Loading...
HomeMy WebLinkAboutWPO202000058 Bond Estimates 2021-03-16 (2)Project Name: VSMP Plan Albemarle Business Campus WPO file number: WP02020-00068 TMP(s): 07600-00-00-046A0, 07600-00-00-00540 Date Estimate Completed: 03-08-2021, K.Rucker; chk_031621ja Erosion & Sediment Control Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed r stablization (PS, TS) 8.5 acres $5,000.00 $42,500.00 z silt fence (SF) 1970.0 ft $5.00 $9,850.00 3 safety fence(SAF) 1630ft $5.00 $8,150.00 4 diversion (DD, FD, RWD) 1160. ft $13.00 $15,080.00 5 temporary slope drain (TSD) pipe length �ft pipe diameter Mr $0.00 $0.00 6 Sediment Basin #1 7 earthwork for trap/basin 8 height of dam at toeoft ft cut at high sideoft ft 9 height of fill at faceft cut at faceft 10 length of damft length of cutft rr top width width of cut rz (area above transition 442 sf (area below transiti( 108 sf 13 (total width of dam) 30 ft (total width of cut) 58 ft 14 (height below transilio 2 ft (depth below transit 0 ft 15 (area below transition; 26 sf (area above lransitik 0 sf 16 (total fill volume) 2080.0 cy (total cut volume) 400.0 cy 17 length of spillway -It (TOAL CY estimate, 2213 cy $13.00 $28,769.00 18 width of spillway ft (spillway stone tons 0 tons $50.00 $0.00 19 structures for basin 20 riser height it zr riser diameterMin in (riser unit price) $150.00 $1,500.00 zz barrel lengthft base plate or fdn -q $200.00 $500 23 barrel diameter (barrel unit price) $50.00 $3,750.00 24 barrel collars $200.00 $0 25 baffle length Mft $50.00 $6,000 26 silt fence inlet protection (IP) $100.00 $0.00 27 stone inlet protection (IP) 22 $200.00 $4,400.00 28 outlet protection (OP)- basin 1 length ft width Lft it 1 $1,778.63 $1,778.63 z9 outlet protection (OP) length ft width ft 0 $0.00 $0.0030 channel (SCC, matted) length ft width ft 0 $0.00 31 check dam depth in channel ft channel width 0 $0.00 $0.00 32 construction entrance (CE) 0 $2,500.00 $0.00 33 wash rack 1, $2,000.00 $2,000.00 3/16/2021 Project Name: VSMP Plan Albemarle Business Campus WPO file number: WP02020-00068 TMP(s): 07600-00-00-046A0, 07600-00-00-00540 Date Estimate Completed: 03-08-2021, K.Rucker; chk_031621ja Erosion & Sediment Control Plan Bond Estimate Item Item Number 34 paved construction entrance 35 rip -rap, placed depth it leng8i -ft 36 width (tons) 10.8675 tons 37 38 survey and layout (price per 0.1 mi.) acres traps and basins - 39 mobilization WP0202000058 Albemarle Business Campus_ESCP_bond_SE03-08-2021_chk_031621ja No. Unit Unit Cost Cost (installed) - $3,500.00 $3,500.00 $60.00 $652.05 $4,750.00 $2,500.00 cost sum $135,679.68 contingency $13,567.97 Total $149,250 3/16/2021