Loading...
HomeMy WebLinkAboutSDP202000061 Review Comments Final Site Plan and Comps. 2021-03-12Phone 434-296-5832 � OF J� o 0 �GI1JlN4i County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 Memorandum To: Daniel Hyer, PE From: Paty Saternye, Senior Planner Division: Planning Date: October 22, 2020 Rev. 1: January 12, 2021 Rev. 2: March 12, 2021 Subiect: SDP202000061 Airport Road Sheetz — Final Site Plan Fax 434-972-4126 The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Comments to be addressed with the Final Site Plan submission: 2. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. FINAL: Comment not yet fully addressed. Rev. 1: Comment not yet fully addressed. Rev. 2: Comment not vet fully addressed. Address the comment. 3. [32.5.2(a)] General information. Revise the following: i) This site plan is based upon a boundary line adjustment. Therefore, address the following: a. A boundary line adjustment plat must be submitted (separate application, fee and submission) and approved prior to the approval of the final site plan. FINAL: Comment not yet addressed. Address the comment. Rev. 1: Comment not yet addressed. Submit a boundary line adjustment plat (separate application & fee) for review and approved prior to the approval of the final site plan. Rev. 2: Comment not yet fully addressed. The plat has been submitted and is under review. The plat and any required documents, must be approved and recorded prior to final site plan approval. e. Rev. 2 [NEW COMMENT]: Revise the existing conditions sheet to label each property line that is to be vacated as "To Be Vacated". Ensure that the easement plat and the site plan are consistent 6. 132.5.20), (k) & (1)]] Existing sewer and drainage facilities; Private & public easements; Existing and proposed utilities. Address the following: b) See engineering comments in reference to required storm drainage easements and modification that will be required. FINAL: Comment not yet fully addressed. See engineering comments in reference to required storm drainage. Rev. 1: Comment not vet addressed. Address the comment. Rev. 2: Comment not vet fully addressed. Address the comment. e) An easement plat must be submitted (separate application, fee and submission) and approved prior to the approval of the final site plan. FINAL: Comment not yet addressed. Address the comment. Rev. 1: Comment not vet addressed. Address the comment. Rev. 2: Comment not vet fully addressed. The plat has been submitted and is under review. The plat, and any required documents, must be approved and recorded prior to final site plan approval. f) Include the abandonment of any easement in the proposed easement plat. FINAL: Comment not yet addressed. Address the comment. Rev. 1: Comment not yet addressed. Address the comment. Rev. 2: Comment not vet fully addressed. The plat has been submitted and is under review. The plat, and any required documents, must be approved and recorded Prior to final site plan approval. h) Rev. 1 [New Comment]: Revise the labels in the site plan, for all "proposed easements", to include the Deed Book and Page number for all newly recorded easement plats prior to final site plan approval. Also, revise the labels to say " New" instead of "Proposed". Rev. 2: Comment not vet addressed. Address the following: i) Comment response letter states this will be addressed after plat is approved, which is appropriate. However, the lines can be added to the labels ahead of time so that wording and location can be reviewed and confirmed. "DB PG " (with blanks/underlines in place of the numbers) is usually added at this stage. j) The temporary construction easement and access easement have already been recorded (and submitted). Therefore, that information is already available and should be added. k) Rev. 2 [NEW COMMENT]: Revise the existing conditions sheet to label each easement that is to be vacated as "To Be Vacated". Also, ensure all easements to be vacated are no longer shown on the proposed sheets. 7. 132.5.2(m) & 32.5.2.(i)] Ingress and egress; Streets, easements and travehvays. Address the following: f) Rev. 1 [New Comments Revise the labels in the site plan, for all "proposed easements", to include the Deed Book and Page number for all newly recorded easement plats prior to final site plan approval. Also, revise the labels to say " New" instead of "Proposed. Rev. 2: Comment not vet addressed. The access easement has already been recorded (and submitted). Therefore, that information is already available and should be added. 8. [32.5.2(n)] Existing and proposed improvements. Address the following: g) Show all streettaccessway signage on the plan, ensure it is shown on the layout and landscaping sheets, and ensure there are no conflicts with landscaping. FINAL: Comment not yet fully addressed. Please get any clarification on required signs from engineering. In reference to this comment, show all existing and proposed signs in the Landscape Plan sheet and ensure that there are not conflicts between the signage and the landscaping. Rev. 1: Comment not yet addressed. Address comment. Comment response letter said this would be addressed after ARB approval. Show all streettaccessway signage on the plan, ensure it is shown on the layout and landscaping sheets, and ensure there are no conflicts with landscaping. Rev. 2: Please clarify, will there be no stop signs placed at either entrance. If stop signs will be located at the entrances, they should be shown on the site plan and all conflicts avoided h) Rev. 2 [NEW COMMENT]: Please remove the monument sign, and the landscaping directly related to it from the site plan. This comment was directed towards traffic signage although that may not have been clear. Monument signs, and business signs on the building, are approved in a separate process and should not be shown on this sit Plan. 9. 132.5.2.(e), 32.5.2.(p) & 32.6.2(j)] Landscape plan. A landscape plan is required in the final site plan that complies with section 32.7.9. A landscape plan was submitted but requires additional information for the final site plan. Such information should include, but is not limited to, the following: g) Include in the site plan a filled out, signed, and dated conservation checklist. FINAL: Comment not yet fully addressed. Ensure that the owner of the site also signs the Conservation Checklist. Rev. 1: Comment not yet fully addressed. Once the ownership has transferred ensure that the owner of the site also signs the Conservation Checklist in the appropriate location. Rev. 2: Comment not yet addressed. Address the comment once ownership has changed. 13. [Comment] See the SRC comments from most of the reviewers attached. All SRC reviewer comments must be sufficiently address prior to final site plan approval. FINAL: Comment not yet fully addressed. See the comments from most of the reviewers attached. ARB comments are still pending (see below). All reviewer comments must be sufficiently address prior to final site plan approval. Rev. 1: Comment not yet fully addressed. Fire Rescue, Inspections and RWSA have no objections. See attached comments from Engineering, VDOT, and ACSA. All reviewer comments must be sufficiently address prior to final site plan approval. Rev. 2: Comment not vet fullv addressed. See attached comments from Engineering. VDOT. and ACSA. ARB comments are still Dending. All reviewer comments must be sufficiently address prior to final site Dian approval. Please contact Paty Saternye in the Planning Division by using psaternve(tDalbemarle.org or 434-296-5832 ext 3250 for further information. Review Comments for SDP202000061 Final Site Development Plan Project Name I AIRPORT ROAD SHEETZ - FINAL - DIGITAL Date Completed: Friday, March 05, 2021 Department/DivisionlAgency: Review Status: Reviewer: David James CDD Engineering Requested Changes 1. The VSMP plan will need approval prior to FSP approval. (Rev-1/2) Comment still valid. 2. Record plat for SWM facility easements, Access, Temporary Construction, Forest/Open Space. Drainage easements needed prior to FSP approval. (Rev.112) SWM facility easements will need to be recorded along with the deed prior to FSP approval. 3. Please remove the E&SC, SWM, and drainage design sheets from the FSP - Sheets C2.0 thru C2.8, C7.0 thru C7.6. (Rev-1) Addressed. 4. C3.1 — Show the turn and taper lane lengths and widths labeled. Taper at 12:1 with 12' lane widths. (Rev.1)Acknowledged. 5. Sheet C4.1: Show a stone base thickness of 6" for C&G (21-A or better), 4' shown. (Rev. 1) Addressed. 6. Provide retaining wall design for walls over 4' high. (Rev. 1) Acknowledged. 7. Walls over 3' will need separate building permit. (Rev. 1) Acknowledged. 8. Walls over 30" will need safety railing. (Rev. 1) Addressed. 9. Show & label SWM facility & access easements. (Rev. 1) Addressed. Pape: 10 County of Albemarle Printed Cn: o3f11f2021 Patricia "Paty" Saternye From: Richard Nelson <rnelson@serviceauthority.org> Sent: Wednesday, March 10, 2021 11:29 PM To: Daniel Hyer Cc: Patricia "Paty" Saternye Subject: Airport Rd Sheetz Attachments: Sheetz.pdf, SewerDataSheet_01162021.pdf, WaterDataSheet_01162021.pdf CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Daniel, Below are comments for Airport Rd Sheetz: Include ACSA General Water/Sewer Conditions (Link Below) There is an existing water meter along Airport Acres Road that serves the existing 3500-3510 buildings to be demolished. This meter will need to be abandoned. A water/sewer connection fee credit will be applied appropriately. RWSA may require an inspector to be on site during this abandonment. Please submit an updated PDF copy to me for review and approval. Please submit water/sewer data sheets. https:Hserviceauthority.o re/wp-co ntent/u ploads/2019/09/G E N ERALWATE RSE W ERCO N DITlO NS062719-1. pdf Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 agaai-1 PW kh June 27. 2019 ACSA GENERAL WATER & SEWER CONDITIONS 1. WORK SHALL BE SUBJECT TO INSPECTION BY ALBEMARLE COUNTY SERVICE AUTHORITY (ACSA) INSPECTORS. THE CONTRACTOR WILL BE RESPONSIBLE FOR NOTIFYING THE PROPER ACSA OFFICIALS AT THE START OF THE WORK. 2. THE ALBEMARLE COUNTY SERVICE AUTHORITY SHALL HAVE ACCESS TO USE THE AIRSPACE ABOVE THE LOCATIONS OF CONSTRUCTION FOR THE FLIGHT OF UNMANNED AERIAL VEHICLES FOR THE PURPOSE OF IMAGERY COLLECTION. 3. THE LOCATION OF EXISTING UTILITIES ACROSS THE LINE OF THE PROPOSED WORK ARE NOT NECESSARILY SHOWN ON THE PLANS AND WHERE SHOWN ARE ONLY APPROXIMATELY CORRECT. THE CONTRACTOR SHALL, ON HIS OWN INITIATIVE, LOCATE ALL UNDERGROUND LINES AND STRUCTURES, AS NECESSARY. 4. ALL MATERIALS AND CONSTRUCTION SHALL COMPLY WITH THE CURRENT EDITION OF THE GENERAL WATER AND SEWER CONSTRUCTION SPECIFICATIONS, AS ADOPTED BY THE ACSA. 5. DATUM FOR ALL ELEVATIONS SHOWN IN NATIONAL GEODETIC SURVEY. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING MISS UTILITY (1-800-552-7001). 7. ALL WATER AND SEWER PIPES SHALL HAVE A MINIMUM OF THREE AND A HALF (3.5) FEET OF COVER MEASURED FROM THE TOP OF PIPE, OVER THE CENTERLINE OF PIPE. THIS INCLUDES ALL FIRE HYDRANT LINES, SERVICE LATERALS AND WATER LINES, ETC. 8. ALL WATER AND SEWER APPURTENANCES ARE TO BE LOCATED OUTSIDE OF ROADSIDE DITCHES. 9. VALVES ON DEADEND LINES SHALL BE RODDED TO PROVIDE ADEQUATE RESTRAINT FOR THE VALVE DURING A FUTURE EXTENSION OF THE LINE. 10. TREES ARE NOT PERMITTED IN THE ACSA EASEMENT. 11. THE CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY WITH THE NO - LEAD REGULATION REGARDING BRASS FITTINGS EFFECTIVE JANUARY 4, 2014 (SENATE BILL 3874 WHICH AMENDS THE SAFE DRINKING WATER ACT). 12. THE SEWER LATERAL BEYOND THE CONNECTION AT THE SEWER MAIN SHALL BE PRIVATE. THE SEWER LATERAL STUB -OUT SHALL UNDERGO THE ACSA LOW-PRESSURE AIR TEST TO SATISFY COUNTY TESTING REQUIREMENTS. VISUAL INSPECTION OF THE SEWER LATERAL STUB -OUT SHALL BE WITNESSED BY THE COUNTY BUILDING INSPECTIONS DEPARTMENT. THIS INSPECTION SHALL OCCUR UNDER AN "OTHER PLUMBING' PERMIT WHICH MUST BE OBTAINED BY THE CONTRACTOR. 13. THE SEWER LATERAL BEYOND THE CONNECTION AT A MANHOLE SHALL BE PRIVATE. VISUAL INSPECTION AND PRESSURE TESTING OF THE SEWER LATERAL SHALL BE WITNESSED BY THE COUNTY BUILDING INSPECTIONS DEPARTMENT. THIS INSPECTION SHALL OCCUR UNDER AN "OTHER PLUMBING' PERMIT WHICH MUST BE OBTAINED BY THE CONTRACTOR. 14. THE FIRE SPRINKLER MAIN DOWNSTREAM OF THE GATE VALVE IS PRIVATE. VISUAL INSPECTION AND TESTING OF THE FIRE SPRINKLER MAIN DOWNSTREAM OF THE GATE VALVE SHALL BE WITNESSED BY THE COUNTY BUILDING INSPECTIONS DEPARTMENT. THIS INSPECTION SHALL OCCUR UNDER AN "OTHER PLUMBING' PERMIT WHICH MUST BE OBTAINED BY THE CONTRACTOR. 15. ALL FLUSHING OF FIRE SPRINKLER MAINS SHALL NOT OCCUR UNTIL APPROVAL IS GIVEN BY THE ACSA. (1) Project Name (2) Project Location (3) Consultant (4) Primary Water Plant (5) Design Population (6) Hydraulic Capacity (7) Pipe Material (8) Pipe Diameter (Inches) All 6" 8" 101, 4 r, (9) Total Pipe Length (10) Fire Hydrant Assemblies (11) Blow -off Assemblies (12) Air Relief Valves (13) Gate Valves (Inches) All 8" 101, 12" WATER DATA SHEET Date Type and Quantity of Units Fire Flow Analysis (Q20) or 3 GPM @ 20 PSI Length (Feet) Quantity (Number) (14) Minimum pressure at critical water meter Authority Provide: Booster Station Water Storage Tank Pressure Zone A-1 (Feet) (Number) (Number) (Number) (20 psi required) SEWER DATA SHEET (1) Project Name (2) Project Location (3) Consultant (4) Wastewater Treatment Facility (5) Design Population Type and Quantity of Units (6) Industrial Waste (7) Pipe Material (8) Pipe Diameter (Inches) DIP Length (Feet) 6" 8" 10" 12" 15" 18" 21" 24" (9) Total Pipe Length (Feet) (10) Manholes: (A) Standard (B) Drop (11) (A) Siphons & Pump Stations (B) Force Main (Size -Length) Date PVC Length (Feet) (Number) (Number) (Number) (Inches -Feet) Authority Provide: Drainage Basin RWSA Interceptor Sub Drainage Basin ACSA Trunk Sewer or Collector Main LWA (Z) COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 February 18, 2021 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Patricia Saternye Re: Airport Road Sheetz — Final Site Plan SDP-2020-00061 Review #3 Dear Ms. Saternye: (804) 786-2701 Fax: (804) 786,2940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Line+Grade Civil Engineering, dated February 5, 2021, and find it to be generally acceptable. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. If further information is desired, please contact Max Greene at 434-422-9894. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING