Loading...
HomeMy WebLinkAboutWPO202000058 Bond Estimates 2021-03-16Project Name: VSMP Plan Albemarle Business Campus WPO file number: WP02020-00058 TMP(s): 07600-00-00-046A0, 07600-00-00-00540 Date Estimate Completed: 03-08-2021, K.Rucker; chk_031621ja Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 permanent diversion or ditch ft $13.00 $0.00 2 standard manhole frame lop (not inlet) ea $500.00 $2,500.00 3 drop inlet or grate ea $3,500.00 $21,000.00 4 manhole structure (per ft. rise) ft $450.00 $66,150.00 5 pipe, rcp, cmp (15 to 48") 15.0 in 0 ES-1,2 EC-1 ft $35.00 $0.00 6 18.0 in 0 ES-1,2 EC-1 ft $40.00 $25,760.00 7 24.0 in 0 ES-1,2 EC-1 ft $50.00 $3,400.00 8 36.0 in 0 ES-1,2 . ft $70.00 $9,730.00 9 aggregate base or drainage stone 0.0 in d J(t L AEC-1 0.0 ton $35.00 $0.00 24 trees 0 ea $275.00 $0.00 25 shrubs 0 ea $50.00 $0.00 26 seedlings 0 ea $5.00 $0.00 27 underdrain (LF) 0 ft $5.00 $0.00 28 biofilter soil mix (CY) 0 cy $45.00 $0.00 29 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 30 maintenance access road (LF) 0 ft $50.00 $0.00 31 rip -rap, placed depth ft length _ft 32 (only Outfall Rip -Rap from BMP incl w dth (tons) 0 $60.00 $0.00 33 survey and layout (price per 0.1 mi.) acres basins _ $1,000.00 34 mobilization $2,500.00 35 as -built drawings (per facility) ea $2,000.00 $2,000.00 36 materials testing (per facility) ea $2,000.00 $0.00 37 compaction testing (per dam) ea $3,000.00 $0.00 38 Survey and platting of Open Space nea $2,500.00 $0.00 cost sum $134,040-00 contingency $13,404-00 WP0202000058 Albemarle Business Campus_SWM_bond_SE03-08-2021_chk_031621ja Total $147,450 3/16/2021