HomeMy WebLinkAboutSP202100003 Review Comments Special Use Permit 2021-03-05COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832
March 5, 2021
Bret Flory
879 Junction Dr
Allen, TX 75013
bfl orv(a)crossa rch itects. com
RE: SP202100003 Caliber Collision
Dear Mr. Bret Flory:
Staff has reviewed your initial submittal for a Special Use Permit for a body shop use
along Route 29/Seminole Trail in the Rio29 Small Area Plan area.
We have some questions and comments which we believe should be resolved or
included as conditions of approval before your proposal goes to public hearing. We
would be glad to meet with you to discuss these issues. Our comments are provided
below.
Comments are organized as follows:
A. Comments on the Special Use Permit
B. How the proposal relates to the Comprehensive Plan
C. Additional comments from reviewers
D. Additional information
A. Special Use Permit
1. The narrative should be updated to specifically provide justification for the four
"factors to be considered" for Special Use Permits per §18-33.40. It may be
helpful to note that special use permits, when approved, run with the land. As
such, the County evaluates these requests not specific to individual businesses
but specific to the use and whether the proposed use is appropriate on the
intended parcel in perpetuity.
2. Parking requirements for automobile service stations are one space per
employee plus two spaces per each service stall. Your narrative has identified a
total of up to 22 employees on site, plus what appears to be 12 service stalls, for
a total of 46 required parking spaces, but only identifies 31 parking spaces.
Please clarify in your narrative whether the 22 employees will not be on site
simultaneously. Off -site parking is not permitted.
B. Comprehensive Plan
Initial comments on how your proposal generally relates to the Comprehensive Plan,
which in this area is the Rio29 Small Area Plan, are provided below. Comments on
conformity with the Rio29 Small Area Plan are provided to the Planning Commission
and Board of Supervisors as part of the staff report.
The Rio29 Small Area Plan designates this property, TMP 45-106, as a Core area. The
Core designation is characterized by a highly urban and pedestrian -friendly
environment. Buildings within this area are recommended to be 3-6 stories in height,
built close to the street, have windows on the ground story along the street and active
first floor uses. The plan also recommends pedestrian access and relegated parking in
the Core area.
In comparison with Rio29 Small Area Plan, the proposal is inconsistent with the
recommendations of the Plan in three ways: use, street frontage design, and building
form. The Rio 29 Small Area Plan explicitly states that auto service uses are not
encouraged in the Core. However, the Plan does allow that these uses may be
permitted by exception when the applicant can demonstrate that there will be minimal
impacts on surrounding uses.
The proposal is also inconsistent with the recommended street frontage design along
Route 29, on which the subject property is located. The Plan designates Route 29 as a
Through Corridor, prescribing an optimal street frontage design that includes a 5-foot to
25-foot frontage zone, a 14-foot shared -use path, and an 8-foot separation zone
between the building face and the public street. Staff recommends the proposal work to
incorporate these recommended street frontage design aspects in order to be more
consistent with the Rio 29 Small Area Plan.
Lastly, the proposal is inconsistent with the Rio29 Small Area Plan in that the existing
building, to be utilized by the proposed body shop, does not align with the Plan's form
and site design standards. The Plan recommends buildings 3-6 stories in height and
massing that avoids expansive blank walls, in favor of transparent first floors to create
visually interesting pedestrian environments. The existing building on this site is 1-story
in height and includes expansive blank walls along the sides of the building which are
visible from the Entrance Corridor. That said, since the proposed use does not intend to
make significant changes to the existing building's exterior, staff acknowledges that the
continuation of the existing building form is acceptable, as the current inconsistency with
the Rio29 Small Area Plan is not being increased.
C. Additional Comments from Reviewers
Planning Comments
The following comments related to planning matters have been provided by Mariah
Gleason:
Comments related to the Special Use Permit:
1. Please revise the application materials to include the assigned project number
"SP202100003".
2. The narrative should be expanded to address the Supplemental Regulations for
body shops contained in §18-5.1.31.
3. Provide information or include a site plan exhibit to show current and/or proposed
buffering characteristics/aspects of the property, such as topographic changes,
tree plantings or stands, fences (transparent, opaque), etc.
4. Is the subject property platted as 1.00 acres? Staff research found the parcel
recorded to be 1.016 acres in size. Please review and revise if necessary.
5. In Section 1 of the Application Narrative, it looks as though there might be a
clerical error. Revise the fourth sentence of the Project Narrative section to state
"special use permit" instead of "special exception".
6. Section 1 subsection (b) of the Application Narrative suggests that the building
may be added onto 'Bldg SF: 9,200 (proposed)". Is this the case? If not, staff
recommend removing the parenthetical "proposed" and replacing it with "+/-" if
the exact building square footage is not known.
7. Section 3 of the Application Narrative suggests Caliber Collision is already an
existing business in the area. Please clarify whether this a relocation or an
expansion of an existing business.
8. In Section 4, include all planned exterior changes to the site, for example, the 6-
foot screening fence and a swinging gate(s).
9. In the Application Narrative, please clarify why a swinging gate is being added to
the travelway along the northeastern side of the building.
10. Expand on the planned updates/enhancements to the site landscaping
mentioned in Section 4.
11. Please keep in mind, approval of the special use permit in no way implies
approval of a site plan or any modifications to any standards.
12. Should the special use permit be approved, development of the site and building
cannot commence without an approved site plan and appropriate building
permits.
Comments related to a future site plan:
1. Staff have concerns with the location of the proposed handicap parking space.
Staff understands that section 4.12.15 of the County Code requires handicapped
parking spaces to be located in a way that provides direct, unobstructed access
to buildings by the shortest practical route, eliminating the need to cross
vehicular access aisles wherever possible. However, staff is concerned that the
proposed configuration may cause vehicular conflicts at the site entrance and is
a difficult position for vehicles to maneuver into/out of due to sight lines and the
relative building location and existing bollards in that area.
2. Make it clear how vehicular circulation around the building will work, particularly
with the gated travelway along the northeastern side of the building. Please be
aware, per section 4.12.17, two-way access aisles must be a minimum of 20 feet
in width.
3. The proposed dumpster pad shown on the site plan does not appear to meet the
County's minimum design standards for dumpster pads. Please reference
section 4.12.19 for more information.
Zoning
The following comments related to zoning matters have been provided by Lea
Brumfield, Ibrumfield(a)albemarle.org:
1. Concept plan
a. Identify the outdoor lighting on the concept plan, with location, height, and
lumens clearly labeled.
2. Conformity with the Zoning Ordinance
a. Lighting. Full cutoff luminaires are required for all lighting over 3,000
lumens. Full cutoff luminaires are defined as an outdoor light fixture
shielded in such a manner that all light emitted by the fixture, either
directly from the lamp or indirectly from the fixture, is projected below the
horizontal plane. For equivalency of wattages, see section 4.17.4 of the
Zoning Ordinance.
These requirements do not apply to security lighting controlled by sensors
which provides illumination for 15 minutes or less.
b. Noise. Per section 4.18.04, maximum sound levels for a commercial
receiving zone is 65 dBA, both during the daytime and at night. Noise from
the repair services at the site may not exceed that dBA.
Additionally, noise levels at the nearest residential district boundary, at
TM 04500-00-00-10100, to the rear of the site beyond the self-service
storage facility, may not exceed 60 dBA during the daytime and 55 dBA at
night.
c. Supplementary regulations. Per section 5.1.31, "No vehicle awaiting repair
shall be located on any portion of the site so as to be visible from any
public street or any residential property, and shall be limited to locations
designated on the approved site plan." Due to the topography of the site,
the applicant's proposed 6' tall wood fence on the southwestern border of
the property, will likely screen vehicles from Seminole Trail to the south of
the property. However, the parking spots in front of the property may not
be used for vehicles awaiting repair.
Engineering
The County Engineer, Frank Pohl, fpohl(c-)albemarle.org, has provided the following
comments:
1. The minimum travelway width for two-way access aisles shall be 20-ft where the
travelway is not adjacent to parking spaces [18-4.12.17.c.1].
2. The access aisle around the building is 16-ft on the south side of the building and
only 12-ft when entering the gate on the north side of the building. Provide a 20-ft
wide access aisle where two-way travel is proposed and indicate one-way travel
around the building where 20-ft cannot be provided.
3. The minimum travelway width for one-way access aisles shall be 12 feet, with the
exception that 16-ft may be necessary to allow for bypass traffic [18-4.12.17.c.2
and 3]. Additional signage may be necessary if both one-way and two-way aisles
are proposed.
4. Where the travelway is adjacent to perpendicular parking spaces, the access
aisle width must be either 20-ft wide or 24-ft wide, depending on the parking
space width [18-4.12.16].
Entrance Corridor/Architectural Review Board (ARB)
The following comments related to the Entrance Corridor Guidelines have been
provided by Khristopher Taggart, ktaggart(a)albemarle.org:
The ARB does not recommend approval of the Special Use Permit as proposed
because screening issues have not been resolved and it is not clear that the
visual impacts can be sufficiently mitigated. The applicant should return for a
work session with the ARB to review alternate fence designs that are more
coordinated with the building, and options for mitigating the view of the new
rooftop equipment, including but not limited to: alternate equipment locations,
paint color, and/or landscape screening.
Fire/Rescue
The Fire/Rescue reviewer, Howard Lagomarsino, hlagomarsino(a-)-albemarle.org has no
objections to the special use permit but has provided the following comments that will
need to be addressed during the site plan review process:
1. Please provide ISO needed fire flow for the structure's intended use.
2. Please provide ACSA available fire flow test.
3. Knox Box will be required. Please place a note indicating this on the plan. The
location of this can be coordinated with the Fire Marshal's Office.
4. An unobstructed path of 20ft is required for emergency vehicle and fire apparatus
access so that all portions of grade level are within 150 ft of the emergency
vehicle and fire apparatus while on access road.
5. Gate on north side of building is two narrow and restricts access of emergency
vehicles and fire apparatus. Width is required at 20 ft, unobstructed.
6. Clarify locations and distances to closest hydrants.
7. Clarify square footage of space and determine need for fire suppression sprinkler
system (if required, fire department connection needs to be within 100 ft of a fire
hydrant and on address side of building)
Virginia Department of Transportation (VDOT)
The VDOT reviewer, Adam Moore, adam.moore(a)vdot.virginia.gov, has no objections to
the special use permit proposal but has provided comments that will need to be
addressed with a site plan review. Please see the review letter attached.
Building Inspections
The Building Inspections reviewer, Betty Slough, bslough(a)-albemarle.org, has no
objections to this proposal.
Albemarle County Service Authority (ASCA)
The ACSA reviewer, Richard Nelson, rnelson(a)serviceauthority.org, has no objections
to this proposal, but offers the following information/comments:
1. Water pressures in the area are high. This building should already be served by
a PRV.
2. Fixture counts will be required, once available, to confirm the existing meter size
is adequately sized.
Natural Resources
The Natural Resources Manager, Kimberly Biasiolli, kbiasiolli(a)-albemarle.org, has no
objections to this proposal.
Additional Information
SP Conditions
Staff has not fully drafted conditions to date for this special use permit, due to the
potential changes and additional information requested. Once conditions are drafted,
staff will send them to you.
Summary of potential proposed conditions:
1. Development of the use must be in general accord (as determined by the
Director of Planning and the Zoning Administrator) with the concept plan exhibit
provided on Sheet SP1.0 in the plans titled "Caliber Collision (Building
Renovation)", prepared by Bret Flory, dated January 16, 2021. To be in general
accord with the concept plan exhibit, development and use of the site must
reflect the general location of the parking area for vehicles awaiting repair.
Permitted modifications may include those required by ARB and those to make
the site layout more consistent with the recommendations of the Comprehensive
Plan.
Action after Receipt of Comments
This application has been tentatively scheduled for Planning Commission public hearing
for May 4, 2021, which is within 90 days after submittal. However, staff recommends
that you resubmit your application, which would require deferral. Staff will work with you
to choose a Planning Commission date for public hearing.
Resubmittal
If you choose to resubmit, please use the attached form. There is no fee for the first
resubmittal. The resubmittal date schedule and other related resources are provided for
your convenience online at:
https://www.aIbemarle.orq/government/community-deveIopment/apply-for/planning-and-
site-development-applications
Notification and Advertisement Fees
Additional notification fees will not be required unless a deferral takes place and
adjoining owners need to be notified of a new date.
Community Meeting
Prior to requesting a public hearing with the Planning Commission and Board, a
community meeting must be held in accordance with Zoning Ordinance Section 18-
33.37.
Feel free to contact me if you wish to meet or need additional information. My email
address is mgleason(a)albemarle.org.
Sincerely,
kdu4*
Mariah Gleason
Senior Planner, Community Development Department
enc: Att. 1: VDOT Comment Letter
Att. 2: Action After Receipt of Comments
Att. 3: Resubmittal Schedule
Att. 4: Resubmittal Form
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1401 East Broad Street (804) 7862701
Commissioner Richmond, Virginia 23219 Fax: (804) 7862940
February 11, 2021
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Mariah Gleason
Re: Caliber Collision — Special Use Permit
SP-2021-00003
Review # 1
Dear Ms. Gleason:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Bret Flory, Architect, dated 16
January 2021, and find the special use permit generally acceptable; however the following
comments will need to be addressed through the initial site plan submittal.
1. Please provide trip generation data.
2. The southern proposed entrance does not meet the minimum entrance spacing (565') for
a 45 mph Principal Arterial road. An Access Management Exception is required.
3. Please provide right turn lane\taper warrant, and if required turn lane and taper must be
provided. Please see VDOT's Road Design Manual Appendix F-pg., F-96, for turn
lane\taper warrants and required geometry.
4. Intersection sight distances must be shown on the Site Plan and profiles provided.
5. Entrance geometry must be provided on the Site Plan. Note that the minimum radius for a
commercial entrance without a separate truck access is 42 feet.
6. Note that the final site plan must show conformance with the VDOT Road Design
Manual Appendices B(1) and F, as well as any other applicable standards, regulations or
other requirements.
Please provide two copies of the revised plan along with a comment response letter. If further
information is desired, please contact Willis Bedsaul at 434-422-9866.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process.
Sincerely,
Adam J. Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
DEPARTMENT OF COMMUNITY DEVELOPMENT
ACTION AFTER RECEIPT OF COMMENT LETTER
FIRST SET OF COMMENTS
Your project has been scheduled for a public hearing by the Planning Commission for May 4, 2021,
which is 90 days from the date your application was accepted for review. State Code requires a 90-day
review by the Planning Commission unless the applicant requests deferral. As you will read in this
comment letter, staff recommends changes to your project to help you achieve approval. Without
these changes, staff cannot recommend approval to the Planning Commission.
If you need more time to make these changes, and if you prefer to move forward to the Planning
Commission with a recommendation for approval, you must request deferral. If you choose not to
request deferral, staff will take your project to the Commission as originally submitted, but without a
recommendation of approval. Instructions for requesting a deferral are outlined below.
Within one week please do one of the following:
1) Request deferral, as required by Section 33.52(A)1, if you will resubmit, but would like to
receive comments on the revised submittal, and understand the Planning Commission
date will be later than May 4, 2021
2) Proceed to Planning Commission public hearing on May 4, 2021
3) Withdraw your application
(1) Deferral requested
To request deferral, you must submit a request in writing to defer action by the Planning Commission
and Board of Supervisors. The request may be made by email. You may request a deferral for up to 36
months from the date your application was accepted for review, which is February 3, 2024. (This is
based on the Board of Supervisors' September 5, 2018 action.) However, all outstanding information
necessary for Commission action must be submitted by October 6, 2023, according to the published
schedule. (See Section 18-33.52 of the Albemarle County Code.)
(2) Proceed to Planning Commission Public Hearing on May 4, 2021
At this time, you may request that your application proceed to public hearing with the Planning
Commission on May 4, 2021. With this option no additional documents will be accepted, and staff will
take your project to the Commission as originally submitted, but without a recommendation of
approval.
Revised 9-17-19 MCN
(3) Withdraw Your Application
If at any time you wish to withdraw your application, please provide your request in writing.
Failure to Respond
An application shall be deemed to be voluntarily withdrawn if the applicant requests deferral pursuant
to subsection 33.52(A) and fails to provide within 90 days before the end of the deferral period all of
the information required to allow the Board to act on the application, or fails to request a deferral as
provided in subsection 33.52(B) or (C).
Fee Payment
Fees paid in cash or by check must be paid at the Community Development Intake Counter. Make
checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator.
Fees may also be paid by credit card using the secure online payment system, accessed at
http://www.albemarle.org/department.asp?department=cdd&relpage=21685.
Revised 9-17-19 MCN
2021 Submittal and Review Schedule
Special Use Permits and Zoning Map Amendments
Mandatory
Preapp must be
held no later
than this day to
file application
by Deadline for
Deadline for Filing
(3 P.M.)
First Set of
Written
Comments
Due to
Applicant
EITHER
Planning
Commission
Public Hearing
if No
Resubmittal is
Necessary
OR
Resubmittal
Deadline"
PLEASE SEE
THE
RESUBMITTAL
SCHEDULE
Monday
Monday
Friday
Tuesday
Monday
Jan 04
Tue Jan 19
Mar 05
A r 06
Feb 01
Feb 15
A r 02
May 04
Mar 01
Mar 15
A r 30
Jun 01
"*
A r 05
Apr 19
Jun 04
Jul 06
"*
Ma 03
Ma 17
Ju102
Auq 03
"*
Jun 07
Jun 21
Aug06
Sep 07
"*
Jun 28
JUI 19
Sep 03
Oct 05
"*
Aug02
Aug16
Oct 01
Nov 02
"*
Aug30
Sep 20
Nov 05
Dec 07
"*
Oct 04
Oct 18
Dec 03
Jan 11 2022
"*
Nov 01
Nov 15
Dec 30
Feb 01 2022
"*
Nov 29
Dec 13
Jan 28 2022
Mar 01 2022
**
Dates with shaded background are not 2021.
SPs for offsite or electric message signs follow the Variance schedule for the BZA.
2022 dates are tentative.
Board of Supervisors' worksess ions and public hearings will be scheduled after the Planning Commision's
action on applications.
"" Resubmittals are accepted on ANY resubmittal Monday listed after the date of the written comments to
the applicant. The PC public hearing date is the earliest date at which the request may be heard after the
corresponding resubmittal deadline date.
These schedules provide basic information. Please consult with the Planning Division for more
details regarding schedules and processing
FOR OFFICE USE ONLY SP #
Fee Amount $ Date Paid By who? Receipt # Ck# By:
Resubmittal of information for
Special Use Permit
PROJECT NUMBER THAT HAS BEEN ASSIGNED:
Owner/Applicant Must Read and Sign
I hereby certify that the information provided with this resubmittal is what has been requested from staff
Signature of Owner, Contract Purchaser
Date
Print Name Daytime phone number of Signatory
FEES to be paid after application
For original Special Use Permit fee of $1,075
❑
First resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF)
Free
❑
Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF)
$538
For original Special Use Permit fee of $2,000
❑
FirSt resubmis5lon (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF)
Free
❑
Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS MADE TO INTAKE STAFF)
$1,075
County of Albemarle Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
Revised 11/2/2015 Page 1 of 1