HomeMy WebLinkAboutSUB202100035 Action Letter 2021-03-03or ALg Christopher Perez County of Albemarle Senior Planner coerez@albemazle.org _ Community Development Department 434-296-5841 ext. 3444 Memorandum To: Bethany Velasquez of Roudabush & Jeremy Swink of Stanley Martin Companies, LLC From: Christopher Perez, Senior Planner Division: Planning Date: March 3, 2021 Subject: SUB202100035 Pleasant Green Phase IIA - Final Plat Because the above -referenced final plat omits information required by Albemarle County Code Sections 14-303 through 14-318, the plat is incomplete and is not accepted for official submittal, pursuant to Section 14-226. Below are the corrections or modifications that will be required to permit acceptance of the plat. Within fifteen (15) days after the date of this letter, the subdivider may resubmit the final plat together with payment of the fee for the reinstatement of review. The date of the next application deadline after the resubmittal of the plat shall be deemed to be the date upon which the plat was officially submitted. In the event the subdivider fails to resubmit the plat within the fifteen (15) day period, the plat shall be deemed to be disapproved and a new application and fee shall be required for submittal of the plat as provided by Section 14-226(E). 1. 114-302(A)(16), 14-307.1] Dam break inundation zones. Depict and label the limits of the dam break inundation zone. Though the property is in a Dam Break Inundation Zone (DBIZ), the preliminary plat had indicated that it was not. When discovered, Planning staff sent the plat to Mark Killgore and Justin Deel of the Department of Conservation and Recreation (DCR). Pursuant to Virginia Code § 10.1-606.3, DCR has determined that Phase 2 will change the spillway design flood standards of the impounding structure. The County cannot approve this application until (a) the limits of the dam break inundation zone are depicted and labeled, and (b) the requirements of Virginia Code § 15.2-2243.1 are met. See the attached letter from Megan Nedostup to the applicant dated February 10, 2021 regarding the DBIZ. 2. 114-3181 Dam break inundation zones; engineering study and mapping information. Because the proposed subdivision is within a dam break inundation zone, the subdivider must submit with the final plat the following engineering study and mapping information: A. Engineering study. If the Virginia Department of Conservation and Recreation determines that a plan of development proposed by a subdivider would change the spillway design flood standards of an impounding structure pursuant to Virginia Code § 10.1-606.3, the subdivider shall submit an engineering study in conformance with the Virginia Soil and Water Conservation Board's standards under the Virginia Dam Safety Act in Virginia Code § 10.1-604 et seq. and the Virginia Impounding Structure regulations in 4 VAC 50-20. The engineering study shall be reviewed and acted upon by the Virginia Department of Conservation and Recreation as provided in Virginia Code § 15.2-2243.1. B. Mapping information. The subdivider shall provide the dam owner, the county, and any other affected localities with information necessary for the dam owner to update the dam break inundation zone map to reflect any new development within the dam break inundation zone following completion of the development. 3. 114-302(B)(5)] Zoning classification. Label the special use permits related to this development. SP2019-2 and SP1990-103. Please review the conditional approval letters of each SP. When the final plat is resubmitted it will be reviewed against these conditions as well. 4. 114-302(A)(9)] Building sites on proposed lots. On the plat depict and label the buildable area of each lot. 5. 114-303(G)] Ownership of common areas. Label the intended ownership of all common areas. 6. 114-303(Q)] Water supply. Provide a statement as to whether the subdivision will be served by a public water supply and a public sewer system: "Under current county policy, public water and/or sewer service will be available to this property. " 7. [14-303(S)] Control points. Provide at least four (4) control points, evenly distributed across the property and located at survey property comers, and shown on each sheet depicting the property. At the option of the subdivider, the control points may be shown on a copy of the final plat, rather than on the original final plat. 8. [14-302(A)(5)] Public easements. Depict the location and dimensions of all existing and proposed public easements outside of a street right-of-way. Existing easements shall be labeled with the deed book and page number and the name of the public owner of record. Proposed easements shall be labeled as "dedicated to public use. " The variable width Greenway easement is being platted on a separate plat provide the recordation information on the plat. 9. 114-3121 Location of existing buildings. The subdivider shall submit with the final plat a survey showing the location of all existing buildings on the land to be subdivided within fifty (50) feet of a proposed lot line or a proposed street. 10. 114-3161 Approval of entrance onto public streets. The subdivider shall submit, prior to or with the final plat, evidence satisfactory to the agent that the entrance of the principal means of access for each lot onto any existing or proposed public street complies with Virginia Department of Transportation standards. 11. 114-3171 Instrument evidencing maintenance of certain improvements. The subdivider shall submit with the final plat an instrument assuring the perpetual maintenance of the improvements (open space, stormwater management easement, and the alley). Please contact Christopher Perez in the Planning Division by using cnerez(Wbemarle.orz or 434-296-5832 ext. 3443 for further information. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 February 9, 2021 Updated: February 10, 2021* Jeremy Swink Vice President, Land — Charlottesville and Richmond Divisions Stanley Martin Homes 404 People Place #303 Charlottesville, VA 22911 RE: Pleasant Green Phase 2 Plans of Development Mr. Swink, Pursuant to Virginia State Code § 10.1-606.3, the Department of Conservation and Recreation (DCR) has made the determination that Phase 2 will change the spillway design flood standards of the impounding structure, see attached email correspondence. Pursuant to the same section of the Virginia State Code, "If the Department determines that the plan of development would change the spillway design flood standards of the impounding structure, the locality shall not permit development as defined in §15.2-2201 or redevelopment in the dam break inundation zone unless the developer or subdivider agrees to alter the plan of development so that it does not alter the spillway design flood standard required of the impounding structure or he contributes payment to the necessary upgrades to the affected impounding structure pursuant to § 15.2-2243.1 ...." Therefore, the County cannot approve the following applications until this matter is resolved in accordance with Virginia State Code § 15.2-2243.1. 1. WP0202000053 Pleasant Green Phase II —VSMP 2. SUB202000226 Pleasant Green Phase II — Road Plans 3. SUB201900058 Pleasant Green Connector Road Plan 4. WP0201900027 Pleasant Green Connector Road- VSMP* Optional alternatives: Request that DCR reconsider its determination — DCR would need to determine not whether existing development has changed the spillway design flood standards of the impounding structure, but whether the pending plan of development would change the spillway design flood standards of the impounding structure (Virginia Code § 15.2-2243.1(A)). Pagel of 2 Alter the plan of development so that it does not alter the spillway design flood standard required of the impounding structure (Virginia Code § 10.1-606.3(A)) — DCR would again make any determination of any altered plan(s) of development. Required procedures if/when the above alternatives are exhausted: 1. Submit an engineering study to DCR to provide a contract -ready cost estimate for conducting the upgrades to the impounding structure (Virginia Code § 15.2-2243.1(A)). 2. Contribute 50 percent of the contract -ready costs for necessary upgrades to the impounding structure attributable to the development, together with administrative fees (Virginia Code § 15.2-2243.1(B)) -- Those amounts would be payable to Dam Safety, Flood Prevention and Protection Assistance Fund held by the Virginia Resources Authority (County Code § 14-441(A) and § 18-32.8.6(a)). Please note that the Virginia State Code outlines the order in which the study and payment occur. The code states the following: "Following the completion of the engineering studies in accordance with subsection A, and prior to any development within the dam break inundation zone, a locality shall require that a developer or subdivider of land pay 50 percent of the contract -ready costs for necessary upgrades to an impounding structure attributable to the development or subdivision, together with administrative fees not to exceed one percent of the total amount of payment required or $1,000, whichever is less." Respectfully, Megan Nedostup Development Process Manager— Planning Services Division Albemarle County Community Development Department mnedostup@albemarle.org (434)-296-5832 x 3004 CC: Mr. Scott Collins — Collins Engineering (c/o scott@collins-engineering.com ) Page 2 of 2 FW: Pleasant Green 2 - Mint Springs Dam Megan Nedostup <mnedostup@albemarle.org> Thu 2/4/2021 5:00 PM To: Jeremy W. Swink <SwinkJW@stanleymartin.com>; Scott Collins <scott@collins-engineering.com> Cc: Frank Pohl <fpohl@albemarle.org>; Charles Rapp <rappc@albemarle.org>; Amelia McCulley <AMCCULLE@albemarle.org>; Andy Herrick <aherrick@albemarle.org> Good Afternoon, See the email chain below for the determination by DCR pursuant to State Code § 10.1-606.3 on Phase 2 of Pleasant Green. Under that same section, once DCR makes that determination, the County cannot permit development in the DBIZ unless certain conditions are met. That section also outlines options for the developer going forward. Here is the relevant excerpt: If the Department determines that the plan of development would change the spillway design flood standards of the impounding structure, the locality shall not permit development as defined in § 15.2-2201 or redevelopment in the dam break inundation zone unless the developer or subdivider agrees to alter the plan of development so that it does not alter the spillway design flood standard required of the impounding structure or he contributes payment to the necessary upgrades to the affected impounding structure pursuant to § 152- 2243.1. Best, Megan Nedostup, AICP (pronounced nuh-DAHST-up) Development Process/Project Manager She, her, hers Albemarle County mnedostup@albemarle.org 434-296-5832 x3004 401 McIntire Road, Charlottesville, VA 22902 From: Howard -cooper, Wendy <wendy.howard-cooper@dcr.virginia.gov> Sent: Wednesday, February 3, 2021 12:59 PM To: Andy Herrick <aherrick@albemarle.org> Cc: Deel, Justin <justin.deel@dcr.virginia.gov>; Frank Pohl <fpohl@albemarle.org>; Megan Nedostup <mnedostup@albemarle.org>; Greg Harper <gharper@albemarle.org> Subject: Re: FW: Pleasant Green 2 - Mint Springs Dam CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Andy, That is correct. This development plan would change spillway design flood standards for this impounding structure. Wendy C. Howard Cooper Director, Dam Safety and Floodplain Management State NFIP Coordinator Department of Conservation and Recreation 600 East Main Street, 24th Floor Richmond, Virginia 23219 Office (804) 786-5099 Cell (804) 298-4288 Fax (804) 371-2630 "As a human being, I am committed to the promotion of what I call basic human values, by which I mean especially compassion. Nurturing the compassionate seed within us and acting out of this innate capacity are the keys to fulfilling our basic aspiration to happiness." Dalai Lama "Distance means so little, when life means so much." — Amit Kalantri, Wealth of Words On Wed, Feb 3, 2021 at 12:09 PM Andy Herrick <aherrick@albemarle.org,> wrote: Ms. Howard -Cooper, Thanks for your response. So then, in the language of Virginia Code § 10.1-606.3, is it DCR's deternunation that the plan of development would change the spillway design flood standards of the impounding structure? Andy Herrick Deputy County Attorney Albemarle County aherrick@albennarle.org 434-972-4067 401 McIntire Road, Suite 325, Charlottesville, VA 22902 Notice: This message is for the intended recipient only. It likely is protected by the attorneyrchent privilege. If you have received this message in error, please call (434) 9724A167 immediately, report your receipt of this email, and promptly delete the email from all sources on your computer. If you are a client, you should maintam this email's contents m confidence to preserve its protected status. Tbank you. On Wed, Feb 3, 2021 at 9:46 AM Howard -cooper, Wendy <wendy.howard-cooper(o)dcr.virginia.gov> wrote: All, Based on the existing DBIZ, existing conditions identifiable through GIS, and proposed development, DCR has consistently stated this dam, currently rated as significant hazard, would require spillway upgrades to meet high hazard dam spillway requirements. As you have indicated, Virginia Code § 15.2-2243.1 states "If the Department of Conservation and Recreation detcmunes that a plan of development proposed by a developer or subdivider is wholly or partially within a dam break inundation zone and would change the spillway design flood standards of an im oonding structure pursuant to § 10.1-606.3, a locality shall require, prior to its final approval of a subdivision or development, that a developer or subdivider of land submit an engineering study ..." Absent a new study demonstrating impacts of structures that now exist, the impact of fill on the existing maps, and the proposed development, DCR cannot make any other determination. DCR has recommended the locality obtain a new study to assess all risks related to this impounding structure and to update the required emergency action plan to include all structures in the dam break inundation zone. Please let me know if you have additional questions. Thank you, Wendy C. Howard Cooper Director, Dam Safety and Floodplain Management State NFIP Coordinator Department of Conservation and Recreation 600 East Main Street, 24th Floor Richmond, Virginia 23219 Office (804) 786-5099 Cell (804) 298-4288 Fax (804) 371-2630 "As a human being, I am committed to the promotion of what I call basic human values, by which I mean especially compassion. Nurturing the compassionate seed within us and acting out of this innate capacity are the keys to fulfilling our basic aspiration to happiness." Dalai Lama "Distance means so little, when life means so much." — Amit Kalantri, Wealth of Words