March 8, 2021
Margaret Maliszewski
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: 1680 Seminole Trail Outdoor Storage & Display ARB site Plan
200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
��434.293.3719 PH 434.293.2813 FX
www.coll ns-eng ineeri ng.com
Thank you for your comments dated September 4, 2020 the above referenced project. Below are our responses to the comments
from the review of the Special Use Permit application.
Entrance Corridor Review:
1. The photometric plan has been updated to extend footcandle readings out to the property line. The spillover has been
checked, and the spillover at the property line does not exceed 0.5 fc at the street or property lines.
2. A note has been added to the lighting plan that states the color of the fixture and poles shall be bronze.
3. A note has been added to the lighting plan that states the maximum pole light height shall be 20'.
4. The conflict between the tree and the light pole on the southern side of the building has been resolved. The landscaping has
been shown on the lighting plan (Shaded back) to verify no additional conflicts exist.
5. A note about the construction type and material on the rebuilt portion of the wall has been added to sheet 4 as discussed
during the ARB meeting. The note indicates the wall and handrail shall match the existing concrete wall/handrail.
6. The demolition plan has been updated to address the partial removal of the retaining wall.
Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com.
Sincerely,
Scott Collins, PE