HomeMy WebLinkAboutWPO202100012 Plan - E&S 2021-03-15m 'P/dGe 0< SHEET INDEX 7MP41-9F \ PRE -CONSTRUCTION CONDITIONS EROSION & SEDIMENT CONTROL PLAN M/LEER, DAV/L�R , / / I 'Ac,\ TMP41-9C I \ EROSION & SEDIMENT CONTROL DETAILS / \ CARTER, W/LLIAMLEE& \ STORMWATER RUNOFF CALCULATIONS CARRIE CARTER I \ BEAVER 04s Qa�r�, / \ 1 APPROVED CREEK C'd.0 T C-41 / \ RESERVOIR / by the Albemarle County Ceeekr / 1 1 Community Development DeRartment Park Do. — '03/1512G2_1 �SO�SD�V\/DE, �p 1 I I\ \ 'File WP0202100012 I / / /\1 / Three NO[Ch'D Rd SOILS / 1 � � / d� / dC GROUP802 � \ / da I DRAINAGE DIVIDE, TYPS / \ ' \ I / P / T P41-9H / __-CAA ELL, CLEVELAND C \ & FERN G. CAMPBELL / . , I 752 a_ \ GROUP SOILS / TMP 41-9C1 \ \\ LICKING14OLE Lelu.� .ate 81B TERHAAR,KEVIN& \ \�� `_—_—_� ��/ / •` —\\J� 1 \ SUSAN D MART/N TMGROUP/ P41-9F /y SOILS \ — — / 1 / MILDER, DAVID R 1 �O \ \ BI \ \ \ CUL VNGERT / UL — / I \ SOILS % / 1 \ �O \ \ — — —i-� \ CONCENTRATION PATH / m \ GROUP / \ — — — SO/LS SHEET 1 SHEET 2 SHEET 3 SHEET 4 rn 0 I I i< • I I O�I / \ — — l // . / — I — TMP41-16 PRE/POST DRAINAGE / / I I / I / WETAREA I I / / / PATTERSON, \ � I ANALYSIS POINT / �c TMP41-9B2 / ° TMP41-9B4 CAROLYND I / // \ D.A. = 8.33 Ac / \ \ / --- \ \ BROWNS GAP FARM LLC / COL VIN, STEPHEN C & / \ (SEE SHEET 2) / / / / — — �— 5.670ACRES CATHERINEP COL VIN D.B. 52091597 / l I EXIST/NG \ / I CUL VERT TIME OF • / / / � — — � \ / CONCENTRATION PATH TMP 41-9F p SOILS MILLER, DAVID R 9 GROUP SOIL.5 DA — DA 816DA — DA DA GROUP SO/LSD/VIDE, TYP. O / q v\ � -- / DRAINAGE DIVIDE, TYP. TMP 41-9A2 / I MCQUADE, JOHN JOSEPH / TMP 41-9A 1 / , &SHE/LA MARY MCQUADE / SOILS \ I' • I \ \ I I \ \ / I Oq / JEHAI YWOOD MAS GROUP — — / \ 7B %� Oq SOILS / \II G BOB P \�..—. Oq � / �I \ � \\ \lip / l /•\ // q� � I i J / / %•// /// / / JOKES M/LL RD PU DA TMP 41-10EI SOILS INFO. HIS LAN PARTNERH/P SOILS GROUP 7B BRADDOCK LOAM, 2 TO 7% SLOPES \ SOILS GROUP 14B CHESTER LOAM, 2 TO 7% SLOPES LLLP SOILS GROUP 14C CHESTER LOAM, 7 TO 15% SLOPES ORT 0 25' 50' 100, SOILS GROUP 81C THURMONT LOAM 7 TO 15% SLOPES SOILS GROUP 96B DELILA LOAM, 2 T6 7% SLOPES \ \ �w RE/POST DRAINAGE ANALYSIS POINT / \ \ D.A. = 14.33 Ac \ / l WETA�E/ (SEE SHEET 2) / /' / \ II TMP 41-9B3 (�H/TWOANNERZANNE / I Sco SOILS h = 1 I / GROUP DA �\ O A I / TMP41-9G r / / / / / ON / / \ 81B r DAV/S, ROBERT G I Oq / \ \ O r I I m / TRUSTEE, ROBERT G \// I i / n� \ Oq / DRAINAGE DIVIDe, TYP. / / DP / \ q / — — — DAVIS REVOC TRUST & DA DA A I — — DA — DA — DA — DA DPc \ — — -DA BARBARA DAV/S TRUSTEE \ I I — — — r— O D / \ 9 pqDA� I DADADA i 0' ►Ian Franklin PE, LLC Civil and Site Plan Engineering 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@alanfranklinpe.com W � Z Z O J Q Q w Z Z v' i U > Z 0z o N _ o C)I LU N J N < LU �V^�J Q J Z CO O C)C) Nw M \ / I..L L.L �P,OH OF c= U •y Alan G. Franklin Lic. No. 35326 w 03-11-21 = ASS/ONAL ISSUED: 02-26-2021 SCALE: 1" = 50' REVISIONS: 1. 3-11-21 - RESPONSE TO REVIEW SHEET OF 4 E&SC MEASURES OCE CONSTRUCTION ENTRANCE E&SC STD. 3.02 MILLMP ER, DAV/dR 1 / / I a0 \ \ TMP4119C I \ SF SILT FENCE E&SC STD. 3.06 CARTER, W/L lAM LEE & \ CARR/ECfIRTER I \ TO TOPSOILING E&SC STD.3.30 TEMPORARY SEEDING E&SC STD. 3.31 l o / PERMANENT SEEDING E&SC STD. 3.32 \♦ \ / \ \ \ \ / / I / / / ` \ \ \ / / S� SOD E&SC STD. 3.33 /� ♦ / / / / / D / \ / - - - - MULCHING E&SC STD. 3.35 �, /' I / \ ♦ \� ♦ // I \\ \\\ _ J / / I / SOILSD�VIDE, /I I / ♦ F� �\ \ \ TYP. I \,40 TMP41-9c1 d0 / TERHAAR, KEN& I 1 SOILS / \ 1 11 \'40 / \ \ SUSANDMA TIN \ l^ (\ II GROUP j \ \ l 1 \ I \ I \ DRAINAGE DIVIDE, TYP. EXISTING SWALE HAS DRAINAGE AREA TO �\ / "CLEANWATER" DIVERSION _ BEEN LINED WITH FILTER \ \ 2 \ (5.10 ACRES) \ \ \ - - - - - �l FABRIC & RIVERSTONE SOILSs� RIP RAP -- ' \- \ - / a0 \ B�BP \ APPROXIMATE LIM / #57 STONE DRY WELL #2 FOR / _ \ \ \ � l / 1 SOILS \ OF DISTURBANCE GARAGE DOWNSPOUTS TMP 41-9F / I \ (4 ACRES) W/ 4" OVERFLOW TO SWALE - \ \ \ EX/STING / 1 / M)4ER, DAVID R 1 �O GROUP \ / (9' X 9' X 4')- \ CULVERT / CD \ "CLEANWATER" - \\ J DIVERSION FRENCH DRAIN ROCK CHECK DAYLIGHTS TO SWALE \ PRE/POST DRAINAGE SOILS % \ �� DAM #1 \ �__�-� - - TIM OF / \ ANALYSIS \ GROUP 1 - - - - 0 �/ CONCENTRATION PATH m \ \ / (D.A. = 9.23 AC J \ _ - /0 SOILS I - D.A. = 14.33 Ac \ 14C / I - - - ���� I FRENCH DRAIN W/ #57 / \ / ♦� _ = - % Time of Conc. Tc = 18.8 Min /7 \ �O I GRAVEL AND UNDERDRAIN GROUP I Al I _ / (same for Pre & Post) \ - I _ ttT-- 70 � - - / Z7 l- - a T- - - - I / \ 96B / ' CN(PRE)=64* \ 0 sr - / / s / / CN(PosT)= 64* / \� /• \ 57� � I � \ 1 / \ i / *Adjusted for Unconnected / / / �� ss� S l�0 PSI MU I 114, / Impervious Areas \ \ / QPm(,-yr,24Hr) = 5.55 CFS / / /( S / \ F/ \ I WETAR Rv1(Pra) = 20,958 CF / QPm(to-yr, 24Hr) = 30.26 CFS / / / \ SF igF- QPost(1-yr,24Hr) =5.55 CFS \ / / __SF SF/ SOD.. : ' ��' Y \CONSTRUCTION I / �SF� / v' `ENTRANCE CE \ CHITWOOD, SU2ANNE Rv1(Post) = 20,958 CF �S��SF SF \ QPost(10-yr,24 Hr) = 30.26 CFS 'S.O' .. ' 1 I T.O.' f I TANNER SOILS N / TMP41-9H I SILT F NCE / /�::. GARAGE ...� \ I GROUP / 7 / /w ° I AMPBELL, CLEVE LAND C I I / LIMITS OF / / / \\ q \ 81B �` TMP41-9G / I SF /.. \ 1 1 ACRE LIMITS WHERE &FERNG. CAMPBELL I I / GRADING %^ / � \ DAV/S, ROBERT G I °q f BARN \' �RADING HAS OCCURRED I C \ TRUSTEE, ROBERT G \ / I I / \ ° DRAINAGE DIVIDe, TYP. �� HOUSE f .� ;\ \ (NO GRADING OPERATXONS - \ DAV/SREVOC TRUST& I CD 11 / FFE 64 HAVE OCCURRED OUTSIDE _ _ cn �` DA �DA A DA DA DA - A'. _ OF THI Z - -0A \ BARBARA DAV/S TRUSTEE \ I � ,(� � ' . " ' ! '. /•� \ � � �� � D+4 I I ROCK CHECK SILT FENC r. S.V 09 D \ I DAM #2 TS'.. , DA DA PRE/POST DRAINAGE I \(D.A. = 2.33 AC.) SF EXISTING 80D :::," SO() ' DA � DA ANALYSIS I / SILT FENC .. \ I I \ / D.A. = 8.33 Ac \ .. TO. Time of Conc. (Tc) = 15.3 Min - - / - - (same for Pre & Post) / / AREAS DENUDED TO REMOVE INVASIVE TAREA VAR 6� ' \ CN(PRE)= 62* / \ \ GROUND CO TO BE RE -SEEDED AND 6v /', WE a \ CN(PosT)=62* / S,F_ COVERED WITH-ST.1,2AW FOR PASTURE \ I' ''. ! / / I \ / TMP41-9B4 * \ / - NSF a /` ' ROOF DRAINS TIED \ / I COLV/N, STEPHENC& Adjusted for Unconnected / - SF Impervious Areas EX/STING / SF SF F:__SF SF� INTO UN ERDRAIN / - _ I / I P SF tSF - CA THERINE P COL VIN / / QPre(1-N.24 Hr)= 2.$2 CFS \ CULVERT l l /5F SF�`SF�SF \ - -� - _ _ _ _ - - _ Rv7(Pre) = 10,260 17.8 CF / / / �S I\ / / QPre(10-yr,24Hr) = 17.$0 CFS I / A f \ / I \ / QPost(1-yr.24Hr)= 2.82 CFS / / \ ° / ENDYAROF BOX INSTALLED AT \ FRENCH DRAIN W/ #5 / \\ / RV1(Post) = 10,260 CF I / // ��° O OF FRENCH DRAIN FOR �/ \ GRAVEL AND UND RDRAIN I TIME OF QPosl(10-yr,24 Hr) = 17.80 CFS / / //°\� O_ VERFLOW RELIEF SILT FENCE �SF \ / �` O• CONCENTRATION PATH - "CLEANWATER" S\SF� �S DIVERSION DD TMP41-9F / SOILS �L \ SF MILLER, DAV/DR 9 GROUP /� �\ / /-/�O / TMP41-962 \ 0 (BROWNS GAP FARM LLC I (APPROXIMATE LIMITS SOILS ` DA DA DA DA DA `- lam/ ("F DISTURBANCE GROUP \ O #57 STONE DRY WELL #1 5.670ACRES _ �S) 1 f4B I/ TOP. SD/V/DE, 9 W/ 6" UNDERDRAIN AND (3) YARD / D.B. 5209/597- I/I 4q DRAINS FOR OVERFLOW RELIEF \\ \ (80'X20'X2') - - \ \ DRAINAGE DIVIDE, TYP. : \ "CLDRAEANWATER" AREA DIVERSION l TMP41-9A2 / I \ (6.00 ACRES) / MCOUADE, ✓OHN✓OSEPH / � I I �I\ \ I I \ • ' SOILS °q TMP 41-9A 1 / I &SHE/LA MARYMCOUADEx / \ I' • I \ \ I I \ \ �/ GROUP I 01 ✓EHA/YWOOD THO/MAS 7B ° / SOILS / \ GROUP \4\ \ T CONSTRUCTION SEQUENCE 1. NOTIFY THE EROSION CONTROL INSPECTOR 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. 2. INSTALL CONSTRUCTION ENTRANCE AT LOCATIONS SHOWN ON PLAN AND CLEARLY DEMARCATE THE \ LIMITS OF WORK. I / J 3. INSTALL ALL PERIMETER EROSION CONTROL MEASURES SUCH AS SILT FENCE AND INLET PROTECTION ON EXISTING DRAIN INLETS. r/ f 4. ESTABLISH LAY -DOWN, CONSTRUCTION PARKING/STAGING, AND MATERIAL STOCKPILE AREAS IN LOCATION SHOWN ON PLANS. 5. PERFORM ANY DEMOLITION ACTIVITIES REQUIRED TO EXECUTE THE APPROVED EROSION CONTROL PLAN. 6. STRIP TOPSOIL AND STORE IN STOCKPILE AREA, 8' HEIGHT MAX. DISPOSE OF DEBRIS AND ADDITIONAL - - - \L�l� QA 656DA \ - - 1 DA SOILS APPROPRIATELY. - / DA 7. ESTABLISH NEW SITE GRADES AND STORM DRAIN INFRASTRUCTURE WITH INLET PROTECTION. J JONES MILL RD PU - - - -° 8. APPLY EROSION CONTROL MATTING ON ALL SLOPES GREATER THAN 3:1. _ 9. STABILIZE PARKING LOT AREAS, BUILDING PADS, AND SIDEWALK AREAS WITH GRAVEL OR PAVEMENT / / f - J J AND ESTABLISH TURF VEGETATION ON ALL NON -PAVED AREAS THAT HAVE BEEN DISTURBED. _ / TMPI41-10E I SOILS INFO. 10. ONCE PERMANENT VEGETATION IS ESTABLISHED AND UPON APPROVAL OF THE ENGINEER OR / H/ LAND HIS SOILS GROUP 7B BRADDOCK LOAM, 2 TO 7% SLOPES 11. LANDSCAPE ARCHITECT, SCHEDULE A FINAL INSPECTION BY THE COUNTY EROSION CONTROL OFFICER. PARTNONCE SITE IS DEEMED STABILIZED BY THE COUNTY EROSION CONTROL INSPECTOR AND ALL SOILS GROUP 14B CHESTER LOAM, 2 TO 7% SLOPES ORT 0 25' 50' CONSTRUCTION ACTIVITIES ARE COMPLETED, RESTORE STAGING AND ACCESS AREAS TO ACCEPTABLE SOILS GROUP 14C CHESTER LOAM, 7 TO 15% SLOPES / SOILS GROUP 81C THURMONT LOAM 7 TO 15% SLOPES (PRE -CONSTRUCTION) CONDITIONS AND REMOVE ALL EROSION CONTROL MEASURES. / I SOILS GROUP 96B DELILA LOAM, 2 T6 7% SLOPES 100, l/ rn 0 I TMP 41} 16 PATTERSION, CAROL Y/ D I Alan Franklin PE, LLC Civil and Site Plan Engineering 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@alanfranklinpe.com Z Q w � Z Q J J N0 I..L Q Z 1 1 1 Z U) � O > U •pZ z CN CD O C W Z LU CV Q W a LU Go V J M Q W` W Z o O N cn C') 0 0. W OH OF � A Alan G. Franklin Lic. No. 35326 w 03-11-21 = ISSUED: 02-26-2021 SCALE: 1" = 50' REVISIONS: 1. 3-11-21 - RESPONSE TO REVIEW SHEET STONE 70' MIN. CONSTRUCTION ACCESS //�- 3" SM-2A ASPHALT TOP / COURSE 2% f 29, STONE CONSTRUCTION ACCESS `6" M:N. 21A AGGREGATE BASE PROFILE 70' 2% �2% ASPHALT PAVED WASHRACK 1 2% 12' MIN.* ~- I *MUST EXTEND FULL WIDTH `--Q t POSITIVE DRAINAGE I TO SEDIMENT OF INGRESS AND EGRESS + OPERATION TRAPPING DEVICE PLAN 2' EXISTING PAVEMENT EXISTING PAVEMENT--' SITIVE DRAINAGE SEDIMENT 4PPING DEVICE FILTER CLOTH) SECTION A -A A mninvnmunn water tap of 1 inch must be installed with a ntavtmun 1 inch ballcock shutoff valve supplying a wash hose with a diameter of 1.5 itches for adequate constant pressure. Wash water must be caned away from the entrance to an approved settlitng area to remove sediment. All sediment shall be prevented from entering stonn drains, ditches or watercourses. PAVED WASH RACK NO SCALL ALBEMARLE COUNTY CONSTRUCTION ENTRANCE SECTION SOURCE: VA. DSWC FILTI CLASS 1 RIP RAP FLOW VDOT#1 COARSE AGGF FLOW 10, ROCK CHECK DAM #1 (DOWNSTREAM VIEW) ?'7 CLASS I RIPRAP ROCK CHECK DAM #2 15 (DOWNSTREAM VIEW) CLASS I RIPRAP 3' E-001 N.T.S. PLATE. 3.20-1 SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control,VA. DSWC PLATE. 3.05-2 Sherwood and Wyant 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. J FLO�� 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 55Y 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. FLOW SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) DETAIL ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS QUICK REFERENCE FOR ALL REGIONS RATE PLANTING DATES SPECIES (LBS/ACRE) SEPT. 1- FEB. 15 50/50 MIX OF ANNUAL RYEGRASS & CEREAL WINTER RYE 50-100 FEB. 16 - APR. 30 ANNUAL RYEGRASS 60-100 MAY 1 -AUG. 31 GERMAN MILLET 50 TEMPORARY SEEDING SPECIFICATION SOURCE: VA. DSWC Soil E-028 N.T.S. ID-000 N.T.S. PLATE 3.09-1 18" min. Line Uphill Toe with 6' Wide EC-2 Erosion Control Matting Stabilize Outlet with Rip Rap -Flow 4.5' min. TEMPORARY DIVERSION DIKE 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CONSTRUCTION. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS( INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL SHALL BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 13. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/10OSF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE EROSION CONTROL INSPECTOR. 14. PERMANENT SEEDING, LIME, FERTILIZATION, AND MULCHING IS TO BE APPLIED TO ALL AREAS NOT PROPOSED FOR HARDSCAPE OR BUILDING IMPROVEMENTS AS SOON AS POSSIBLE. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE TURF -TALL FESCUE APPLIED AT 200-250 LBS/ACRE, UNLESS OTHERWISE SPECIFIED BY THE ARCHITECT. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE EROSION CONTROL INSPECTOR. 15. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DIKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 16. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. 1992 3.32 TABLE 3.32-D SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA Total Lbs. Per Acre Minimum Care Lawn - Commercial or Residential 175-200 lbs. - Kentucky 31 or Turf -Type Tall Fescue 95-100% - Improved Perennial Ryegrass 0-5% - Kentucky Bluegrass 0-5% High -Maintenance Lawn 200-250 lbs. Kentucky 31 or Turf -Type Tall Fescue 100% General Slope (3:1 or less) - Kentucky 31 Fescue 128 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop ' 20 lbs. 1501bs. Low -Maintenance Slope Steeper than 3:1) - Kentucky 31 Fescue 108 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop * 20 lbs. - Crownvetch ** 20 lbs. 150 lbs. * Use seasonal nurse crop in accordance with seeding dates as stated below: February 16th through April ...................... Annual Rye May 1st through August 15th ..................... Foxtail Millet August 16th through October ...................... Annual Rye November through February 15th ................... Winter Rye " Substitute Sericea lespedeza for Crownvetch east of Farmville, Va. (May through September use hulled Sericea, all other periods, use unhulled Sericea). If Flatpea is used in lieu of Crownvetch, increase rate to 30 lbs./acre. All legume seed must be properly inoculated. Weeping Lovegrass may be added to any slope or low -maintenance mix during warmer seeding periods; add 10-20 lbs./acre in mixes. III - 303 PERMANENT SEEDING Alan Franklin PE, LLC Civil and Site Plan Engineering 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@alanfranklinpe.com VJ J_ W W Z o Q J J O Q < Uj 0- U Z 0- > O U NOj � =o Z LLI W O 0 W 0 Q GoW Q C) m 06 O Z N 0 cn NO 0. W o4 4nITH OF A U �y Alan G. Franklin _0 Lic. No. 35326 w 03-11-21 = NAL ISSUED: 02-26-2021 SCALE: AS SHOWN REVISIONS: 1. 3-11-21 - RESPONSE TO REVIEW SHEET SECTION E-047 N.T.S. SECTION E-005 N.T.S. SPECIFICATION ID-000 N.T.S. OF 4 X// ) YARD INLETS @ 25' O.C. DRY WELL #1 SECTION DOWNSPOUT OVERFLOW SOD 4" PVC DRY I WELL INLET PIPE #57 STONE WRAPPED IN FILTER FABRIC 2' MIN_ DEPTH PERFORATED SPLASH BLOCK PVC PIPE, TYP. CAP END OF PIPE, TYP. 12' TO PERFORATIONS, TYP. 10, MIN. SETBACK /. /j /i / /, /j TO FOUNDATION REBAR ANCHOR WASHED #57 STEEL FOOT STONE PLATE WRAPPED IN FILTER FABRIC DRY WELL #2 SECTION DRAIN W/ 6" PIPE NTO STONE INSPECTION PORT W/CAP BELOW SOD N.T.S. N.T.S. 4" PVC OVERFLOW TO SWALE Pre -Development Barnhouse Type/1 24-hr lyrAlb. Rainfall=3.00" Prepared by Microsoft Printed 3/11/2021 HydroCAD@ 10.00-20 s/n 02893 @ 2017 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 1S: Pre-Dev. North Runoff = 5.55 cfs @ 12.16 hrs, Volume= 20,958 cf, Depth> 0.40" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1yr Alb. Rainfall=3.00" Area (ac) CN Adi Description 12.350 61 >75% Grass cover, Good, HSG B 0.760 98 Unconnected pavement, HSG B 0.090 98 Unconnected pavement, HSG D 1.130 80 >75% Grass cover, Good, HSG D 14.330 65 64 Weighted Average, UI Adjusted 13.480 94.07% Pervious Area 0.850 5.93% Impervious Area 0.850 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 50 0.0250 1.39 Sheet Flow, Sheet Flow pavement Smooth surfaces n= 0.011 P2= 3.60" 8.4 100 0.0250 0.20 Sheet Flow, Sheet flow grass Grass: Short n= 0.150 P2= 3.60" 9.8 1,500 0.0250 2.55 Shallow Concentrated Flow, Shallow Concentrated Unpaved Kv= 16.1 fps 18.8 1,650 Total Summary for Subcatchment 2S: Pre-Dev. South Runoff = 2.82 cfs @ 12.12 hrs, Volume= 10,260 cf, Depth> 0.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1yrAlb. Rainfall=3.00" Area (ac) CN Add Description 7.850 61 >75% Grass cover, Good, HSG B 0.480 98 Unconnected pavement, HSG B 8.330 63 62 Weighted Average, UI Adjusted 7.850 94.24% Pervious Area 0.480 5.76% Impervious Area 0.480 100.00% Unconnected Pre -Development Barnhouse Type // 24-hr lyrAlb. Rainfall=3.00" Prepared by Microsoft Printed 3/11/2021 HydroCAD@ 10.00-20 s/n 02893 @ 2017 HydroCAD Software Solutions LLC Page 2 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.3 25 0.0350 1.38 Sheet Flow, Sheet Flow pavement Smooth surfaces n= 0.011 P2= 3.60" 8.8 125 0.0350 0.24 Sheet Flow, Sheet flow grass Grass: Short n= 0.150 P2= 3.60" 6.2 954 0.0250 2.55 Shallow Concentrated Flow, Shallow Concentrated Unpaved Kv= 16.1 fos 15.3 1,104 Total Pre -Development Barnhouse Type/1 24-hr 10yrAlb. Rainfall=5.50" Prepared by Microsoft Printed 3/11/2021 HydroCAD@ 10.00-20 s/n 02893 @ 2017 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1S: Pre-Dev. North Runoff = 30.26 cfs @ 12.12 hrs, Volume= 89,617 cf, Depth> 1.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr Alb. Rainfall=5.50" Area (ac) CN Add Description 12.350 61 >75% Grass cover, Good, HSG B 0.760 98 Unconnected pavement, HSG B 0.090 98 Unconnected pavement, HSG D 1.130 80 >75% Grass cover, Good, HSG D 14.330 65 64 Weighted Average, UI Adjusted 13.480 94.07% Pervious Area 0.850 5.93% Impervious Area 0.850 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 50 0.0250 1.39 Sheet Flow, Sheet Flow pavement Smooth surfaces n= 0.011 P2= 3.60" 8.4 100 0.0250 0.20 Sheet Flow, Sheet flow grass Grass: Short n= 0.150 P2= 3.60" 9.8 1,500 0.0250 2.55 Shallow Concentrated Flow, Shallow Concentrated Unpaved Kv= 16.1 fps 18.8 1,650 Total Summary for Subcatchment 2S: Pre-Dev. South Runoff = 17.80 cfs @ 12.09 hrs, Volume= 47,662 cf, Depth> 1.58" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1 Oyr Alb. Rainfall=5.50" Area (ac) CN Add Description 7.850 61 >75% Grass cover, Good, HSG B 0.480 98 Unconnected pavement, HSG B 8.330 63 62 Weighted Average, UI Adjusted 7.850 94.24% Pervious Area 0.480 5.76% Impervious Area 0.480 100.00% Unconnected Pre -Development Barnhouse Type 11 24-hr 10yrAlb. Rainfall=5.50" Prepared by Microsoft Printed 3/11/2021 HydroCAD@ 10.00-20 s/n 02893 @ 2017 HydroCAD Software Solutions LLC Page 4 Tc Length Slope Velocity Capacity Description (min) (feet) (f /ft) (f 1sec) (cfs) 0.3 25 0.0350 1.38 Sheet Flow, Sheet Flow pavement Smooth surfaces n= 0.011 P2= 3.60" 8.8 125 0.0350 0.24 Sheet Flow, Sheet flow grass Grass: Short n= 0.150 P2= 3.60" 6.2 954 0.0250 2.55 Shallow Concentrated Flow, Shallow Concentrated Unpaved Kv= 16.1 fps 15.3 1,104 Total Post -Development Barnhouse Type 1124-hr lyrAlb. Rainfall=3.00" Prepared by Microsoft Printed 3/11/2021 HydroCAD@ 10.00-20 s/n 02893 @ 2017 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 3S: Post-Dev. North Runoff = 5.55 cfs @ 12.16 hrs, Volume= 20,958 cf, Depth> 0.40" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1yrAlb. Rainfall=3.00" Area (ac) CN Add Description 12.280 61 >75% Grass cover, Good, HSG B 0.830 98 Unconnected pavement, HSG B 0.090 98 Unconnected pavement, HSG D 1.130 80 >75% Grass cover, Good, HSG D 14.330 65 64 Weighted Average, UI Adjusted 13.410 93.58% Pervious Area 0.920 6.42% Impervious Area 0.920 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 50 0.0250 1.39 Sheet Flow, Sheet Flow pavement Smooth surfaces n= 0.011 P2= 3.60" 8.4 100 0.0250 0.20 Sheet Flow, Sheet flow grass Grass: Short n= 0.150 P2= 3.60" 9.8 1,500 0.0250 2.55 Shallow Concentrated Flow, Shallow Concentrated Unpaved Kv= 16.1 fps 18.8 1,650 Total Summary for Subcatchment 4S: Post-Dev. South Runoff = 2.82 cfs @ 12.12 hrs, Volume= 10,260 cf, Depth> 0.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1yrAlb. Rainfall=3.00" Area (ac) CN Add Description 7.690 61 >75% Grass cover, Good, HSG B 0.640 98 Unconnected pavement, HSG B 8.330 64 62 Weighted Average, UI Adjusted 7.690 92.32% Pervious Area 0.640 7.68% Impervious Area 0.640 100.00% Unconnected Post -Development Barnhouse Type 1124-hr lyrAlb. Rainfall=3.00" Prepared by Microsoft Printed 3/11/2021 HydroCAD@ 10.00-20 s/n 02893 @ 2017 HydroCAD Software Solutions LLC Paae 2 Tc Length Slope Velocity Capacity Description (min) (feet) (f /ft) (ft/sec) (cfs) 0.3 25 0.0350 1.38 Sheet Flow, Sheet Flow pavement Smooth surfaces n= 0.011 P2= 3.60" 8.8 125 0.0350 0.24 Sheet Flow, Sheet flow grass Grass: Short n= 0.150 P2= 3.60" 6.2 954 0.0250 2.55 Shallow Concentrated Flow, Shallow Concentrated Unpaved Kv= 16.1 fps 15.3 1,104 Total Post -Development Barnhouse Type/1 24-hr 10yrAlb. Rainfall=5.50" Prepared by Microsoft Printed 3/11/2021 HydroCAD@ 10.00-20 s/n 02893 @ 2017 HydroCAD Software Solutions LLC Paoe 3 Summary for Subcatchment 3S: Post-Dev. North Runoff = 30.26 cfs @ 12.12 hrs, Volume= 89,617 cf, Depth> 1.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr Alb. Rainfall=5.50" Area (ac) CN Add Description 12.280 61 >75% Grass cover, Good, HSG B 0.830 98 Unconnected pavement, HSG B 0.090 98 Unconnected pavement, HSG D 1.130 80 >75% Grass cover, Good, HSG D 14.330 65 64 Weighted Average, UI Adjusted 13.410 93.58% Pervious Area 0.920 6.42% Impervious Area 0.920 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 50 0.0250 1.39 Sheet Flow, Sheet Flow pavement Smooth surfaces n= 0.011 P2= 3.60" 8.4 100 0.0250 0.20 Sheet Flow, Sheet flow grass Grass: Short n= 0.150 P2= 3.60" 9.8 1,500 0.0250 2.55 Shallow Concentrated Flow, Shallow Concentrated Unpaved Kv= 16.1 fps 18.8 1,650 Total Summary for Subcatchment 4S: Post-Dev. South Runoff = 17.80 cfs @ 12.09 hrs, Volume= 47,662 cf, Depth> 1.58" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10yr Alb. Rainfall=5.50" Area (ac) CN Add Description 7.690 61 >75% Grass cover, Good, HSG B 0.640 98 Unconnected pavement, HSG B 8.330 64 62 Weighted Average, UI Adjusted 7.690 92.32% Pervious Area 0.640 7.68% Impervious Area 0.640 100.00% Unconnected Post -Development Barnhouse Type 1124-hr 10yrAlb. Rainfall=5.50" Prepared by Microsoft Printed 3/11/2021 HydroCAD@ 10.00-20 s/n 02893 @ 2017 HydroCAD Software Solutions LLC Page 4 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.3 25 0.0350 1.38 Sheet Flow, Sheet Flow pavement Smooth surfaces n= 0.011 P2= 3.60" 8.8 125 0.0350 0.24 Sheet Flow, Sheet flow grass Grass: Short n= 0.150 P2= 3.60" 6.2 954 0.0250 2.55 Shallow Concentrated Flow, Shallow Concentrated Unpaved Kv= 16.1 fps 15.3 1,104 Total Jan Franklin PE, LL( Civil and Site Plan Engineering 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@alanfranklinpe.com U) Z W O Z ~ Q Q J J D Q U z w z J Cl) v D_ > > LL pZ O � _° Z W 0 Z J � N � 0_ LL W m w Q W O N � M � O VJ P"OH OF A d et U y Alan G. Franklin Lic. No. 35326 w 03-11-21 = �SS'ONAL ISSUED: 02-26-2021 SCALE: AS SHOWN REVISIONS: 1. 3-11-21 - RESPONSE TO REVIEW SHEET 4 OF 4