Loading...
HomeMy WebLinkAboutWPO202000041 Correspondence 2021-03-02I® COLLINS ENGINEERING March 2, 2021 Emily Cox Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Avon Park II Development (WPO 202000141) 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.coll i ns-engineering.com Thank you for your comments dated March 2, 2021 on the above referenced project. Below are our responses to the remaining comments on the road plans. A. Stormwater Pollution Prevention Plan 3. Addressed 4. Addressed 5. Section 3 has been updated to 4.47 acres of disturbance. 6. Estimated start date has been updated. B. Pollution Prevention Plan 1. Addressed C. Stormwater Management Plan 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. 6. Addressed. 7. Addressed. 8. Addressed 9. Addressed. 10. Addressed. 11. Addressed. 12. Addressed. 13. Addressed. 14. Addressed. 15. Addressed 16. Addressed 17. Calculations have been corrected to show 3.06 Ibs/yr as what was purchased. D. Erosion and Sediment Control Plan 1. Addressed. 2. Addressed. 3. Addressed. 4. Addressed. 5. Addressed. 6. Addressed. 7. Addressed. 8. Addressed. 9. Addressed. 10. Addressed. 11. Addressed. 12. Addressed. 13. Addressed. 14. Addressed. Should you have any questions, please feel free to contact Scott Collins at Scott@collins-engineerine.com. Sincerely, Scott Collins, PE