HomeMy WebLinkAboutWPO201800014-61628-Full Inspection ReportV
NOTICE TO COMPLY
Hand delivered
Project: WP0201800014
Hansen Road Church - VSMP
Operator/Contractor: Martin / Horn Inc. (Jeff Sims - project manager)
ALBEMARLE LAND LLC
Issued Date: 2/26/2021
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Under section § 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with
the requirements of the Land Disturbance Permit (or Agreement in Lieu of a Plan) for the
referenced project and to immediately take corrective measures to address erosion and sediment
control deficiencies on this property. This Notice to Comply is being issued because of the
following deficiencies:
Deficiency: Project has active permit, Permit and all required documents must be posted until
termination
Corrective Action: Post all required documents until termination.
Deficiency: see item 2
Corrective Action:
Deficiency: until permit termination, SWPPP must be onsite and available for use.
Corrective Action: Keep SWPPP on site ane accessable for inspections
Deficiency: Site inspections must be continued until permit termination.
Corrective Action: Inspections at this stage of project can be done every 30 days an within 48
hours of a major rain event
Deficiency: See item 25
Corrective Action:
Deficiency: Areas of the site observed with weak or inadequte coverage to inhibit erosion
Corrective Action: Amend the soil with topsoil, fertilizer,lime and additional seed to increase the
growth
Deficiency: See item 32
Corrective Action:
Deficiency: remove waddles at inlet Hanson Road
Corrective Action: remove controls that are not needed.
Unless subsequently amended in writing by this office, it is expected all of these corrective
measures will be completed by.
Re -inspection of this notice to verify corrective measures will incur a $150 for land disturbing under
VESCP and single-family dwelling units (§ 17-207) or a $250 fee for land disturbing under VSMP (§ 17-
208). Failure to take effective corrective measures will result in a Stop Work Order upon re -inspection.
County Inspector Name: Geoff Elsie
County Inspector Phone Number: (434) 296-5832
OF Al.,& Inspection Result: Notice to Comply
r
L�eo��P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
Hansen Road Church - VSMP
Project/WPO Number:
WP0201800014
TMP:
078000000073AB
DEQ Permit Number (if
applicable):
VAR10L924
Project Operator:
Martin / Horn Inc. (Jeff Sims - project
manager)
Operator Telephone #:
(434) 220-7772
Project Contact:
ALBEMARLE LAND LLC
Contact Telephone #:
Contact E-Mail:
Qualified Personnel (QP):
Jason Harris (DIGS Inc)
Inspector:
Geoff Elsie
Weather (Wet/Dry/Rain):
Disturbed Acreage:
4.45
Inspection Date & Time:
2/22/2021
Single -Family:
Stage of Construction: Final Stabilization
Re -Inspection: No
COVERAGE & POSTING REQUIREMENTS
Compliant?
Reviewed during re -inspection? Yes
Comments/Description
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
Yes
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
A copy of the notice of coverage letter is posted conspicuously near the
No
Project has active permit, Permit and all required
2
main entrance of the construction activity? (CGP Part II.C)
documents must be posted until termination
Notice of the location of the SWPPP is posted near the site's entrance, if
No
see item 2
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Compliant?
Reviewed during re -inspection? Yes
Comments/Description
4
The SWPPP is on -site or made available during the inspection? (CGP
No
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
Yes
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
Yes
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP includes a narrative description of the nature of the
Yes
7
construction activity, including the function of the project? (CGP Part II
A.1 A)
The SWPPP includes a legible site plan identifying all appropriate
Yes
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
Page 1 of 4
9
The SWPPP contains the name, phone number and qualifications of
Yes
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
Yes
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
Yes
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
Yes
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
Yes
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
Yes
K? (CGP Part 11 A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
Yes
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Compliant?
Reviewed during inspection? No
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
54.G)
Has the SWPPP been amended if inspections or investigations by the
17
operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part 11 B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19
grading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part 11 B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part 11 B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-f)) (9VAC25-870-54.G)
24
mendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
Compliant?
Reviewed during inspection? Yes
Comments/Description
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
No
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
No
Part 11 F (3-4)? (CGP Part 11 F (3-4))
Page 2 of 4
27
Corrective actions are taken consistent with the requirements of the
N/A
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
Yes
plan?
Sequencing of the project is implemented in accordance with the
Yes
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
Yes
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
N/A
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
No
Areas of the site observed with weak or inadequte
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
coverage to inhibit erosion
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
Yes
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
N/A
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.6)
Are sediment traps and basins installed in accordance with MS-6 and the
N/A
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
No
See item 32
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
N/A
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
N/A
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
Yes
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
Yes
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
N/A
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
N/A
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
43
Is necessary restabilization of in -stream construction complete? (9VAC
N/A
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
N/A
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are soil and mud kept off paved or public roads to minimize the transport
N/A
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
46
Have all temporary control structures that are no longer needed been
No
remove waddles at inlet Hanson Road
removed and disturbed soil resulting from their removal permanently
Page 3 of 4
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are properties and waterways downstream from development adequately
47
protected from erosion, sediment and damage in accordance with the
Yes
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
Yes
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? No
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Page 4 of 4
Construction General Permit Site Inspection Report
Request for Correction Action
Check
Regulatory Citation/Legal
Occur.
Observation
Recommended Corrective
List #
Requirement*
Action
2
(CGP Part II.C)
Project has active permit,
Post all required documents
Permit and all required
until termination.
documents must be posted
until termination
3
(9VAC25-870-54.G)
see item 2
(CGP Part II D.2 &
3)
4
(CGP Part II D.1 &
until permit termination,
Keep SWPPP on site ane
2)(9VAC25-870-54.G)
SWPPP must be onsite and
accessable for inspections
available for use.
25
(CGP Part II F (2)) (CGP
Site inspections must be
Inspections at this stage of
Part II A.5.b.3)
continued until permit
project can be done every 30
termination.
days an within 48 hours of a
major rain event
26
(CGP Part II F (3-4))
See item 25
32
(9VAC 25-840-40.3)
Areas of the site observed
Amend the soil with topsoil,
(CGP Part II A.2(c))
with weak or inadequte
fertilizer,lime and additional
(CGP II E(1-2))
coverage to inhibit erosion
seed to increase the growth
(9VAC25-870-54. B )
36
(9VAC 25-840-40.7)
See item 32
(CGP Part II A.2(c))
(CGP II E(1-2))
(9VAC25-870-54. B )
46
(9VAC 25-840-40.18)
remove waddles at inlet
remove controls that are not
(CGP Part II A.2(c))
Hanson Road
needed.
(CGP II E(1-2))
(9VAC25-870-54. B )
Recommended 3/8/2021
Corrective Action
Deadline:
Targeted Re- 3/8/2021
Inspection Date:
Comments: Postings and SWPPP placed and inspections started by the 8th of March, soil
amending and seed to have an action plan to the County by March 8th. Plan must
include start date for soil work.
*Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control
Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from
Construction Activities (9VAC25-880).
Construction General Permit Site Inspection Photo Log
Photos for Item 2
Photos for Item 4
Photo Description:
Photos for Item 10
Photo Description:
Photos for Item 30
20210210_104657.jpg.jpg 2.23MB
Photo Description: example of erosive flow damage due to lack of ground cover
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Inspection Date: 2/26/2021
County Inspector