HomeMy WebLinkAboutARB202100026 Correspondence 2021-02-17COURSE
ENTRANCE CORRIDOR ELEVATION
PROPOSED REVISION ADDRESSING ARB COMMENTS
1-12-2021
ON INSIDE
DGIVETHE
STREET FACING FACADE
MECHANICALEpUIPMENTNOTE: WNDOWGI INGNOTE_
AL tUUlFMEN I �NCLUDINGVACUUM DANCE Mn SN LNOT DROP
MACHINE) IS LOCATED AT THE INTERIOR OF THE BUILDING, BELOWJ0%_ VISIBLE LIGHT REFLECTANCE(VIR)$N4LL
TIEREFORENISIBIIItt Ci ALL MECHANICAL EpNPMENT NOT EXCEED 30%.
FROM THE ENTRANCE CORRIDOR IS ELIMINATED'
ON