOTES 6 A2.1 6ONTINUOU5 RIDGE VENT 5TANDIN6 5EAM MTL. ROOF 1 DOWN5POUT W/1 \ GULTURED STONE EIF5 — 5PLA5HBLOGK `VENEER SOUTH ELEVATION s2.1 J SCALE: 1/8"=V-0" u X DOWN5POUT PIPED TYP GONTROL JOINT TO 5TORH 5Y5TEM 1 EAST ELEVATION 1 J SCALE:1/8"=l'-0" EIF5 A3.1 5TANDIN6 SEAM MTL. ROOF GULTURED STONE TRIM RIDGE VENT GANVA5 AWNING ABOVE DOOR5 (TYPl II �II'll y�� II y11= �, �-- � Ilf',',•�C.:-�=:�nl�f.° , :;..,' CULTURED STONE DOWN5POUT PIPED TO STORM 5Y5TEH 5EE SOUTH ELEVATION FOR TYPIGAL NOTE5 5EE EA5T ELEVATION FOR TYPICAL NOTE5 n NORTH ELEVATION WEST ELEVATION A2,1 I SCALE: 1l8"=11-01, k A2.1 I SC;AI P VA'1=1"-011 j P05T POST j ♦ 05T 4' f4W SLAB- DONN 4 SIVES- 5TMTU2AL DWG5 705T SLAB PAVILION PLAN A2.1 SCALE:118"=V-0" '05T x1l STANDING SEAM — — —�OF II II II Li LJ i _1 PAVILION ELEVATION SCALE: 1 /8"= V-0" 8 A2.1 P05T I P05T 4' COW' 5LAB- rI DONN 4 SIDES- 5EE STRUCTURAL DWG5 —rl rL P05T l — — SLA5 BAND CANOPY PLAN i P05T IA FLUSH D TRV55ES TO MATCN 4 P05T 05T BAND CANOPY ELEVATION V' 6R00lv rr.—T"-Pj002 BxB P05T SEE STRUCTUm 1. CONTRACTORS ARE REQUIRED TO FIELD VERIFY ALL EXISTING BUILDING CONDITIONS DURING THE BID PERIOD TO DETERMINE THE SCOPE OF DEMO WORK REQUIRED. 2. DEMOLITION TO THE EXTENT SHOWN ON ARCHITECTURAL DRAWINGS ARE APPROXIMATIONS OF THE WORK REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS FOR PROPER COORDINATION OF DEMOLITION WORK AND PREPARATION FOR NEW CONSTRUCTION. 3. CONTRACTORS ARE RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL WASTE AND MATERIAL RELATED TO DEMOLITION ACTIVITIES PRIOR TO PROCEEDING WITH NEW CONSTRUCTION. 4. REPAIR ALL ADJACENT STRUCTURE AND FINISH MATERIALS (INCLUDING BUT NOT LIMITED TO FLOORS, WALLS, & CEILINGS) TO RECEIVE NEW CONSTRUCTION AS REQUIRED AT LOCATIONS WHERE STRUCTURE IS DEMOLISHED. 5. PROVIDE TEMPORARY STRUCTURE (POSTS AND BEAMS) AS SUPPORT TO REQUIRED EX Q RT EXISTING G STRUCTURE ABOVE NEW OPENINGS. ❑ ELEVATION KEYNOTES 1. REMOVE EXISTING OVERHEAD SECTIONAL DOOR, HARDWARE, TRACK, TRIMS, ETC. AND PROPERLY DISPOSE. PREPARE OPENING TO RECEIVE NEW CMU INFILL. SEE NEW WORK PLANS. 2. REMOVE EXISTING DOOR, FRAME & HARDWARE. PROPERLY DISPOSE. PREPARE OPENING TO RECEIVE NEW CMU INFILL. SEE NEW WORK PLANS. 3. DEMOLISH EXISTING CMU PARTITION TO 8" BELOW SLAB. PREPARE SLAB FOR REPAIRS. SEE NEW WORK PLANS. 4. DEMOLISH EXISTING METAL STUD & GYPSUM BOARD PARTITION, INCLUDING ANY FINISHES, ALL STUDS, TRACK, AND FASTENERS. ALSO REMOVE ANY JUNCTION BOXES, CONDUIT OR WIRE IF FOUND. TAKE CONDUIT RUN BACK TO NEAREST JUNCTION OR PULLSOX. 5. REMOVE EXISTING STEEL BEAMS AT TOP OF WALL AND REPAIR WALL W1 12" CMU TO MATCH T.O.W. 6. DEMOLISH PORTION OF EXISTING CMU WALL TO MAKE NEW OPENING FOR NEW WINDOW OR DOOR. SEE NEW WORK PLANS. 12 STANDING SEAM OOF UILDING FELT OVER PLYWOOD 5WATHIW b TREATED WOOD *111"X8 SCIA TREATED WOOD FFIT b TREATED WOOD TRIM TREATED WOOD BAND CANOPY DETAIL A2.1 SCALE; 1!2"=V-0" PAVILION SIM. Y W o N O m z W M N z U J o Li L Q o> o� ty-o CD U �-F M COPYRIGHT J 2020 ALL RIGHTS RESERVED U) z J 0 Q > J J_ I- Z � w Lj LIJ ti �...� 2 U 0 z� z 0cy— ~ J w J z z_ W m Lu w Y ' w rF- vJ DATE: ISSUED:1114/ 2021 REVISIONS: NO. DATE J.N. 1923 SHEET TITLE: REMARKS BUILDING AND PAVILION ELEV. SHEET NO. A201 O DEMOLITION KEYNOTES SCOPE OF WORK 6'x6' CONC. PAD UP TO DOOR SILL MAX 2% II II II II 3 I 4 II I I Lu II I I 1 I I I I 23'-0" 7 6-4" L L 32'-8" 5 2'-4" 1'-0" 1' DEMOLITION PLAN AI.2 SCALE:118"=V-O" I I I I I I I I I I I I ®�I I I I I I I I 1 6 6An ii 6 I I 3 '-0" 2'.0" ,T-0 :1'-0" 4 A2.1 100'-O" EXISTING 21'-0" ADDITION 4 3 A1.2 _ - - - - - - ELECTRIC- �F+S r I ,FY_V,.x��. VG L SHEI f(ORDER RJAI.DISHSINKC L NAND FD FD OPEN AIR COOLERS RETAILAEA 111 b8 KITCHEN RETAIL AREA I O © ov I I WALK-IN FREEZER WALK.IN LEft y l04 ` I v I 1 - I pD / I COFFEE PDS 4 WAY MERCHANDISERS -- _ I ® IOJ I UNDER BFURNISHINGSSEPARATE O I OFFICE ° UNDER SEPARATE CONTRACT r_ i \\ I WOMEN MEN I 101 PREP AREA Ng �.���IO9 � FD r. .. D �7T-gl:�v 4 ., ' X. _ -� - - 103 104 GEOF-------------------------------------------1- -------------------�--------------'_ co CONC. 4" 12'-0" 11'-0" 6'�" 11_2 10-10 3-d"','.. 6'-4" T-4" 8" L[T-4"t 12'�" U3'-i" EDGE OF 2'-4" 2' „ 2 0" 2'-0" 2` 2' „ 2'-0" CONC. 1'-0" 1'-0" 1'-0" 1'-W STAMPED CONC: WARP _ � UP TO DOOR SILLS t 2 FLOOR PLAN NEW WORK A2.1 MAX2°'° SCALE: 1 /8"=V-0" c o ! I WH / I HVAC u� `. HAND IO3 1 HAND DISH SINK SINK J MECHANICAL LSINK J RFD III _ R 4'-11/2" 6'-0" M ez �oR 1 8'-0" 1 1 110 `o i FD I / I ` ` o j � L075 OFFICE! I - 12 lo- \ 5'-0" CLR. 1 I 106 °° Fd IOq U-71/8" 7112 , I 11'-23/4�Fil ENLARGED PLAN AT.z J SCALE:1/4"=1'-0" x, RETAIL AREA JAN. lob III To� \ I ( I 1 '1 6 � A1.2 WOMEN MEN f IOq L-- FD QFD- 40 G 0 >\ ENLARGED TOILET PLAN A1.2SCALE:1/4"=1'-0" 1. REMOVE EXISTING OVERHEAD SECTIONAL DOOR, HARDWARE, TRACK, TRIMS, ETC. AND PROPERLY DISPOSE. PREPARE OPENING TO RECEIVE NEW CMU INFILL. SEE NEW WORK PLANS. 2. REMOVE EXISTING DOOR, FRAME & HARDWARE. PROPERLY DISPOSE. PREPARE OPENING TO RECEIVE NEW CMU INFILL SEE NEW WORK PLANS. 3. DEMOLISH EXISTING CMU PARTITION TO 8" BELOW SLAB. PREPARE SLAB FOR REPAIRS. SEE NEW WORK PLANS. 4. DEMOLISH EXISTING METAL STUD & GYPSUM BOARD PARTITION, INCLUDING ANY FINISHES, ALL STUDS, TRACK, AND FASTENERS. ALSO REMOVE ANY JUNCTION BOXES, CONDUIT OR WIRE IF FOUND. TAKE CONDUIT RUN BACK TO NEAREST JUNCTION OR PULLBOX. 5. REMOVE EXISTING STEEL BEAMS AT TOP OF WALL AND REPAIR WALL Wl 12" CMU TO MATCH T.O.W. 6. DEMOLISH PORTION OF EXISTING CMU WALL TO MAKE NEW OPENING FOR NEW WINDOW OR DOOR. SEE NEW WORK PLANS. FINISH SPECIFICATIONS INTERIOR PAINTING - INTERIOR DRYWALL 1 I1 L 1 COAT PRIMER -S-W PROMAR 200 ZERO VOC LATEX PRIMER (828-2600 SERIES) & 2 FINISH COATS -S-W PROMAR 200 ZERO VOC LATEX PAINT (B20-2600 SERIES) IN FLAT FINISH INTERIOR DRYWALL 1#101.106:10&1121: 1 COAT PRIMER- S-W PROMAR 200 ZERO VOC LATEX PRIMER (B28.2600 SERIES) & 1 FINISH COAT- S-W PROMAR 20C ZERO VOC LATEX PAINT (B20.2600 SERIES) & 1 COAT S V! PRO -EXTERIOR INDUSTRIAL WATER BASED EPDXY (873.300 SERIES) INTERIOR METALS (DOORS & FRAMES): 1 COAT PRIMER - S-W PRO INDUSTRIAL PRO-CRYL PRIMER IB66-310 SERIES) & 2 FINISH COATS - S-W PROMAR 200 ZERO VOC LATEX PAINT (931-2600 SERIES) IN SEMI-GLDSS FINISH INTERIOR WOOD DOORS: 1 COAT PRIMER - S-W PROMAR 200 ZERO VOC LATEX PRIMER N (B28-26D0 SERIES) & 2 FINISH COATS - S-W PRO INDUSTRIAL PAtSLR VJRFACE fY.,9NA n ENAMEL IN SEMIGLOSS FINISH INTERIOR WALLS - SPACES- 104,106,109, 110 CERAMIC TILE WAINSCOT & BASE FLOORING - POLISHED CONCRETE [ALT. FINISH FOR SPACES #10141121: 3 800 GRIT SALT & PEPPER FINISH WI STAIN GUARD & FINAL BURNISH AL 1 VINYL WALL BASE 1#1014107. #E71: JOHNSONITE, 4" h x V8' CEILING - ACOUSTICAL CEILING GRID SYSTEM I#101-#1081: ARMSTRONG 15P6" STANDARD WHITE, ZxY -CLG. HEIGHT TO MATCH EXIST. GYPSUM BOARD 1#10941121: PAINTED wl 1 COAT PRIMER - S-W PROMAR 200 ZERO VOC LATEX PRIMER (828.2600 SERIES) & 2 FINISH COATS - S-W PROMAR 200 ZERO VOC LATEX PAINT (820.2600 SERIES) IN EGGSHELL FINISH EXTERIOR WOOD WOOD STAIN @ PAVILIONS TO BE SW "WOODSCAPES" POLYURETHANE WOOD STAJI* COLOR TO BE SELECTED DOOR & HARDWARE NOTES 1, DOOR HARDWARE TO BE BRUSHED CHROME WI LEVER STYLE HARDWARE & CONFROM TO ACCESSIBILITY REQUIREMENTS & TO MATCH EXISTING 2. ALL HINGES TO BE BALL BEARING 3. ALL HARDWARE TO BE HEAVY DUTY, DULL CHROME 4. HARDWARE SHALL BE EQUAL SCHLAGE TO MATCH EXISTING S. ALUMINUM FRAME & DOOR TO BE CLEAR ANODIZED W1 CLEAR TEMP. GLASS 6. DOOR #102. Y-ON '-W ALUMJGLASS DOOR WI ALUM. FRAME & SIDELIGHT; CLOSER. 12"OFFSET PUSHIPULL Wl CYL & PUSH PADDLE, & H,J,S WEATHERSTRIPPING T. DOOR #108, #111, #112 - T-G"W-B" SOLID CORE WOOD DOOR W1 HLW. MTL. FRAME; OFFICE LOCK, CLOSER 8. DOOR #105, #107, #109, #110. 3'-0"x&-8" SOLID CORE WOOD DOOR Wl HLW, MTL. FRAME; PRIVACY LOCK, CLOSER 9. DOOR #103, #104.3'-0"x6'-8" HLW. MTL DOOR W/ HLW. MTL. FRAME; H,J,S WEATHERSTRIPPING; THRESHOLD; CLOSER; OFFICE LOCK 10. DOOR #101. 3'-VxV-8* HLW. MTL DOOR W/ HLW. MTL. FRAME; H.J.S WEATHERSTRIPPING; THRESHOLD, CLOSER, OFFICE LOCK 5 TOILET ELEVATION A1.2 SCALE:1/4"=1'-0" 1. CONSTRUCTION OF NEW WALLS AS INDICATED IN THE MAIN 2. CONSTRUCTION OF NEW ADA TOILET ROOMS AS INDICATED 3. REMOVAL AND REPLACEMENT OF FLOOR FINISHES, WALL FINISHES AND NEW CEILING TILES AS INDICATED 4. REMOVAL & REPLACEMENT OF ALL ROOFING, GUTTERS & DOWNSPOUTS GENERAL DEMOLITION NOTES 1. CONTRACTORS ARE REQUIRED TO FIELD VERIFY ALL EXISTING BUILDING CONDITIONS DURING THE BID PERIOD TO DETERMINE THE SCOPE OF DEMO WORK REQUIRED. 2. DEMOLITION TO THE EXTENT SHOWN ON ARCHITECTURAL DRAWINGS ARE APPROXIMATIONS OF THE WORK REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS FOR PROPER COORDINATION OF DEMOLITION WORK AND PREPARATION FOR NEW CONSTRUCTION. 3. CONTRACTORS ARE RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL WASTE AND MATERIAL RELATED TO DEMOLITION ACTIVITIES PRIOR TO PROCEEDING WITH NEW CONSTRUCTION. 4. REPAIR ALL ADJACENT STRUCTURE AND FINISH MATERIALS (INCLUDING BUT NOT LIMITED TO FLOORS, WALLS, & CEILINGS) TO RECEIVE NEW CONSTRUCTION AS REQUIRED AT LOCATIONS WHERE STRUCTURE IS DEMOLISHED. 5. PROVIDE TEMPORARY STRUCTURE (POSTS AND BEAMS) AS REQUIRED TO SUPPORT EXISTING STRUCTURE ABOVE NEW OPENINGS. EXTERIOR FINISHES NOTES 1. STONE VENEER TO BE BORAL CULTURED STONE- BUCKS COUNTY COUNTRY LEDGESTONE Wl WATERTABLE & OTHER TRIM SHAPES AS MAY BE REQUIRED - STONE TO BE INSTALLED PER MANUFACTURER'S DIRECTIONS & PROVIDE FOR POSITIVE DRAINAGE 2. EIFS TO BE STONE OR EQUAL AS INDICATED ON THE DRAWINGS -SYSTEM SHALL INCORPORATE 1-1f2" FOAM BASE WI'V' GROOVE & CONTROL JOINTS AS INDICATED -SYSTEM SHALL PROVIDE FOR POSITIVE DRAVKAGE CODE NOTES 1. APPLICABLE CODE -VIRGINIAREHABILITATION CODE (VRC)-2015 ARTICLE 301.1.1 & 504 - PRESCRIPTIVE COMPLIANCE METHOD, LEVEL 2 ALTERATION Z USE GROUP M-MERCANTILE [MARKET) 3. CONSTRUCTION CLASSIFICATIONS -TYPE NIB [NO CHANGE) 4. FIRE PROTECTION -NONE (NO CHANGE) 5. AREA - 2,904 S.F. 6. OCCUPANCY LOAD- A.STORAGEISTOCK- 672 S.F.1300 = 3 B. BALANCE OF SPACE - 2,232 STJ60 = 38 TOTALOCCUPANCY=41 ❑ RESTROOM KEYNOTES 1. ELONGATED WATER CLOSET, ADA HEIGHT 2. ELONGATED WATER CLOSET 3. URINAL, ADA HEIGHT 4. LAVATORY Wl ADA COMPLIANT FAUCET 5. LAVATORY Wl FAUCET 6. 34" HIGH SOLID SURFACE COUNTER W/ 4" BACKSPLASH 7• 42" + 36" + 1 B" GRAB BARS CONFIGURED ADA COMPLIANT 8. WALL MOUNTED PAPER TOWEL DISPENSER 9. GLASS MOUNTED SOAP DISPENSER IC TOILET PAPER OfSPEMSER 11, SANITARY NAPKIN DISPOSAL 12. 24X24 MOP SINK FINISH FLOOR EQ EQ TOILET ELEVATION TOILET ELEVATION ALz SCALE:1/4"=V-0" A1.z SCALE:14'=V-0" Y W CD z M W Cy m QQ a •_- W Z Z = s V J o C) i Of ` „ Q W > U oZ o 0 CD U04 m d' COPYRIGHT © 2020 ALL RIGHTS RESERVED z J O > `Q / L J J { z U) w ` . , W W LL O J tr U O z J z -J � w J O Z_ W LU w � r� C/ / W VJ DATE: ISSUED: 111412021 REVISIONS: NO. DATE REMARKS J.N. 1923 SHEET TITLE: DEMOLITION & NEW WORK PLANS SHEET NO. A1,2 ALL SECTION A3.1 SCALE:1"=1'-0" H015TLJRE M15TANT GLUL APPLY GWB TO GWB WINDOW 5TOOL TOOTH -IN HEW CMU JAMB5 HEAD AND 51LL --- (TYP) - BLOCK A5 RE01D. EA II 5/8' V- I I/2' , Ir —Ij v EXISTING MA5. WALL EI1`5 PINI5H 5Y5TEM NEW 5TEEL LINTEL = W HAS. INFILL - ~ W5xlo w/ C!"A/4' PLATE 5' BEARING ON EACH END ALUM. 5TOREFRONT YAW. FRAME FLR5HIN6 -DRIP Foa VARIE5 ry ROD 4 5EALANT ALUM. 5TOREFRONT v DOOR FRAME` ROD d SEALANT LFEH STONE VENEER OR SEE PLAN72' 3/6' EIF5 WALL A55EMBLY 4 1/4' T Veil 14 1/2' FRAME I I/2' A R.O. Z HM DOOR HEAD A3.i SCALE: 3"=V-0" JAMB SIM, —ALUM. POOR 4 FRAME 5TO IN BED OF 5EALLV I I ROP 4 VENEER ALUM THRESHOLD ROp SEALAA NT pkm NEW CONO. WALK EXISTING SLAB EXISTING WALL (�Z DOOR SILL A31 SCALE:3"=V-0" -� DOOR JAMB- ALUM A3.1 I SCALE: 311=V-0" HM SIM FIN. FLOOR a I Iz II I_o11 - M.O. WINDOW MA5. WALL T +4 WINDOW STOREFRONT ELEVATIONS A3.1 J SCALE:114"=V-0" b 1-41' �� E 4 Y W o N m Z W M N Q Z«—• = U W Q _ C)f O Q L U) ryOs m=g M (Y a COPYRIGHT © 2020 ALL RIGHTS RESERVED vJ J 0 {. y > Lu J J I— z w W Lu CL' J 0_ 0z J Z oLu z_ Lu m � 06w V ♦ W F_ DATE: ISSUED: 1/14/2021 REVISIONS: NO. DATE O r � — ALUM. ENTRANCE REMARKS J.N. 1923 SHEET TITLE: WALL SECTION & DETAILS SHEET NO. All