Loading...
HomeMy WebLinkAboutSP202100005 Checklist 2021-02-15SPECIAL USE PERMIT CHECKLIST for M. Reitelbach PREAPP2019-00133 Camp SP Amendment — Haupt Property / TMPs 85-3A and 85-3A1 (Staff Member) PreApp Number and Project Name / Tax Map Parcel Number After the mandatory pre -application meeting, county staff will mark this checklist appropriately so that it is clear to the applicant the information from Section 33.4 (c) that must be submitted with the official application. Required for Provided with application? Staff) application SECTION 33.4(c) (County (Applicant) X X YES NO X A narrative of the project proposal, including its public need or benefit; be sure to include the proposed number of camp participants, in addition to staff members; the hours of operation; and the number of days per week of operation and weeks per year. Also include whether the camp will be a day or an overnight camp. X A narrative of the proposed project's consistency with the comprehensive plan, including the land use plan and the master plan for the applicable development area; X A narrative of the proposed projects impacts on environmental features. X A narrative that addresses the impacts of the proposed development on public transportation facilities, public safety facilities, public school facilities, and public parks. X One or more maps showing the proposed projects regional context and existing natural and manmade physical conditions; X A conceptual plan showing, as applicable: X 1) circulation within the project and connections to existing and proposed or planned streets within and outside of the project. This conceptual plan should depict the entrance into the site from Batesville Road, along with the vehicle circulation proposed within the site for camp attendees, such as how and where vehicles dropping off attendees will park or turn around on the site. If a bus is proposed to be used, depict where the bus will turn around and where the bus will stop to drop attendees off. X 2) typical cross -sections to show proportions, scale and streetscape/cross- sections/ci rcu lation; X 3) the general location of pedestrian and bicycle facilities; SPECIAL USE PERMIT CHECKLIST 09-2020 Page 1 of 2 4) �_.Iding envelopes; the location of any exis...,g or proposed new buildings that will rX be used for the camp activities. X 5) parking envelopes; the location of the parking areas for staff members and the parking areas for attendees, such as parents/guardians who are dropping off camp participants. X 6) public spaces and amenities; X 7) areas to be designated as conservation and/or preservation areas; identify the boundaries of the conservation easement on the property and the conditions of the easement X S) conceptual stormwater detention facility locations; if applicable. Any questions regarding stormwater should be directed to the County Engineer, Frank Pohl, fpohl(c@albemarle.org. X 9) conceptual grading; if applicable. Any questions regarding grading should be directed to the County Engineer, Frank Pohl, fpohl@albemarle.org. X Other special studies or documentation, if applicable, and any other information identified as necessary by the county on the pre -application comment form. -approval from the Health Department will be required for water and sewage facilities. Provide information on the existing water and sewage facilities and proposed changes. For example, are additional bathrooms proposed to be constructed somewhere on the property. -approval by VDOT of the entrance will be required. Provide the proposed number of vehicle trips that this use will produce. How many participants of the camp are requested, along with the proposed number of staff members? Will any type of group transport be used, such as a bus, to reduce the number of individual vehicles that will be entering the site each day of the camp's operation? Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist as required for application. zoml&e t /V T t"e)) " Signatur of person completing this'checklist Print Name -4 e/6,� Date Daytime phone number of Signatory SPECIAL USE PERMIT CHECKLIST 09-2020 Page 2 of 2