HomeMy WebLinkAboutSP202100005 Checklist 2021-02-15SPECIAL USE PERMIT CHECKLIST for
M. Reitelbach
PREAPP2019-00133 Camp SP Amendment — Haupt Property / TMPs 85-3A and 85-3A1
(Staff Member)
PreApp Number and Project Name / Tax Map Parcel Number
After the mandatory pre -application meeting, county staff will mark this checklist appropriately so
that it is clear to the applicant the information from Section 33.4 (c) that must be submitted with
the official application.
Required for
Provided with
application?
Staff)
application
SECTION 33.4(c)
(County
(Applicant)
X
X
YES
NO
X
A narrative of the project proposal, including its public need or benefit; be sure to
include the proposed number of camp participants, in addition to staff members; the
hours of operation; and the number of days per week of operation and weeks per year.
Also include whether the camp will be a day or an overnight camp.
X
A narrative of the proposed project's consistency with the comprehensive plan,
including the land use plan and the master plan for the applicable development area;
X
A narrative of the proposed projects impacts on environmental features.
X
A narrative that addresses the impacts of the proposed development on public
transportation facilities, public safety facilities, public school facilities, and public
parks.
X
One or more maps showing the proposed projects regional context and existing natural
and manmade physical conditions;
X
A conceptual plan showing, as applicable:
X
1) circulation within the project and connections to existing and proposed or planned
streets within and outside of the project. This conceptual plan should depict the
entrance into the site from Batesville Road, along with the vehicle circulation proposed
within the site for camp attendees, such as how and where vehicles dropping off
attendees will park or turn around on the site. If a bus is proposed to be used, depict
where the bus will turn around and where the bus will stop to drop attendees off.
X
2) typical cross -sections to show proportions, scale and streetscape/cross-
sections/ci rcu lation;
X
3) the general location of pedestrian and bicycle facilities;
SPECIAL USE PERMIT CHECKLIST 09-2020 Page 1 of 2
4) �_.Iding envelopes; the location of any exis...,g or proposed new buildings that will
rX
be used for the camp activities.
X
5) parking envelopes; the location of the parking areas for staff members and the
parking areas for attendees, such as parents/guardians who are dropping off camp
participants.
X
6) public spaces and amenities;
X
7) areas to be designated as conservation and/or preservation areas; identify the
boundaries of the conservation easement on the property and the conditions of the
easement
X
S) conceptual stormwater detention facility locations; if applicable. Any questions
regarding stormwater should be directed to the County Engineer, Frank Pohl,
fpohl(c@albemarle.org.
X
9) conceptual grading; if applicable. Any questions regarding grading should be directed
to the County Engineer, Frank Pohl, fpohl@albemarle.org.
X
Other special studies or documentation, if applicable, and any other information
identified as necessary by the county on the pre -application comment form.
-approval from the Health Department will be required for water and sewage facilities.
Provide information on the existing water and sewage facilities and proposed changes.
For example, are additional bathrooms proposed to be constructed somewhere on the
property.
-approval by VDOT of the entrance will be required. Provide the proposed number of
vehicle trips that this use will produce. How many participants of the camp are
requested, along with the proposed number of staff members? Will any type of group
transport be used, such as a bus, to reduce the number of individual vehicles that will
be entering the site each day of the camp's operation?
Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit.
Read and Sign
I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on
this checklist as required for application.
zoml&e t /V T t"e)) "
Signatur of person completing this'checklist
Print Name
-4 e/6,�
Date
Daytime phone number of Signatory
SPECIAL USE PERMIT CHECKLIST 09-2020 Page 2 of 2