HomeMy WebLinkAboutWPO202000002 Review Comments WPO VSMP 2021-02-15Short Review Comments Report for:
WPO202000002
SubApplication Type:
Horseshoe Farm - VSMP
Stormwater Management/BMP Plan
Erosion and Sediment Control Plan
Date Completed:01-30-2020
Reviewer:John Anderson CDD Engineering
Review Status:Denied
Reviews Comments:
Division:
Date Completed:04-10-2020
Reviewer:John Anderson CDD Engineering
Review Status:See Recommendations
Reviews Comments:
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP.
This plan (VSMP /WPO) is approved pending resolution of bridge proposal; items 5.-6., and
SWPPP /PPP Exhibit approval.
C. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This
plan is disapproved for reason listed at item 1. [ item 1 relates to a Note. ]
Division:
Date Completed:02-11-2021
Reviewer:John Anderson CDD Engineering
Review Status:Approved
Reviews Comments:
Laserfiche notification, 2/10/2021 6:16 PM; ped. bridge over river removed.
Conditional approval:
1. Project is under a stop work order. ESC plan bond amount previously discussed ($20,000) is
required, and pre-requisite to lifting the stop work order. Please coordinate with Ana Kilmer,
Management Analyst, as soon as possible. [ akilmer@albemarle.org; 434.296-5832 -x3246 ]. Submit
bond estimate request form, with fee ($250), to Ana. Link to form:
https://www.albemarle.org/home/showpublisheddocument?id=990
Please ensure request to establish a bond identifies project by file number: WPO2020-00002.
2. Note: Pedestrian /recreation bridge across South Fork Rivanna River is not approved with
this plan.
3. Append ‘Future bridge’ label to image of bridge, C9., prior to final print plan submittal. See
SWM Plan review item 3., below.
4. Revise SWPPP: Please see review comment items A., SWPPP, 1.a./d./e.; 3-4, below.
5. Prior to approval of proposed bridge within mapped floodplain connecting opposing banks of
S. Fork Rivanna River (w/constructed elements within mapped floodplain), a Floodplain Development
Permit is required. FDP application review/approval required prior to FDP issuance.
6. Across all plan sheets, please revise banner revision date from 12/10/21 to 2/10/2021, prior
to print plan submittal (final check of .PDFs is welcome).
email to Applicant /Developer: 2/11/2021 10:48 AM
Also, email to Luke Omand, luke@piedmontlm.com; 2/11/2021 10:53 AM
include Luke Omand on future e-correspondence, Piedmont Land Mgmt.
Division:
Page:1 of 1 County of Albemarle Printed On:February 15, 2021