Loading...
HomeMy WebLinkAboutWPO201800044 Bond Estimates 2021-03-16Project Name: Royal Fern Phase 1 — Amendment for ABC Mass Grading WPO file number: WP02018-00044 Amendment TM P(s): 07600-00-00-046AO Date Estimate Completed: 03-08-2021, K.Rucker; chk_031621ja Erosion & Sediment Control Plan Bond Estimate Item Item Number r 3 4 5 6 7 8 9 10 ii 12 13 14 15 16 17 18 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) temporary slope drain (TSD) Sediment Trap #1 earthwork for trap/basin Sediment Trap #2 earthwork for trap/basin pipe length -ft pipe diameter - in height of dam at toeoft ft cut at high sideoft ft height of fill at faceft cut at faceft length of damft length of cutft top width width of cut (area above transition: 14 at (area below transitic 112 sf (total width of dam) 6 ft (total width of cut) 44 ft (height below transitio 1 ft (depth below transit 4 ft (area below transition) 2 sf (area above transitic 72 sf (total fill volume) 35.6 cy (total cut volume) 340.7 cy length of spillway (TOAL CY estimate; 353 tcy o width of spillway 01 If (spillway stone tons 8.3 to height of dam at toe ft cut at high sideoft ft height of fill at face ft cut at faceft length of dam ft length of cutft top width ft width of cut (area above transition; 0 at (area below transitic 192 at (total width of dam) 2 ft (total width of cut) 52 ft (height below transitio 1 ft (depth below transit 4 ft (area below transition) 0 at (area above transitic 88 at (total fill volume) 0.0 cy (total cut volume) 518.5 cy length of spillway ft (TOAL CY estimate; 519 cy width of spillway =ft (spillway stone tons 11 tons No. Unit Unit Cost Cost (installed) 4.fiJacres $5,000.00 $22,500.00 1400.gft $5.00 $7,000.00 1520. ft $5.00 $7,600.00 1200. ft $13.00 $15,600.00 $0.00 $0.00 $13.00 $4,589.00 $50.00 $415.00 $13.00 $6,747.00 $50.00 $550.00 - $0.00 3/16/2021 Project Name: Royal Fern Phase 1 — Amendment for ABC Mass Grading WPO file number: WP02018-00044 Amendment TM P(s): 07600-00-00-046AO Date Estimate Completed: 03-08-2021, K.Rucker; chk_031621ja Erosion & Sediment Control Plan Bond Estimate Item Item Number 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 silt fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance rip -rap, placed length length depth in channel depth width survey and layout (price per 0.1 mi.) acres mobilization dth �ft Itan width Itchannel channel width rft length (tons) ft L ft ft O.Oft ' _ traps and basins - WP0201800044 Royal Fern Phl, Amendment for ABC Mass Grading_ESCP_bond_SE03-08-2021_chk_031621ja No. Unit Unit Cost Cost (installed) 0 $100.00 $0.00 1 $200.00 $200.00 0 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 0 $2,500.00 $0.00 1J $2,000.00 $2,000.00 4 $3,500.00 $3,500.00 $60.00 $0.00 $3,250.00 $2,500.00 cost sum $76,451.00 contingency $7,645.10 Total $84,100 3/16/2021