HomeMy WebLinkAboutARB202100027 Application 2021-02-22 !.°� 4, Community DerelopmentDe;artmern
;, C
,�it�s -tF Albemarle Colby :: IntireRoaC!-a;:et*esv"1e,'oA229G2-45G5
131-4 1, IMi ice.(434)295-5832 Fax• (434)972-4125
''; . ' Planning Application
PARCEL/ OWNER INFORMATION
IMP 06100-00-00-154B0 Owner(s): WINDMILL VENTURES LLC
Application# ARB202100027
PROPERTY INFORMATION
J
Legal Description ACREAGE
Magisterial Dist. Rio l„' Land Use Primary Residential -- Single-family (incl. modular homes
Current A..FD Not in A/F District 1 Current Zoning Primar, Neighborhood Model District
APPLICATION INFORMATION I
Street Address 999 RIO RD E CHARLOTTESVILLE, 22901 Entered By
Jennifer Smith'
application T,,pe Architectural Review Board .�. - ___._—
Project 999 RIO ROAD - FINAL - DIGITAL
Recei,ed Date 102/22/21 I F.ecei•,ed Date Final I Submittal Date!02/22/21 I Total Fees I 1075
Closing File Date I I Submittal Date Final' l Total Paid 10751
Revision Number
Comments I
Legal Ad
SUB APPLICATION(s)
Type I Sub Applicatio i Comment
Final Site Development Plan 02/22/21
APPLICANT / CONTACT INFORMATION
ContactType 1 Name .Andress [ CityState I Zip Phone I PhoneCell
fe,r 2 T.'.4;pk_srt WINDMILL VENTURES LLC 535 FOXDALE LN CHARLOTTES'VILL 22903'
r'mary Ca-:act JUSTIN SHIMP - SHIMP ENGINEERING :912 E HIGH STREET CHARLOTTESVILL 22902 4342275140
Date
Sianature of Contractor or µuthorized Aaent
Architecturaeview Board ApplicSon A'
Part A: Applicant, Contact and Parcel Information
Project Name: 999 Rio Road
Tax map and parcel(s): 61-154B Physical Street Address: 999 Rio Road
Contact Person: Justin Shimp
Business Name: Shimp Engineering
Address 912 E High Street City Charlottesville State VA zip 22902
Daytime Phone( ) 434-227-5140 Fax#( ) E-mail justin@shimp-engineering.com
Owner of Record: Windmill Ventures LLC
Address 535 Foxdale Lane City Charlottesville State VA zip 22903
Daytime Phone( ) Fax#( ) E-mail
Part B: Review Type and Fee
Select review type
Review by the Architectural Review Board
Conceptual Plan/Advisory Review(for a Special Use Permit or a No Fee
Rezoning)
Preliminary/Initial Review of a Site Development Plan No Fee
X Final Review of a Site Development Plan $1075.00
Amendment to an approved Certificate of Appropriateness $242.00
Building Permit Review $634.00
County-wide Certificate of Appropriateness
Structures 750' or more from the EC,no taller than 5 stories No Fee
Structures located behind a structure that fronts the EC No Fee
Personal wireless service facilities No Fee
Fencing or Equipment or Lighting No Fee
Additions to ARB-approved buildings No Fee
Minor amendments to site or architectural plans No Fee
Building permits where the change is 50%or less of the altered elevation No Fee
NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS.
FOR OFFICE USE ONLY BP# r n^ARB# 1
Fee Amount$ I U5 Date Paid aid By wh 1/"t Receipt k# � , By
PIVOT 3
County of Albemarle Dept of Community Development,401 McIntire Rd,Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)9 2-4 p 7 126
10/2015 Page I oft
OVER
Part C: Description of Proposal
Describe your proposal. Attach a separate sheet if necessary.
See attached narrative
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate
copies of all submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
1 hereby certify that 1 own the subject property or have the legal power to act on behalf of the owner in filing this
application. *S mittal requirements below. I also certify that the information provided on this application
and accom vying i form.
tion is accurate, true, and correct to the best of my knowledge, and that the attached
plans co ain ation required by the appropriate checklist.
02/22/2021
Signat r own r, oVlZaesrElrEeEpresseWWative Date
or conract er
Justin Sh434-227-5140
Printed name, Title Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
• If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
• If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency. Attach the owner's written consent.
11 /2010 Page 2 of 2
OVER —
0 �q of nts
o$III' Architectural Review Board
U
�,," Final Review of a Site Development Plan
Submittal Requirements Checklist
Part A: AnDlicant, Contact and Parcel Information
Project Name: 999 Rio Road
Tax map and parcel(,): 61-154B
Contact Person: Justin Shlmp
Business Name: Shl
Address 912 E High Street
Physical street address: 999 Rio Road
city Charlottesville
Daytime Phone ( _) 434-227-5140 Fax # ( _ )
Part B: Submittal Requirements
State VA Zip 22902
E-mail justin@shimp-engineering.cc
Important:Submittal packages must contain 8 collated copies of all information unless otherwise indicated.
A. Written description of the proposal
Provide a description of the proposal. Identify changes from the preliminary submittal. Indicate
specifically how each ARB comment from the preliminary review has been addressed. If there are no
changes proposed, then explain why.
Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of f "=20', clearly legible and folded):
0 Location(s) of proposed building(s) on the site.
0 Location of proposed parking, travelways, walkways and other improvements.
Mechanical equipment, trash containers, loading and service areas, other similar features and
improvements, and associated screening.
Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient
off -site topography to describe prominent and pertinent off -site features and physical characteristics,
but in no case less than 50-feet outside of the site.
0 Location and size of existing and proposed utilities and easements. Identify type of utility and extent
of easement.
0 Stormwater management plan.
0 Location of retaining walls indicating top and bottom elevations, maximum wall height, and proposed
materials, with material and color samples.
0 Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and
contact information for the firm preparing the drawings in the title block on all drawings. For revised
drawings, clearly identify revisions made.
1
OVER
C. Landscape plan showing the following (drawn to the scale of 1' =20' orlarger, clearly legible and folded):
Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
0 Existing landscaping to be removed. Include the location, size, and species.
Landscape key including all landscape symbols and a description of what they represent.
❑ Location of existing and proposed tree lines and tree save areas.
❑ Location of existing natural features.
0 Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by
botanical name and caliper.
Location and height of above -ground utilities and associated easements, and location of below -
ground utilities and associated easements.
J1 Stormwater facilities.
❑ Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans.
❑ Include tree protection fencing and limits of work on the landscape, grading and E&S plans.
D. Lighting plan showing the following (drawn to the scale of 1'=20' orlarger, clearly legible and folded):
❑ Location of all proposed building and site lighting.
❑ Lighting schedule identifying all proposed light fixtures, poles and brackets.
❑ Manufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type,
intensity, style, shielding, color, finish, and installation height.
❑ Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of
Section 4.17 of the Zoning Ordinance.
❑ Coordination of lighting with landscaping and other site elements.
E. Appearance of the building(s) (architectural elevations, color perspective sketches, site sections):
Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to the
scale of 1/8"=1'-0". Include a building materials schedule and key on the elevation drawings.
Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the
overall building design.
❑ Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed
development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and
roof height(s) relative to the natural elevations along the Entrance Corridor.
0 One set of all building materials / colors.
0 A floor plan adequate to show exterior walls, windows and doors.
F. Additional material
❑ Provide labeled, color, 8-%" x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
0 Color perspective images (for example: sketches, renderings, photosimulations, etc.) that show the
proposed development as seen from the Entrance Corridor are often useful for gaining a clear
understanding of the proposal. The ARB may require such images in certain cases when other
submitted documents do not answer all questions of building form, building details, materials, context,
topography, and/or visibility.
❑ Any additional material that is necessary to address comments made by the ARB at the preliminary
review with a memo itemizing how each of the preliminary comments have been addressed.
0 The applicant is welcome to submit any additional material that will make the final site development
review more productive. Drawings or other submittal items that clarify topography, visibility, utilities,
landscaping, or other unique or unusual conditions are welcome.
2
OVER
Part C: Applicant Agreement
Applicant must read and sign
. Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files.
. All information in this checklist is required, unless specifically waived by the ARB, prior to processing
a final site development plan review by the ARB. Additional submittal materials may be required,
depending on the proposal.
. Only complete application packages will be scheduled for ARB review. The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, I hereby state that the
information provided in this application, and all accompanying information, is accurate, true and correct to
the best of my knowledge, and that the attached plans contain all information required by this checklist.
Signature of person completing checklist
Rachel Moon, Planner
Printed Name / Title
02-22-2021
Date
434-227-5140
Daytime phone number of Signatory
County of Albemarle Department of Planning and Community Development
401 McIntire Road, Charlottesville, VA 22902-4596
(434) 296-5832 Tel www.albemarle.org revised 10/24/2014
3
OVER
Written Proposal
999 Rio Road East Rezoning
PROJECT PROPOSAL
Basic Overview:
February 22, 2021
Tax Map Parcel
Owner
Acreage
Zoning
Comprehensive Plan
Land Use Designation
06100-00-00-154BO
Windmill
1.91
NMD
Urban Density
Ventures LLC
Residential
On behalf of Blackbird of Charlottesville, LLC, the contract purchaser of property designated on
the County of Albemarle, Virginia (the "County") tax maps as parcel 06100-00-00-154B0,
having an address of 999 Rio Road East (the "Property"), and zoned Neighborhood Model
District (NMD), we propose a first phase of development that consists of the following:
(1) fourteen (14) one -over -one flats;
(2) six (6) single family attached units;
(3) five (5) single family detached units.
The Property consists of approximately 2 acres, located at the intersection of Belvedere
Boulevard and Rio Road East. The entrance corridor is Rio Road East (see the Property shown
above highlighted in red). The image below shows a section of the site plan. The flats and
single family attached units will be visible from the Entrance Corridor. The single family
detached units will not be visible from the Entrance Corridor, and the office building will be
constructed in a later phase.
BELVEDERE BOULEVARD
i
( rg�g Y nits (Hate) _ H*tat i �nt�(St t
O - r
af I Building (to be IT
i� onstructed in later
1:� Min
hase) ---
The fourteen (14) flats will be constructed by Craig Builders per the enclosed
architectural elevations and renderings (the "Craig Units"). These units were designed as
specified for several reasons. The most important factor was the final grade of the development.
The existing sewer line located within Fowler Ridge Court is too shallow to gravity feed the 999
Rio Road development without increasing the elevation of the Property. Doing so allows for the
Craig Units to easily be accessed from the interior parking lot. However, due to the steep grade
change from the multi -use path adjacent to Belvedere Boulevard to the Craig Units, they cannot
be easily accessed from such path.
To avoid any appearance of "blankness" resulting from the visibility of the "back" of the
Craig Units from the Entrance Corridor (Rio Road East), the proposed Craig Units have
substantial windows facing Belvedere Boulevard as well as balconies with garden space below.
In addition, we are proposing a small retaining wall along the multi -use path so that the grade
between the path and the Craig Units will be relative flat. The retaining wall will look similar to
the units at Out of Bounds (see example picture below), only with differences in aesthetic (see
example conceptual rendering below). There will also be medium-sized trees, where possible,
along Belvedere Boulevard (see the enclosed site plan, and screenshot of such site plan below,
the trees are located where the arrows point stating, " 6W Landscape Easement"). In addition,
2
per the enclosed rendering, there will be landscaping along the brick retaining wall and between
the Craig Units and the multi -use path.
Section of the Site Plan
Picture from Out of Bounds
Conceptual Rendering of 999 Rio Road
The six (6) single family attached units will be constructed by Habitat for Humanity (the
"Habitat Units"). The Habitat Units will not be as visible from Rio Road East, as they are
located further away or further down Belvedere Boulevard. Since the grade change is not as
steep between the multi -use path and the Habitat Units, accessibility and connectivity is easier to
achieve. Below is a rendering of the proposed Habitat Units, showing an entrance from the
Habitat Units to both the interior courtyard as well as the multi -use path along Belvedere
Boulevard (see the enclosed Habitat elevations, and a screenshot of such elevations below, the
top view is looking from the interior courtyard, the bottom view is looking from Belvedere
Boulevard).
LL LL - ion i l
11d —
P TLt] L LL Lp IE m 1
u
Section of Elevation Plans for Habitat Units
3
The five (5) single family detached units will be located interior to the development and
will therefore not be visible from the Entrance Corridor (Rio Road East). The second phase will
include the office building located along Rio Road East. Because the office building will be
constructed in a later phase, the landscaping and other elements surrounding the office building
are not included in this submittal. Such landscaping and other elements would likely be
damaged in the construction of the office building and therefore we believe it would be prudent
to delay such installation until a submittal of the later phase.
Two pictures below show the existing conditions along Rio Road East. The first shows
the view driving towards downtown Charlottesville from US-29. The second image shows the
same view, except looking further down Belvedere Boulevard (where Habitat Units will be).
The below shows conceptual renderings of the views with proposed units (Craig and Habitat).
0
11011171.7U11:1tlltul
The Rio Road East Entrance Corridor consists of larger Church complexes (for example,
Covenant Church) and CATEC, as well as single family attached and detached residential units.
The proposed units are compatible with the single family detached units in Dunlora Park, which
consist of up to three (3) attached units, similar in size and scale to the Habitat Units. One
difference is the Dunlora Park attached units are one-story, while the Craig Units and Habitat
Units are two-story. However, the scale and massing is still similar (for example, the width of
each unit is fairly comparable). In addition, while the single family attached units in Dunlora
Park are one-story, the single family detached homes immediately adjacent to the project (in the
Shephard's Ridge community) are two -stories on basements, located at higher elevations than
Rio Road East. Therefore, the scale and massing of the proposed units are compatible with the
surrounding residential, taking elements from both the Shephard's Ridge community as well as
the Dunlora Park community.
5
999 Rio Townhomes (1 over 1 condos)
Entrance Corridor Plan Proposal
2/22/21
Items of Importance:
• The back and side elevations of these townhomes will be most visible from Rio Rd and
Belvedere Blvd. It is the intention to make the back and side elevations of these homes
more visually pleasing than what would be considered a standard spec level for the back
and side of a townhome. The intentions of the back elevation is to make them look
more like a front elevation with features like numerous windows, cathedral ceilings,
metal roofing, and low profile open air balconies.
• The location of the pedestrian path as well as the site grade makes adding a back door
on the 1stfloor not as desirable to the future residents of the homes as well as a
challenge to build on the site. We are hoping for an exception to this for the following
reasons:
1. Safety- Because the public pedestrian path is so close (roughly 7 feet) to the
condos, it creates a safety concern for the future residents of the units. It is our
estimation that a person living here would much prefer the safety of a locked
window and a landscaping buffer versus an accessible door w/steps down to the
path.
2. Overall Look-The grade of the site is a challenge. If a back door is added the
grade will force a tall stoop w/many steps down to "grade" level. Also If the
stoop/steps are forced on the site it will create a wall like structure that is very
close to the pedestrian path.
3. Connectivity- Our goal is to still create a feeling of connectivity to the homes and
the pedestrian path by featuring a pathway in between the rows of homes
connecting the fronts to the pedestrian path. Also the 2nd floor open balconies
create a feeling of connectivity between the homes and the corridor.
4. Landscaping- a retaining wall will create a garden like feel to the back of the
homes and help create a natural look between the homes and the corridor. This
will also help mitigate the sloping grade between the homes and the path and
will create more of a tiered look leading down to the grade of the pedestrian
path.
Material List:
• Brick: Blue Ridge Regent
• Siding: fiber cement, 12" exposure
• Paint: Sherwin Williams® "Dovetail"
• Doors: fiberglass painted Sherwin Williams® "Sealskin"
• Windows: Plygem® 1500 series Vinyl, Dark Bronze Color
b
1. Visible Light Transmittance above 40%
2. Visible Light Reflectance below 30%
• Trim: James Hardie® Trim painted white
• Porch and dormer roofs: metal—black
• Window and door heads (when on brick): row lock
• Window and door heads (when on siding): N/A
• Roof shingles: heavy architectural shingles—black
• Front railings: painted aluminum — N/A
• Rear railings-Balcony: painted aluminum— Dark Bronze
• Balcony band boards: PVC painted white
ENTRANCE CORRIDOR COMPATIBILITY
The Rio Road East Entrance Corridor consists of larger Church complexes (for example,
Covenant Church)and CATEC, as well as single family attached and detached residential units.
The proposed units are compatible with the single family detached units in Dunlora Park, which
consist of up to three(3) attached units, similar in size and scale to the Habitat Units. One
difference is the Dunlora Park attached units are one-story, while the Craig Units and Habitat
Units are two-story. However, the scale and massing is still similar(for example,the width of
each unit is fairly comparable). In addition, while the single family attached units in Dunlora
Park are one-story,the single family detached homes immediately adjacent to the project(in the
Shephard's Ridge community) are two-stories on basements, located at higher elevations than
Rio Road East. Therefore, the scale and massing of the proposed units are compatible with the
surrounding residential,taking elements from both the Shephard's Ridge community as well as
the Dunlora Park community.
5
December 3, 2019
County of Albemarle, Virginia
Departru"t of Community Develop¢nenl
401 McIntire Road
Charlottesville, VA 229024596
Re: AuTmOM2wTIONTOSUelrltTLAND Lisli,APrt-WATlOMS
W iodmiJ l Ventures LLC (the "Ownce') is the owner of Albemarle County tax map parcel
number 0610"0-WI54B0 (the '-Praperty'} nx Owner hereby authoriu-s the following
individuals an&or rcpresentatives of the awed entities to subrrrit land use applications on the
Owncr's bohalf in connection with the propoa A redevelopment of the Prope -
Niwle M_ Scro,
Justin M. Shimp, and
Shimp Frtginecring, P.C., and its mcmbcrs and employees thereof
such Iwo use applications may include zoning trap mnendments, spucial roe permit
applications, subdivision plat and site plan applications, and any other similar appliurtioos
rclaling to the proposed redevelopment of the Praperty _
WINDMILL VENTURIiS LLC
a Virginia timitati liability wrttpany
By:
Printed Name: Elizabeth Shan Hoobler
Title: Manager
SHIMP ENGINEERING, P.C.
Design Focused Engineering
February 22, 2021
Khris Taggart
County of Albemarle
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
RE: Response Letter #1 for ARB2020-63 999 Rio Road
Dear Mr. Taggart,
Thank you for your review of 999 Rio Road. This letter contains responses to ARB comments dated July
7, 2020. Our responses are as follows:
1. Provide architectural designs with the next submittal. The Rio Road -facing elevation of the office
building and the Belvedere Boulevard -facing elevations of the multi -family units must be
designed to appear as front facades, and side elevations visible from the EC street must be treated
with architectural detail to eliminate blankness.
RESPONSE: Elevations have been provided with this submission. The office building elevations
have not been provided. The office building will be constructed in a later phase.
2. Show the location of mechanical equipment (building and ground mounted) on the site and
architectural plans and show how it will be screened from the EC.
RESPONSE: Mechanical equipment is shown on the site plan. Screening fences are provided
where necessary; a detail for this screening fence has been provided on the site plan.
3. Provide a detail of the proposed dog park fencing in the site plan. Chain link fencing is not
appropriate.
RESPONSE: A detail of the dog park fencing has been provided.
4. Include the standard mechanical equipment note on the architectural plans.
RESPONSE: This note has been included with the architectural plans.
5. Provide a complete plant schedule with the next submittal.
RESPONSE: Please see the revised site plan.
6. Provide confirmation that easements will not conflict with the proposed/required landscaping.
RESPONSE: Please see the revised site plan.
7. Reduce the spacing of the proposed trees along Belvedere Boulevard to 40' on center.
RESPONSE: Comment received.
8. Identify the landscaping proposed in the landscaped courtyard.
RESPONSE: The landscaped courtyard is located adjacent to the office building. As stated
earlier, the office building will be constructed in a later phase. Because construction of the office
building could damage the then -existing landscaping and other features of the courtyard, the
details of this area will be provided during the later phase.
912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineeong.com
9. Provide a complete plant schedule with the next submittal.
RESPONSE: Please see the revised site plan.
10, Consider adding landscaping at the corner of the site between office building and the Lot 1-2
building to help the visual transition between the varying building uses and characters.
RESPONSE: The office building will be constructed at a later phase. If landscaping is installed
prior to construction of the office building, such landscaping will likely be destroyed during such
construction. Therefore, landscaping in this area will be installed following and/or during the
construction of the commercial building.
11. Provide a complete plant schedule with the next submittal.
RESPONSE: Please see the revised site plan.
12. Add the standard landscaping note to the landscape plan.
RESPONSE: Please see the revised site plan.
13, Identify the retaining wall heights on the grading plan.
RESPONSE: Wall heights are provided on the site plan.
14. Indicate retaining wall material(s) and color(s) on the plan. A physical sample may be necessary
for review.
RESPONSE: The retaining wall along the back parking lot will be a segmental block and will not
be visible from the Entrance Corridor. Additional walls are now provided along lots 1-7. The
brick material of these walls will match the structure. Please refer to the attached image of Out of
Bounds for a similar condition.
If you have any questions or concerns about these revisions, please feel free to contact me at
Rachel anshimp-en ing eering com or by phone at 434-227-5140.
Regards,
Rachel Moon
Shimp Engineering, P.C.
912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com