Loading...
HomeMy WebLinkAboutSDP202000080 Correspondence Final Site Plan and Comps. 2021-02-19Kimley>>> Horn February 19, 2021 Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Green Clean - 3290 Worth Xing Comment Responses Review Comments found on page: CommunityDevelopment...................................................................................................................... 1 EngineeringServices..............................................................................................................................2 ServiceAuthority...................................................................................................................................2 Architectural Review Board (ARB) Communi(v Development 1. [32.5.2 (a)] Add "Entrance Corridor, Airport Impact Area, and Steep Slopes — Managed" to the site statistics on the cover sheet. Please clarify that they are "Steep Slopes — Managed." Response: Site statistics on cover sheet updated to reflect "Steep Slopes — Managed" is an applicable overlay district. 2. [32.5.2 (d)] Show and label all areas of Managed Steep Slopes on the site plan. Identify the source used to locate areas of Managed Steep Slopes. Clarify the label on Sheet CV-101 to identify these slopes as Managed Steep Slopes. Response: Label clarified on sheet CV-101, identifying the areas as "Steep Slopes -Managed". 3. [32.7.5.3] Prior to final site plan approval, the applicant must submit an easement application for review that shows all proposed ACSA water and sewer easements. The plat must be approved by the County and recorded prior to final site plan approval. The final site plan will need to be updated to state the deed book and page number of the recorded instruments associated with all new easements. Comment has been addressed pending ACSA approval/comment. Response: Comment noted. Plat will be submitted under separate cover and will be recorded prior to plan approval. 4. [32.7.5.4] If any new easements for cable or public service utilities are needed, please include these on the easement plat mentioned in comment #3 above Response: Comment noted. 5. [32.7.9.4(b)(2)] Please have the owner or contract purchaser sign the conservation checklist on Sheet CP-101. Response: Conservation checklist signed and included on sheet CPA01 as requested. Kimlep Horn Page 2 6. [General Comment] The label for "10 Po" on the landscaping plan (Sheet CP-101) should be corrected to 9. There is a total of 15 of these shrubs on the site, a string of 9 (not 10) and a string of 6. Response: Label on sheet CP-101 updated as requested. Engineering Services 1. A VSMP plan will need to be submitted and approved prior to Final Site Plan approval. Review of the VSMP plan may generate additional comments on the Final Site Plan. Response: Comment noted. Service Authority 1. Relocate proposed tap outside of concrete sidewalk. Response: Proposed tap relocated to outside of the concrete sidewalk as requested. 2. Proposed sewer lateral is a 6" tying into an existing 4". The existing 4" lateral will need to be abandoned, if a 6" lateral is needed. Response: Sheet CV-102 updated to indicate the 4" lateral will be abandoned and capped at main. 6" lateral connected from proposed building to existing sanitary sewer line using a saddle connection. 3. Pressures in this area are high. A PRV will be needed for the car wash. Response: Callout added to sheet CU-101 indicating a 2" PRV will need to be installed within the building. 4. Provide desired flow rate, to confirm water meter size. Response: Carwash additional water demand calculations added to sheet CU-502. Desired flow rate and calculations included on sheet CU-502. 5. Include TD-11 "Typical Service Tap Abandonment' detail. Response: TD-11 "Typical Service Tap Abandonment' detail added to sheet CU-501 as requested. Architectural Review Board (ARB) 1. Review pending an ARB final site plan submittal. Response: Comment noted.