Loading...
HomeMy WebLinkAboutWPO202000002 Review Comments WPO VSMP 2021-02-15Short Review Comments Report for: WPO202000002 SubApplication Type: Horseshoe Farm - VSMP Stormwater Management/BMP Plan Erosion and Sediment Control Plan Date Completed:01-30-2020 Reviewer:John Anderson CDD Engineering Review Status:Denied Reviews Comments: Division: Date Completed:04-10-2020 Reviewer:John Anderson CDD Engineering Review Status:See Recommendations Reviews Comments: VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan (VSMP /WPO) is approved pending resolution of bridge proposal; items 5.-6., and SWPPP /PPP Exhibit approval. C. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reason listed at item 1. [ item 1 relates to a Note. ] Division: Date Completed:02-11-2021 Reviewer:John Anderson CDD Engineering Review Status:Approved Reviews Comments: Laserfiche notification, 2/10/2021 6:16 PM; ped. bridge over river removed. Conditional approval: 1. Project is under a stop work order. ESC plan bond amount previously discussed ($20,000) is required, and pre-requisite to lifting the stop work order. Please coordinate with Ana Kilmer, Management Analyst, as soon as possible. [ akilmer@albemarle.org; 434.296-5832 -x3246 ]. Submit bond estimate request form, with fee ($250), to Ana. Link to form: https://www.albemarle.org/home/showpublisheddocument?id=990 Please ensure request to establish a bond identifies project by file number: WPO2020-00002. 2. Note: Pedestrian /recreation bridge across South Fork Rivanna River is not approved with this plan. 3. Append ‘Future bridge’ label to image of bridge, C9., prior to final print plan submittal. See SWM Plan review item 3., below. 4. Revise SWPPP: Please see review comment items A., SWPPP, 1.a./d./e.; 3-4, below. 5. Prior to approval of proposed bridge within mapped floodplain connecting opposing banks of S. Fork Rivanna River (w/constructed elements within mapped floodplain), a Floodplain Development Permit is required. FDP application review/approval required prior to FDP issuance. 6. Across all plan sheets, please revise banner revision date from 12/10/21 to 2/10/2021, prior to print plan submittal (final check of .PDFs is welcome). email to Applicant /Developer: 2/11/2021 10:48 AM Also, email to Luke Omand, luke@piedmontlm.com; 2/11/2021 10:53 AM include Luke Omand on future e-correspondence, Piedmont Land Mgmt. Division: Page:1 of 1 County of Albemarle Printed On:February 15, 2021