Loading...
HomeMy WebLinkAboutSDP201900015 Correspondence Final Site Plan and Comps. 2021-03-12M COLLINS ENGINEERING March 12, 2021 Cameron Langille Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Brookhill Block 8B Final Site Plan (SDP 201900015) 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 (�434.293.3719 PH 434.293.2813 FX www.coll i ns-engineering.com Thank you for your comments dated January 29, 2020 on the above referenced project. Planning Comments: 1. Comment previously addressed. 2. Comment previously addressed. 3. Comment previously addressed. 4. Comment previously addressed. 5. Comment previously addressed. 6. Comment previously addressed. 7. Comment previously addressed. 8. Comment previously addressed. 9. The existing conditions sheet includes the information from these plats and the updated boundary parcels. 10. The approved Special use permit conditions have been added to the plan sheets with the proffers, as requested. See sheet 16. 11. Comment previously addressed. 12. Comment previously addressed. 13. Comment previously addressed. 14. Comment previously addressed. 15. Comment previously addressed. 16. Comment previously addressed. 17. Comment previously addressed. 18. Comment previously addressed. 19. Comment previously addressed. 20. Comment previously addressed. 21. Comment previously addressed. 22. Comment previously addressed. 23. Comment previously addressed. 24. Comment previously addressed. 25. Comment previously addressed. 26. Comment previously addressed. 27. Comment previously addressed. 28. Comment previously addressed. 29. Comment previously addressed. 30. Comment previously addressed. 31. Comment previously addressed. 32. Comment previously addressed. 33. Comment previously addressed. 34. Comment previously addressed. 35. Comment previously addressed. 36. Comment previously addressed. 37. Comment previously addressed. 38. Comment previously addressed. 39. Comment previously addressed. 40. Comment previously addressed. 41. Comment previously addressed. 42. Comment previously addressed. 43. Comment previously addressed. 44. Comment previously addressed. 45. Comment previously addressed. 46. Comment previously addressed. 47. Comment previously addressed. 48. Comment previously addressed. 49. Comment previously addressed. 50. Comment previously addressed. 51. Comment previously addressed. 52. All the existing and proposed parcel lines have been clearly delineated on the existing conditions sheet and layout sheets. The TMP numbers, acreages, DB/PG have been updated per the recorded plats. 53. Comment acknowledged. 54. Comment previously addressed. 55. Comment previously addressed. 56. Comment previously addressed. 57. Comment previously addressed. 58. Comment previously addr, 59. Comment acknowledged. The leader pointing to the greenway area on Sheet 4 has been revised, and the note has been updated to state "Future Greenway Area to be dedicated to Albemarle County per ZMA201800011". 60. Comment previously add. 61. Comment previously addressed. 62. r- --eviously addressed. Engineering Comments: 1. Comment acknowledged. 2. Comment previously addressed. 3. Comment acknowledged. 4. Comment previously addressed. 5. Comment previously addressed. 6. Comment previously addressed. 7. Comment previously addressed. 8. The existing conditions sheet has been revised to specify the demolition of the existing entrance and installation of new entrance. Note, this work has already been performed in the field with the modifications to Archer Avenue. 9. Comment previously addressed. 10. Comment previously addressed. 11. Comment previously addressed. 12. Comment previously addressed. 13. Comment previously addressed. 14. Comment previously addressed. 15. Comment previously addressed. 16. Comment previously addressed. 17. Comment previously addressed. 18. Comment previously addressed. ARB Comments: 1. Comment acknowledged. A separate ARB plan is under review (ARB202000012). 2. Site sections are shown on the ARB plan (ARB202000012). 3. Building materials and color samples were submitted with the ARB plan (ARB202000012). 4. Standard window glass note is shown on the architectural elevations that were submitted with the ARB plan (ARB202000012). 5. A roof plan and architectural elevations were submitted with the ARB plan (ARB202000012). 6. Utilities and their easements are shown on the site plan. 7. This note has been added to the landscaping plan sheets in this plan set. 8. No light fixtures are proposed with this plan set. 9. The landscaping plan is shown at a scale of 1"=30'. 10. Street trees are proposed along the east and south sides of Road E/Wesley Circle. 11. Shade trees are proposed on the eastern edge of the site around the four parking spaces. 12. This note has been added to the landscaping plan sheets in this plan set. Should you have any questions, please feel free to contact me at Scott@collins-eneineerine.com. Sincerely, Scott Collins